FUJ00001895 - Fujitsu Services Report re: Business Continuity Framework (V.9.0)

Evidence on official site

Fujitsu Services

FUJ00001895

FUJ00001895

BUSINESS CONTINUITY FRAMEWORK Ref: CS/STP/002
Version: 9.0
COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

Document Title:

Document Type:

Release:

Abstract:

Document Status:

Originator & Dept:

Contributors:

Reviewed By:

(Internal Distribution:

External Distribution:

Approval Authorities:

BUSINESS CONTINUITY FRAMEWORK

SERVICE PROVISION PLAN

Not Applicable

This document provides a Service Continuity Framework as
required by Schedule 21 of the Varied and Restated Codified
Agreement

APPROVED

Tony Wicks, Post Office Account, Customer Service Business
Continuity.

Dave Baldwin, Peter Burden, Carl Marx, Peter Thompson, John

) Holman-Dine, Bill Reynolds, Richard Brunskill, Mike Stewart,
Bill Mitchell, Mik Peach, David Wilcox, John Wright, Mike
Woolgar, Simon Fawkes, James Stinchcombe, Dave Tanner,
Post Office Account Library

Richard Ashcroft- Post Office Limited, Post Office Limited
Library

(See PA/PRO/010 for Approval roles)

Name Position Signature Date
Dave Baldwin Director Customer Service,
Post Office Account
Richard Ashcroft Post Office Limited, Service
Continuity Manager
© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 1 of 32

(CONTRACT CONTROLLED)
Fujitsu Services

FUJ00001895
FUJ00001895

BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/STP/002

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

0.0 Document Control
0.1. Document History

Version I Date Reason for Issue Associated

No. CP/PinICL

0.1 13/9/98 I Initial draft None

0.2 5/10/98 I Incorporation of comments from Phil Preece(Horizon) and None
David Jones(Pathway)

0.3 11/11/98 I Incorporation of further comments. None

0.4 1/12/98 I Incorporation of comments from P Preece. None

0.5 20/1/99 I Format revision. Introduction of test strategy None

0.6 5/3/99 Incorporation of further comments from P. Preece (Horizon) None
and B Booth (Horizon)

0.7 15/4/99 I Incorporation of further comments from P. Preece(Horizon), None
Paul Martin (Horizon), Andrew Parsonage (Horizon) and B
Booth (Horizon)

0.8 30/04/99 I Incorporated changes that addressed comments raised by P. None
Preece (Horizon).

1.0 02/05/99 I Incorporated changes that address comments raised by P. None
Preece (Horizon).

Ld 02/06/99 I Removed all references to DSS, BA and any services that None
were specifically documented in previous versions for the
DSS.

2.0 18/06/99 I Removed For NR2 from title and formalise version 1.1 None
changes.

3.0 02/08/99 I Incorporates minor comments from Paul Martin (PON). None
Issued for approval.

3.1 19/10/99 I Incorporates changes relating to comments received from None
Graham White (PON).

4.0 29/10/99 I No changes made since V3.1, issued at whole integer for None
approval. (CCN 486c)

41 03/02/00 I Amendments required which reflect the changes None
implemented in CSR2+ releases during 2000.

42 03/08/00 I Additional changes for CI4 introduction. Specifically in the None
area of KMS and OCMS.

43 06/10/00 I Incorporates comments on V4.2 and the AP and MBS None
services.

5.0 31/10/00 I Document formally re-issued for approval None

5.1 02/07/02 I Major rewrite for the introduction of Network Banking and None
to document all applicable Horizon service changes since

© 2004 Fujitsu Services

COMMERCIAL-IN-CONFIDENCE Page: 2 of 32
(CONTRACT CONTROLLED)
Fujitsu Services

BUSINESS CONTINUITY FRAMEWORK _ Ref:

Version: 9.0

CS/SIP/002

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

version 5.0 was approved.

5.2 24/07/02 I Incorporates comments from an internal Pathway Customer None
Service comment cycle.

5.3 07/08/02 I Incorporates comments from Dave Hulbert, Peter Burden None
and Mik Peach and is intended to be the final draft of this
version.

5.4 29/08/02 I Incorporates comments from Dave Hulbert and Bob Booth None
Post Office Limited

6.0 08/10/02 I Document formally issued for approval after review by Post None
Office Limited and Pathway.

6.1 07/11/02 I Introduces the Technical Support Desk and the Debit Card None
System.

6.2 27/11/02 I Incorporates a recommended improvement from Peter None
Burden.

7.0 17/12/02 I Document formally issued for approval after review by Post None
Office Limited and Pathway.

TA 12/01/04 I Major rewrite for the introduction of the Varied and None
Restated Codified Agreement and to reflect the Horizon
contingency documents being condensed into three Business
Continuity Plans during 2003.

8.0 11/02/04 I Document formally issued for approval after review by Post None
Office Limited and Post Office Account.

8.1 04/06/04 I Major update for S55, S60, S70 and S75 Horizon None
infrastructure changes

8.2 12/07/04 I Incorporates comments from Peter Burden and amendments None
identified by Tony Wicks

8.3 30/10/04 I Incorporates comments from Post Office Limited as per QR None
3572.

