(oe) Definitions of Engineering Service Priority and Local / Remote -
FUJITSU Locations
Commercial in Confidence
Document Title: Definitions of Engineering Service Priority and Local / Remote
Locations
Document Type: Process — Contract Controlled Document
Release: HNG-X / HNG-X Application Roll Out Transitional Period / Pre HNG-
X Application Roll Out Transitional Period
Abstract: Defines postal zone locations for which the location of PO branches
is classified as Remote
Document Status: APPROVED
Author & Dept: Jan Ambrose: Fujitsu Services
Internal Distribution: NIA
External Distribution: N/A
Approval Authorities:
Signature
Mark Weaver Post Office: Senior Service
Delivery Manager
Steve Denham Fujitsu Services: Head of
Service Management, RAGA
Note. See Post Office Account HNG-X Reviewers/Approvers Role Matrix (PGM/DCM/ION/0001) for guidance.
©Copyright Fujitsu Services Ltd 2006 ‘Commercial in Confidence Ref. ‘SVM/SDM/PRO/0004
Version: 2.0
Date: 21-Jan-09
PageNo: 1 0f 6
FUJ00002079
FUJ00002079
Definitions of Engineering Service Priority and Local / Remote
oO
FUJITSU Locations
Commercial in Confidence
0 Document Control
0.1 Table of Contents
0 DOCUMENT CONTROL.........cscscsssssessnssssescesssssssesssessseeseasaestecseenenseeesensneseeeesaeaee 2
0.1 Table of Contents. 2
0.2 Document History. 3
0.3 Review Details.. 3
0.4 Associated Documents (Internal & External 3
0.5 Abbreviations. 4
0.6 Glossary... 4
0.7. Changes Expecte 4
1 SUMMARY.......ccscsssesessesseseseseseesssssessensstecasasseseesescsessersesenenrsssetsensesssessneneetasasensenee 5
DEFINITION AND PROCESG..........:ccccssssssssssnssssseseseseseesessseseeensoserscesseseeseaseesees 5
2.1 Remote LocationsS.............00 ed
3 CALCULATING SERVICE LEVEL PERFORMANCE .........s:sssssssssessssssssseesssesssecers 6
©Copyright Fujitsu Services Ltd 2006 ‘Commercial in Confidence Ref. ‘SVM/SDM/PRO/0004
Version: 2.0
Date: 21-Jan-09
Page No: 20f6
FUJ00002079
FUJ00002079
Definitions of Engineering Service Priority and Local / Remote
oO
FUJITSU Locations
Commercial in Confidence
0.2 Document History
Version No. Date Summary of Changes and Reason for Issue Associated Change -
CP/PEAK/PPRR
Reference
4 10/11/08 For review
1.0 06/02/07 Reference to Branch Network incidents removed and document
issued for approval
14 22/12/08 To include PA21 and PA22 as remote locations
2.0 21/01/09 For approval
0.3 Review Details
Review Comments by
Review Comments to
Mandatory Review
Role Name
Post Office: Commercial Liz Tuddenham
Post Office: Service Delivery Mark Weaver
Fujitsu Services: Commercial Hilary Forrest
Fujitsu Services: CS Steve Denham *
Role Name
Fujitsu Services: FMS Vince Watkins
Fujitsu Services: CS Leighton Machin
Issued for Information — Please restrict this
distribution list to a minimum
Position/Role Name
(*) = Reviewers that returned comments
0.4 Associated Documents (Internal & External)
Reference Version Date Title Source
PGM/DCM/TEM/0001 Fujitsu Services Post Office Account I Dimensions
(D0 NOT REMOVE) HNG-X Document Template
SVM/SDM/SD/0002 Engineering Service: Service I PVCS.
