WITNO9020103
WITNO9020103
‘Date Due: Entered By: Entered On: Action: Action Resolution:
18/9/2000 potters 08/09/2000 I have spoken to the Subpostmaster who has given me a history IIn March / April, the office experienced numerous problems
lof the problem. with regards to screen freezes, ghost reports and lock outs.
Since then, equipment has been swapped out and ICLP have
attended the office on a number of occasions. The office has
also experienced losses virtually every week since the
Horizon system was installed. These losses have increased
significantly during the last 6 weeks. The staff are now
balancing using individual stock units and the SPMR has
been undertaking a number of security checks to eliminate
other possibiliti