9.0 19/10/04 I Nil comments returned from comment cycle. Incorporated None
amendment to reflect recent organisational changes in Post
Office Account.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 3 of 32

(CONTRACT CONTROLLED)

FUJ00001895
FUJ00001895

FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

0.2 Review Details

Review Comments by :

Review Comments to: I Tony Wicks

Mandatory Review Authority Name

Director, Customer Service, Post Office Account Dave Baldwin

Post Office Limited, Service Continuity Manager Richard Ashcroft*

Infrastructure and Availability Manager Customer Service, I Carl Marx

Post Office Account

Post Office Account Technical Design Authority for
Availability and Service Management

Simon Fawkes

Optional Review / Issued for Information

Post Office Account Technical Design Authority for

Networks

Dave Tanner

Post Office Account Customer Services Manager

Peter Burden

(*) = Reviewers that returned comments

0.3 Associated Documents

REF I Reference Version I Date I Title Source

1. CS/PLA/079 The Horizon Services Business PVCS
Continuity Plan

2. CS/PLA/080 The Horizon Support Services Business PVCS
Continuity Plan

3. CS/PLA/O11 Business Continuity Test Plan PVCS

4. CS/PLA/015 Horizon System Helpdesk Business PVCS
Continuity Plan

5. CS/PRD/021 Fujitsu Services (Post Office Account) PVCS
Problem Management Process

6. CS/PRD/031 Fujitsu Services (Post Office Account) PVCS
Customer Service Business Continuity
Management Process

7. SU/MAN/018 Operations Procedures Manual Index PVCS

8. TD/DES/031 Resilience and Recovery Strategy for PVCS
Release 2

9. VI/TSC/105 Technical Integrity & Networking Test PVCS

Plan

© 2004 Fujitsu Services

COMMERCIAL-IN-CONFIDENCE
(CONTRACT CONTROLLED)

Page: 4 of 32

Fujitsu Services

BUSINESS CONTINUITY FRAMEWORK _ Ref:

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

CS/SIP/002

10. I SU/TRP/005 Technical Integrity & Networking Test PVCS
Results

11. I RS/ACS/002 Security Acceptance test Specification PVCS

12. SU/TRP/003 Release 2 Final Security Test Report PVCS

13. RS/POL/003 Access Control Policy PVCS

14. I BP/PRO/003 Post Office Site Failure Contingency PVCS
Procedure

15. CS/PRO/21 Release 2 Electronic Point of Sale PVCS
Service

16. CS/PRO/25 Release 2 Access Control and User PVCS
Administration Process & Procedures

17. I CS/PRO/45 Release 2 Automated Payment Service PVCS

18. CS/PRO/48 Horizon System Help desk Processes & PVCS
procedures Description

19. I CS/PRO/24 Release 2 Operating Environment PVCS

20. CS/PRO/22 Order Book Control Service PVCS

21. CR/FSP/004 Service Architecture and Design PVCS
Document

22. I CS/QMS/007 Operations Manual for the Customer PVCS
Service Directorate

23. TD/STR/O01 Host Systems Storage Strategy PVCS

24. I TD/DES/059 High-level Network Design for Release PVCS
2

25. I TD/DES/033 Agent and Correspondence Server PVCS
Resilience and Recovery for Release 2

26. I TD/DES/086 Correspondence Server back-up PVCS
Strategy

27. I TD/DES/057 Auto-config and Rollout Resilience and PVCS
Recovery Strategy

28. TD/DES/093 DYNIX/ptx Configuration for Main PVCS
Host Site Fail-over and Fallback

29. I TD/DES/034 High Level Design for Application PVCS
Recovery after Fail-over using Maestro

30. TD/DES/092 Audit Server Resilience and Recovery PVCS
for Release 2

31. SD/STR/002 FTMS Resilience and Recovery PVCS
Strategy for Release 2

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 5 of 32

(CONTRACT CONTROLLED)

FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref: CS/SIP/002
Version: 9.0
COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

32. SD/STR/005 Data Warehouse Disaster Recovery PVCS
Strategy

33. I CON/MGM/0 Post Office Limited and Fujitsu Post

05 Services Business Continuity Interface Office

Agreement Limited

34. I CR/PRP/004 Post Office Limited Disaster Recovery PVCS
Interface Service (TIP DR)

35. CS/REP/046 Business Continuity Operational Test PVCS
Report (1999)

36. I NB/SDS/007 System Design Specification for PVCS
Network Banking End-to-End Service

37. NB/SPE/001 Network Banking Statement of PVCS
Requirements

38. SY/SPG/002 Agent and Correspondence Server PVCS
Resilience and Recovery Operations
Support Guide

39. I EF/SDS/001 System Design Specification for the PVCS
Debit Card System

40. EF/SER/001 Debit Card MoP Functional Description PVCS

41. I DV/HLD/003 DVLA and PAF Network PVCS
Infrastructure High Level Design

42. I SD/HLD/003 PAF Network Infrastructure High Level I pycs
Design

43. I PA/TEM/001 Fujitsu Services Document Template PVCS

Unless a specific version is referred to above, reference should be made to the current

approved versions of the documents.