Description
©Copyright Fujitsu Services Ltd 2006 Commercial in Confidence Ref. SVM/SDM/PRO/0004
Version: 2.0
Date: 21-Jan-09
PageNo: 3 0f6
FUJ00002079
FUJ00002079
Definitions of Engineering Service Priority and Local / Remote
oO
FUJITSU Locations
Commercial in Confidence
Unless a specific version is referred to above, reference should be made to the current approved
versions of the documents.
0.5 Abbreviations
Abbreviation Definition
ccD Contract Controlled Document
SLT Service Level Target
0.6 Glossary
Term Definition
0.7 Changes Expected
©Copyright Fujitsu Services Ltd 2006 ‘Commercial in Confidence Ref. ‘SVM/SDM/PRO/0004
Version: 2.0
Date: 21-Jan-09
PageNo: 40f6
Fe)
FUJITSU
Locations
Commercial in Confidence
Definitions of Engineering Service Priority and Local / Remote
FUJ00002079
FUJ00002079
1 Summary
This document defines the classification of locations used in measuring Engineering Service Time to
Repair Service Levels.
2 Definition and Process
The location of each Branch is classified as either Local or Remote. The following postal zone locations
are classified as Remote. All other postal zone locations are classified as Local.
2.1 Remote Locations
Branches in the following postal zone locations are classified as Remote unless excluded specifically.
pee “* bev“ pes“ Deo“
BT47 *** BT48 ** BT49 ** BT546RT __BT81 *** (excluding BT81 7AA)
BT82 ***
Hs
vat ** \v22 *** 123 *** IV24 *** \v25 *** 1V26 ***
27 ** 1V28 *** 1vao *** vat \v42 1v43
44 “** IV45 “* 1V46 *** \V47 “** IV48 “* IV49 “**
IV51 *** V2 ** 1V53 vs + V5 *** IV56 ***
KA27 ** KA26 *“**
kw
PA20 *** PA21 ** PA22 "* PA26 *** PA29 *** PAO "**
PASI ** PA32 “** PA33 "* PA34 *** PA35 *** PA36 "**
PAST ** PA36 *** PA39 "** PAA ** PAd2 “* PA43 **
PAd4 ** PAGS ** PA46 *** PA? ** PAGS ** PA4Q **
PAGO *** PAG *** PAG2 "* PAGS *** PAG *** PAGS **
PAG6 *** PA67 *** PA68 *** PA69 *** PA70 *** PA72 ***
PA73 ** PATS *“** PAT6 ** PAT7 ** PA78 “* PAgt***
PA82 *** PAS “**
PH15 *** PH16 *** PH17 *** PH18 *** PH19 ** PH31 ***
PH32 *** PH33 *** PH34 *** PH35 *** PH36 *** PH7 ***
PH36 *** PH40 *** PH41 *** PH42 *** PH43 *** PH44 ***
PH49 ***
SA70 7UJ
TR21*** TR22 ** TR23 *** TR24 *"** TR25 ***
Ze
©Copyright Fujitsu Services Ltd 2006 Commercial in Confidence Ref. SVM/SDM/PRO/0004
Version: 2.0
Date: 21-Jan-09
PageNo: 50f6
FUJ00002079
FUJ00002079
Definitions of Engineering Service Priority and Local / Remote
fee)
FUJITSU Locations
Commercial in Confidence
3 Calculating Service Level Performance
Counter Equipment and LAN related Incidents which prevent an individual Branch from using HNG-X
Services shall be resolved in accordance with SLTs as defined in the CCD entitled: “Engineering
Service: Service Description” (SVM/SDM/SD/0002). Fault priority is allocated to these Incidents
following the receipt of calls to the Service Desk as follows:
e Calls from Local designated Branches will be allocated priority A, B or C in accordance with
the Hardware component failure as defined in the CCD entitled: “Engineering Service:
Service Description” (SVM/SDM/SD/0002);
e Calls from Remote designated Branches will be allocated priority C.
©Copyright Fujitsu Services Ltd 2006 ‘Commercial in Confidence Ref. ‘SVM/SDM/PRO/0004