oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010
Document Title: Management Information Service: Service Description
Document Type: Service Description - Contract Controlled Document
Release: HNG-X Release 1
Abstract: Service Description for the Management Information Service as
provided under contract to Post Office
Document Status: APPROVED
Originator & Dept: Mark Jones: Fujitsu Services
Internal Distribution: (For Originator to distribute following approval)
External Distribution: (For Document Management to distribute following approval)
Security Risk Assessment YES, see section 0.9
Confirmed
Approval Authorities: (See PGM/DCM/ION/0001 for Approval roles)
Name Role Date
Mark Weaver Post Office: Service Delivery IT
Services
Tony Atkinson Fujitsu: Service Delivery
Director, RMG BU
©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 1 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUUITSU SERVICES Commercial in Confidence Date: 24-Nov-2010
Document Control
0.0 Review Details
Review Comments by
Review Comments to : L. RMGA Document Management
Post Office: Operations Support Mark Weaver
Post Office: Commercial Liz Tuddenham
Fujitsu : Commercial Guy Wilkerson
Fujitsu : Asset & Configuration Manager Mark Brosnan
Fujitsu: Head of Service Operations Tony Atkinson
Fujitsu : Business Analyst Dave Cooke
Fujitsu : Security Tom Lillywhite
Fujitsu : HNG-X Service Transition Graham Welsh
Fujitsu : Service Analysis Jan Ambrose
Fujitsu : Service Delivery Manager Sarah Bull
Programme Manager Mark Andrews
Architect Pete Jobson
Infrastructure Design Pat Lywood
Testing Manager Debbie Richardson
Information Governance Bill Membery
Operational Security Donna Munro
Infrastructure Delivery Manager Martin Brett
Integration Team Manager Vijesh Pandya
Fujitsu : Service Delivery Director James Davidson
list to a minimum

(* ) = Reviewers that returned comments

0.1 Associated Documents

Reference Version Source

SVM/SDM/SD/0003 Data Centre Operations Service: Service Dimensions
Description

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 2 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0

FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

‘SVM/SDM/TP/0001 HNG-X Operational Test Plan - Joint Working I Dimensions
Document

SVM/SDM/PLA/O001 HNG-X Support Service Business Continuity Dimensions
Plan — Joint Working Document

SVM/SDM/PRO/0011 MIS — Joint Working Document Dimensions

NB/SDS/008 Network Banking MIS Reports Design Dimensions

SVM/SDM/SD/0017 Seourity Management Service: Service Dimensions
Description

SVM/SDM/PRO/0017 Transaction Time Benchmarking, Joint Working I Dimensions
Document

VWSTRIO64 Testing Approach for the Horizon System Dimensions

SVM/SDM/PRO/0018 POA Customer Service Incident Management Dimensions
Process

‘SVM/SDM/SD/0007 Service Management Service, Service I Dimensions
Description

SVM/SDM/SD/0010 Service Integration Service : Service Description I Dimensions

Unless a specific version is referred to above, reference should be made to the current

approved versions of the documents.

N.B. Printed versions of this document are not under change control.

0.2 Abbreviations/Definitions

Abbreviation

FTMS

Definition

File Transfer Management Service

Miscellaneous Data Queries

Ad-hoc MIS data requests received from Post Office outside of the contractual or regular MIS
provision

Primary MIS Site

Fujitsu Services primary MIS site at Bracknell or such other location as notified from time to time

Service Management Portal

Web based management information portal developed by Fujitsu Services to allow Post Office to
have real time access to management information

Transaction Time
Benchmarking Credits

An allowance in time given for a component element of a Transaction time which cannot be
regularly measured during a Transaction time benchmark exercise, for example, the speed of the
network

0.3 Document a

©Copyright Fujitsu Services Ltd 2010

(Commercial In Confidence) Page: 3 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

Version No Summary of Changes and Reason for Issue Associated Change -
CP/PEAK/PPRR
Reference
1.0 31-AUG-2006
14 06-DEC-2007 Removal of reference to Money Laundering and Multiple
Transactions Reports as these are no longer provided to POL.
Ceased at S50. This has been confirmed by POL (Jane Smith)
2.0 06-JUN-2008 Approved version
22 19-AUG-2009 Incorporation of comments against version 2.1 ; removal of
reference to the SRB Annex
23 17-DEC-2009 I Update to Fujitsu approvers and reviewers only. Recirculated for
internal review only due to staff changes.
3.0 09-FEB-2010 Approved version
34 09-MAR-2010 Incorporation of charges for Additional Superstock Reports in I (CP5007 (0451).
respect of the Superstock Service.
3.2 25-AUG-2010 Removal of reference to Automated Payments Service
33 22-OCT-2010 Amended list of Reviewers due to personnel changes at Fujitsu
34 27-Oct-2010 Added Security Risk Assessment Statement, changed document
history table to new template.
4.0 24-Nov-2010 Approval version
0.4 Changes Expected
Expected changes should the HNG-X design or solution require amendment to the service provided by Fujitsu Services.
Post contract signature following agreement to any Draft Notes (DN) included within the document

0.5 Security Risk Assessment

Security risks have been assessed and it is considered that there are no security risks relating specifically to
this document. This document and the processes and procedures described herein will generally comply with
1S027001, the information security management standard.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 4 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

Table of Contents
1 SERVICE SUMMARY.