0.4 Abbreviations/Definitions

Abbreviation Definition

ACS Auto Configuration Service

ADSL Asymmetric Digital Subscriber Line

AP Automated Payments

AP-ADC Automated Payments-Advanced Data Capture
APS Automated Payments System

BCF Business Continuity Framework

CSR Core System Release

© 2004 Fujitsu Services

COMMERCIAL-IN-CONFIDENCE

(CONTRACT CONTROLLED)

Page: 6 of 32

FUJ00001895
FUJ00001895

FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

CTF Critical Time Factor

DCS Debit Card System

DRS Data Reconciliation Service

DVLA POME Department of Vehicle Licensing Authority — Post Office MOT
Enquiry

DW Data Warehouse

EPOS Electronic Point of Sale

ETS Electronic Top-ups Service

HSHD Horizon System Help Desk

KMS Key Management Service

LFS Logistics Feeder Service

LNS L2TP Network Server

MBCI Major Business Continuity Incident

MBS Message Broadcast Service

MIS Management Information Service

NBS Network Banking Service

NBX Network Banking Service (Release S75 replacement service)

NRO National Roll Out

OBCS Order Book Control Service

OCMS Outlet Change Management System

PAF Postal Address File

POL Post Office Limited

POLFS Post Office Limited Financial Service

RAB Release Authorisation Board

RD Reference Data

RDMC Reference Data Management Centre

SIAM Service Impact Assessment Module

SMC Systems Management Centre

ssc System Support Centre

sos Systems Operate Service

TIP Transaction Information Processing

TMS Transaction Management Service

© 2004 Fujitsu Services

COMMERCIAL-IN-CONFIDENCE Page: 7 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

TPS Transaction Processing Service

0.5 Changes in this Version

Version I Changes

8.1 Major update for new Horizon release, i.e.

S55 — the introduction of ADSL

S60 — the introduction of DVLA (POME), PAF and POLFS (SAP) services.
S70 — the introduction of “Chip and PIN’ EMV

S75 — the introduction of the NBX Network Banking Service (revised test 16 and
22).

8.2 Incorporates comments from Peter Burden

Amendments made to Figure 5.1 and Table 2.

8.3 Incorporates comments from Post Office Limited as per QR 3572. Changed Post
Office Limited approval authority to Richard Ashcroft and removed references to
the Technical Support Desk.

9.0 Nil comments returned from comment cycle.

Incorporated amendment to reflect recent organisational changes in Post Office
Account.

0.6 Changes Expected

Changes

It is expected that this framework will be amended to reflect the introduction of new services.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 8 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

0.7 Table of Contents

1.0. INTRODUCTION.....

2.0

3.0

4.0 FRAMEWORK OVERVIEW.

4.1 INTRODUCTION.
4.1.1 Contingency Plans.
Service Definition..
Risk Analysis And Servi
ation Contacts...
Resilience Strategy documents.
Contingency Procedures.
4.1.2. Service Framework.
4.1.3 Business Continuity Management Process.
4.1.4 — Test strategy and plans.
4.1.5 Review strategy...
4.1.6 Deliverables and Acceptance Methods.

5.0 SERVICE FRAMEWORK...

5.1 INTRODUCTION.
5.2 SERVICE TO PLAN RI

6.0 I BUSINESS CONTINUITY MANAGEMENT PROCESS.

TIONSHIP TABLE.

7.0 TEST STRATEGY AND PLANS.

7.1 REQUIREMENT...

7.2 INITIAL TESTING
7.2.1 Existing Services.
New Services.

73. : ONGOING
8.0 REVIEW STRATEGY...

TING.

9.0 CONTINGENCY PLAN

91 OWNERSHIP OF PLANS.
9.2 PLAN ACTIVATION...
9.3 IMPACT AND RISK ASSE!
9.4 OTHER REQUIREMENTS.
9.4.1 Preventative Measures.
9AM Technical Design.
94.12 Security. ——
9.4.2 Preparedness Measures.....
9.4.3 Contingency Measures.
9.4.4 Recovery of Normal Service.
9.4.5 Contact Lis!

10.0 DELIVERABLES AND ACCEPTANCE METHOD:

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 9 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/STP/002
Version: 9.0
COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

10.1 INTRODUCTION.
10.1.1 Joint Review
10.1.2. Document Inspectior
10.1.3 Procedural Walkthrough.
10.1.4 Operational Test..

10.2 CONTRACT CONTROLLED DOCUMENTS.
10.2.1 Summary...
10.2.2 Deliverables List.

10.3. BCF REFERENCED DOCUMENTS.
10.3.1 Summary...
10.3.2 Deliverables List

10.4. TECHNICAL DESIGN DOCUMENTATION.
10.4.1 Summary...
10.4.2 Deliverables List...
10.4.3 Review Method....... - sees we

10.5 CUSTOMER CONTINGENCY PLANS AND PATHWAY DELIVERABL

32
10.5.1 Summary,
10.5.2 Deliverables List

IN SUPPORT OF PLANS...

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 10 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref: CS/SIP/002

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

1.0

2.0

3.0

Introduction

A key requirement in the Post Office Account solution is that of business continuity i.e.
ensuring there are operational processes and procedures in place to ensure that any
component failure has minimal effect on the service provided.

This will cover failures in the core Fujitsu Services (Post Office Account) services e.g.
NBS, TPS, APS etc, support services and client services where appropriate

A principle requirement specified within schedule 21 of the Varied and Restated
Codified Agreement is the provision of contingency plans which conform to an overall
“Service Continuity Framework’.

It is the objective of this document and associated contingency plans to satisfy that
requirement and Fujitsu Services (Post Office Account) and Post Office Limited have
agreed that the title of this document should be ‘Business Continuity Framework’

Specifically this document will cover the following areas.

a) Provide a baseline definition of the Business Continuity Framework and
contingency plans as specified in Schedule 21 of the Varied and Restated Codified
Agreement.

b) Provide a detailed definition of Fujitsu Services (Post Office Account) deliverables
associated with business continuity and the methods of review and assurance.

C) Define the contents and format of the contingency plans.
d) Define the overall test strategy adopted for testing of the contingency plans.

@) Define the management processes for the management of Major Business
Continuity Incidents.

Scope

The scope of this document is targeted towards the Acceptance Review process
associated with the Varied and Restated Codified Agreement.

The general framework defined in this document is release-independent.

This document does not include any details in respect of the technical testing of the
recovery processes, however REF 10 does.

Definitions

Business Continuity Framework is this document, which has been generated to
satisfy the requirement for a Service Continuity Framework.

At a working level, Post Office Limited and Fujitsu Services (Post Office Account)
generally recognise the term Business Continuity as having three closely related
components:

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 11 of 32

(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

Resilience may be defined as the steps taken to avert a loss of service or disaster or
reduce the likelihood of a disaster or loss of service.

Contingency may be defined as the interim processes and procedures adopted during
the loss of service.

Recovery may be defined as the business and technical arrangements to restore a lost
system or service and manage the process of reversion to normal processing and full
resumption of service.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 12 of 32
(CONTRACT CONTROLLED)
Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref:

Version: 9.0

COMMERCIAL-IN-CONFIDENCE

FUJ00001895
FUJ00001895

CS/SIP/002

19-Oct-2004

4.0 Framework Overview

4.1 Introduction

The Business Continuity Framework defines the methodology agreed between Fujitsu
Services (Post Office Account) and Post Office Limited for handling all aspects of
Business Continuity.

The constituent elements of the Business Continuity Framework may be represented as

follows. Each element will be looked at in more detail below.

BUSINESS
CONTINUITY
FRAMEWORK

SERVICE REVIEW
FRAMEWORK STRATEGY

i PROCESS Section 8

Section 5 Section 6 Section 7
Deliverables
Section 10
Figure 4.1 Service Elements
© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 13 of 32

(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

4.1.1 Contingency Plans
At the time of writing version 8.0 of this document there are three Continuity Plans:
The Horizon Services Business Continuity Plan
The Horizon Support Services Business Continuity Plan
Horizon System Helpdesk Business Continuity Plan

The contents of these continuity plans are specified within Schedule 21 of the Varied
and Restated Codified Agreement. All plans must be of the document type
Contingency Plan and shall contain Continuity Plan within the title. Each plan shall
have a specified owner. (Further details in section 9)

Major elements of the plans are as follows.

4.1.1.1 Service Definition

The BCF shall be defined in terms of services rather than components of infrastructure.
The definitions of the services that are a subject of the BCF are defined in this
document. This is looked at in more detail in section 5.

4.1.1.2 Risk Analysis And Service Impact

Each contingency plan will identify all potential risks in terms of likelihood and service
impact

Once an incident occurs which has a service continuity impact, there must be a
mechanism in place to assess the impact of the incident and the possible effect(s) it will
have on the end to end service. This is fairly complex and will be dependant upon time
of day and therefore will be a real-time process i.e. the impact of the service failure at
2am will be different from the impact at 8pm. However, a high-level impact statement
will be included in the relevant contingency plan.

4.1.1.3 Escalation Contacts
Each contingency plan will contain escalation routes in conformance to Cross-Domain
Business Continuity management processes.

4.1.1.4 Resilience Strategy documents
Each contingency plan will contain, where appropriate, references to the underlying
resilience strategy document and/or technical design documents.

4.1.1.5 Contingency Procedures
Each contingency plan will contain a section defining contingency actions.

From an operational perspective contingency actions are documented in a number of
places, depending upon the severity of the service element failure.

1, Within operational procedures, subordinate to REF7. Where appropriate the
contingency plan will make reference to the relevant operations manual.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 14 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

2, Where appropriate, contingency actions are documented within the Action column
of the Risk Analysis (and service impact) section of each plan.

3, Where appropriate, for potential MBCIs and MBCI contingency actions are
documented in the contingency section of each plan.

4.1.2 Service Framework
Section 5 contains details of the service elements and components together with their
relationship to each of the contingency plans.

4.1.3 Business Continuity Management Process

The resolution of incidents will be dealt with through the standard Help Desk Incident
Management process.

In the event of a Major Business Continuity Incident there will be a need for controlled
and co-ordinated activity across Post Office Account and Post Office Limited. (See
section 6)

4.1.4 Test strategy and plans
The test schedule and method will be defined as a separate document (REF 3) and will
be referred to within the contingency plans. The overall high-level strategy will be
defined in this document for agreement. (See section 7)

4.1.5 Review strategy
A review strategy defines the joint review mechanism prior to acceptance and also the
review mechanism of the processes following acceptance. This is defined in a later
section for agreement. (See section 8)

4.1.6 Deliverables and Acceptance Methods

Section 10 defines the deliverables required to satisfy the Business Continuity
requirements of Fujitsu Services (Post Office Account).

Also included in that section is the method of acceptance planned for each deliverable.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 15 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

5.0 Service Framework

5.1 Introduction
The core service elements and support services are show in Figure 5.2 below.

The service framework is show diagrammatically in Figure 5.1 below. During 2003 a
simplified set of three Business Continuity Plans were produced, as a significant
amount of the Horizon infrastructure is shared by numerous services and therefore was
replicated across many of the original continuity plans. The reduced set has several
advantages include easier access to the applicable information by POA Duty Managers
during incident management and improved documentation maintenance. The three
Business Continuity Plans are:

The Horizon Services Business Continuity Plan which documents the contingency
measures for the primary Horizon services

The Horizon Support Services Business Continuity Plan which documents, with the
exception of the HSH services, the contingency measures for the supporting Horizon
services

Horizon System Helpdesk Business Continuity Plan

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 16 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

Services Overview

I =] EP) Bl
ES) Gel Gs Ge) ee

ii
r

Horizon Services detailed in @ Support Applications and @Support Service s detailed in
@ REF1 Services detailed in REF 2 REF 4
© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 17 of 32

(CONTRACT CONTROLLED)
Fujitsu Services

COMMERCIAL-IN-CONFIDENCE

BUSINESS CONTINUITY FRAMEWORK Ref:

Version:

Date:

FUJ00001895
FUJ00001895

CS/SIP/002
9.0
19-Oct-2004

5.2. Service to Plan Relationship Table

Table I below identifies which contingency plan addresses each of the service elements
in Figure 5.1 above:

Table 1
Service or Service Expansion of Acronym Related Contingency Plan(s) I Test Ref.
Element (Table 7.2)
ACS Auto Configuration Service Horizon Support Services 8
AP Automated Payments Horizon Services 20
APS Automated Payment Service Horizon Services 2,3,4,5,6,7
BDC Bureau de Change Horizon Services 2,3,4,5,6,7
BUSINESS SUPPORT Horizon Support Services 1
DATA CENTRE Data Centre Horizon Support Services 2
DCS Debit Card System Horizon Services 25
DRS Data Reconciliation Service Horizon Support Services 2,3
DVLA (POME) Department of Vehicle Horizon Services 26
Licensing Authority — Post
Office MOT Enquiry
DW Data Warehouse Horizon Support Services 2,3
EPOSS Electronic Point of Sale Horizon Services 2,3,4,5,6,7
System
ETS Electronic Top-ups Service Horizon Services 25
HSHD Horizon Systems Helpdesk HSH 10
KMS Key Management Service Horizon Support Services 19
LIVE TEST Horizon Support Services 1
LFS Logistics Feeder Service Horizon Services 2,3,4,5,6,7
MBS Message Broadcast Service Horizon Services 1,9
MIS Management Information Horizon Support Services 13
Systems
NETWORK Horizon Services and Horizon
Support Services
NBX Network Banking Service Horizon Services
24
OBCS Order Book Control Service Horizon Services 2,3,4,5,6,7
OCMS Outlet Change Management Horizon Support Services 17
© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 18 of 32

(CONTRACT CONTROLLED)
Fujitsu Services

BUSINESS CONTINUITY FRAMEWORK Ref:

COMMERCIAL-IN-CONFIDENCE

Version: 9.0

Date:

FUJ00001895
FUJ00001895

CS/SIP/002

19-Oct-2004

System
PAF Postal Address File (service) I Horizon Support Services 27
POLFS Post Office Limited Financial Horizon Services and Horizon 28
Service Support Services
RDMC Reference Data Management Horizon Support Services 1,9
Centre
SMC Systems Management Centre Horizon Support Services 12
SOS Systems Operate Service Horizon Support Services 11
SsC Systems Support Centre Horizon Support Services 1,14
TIP Transaction Information Horizon Services
Processing
TMS Transaction Management Horizon Services 23,4,5,6,7,1
System 8
TPS Transaction Processing Service I Horizon Services 2,3,4,5,6,7,1
8
© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 19 of 32

(CONTRACT CONTROLLED)

FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

6.0 Business Continuity Management Process

An incident is an unplanned occurrence that adversely impacts upon the normal service
in some important way. The scale of the event can range from a minor fault to a major
outage e.g.:

Minor incident e.g. Horizon terminal failure affecting service at an individual outlet.
Major incident e.g. outage of key back-end system affecting service at 17,500 outlets.

The resolution of minor incidents will be dealt with through the standard Help Desk
Incident Management process.

Major Business Continuity Incidents will have a significant impact upon Post Office
Limited. In such cases there will be a need for controlled and co-ordinated activity
across supplier organisations and Post Office Limited. Consequently all Major
Business Continuity Incidents will be managed via the ‘Fujitsu Services (Post Office
Account) Customer Service Business Continuity Management’ process (REF6) and
the Post Office Limited and Fujitsu Services Business Continuity Interface Agreement
(REF 33). These documents support the immediate escalation of major incidents to a
Cross Domain Business Continuity Management Team (BCMT). The BCMT consists
of operational managers from each organisation.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 20 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref: CS/SIP/002

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

7.0 Test Strategy and Plans
7.1 Requirement
Schedule 21 of the Varied and Restated Codified Agreement states the requirement as
follows
* The contingency plans shall include a testing strategy with two distinct parts
a) Initial testing before commencement of Roll-Out of Services
b) Regular testing’
7.2 Initial Testing
7.2.1 Existing Services.
Initial Business Continuity testing was conducted prior to the full operational
introduction of the Horizon Service (Core System Release) and the subsequent release
of major services, e.g. MBS, NBS and ETS services. Test reports have been produced
for this testing and are maintained in PVCS within the CS/REP/nnn documentation
work-set
7.2.2 New Services
Where services are introduced as part of a new release the Test Plan (REF3) will be
revised to include the Business Continuity testing of those services and define when the
initial testing will be conducted.
The level and schedule of testing is dependent upon operational constraints and is
accomplished by a mix of operational tests and procedural walk-through. Where
involvement is required from Post Office Limited the test schedule will be agreed in
advance.
In addition customer-initiated test activity may be included, with Post Office Account
agreement, within the Business Continuity Test Plan (REF3).
7.3 Ongoing testing
For ongoing testing, an overall test strategy will be produced defining for each service:
a) name of service
b) ownership of testing plan
C) type of testing i.e. procedural walk-through or operational test
d) frequency of testing and scheduled dates
€) test objectives, conditions, script and expected results
© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 21 of 32

(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

f) other units taking part
Q) criteria for success and failure

h) test reports and follow-up

On-going business continuity tests will be conducted in accordance with the test
methodology and frequency agreed in Schedule 21 of the Varied and Restated
Codified Agreement.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 22 of 32
(CONTRACT CONTROLLED)
Fujitsu Services

BUSINESS CONTINUITY FRAMEWORK

COMMERCIAL-IN-CONFIDENCE

Ref: CS/SIP/002
Version: 9.0
Date: 19-Oct-2004

FUJ00001895
FUJ00001895

Table 2
Test I Business Test Methodology and Frequency
No. I Continuity Test
2 Fujitsu Services (POA) I Live operational test once per year and a Fujitsu Services 1
Campus failure procedural walk-through once per year. (POA)
3 Database Server Failure I Live operational test once per year and a Fujitsu Services 1
procedural walk-through once per year. (POA)
4 I Correspondence Server I Live operational test once per year anda I Fujitsu Services I
Failure procedural walk-through once per year. (POA)
5 Router Failure Live operational test once per year anda Fujitsu Services 1
procedural walk-through once per year. (POA)
6 Data-centre LAN Live operational test once per year and a Fujitsu Services 1
Failure procedural walk-through once per year. (POA)
7 Agent Platform Failure I Live operational test once per year and a Fujitsu Services 1
procedural walk-through once per year. (POA)
9 RDMC failure Operational Test Environment once per Fujitsu Services 2
year and a procedural walk-through once I (POA)
per year.
16 I Network Banking Live operational test once per year anda I Fujitsu Services 1
Service procedural walk-through once per year. (POA)
22 Network Banking Live operational test once per year anda Fujitsu Services 1
Clients Interface procedural walk-through once per year. (POA)
25 I Debit Card Live operational test once per year anda I Fujitsu Services T
Service/Electronic Top- I procedural walk-through once per year. (POA)
ups Service
26 DVLA (POME) web. Live operational test once per year and a Fujitsu Services 1
service procedural walk-through once per year. (POA)
27 PAF web service Live operational test once per year and a Fujitsu Services 1
procedural walk-through once per year. (POA)
28 I POLFS Live operational test once per year and a Fujitsu Services 1
procedural walk-through once per year. (POA)

All other on-going business continuity test details will be defined on an annual basis
and included within the yearly schedule in REF3. The Fujitsu Services (POA) Business
Continuity Manager will be responsible for the planning of the other on-going tests, i.e.

those not defined in table 2, and will co-ordinate and schedule activity as appropriate

with the Post Office Limited Business Continuity Manager and suppliers.

© 2004 Fujitsu Services

COMMERCIAL-IN-CONFIDENCE

(CONTRACT CONTROLLED)

Page: 23 of 32
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

8.0 Review Strategy

A Business Continuity Steering Group has been established between Post Office
Limited and Fujitsu Services (Post Office Account). This group reviews the progress
of each release against the Fujitsu Services (Post Office Account) delivery and
acceptance plans. It also facilitates the co-ordination of joint development review and
assurance activities where necessary. This forum also provides an objective feed into
the release authorisation process for new releases.

This team, or subset of the team, reviews all aspects of business continuity on an
ongoing basis, during Live Trials and beyond. The remit of the team is to continually
look at ways of improving cross-domain business continuity processes.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 24 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

9.0 Contingency Plans

Throughout section 9, the use of //alics denotes the actual words in Schedule 21 of the
Varied and Restated Codified Agreement.

‘The Business Continuity Plans shall be based on impact and_ risk
assessments and agreed by Fujitsu Services and Post Office .....”

9.1 Ownership of Plans

“Ownership of all contingency actions shall be identified in the Business Continuity
Plans.’

Each contingency Plan will clearly state the owner of the plan who is responsible for
the definition, maintenance, testing and review of the plan.

In addition to this, the Fujitsu Services (POA) Business Continuity Manager will have
overall responsibility for the development, co-ordination and integration where
appropriate of all Contingency Plans and providing Post Office Limited with a single
point of contact.

9.2 Plan Activation

‘The Business Continuity Plans shall include activation procedures and time periods
within which the contingency measures shall be activated.’

Where appropriate Contingency Plans will contain a risk and impact assessment for
both the core post office day (08:00 to 20:00) and the non-core post office day (20:00
to 08:00). (See 9.3). For services where the impact of the service element failure is
common throughout the day, a single risk and impact assessment will be documented.

Alternatively, a single risk statement may be documented throughout the day in the
risk table. The Critical Time Factors (CTF) here shall be determined by the criticality
of the service activity. I.e. for on-line service, e.g. NBS and DCS the CTF is identified
against Post Office Core Day processing, whilst for file transfers, e.g. APS and TPS
the CTF is identified against Post Office Non-Core Day processing. The risk
assessment identifies the critical time periods for activation of contingency measures
and identifies the associated contingency actions.

9.3 Impact and Risk Assessment

“The Business Continuity Plans shall be based on impact and risk assessments by
Fujitsu Services and Post Office...’

Contained within each service are a number of critical components, the failure of which
would cause a potential service disruption. Consideration shall also be given to the
impact arising from the loss of building or staff. Each of these critical components and
the associated failure scenarios will be identified and documented within a risk and
impact matrix within the Contingency Plan. This matrix is used as a tool to present ina
tabular form all risks identified with a service together with the impact of that risk

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 25 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

9.4

9.4.1

occurring, the time after which that impact becomes critical, and the contingency
actions to be taken.

Associated with each of the above elements are impact statements, which will define
the likely business impacts of failure of the critical components. To aid in the definition
of these, each Contingency Plan, where appropriate, will contain a schematic defining
the operational day for that particular service. SLA liabilities will be used as an aid in
determining business impact. Where the impact triggers either a Potential MBCI or an
MBCI, the appropriate action will be identified from within the matrix.

Associated with the impact statement will be a reference to the specific recovery and
contingency procedures required.

Business impact assessment will be reviewed jointly with Post Office Limited and will
be subject to ongoing review.

The combination of risk and impact will also determine the level of ongoing testing
that will form part of the testing strategy.

Other Requirements
‘The contingency plan shall include, without limitation, the following
a) Prevention measures
b) Preparedness measures
C) Contingency measures
d) Recovery of normal service
e) Contacts list’

In addition to the above the plans shall include details of the individual services,
references to the relevant operations manual and references to the underlying resilience
strategy document and/or technical design documents, where appropriate.

Preventative Measures

Preventative measures are defined as those measures that are in place to prevent
service continuity failures in the first place. There are two aspects that are considered.

9.4.1.1 Technical Design

A key element of the design of the service is the elimination of single points of failure
and the ability to Fail-over to a replicated operational facility and/or environment and
to recover the service in a timely manner.

This capability is documented in a number of technical design documents, which in
turn are referenced within the relevant Contingency Plans.

9.4.1.2 Security

Another preventative measure is the denial of access to the service to anyone who may
wish to deliberately cause disruption. Although not mentioned specifically within

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 26 of 32

(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK _ Ref: CS/SIP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

Contingency Plans, this requirement is met through general conformance to Access
Control Policy (REF13) and the Security Functional Specification (REF 11).

9.4.2 Preparedness Measures
Preparedness measures are implemented in a number of ways:

a) The provision of risk and impact assessments, along with references to
appropriate recovery and contingency procedures will allow appropriate
actions to be carried out in a pre-prepared manner.

b) Initial technical testing and the operational testing of Contingency Plans
will ensure all activation of the Plans will have been carefully rehearsed.

c) Joint process and procedure walk-through will, as above, ensure all Cross-
Domain (multi-party) Business Continuity processes are tested thoroughly.

9.4.3, Contingency Measures

Contingency measures may be defined as the actions to be performed in the event of a
service break to enable business impact to be minimised during the service outage prior
to recovery being completed.

Contingency measures will include the recognition, activation, incident management
and initiation of recovery procedures. These will be documented within the
contingency plan and also as references to supporting documentation

An example of contingency measures is failing over the host server in the event of the
prime server experiencing a failure.

9.4.4 Recovery of Normal Service

These procedures will be mainly of a technical operational nature and will mainly refer
to technical procedures defined within the Fujitsu Services (Core Services) Operational
Procedures Manual REF7. There may be references to other activities that may impact
across service boundaries. Where appropriate these will be referenced within the plan.

9.4.5 Contact List

Each contingency plan will document the contacts for initial contact and technical
liaison where appropriate, together with details of escalation contacts. This will be in
accordance with the Business Continuity Management process.

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 27 of 32
(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref: CS/SIP/002

Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

10.0 Deliverables and Acceptance Methods

10.1

Introduction

This section defines the deliverables required to satisfy the Business Continuity
requirements of Fujitsu Services (Post Office Account).

Also included within this section is the method of acceptance planned for each
deliverable.

Methodologies used in the acceptance process include those identified below:

10.1.1 Joint Review

Joint review is by circulation of, discussion about and agreement upon the structure
and content of a document by Fujitsu Services (Post Office Account) and Post Office
Limited.

10.1.2 Document Inspection

Formal inspection of a paper copy, by Post Office Limited, of a commercially sensitive
(i.e. technical design) or Service Provider (i.e. Fujitsu Services Core Services)
operational document, by the appropriate reviewing authorities, whilst under
supervision by the document owner. No paper or electronic copies must be taken.
Objective of this process is to verify the existence of the document; no approval rights
are associated with this activity.

Inspection to take place at the premises of the document owner.

10.1.3. Procedural Walkthrough

A paper based technique whereby a scenario is selected and the actions and procedures
of those Service Delivery Units (SDU) impacted followed through to ensure that both
individual service delivery unit procedures, and cross boundary SDU procedures, are
both complete and fully integrated. Where appropriate, i.e. affecting Post Office
Limited services, Post Office Limited will be invited to procedural walkthroughs.

10.1.4 Operational Test

An exercise using live operational service components, or where more appropriate and
agreed by Post Office Limited a test environment, whereby a scenario is selected and
the actions and procedures of those Service Delivery Units (SDU) impacted are
followed through. This is to ensure that both individual service delivery unit
procedures, and cross boundary SDU procedures are both complete and fully
integrated, and that the desired outcome on the operational service components is
achieved. This is then followed by the total regression of any changes made to the live
service components.

An example of live operational functionality testing was the Campus Fail-over test that
was conducted during CSR Live Trial. An example of a business continuity

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 28 of 32

(CONTRACT CONTROLLED)
FUJ00001895
FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref: CS/STP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

operational test in a test environment is the verification of recovery procedures for the
Reference Data RDT Host.

10.2 Contract Controlled Documents

10.2.1 Summary

This section includes all references to current Contract Controlled Documents relating
to Business Continuity.

10.2.2 Deliverables List

Document Document Remarks/Acceptance Method
Reference

Business Continuity CS/SIP/002 Joint Review and sign-off

Framework

Horizon Systems CS/PLA/O15 Joint Review and sign-off

Helpdesk Business

Continuity Plan

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 29 of 32

(CONTRACT CONTROLLED)
Fujitsu Services

BUSINESS CONTINUITY FRAMEWORK Ref:

Version: 9.0

COMMERCIAL-IN-CONFIDENCE

Date:

FUJ00001895
FUJ00001895

CS/SIP/002

19-Oct-2004

10.3 BCF Referenced Documents

10.3.1. Summary
This section summarises all the business continuity deliverables specified within the
BCF:
10.3.2 Deliverables List
Plan Document Owner Review method
Reference

Fujitsu Services (POA) Business I CS/PLA/011 Fujitsu Joint review

Continuity Operational Test Plan Services
(POA)

Fujitsu Services (POA) Business CS/PRD/031 Fujitsu Not Applicable

Continuity Management Process Services
(POA)

Operations Manual for the Customer I CS/QMS/007 _ I Fujitsu Document

Service Directorate Services inspection to verify
(POA) existence of

procedures

Operations Procedures Manual Index I SU/MAN/018 I Fujitsu Document
Services inspection to verify
(Core existence of
Services) procedures

The Horizon Services Business CS/PLA/079 Fujitsu Document

Continuity Plan Services inspection to verify
(POA) compliance with

BCF

The Horizon Support Services CS/PLA/080 Fujitsu Document

Business Continuity Plan Services inspection to verify
(POA) compliance with

BCF

10.4 Technical Design Documentation

10.4.1. Summary

This section contains all technical design documentation relating to Business

Continuity.

10.4.2. Deliverables List

© 2004 Fujitsu Services

COMMERCIAL-IN-CONFIDENCE

(CONTRACT CONTROLLED)

Page: 30 of 32
Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref:

Version:

COMMERCIAL-IN-CONFIDENCE Date:

FUJ00001895
FUJ00001895

CS/SIP/002
9.0
19-Oct-2004

Document

Document

Reference

Owner

method

Resilience and Recovery strategy for TD/DES/031 Fujitsu Services Note 2

Release 2 (POA)

Host Failover strategy TD/STR/001 Fujitsu Services Note 2
(POA)

High-level Network Design for Release I TD/DES/059 Fujitsu Services Note 2

2 (POA)

Agent and Correspondence Server TD/DES/033 Fujitsu Services Note 2

Resilience and Recovery for Release 2 (POA)

Correspondence Server back-up TD/DES/086 Fujitsu Services Note 2

Strategy (POA)

Auto-config and Rollout Resilience TD/DES/057 Fujitsu Services Note 2

and Recovery Strategy (POA)

DYNIX/ptx Configuration for Main TD/DES/093 Fujitsu Services Note 2

Host Site Fail-over and Fallback (POA)

High Level Design for Application TD/DES/034 Fujitsu Services Note 2

Recovery after Fail-over using Maestro (POA)

Audit Server Resilience and Recovery I TD/DES/092 Fujitsu Services Note 2

Release 2 (POA)

FTMS Resilience and Recovery SD/STR/002 Fujitsu Services Note 2
(POA)

Data Warehouse Disaster Recovery SD/STR/005 Fujitsu Services Note 2

Strategy (POA)

Agent and Correspondence Server SY/SPG/002 Fujitsu Services Note 2

Resilience and Recovery Operations (POA)

Support Guide

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE

(CONTRACT CONTROLLED)

Page: 31 of 32
FUJ00001895

FUJ00001895

Fujitsu Services BUSINESS CONTINUITY FRAMEWORK Ref: CS/STP/002
Version: 9.0

COMMERCIAL-IN-CONFIDENCE Date: 19-Oct-2004

10.4.3. Review Method

1 Document inspection to verify Not applicable
compliance with BCF if required
by customer.

Confidentiality Restrictions
apply. Inspection on Fujitsu
Services (Post Office Account)
site by suitable qualified
customer staff with no copying
of document

2 A review of the technical design I Not applicable
documentation does not form
part of the Network Banking
acceptance process.

10.5 Customer Contingency Plans and Pathway Deliverables in
Support of Plans

10.5.1. Summary

This section summarises the deliverables produced by Fujitsu Services (Post Office
Account) in support of external contingency plans. It also contains reference to the
associated external Contingency Plan for completeness

10.5.2 Deliverables List

No documents are required in support of external contingency plans

© 2004 Fujitsu Services COMMERCIAL-IN-CONFIDENCE Page: 32 of 32
(CONTRACT CONTROLLED)