2 HNG-X..

2.1 Service Definition...
The Service Review Bool
Summary Service Overview.
Provision of Information.
Miscellaneous Data Queri
Supporting Liquidated Damages Calculation:
Access to Real Time Management Information. 10
Service Managemen
2.2 Service Availability.
2.3. Service Levels and Remedies.
2.3.1 General Principles.
2.3.2 Service Level Relief.
2.3.3 Rectification Plan..
2.3.4 Service Levels for which Liquidated Damages Apply.
2.3.5 Operational Level Targets.
2.3.6 Performance Metrics.
2.3.7 Design Targets.....
2.4 Service Limits and Volumetrics.
2.5 Assets and Licences..
2.5.1 Assets..
2.5.2 Licence:
2.6 Charges...
2.6.1 Operational Fixed Charg
2.6.2 Operational Variable Charge.
2.6.3 Additional Operational Variable Charges
2.7 Dependencies and Interfaces to Other Operational Services.
Any changes agreed between Post Office and Fujitsu Services to the scope or availability of the
Management Information Service and/or any of the other Operational Services will be agreed in
accordance with the Change Control Procedure. As at the Amendment Date, this Management
Information Service interfaces with all of the Oper nal Services
2.8 Post Office Dependencies and Respon: ies.
2.9 Business Continuity..
2.9.1 Maintaining the Access to Data...
2.10 Documentation Set Supporting the Service.

NRNNRNNNVN

4
4
4
1.
1
1
4

Nouokwnos

3 HNG-X APPLICATION ROLL OUT — TRANSITIONAL PERIOD.

3.1 Service Definition......
3.2. Service Availability...
3.3. Service Levels and Remedies.
3.4 Service Limits and Volumetrics.
3.5 Assets and
3.6
3.7
3.8 Post Office Dependencies and Responsibili
3.9 Business Continuity...
3.10 Documentation Set Supporting the Service.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 6 of 18

CONTRACT CONTROLLED

FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

4 ANNEX A: TRANSACTION TIME BENCHMARKING SERVICE.
41  HNG-X....

4.14 Summary. .15
4.1.2 Service Definition. 15
41.3 Service Levels and Remedies 17
4.14 Service Availability..... .17
4.1.5 Post Office Dependencies and Responsi .18

4.2 I HNG-X Application Roll Out - Transitional Period.
4.2.1 Summary...
4.2.2 Service Definition.
4.2.3 Service Levels and Remedie:
4.2.4 Service Availability...
4.2.5 Post Office Dependencies and Responsibilities. .

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 6 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

1

41.4.

1.2.

1.3.

1.4.

1.5.

1.6.

1.7.

Service Summary

The Management Information Service provides to Post Office, performance reporting and
management information relating to the Services.

The Management Information Service consists of six (6) component services:

(a) The delivery to Post Office of the monthly Service Review Book as detailed in
section 2.1.1 of this Management Information Service, Service Description;

(b) The delivery to Post Office of supporting information in relation to liquidated
damages detailed in section 2.1.5 of this Management Information Service, Service
Description;

(c) The delivery to Post Office of management information in relation to Banking &
Related Services data as detailed in section 2.1.3 of this Management Information
Service, Service Description;

(d) The delivery to Post Office of management information in relation to Miscellaneous
Data Queries which may be received by Fujitsu Services, as detailed in section 2.1.4
of this Management Information Service, Service Description;

(e) The provision of the Service Management Portal to enable Post Office to access real
time updates to Service performance and Service Level Target measurement; and

(f) The provision of the Transaction Time Benchmarking Service, as set out in Annex A
to this Management Information Service, Service Description.

Staff utilised for the Management Information Service will have the necessary skills to
provide statistical and data analysis appropriate to the Management Information Service.

The delivery of the Management Information Service to Post Office may be via electronic
medium, (FTMS or e-mail), compact disk (CD) or paper as agreed between Post Office and
Fujitsu Services.

ARQ will not form part of the Management Information Service and are covered separately
under the Security Management Service as detailed in the CCD entitled: “Security
Management Service, Service Description” (SVM/SDM/SD/0017).

Information in respect of prosecution support cases will not form part of the Management
Information Service. Any information required of this nature should be directed to the
Security Management Service as defined in the CCD entitled: “Security Management
Service, Service Description” (SVM/SDM/SD/0017).

The Management Information Service will provide a service to enable Superstock
management reporting request and changes in accordance with section 3.8 of Annex A of
the Service Integration Service, Service Description (SVM/SDM/SD/0010).

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 7 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

2 HNG-X

2.1. Service Definition

2.1.1 The Service Review Book

The SRB is the primary input into the Service Management Relationship and will record a summary
of Operational and Call Off Services provided in the preceding calendar month. In doing so, Fujitsu
Services will:

2.1.1.1. Deliver the SRB to Post Office within ten (10) Working Days of the end of the relevant
calendar month. This version will contain Service Level Target (SLT) data (which may have
been updated from Version 1 due to the late delivery of information) and a service
summary broken down into the following categories, but not limited to:

(a) management summary — highlights of the Service delivery in the preceding month;
(b) asummary review of each of the Operational Services delivered;

(Cc) performance reporting as agreed between Post Office and Fujitsu Services from time
to time;

(d) summary review of problem management and cross domain problem status;

(e) monthly SLT achievement reported over the previous 13 (thirteen) calendar months
in the following format:

e SLT achievement, with the exception of all Data Services SLTs (Data File
Delivery and Logistical Feeder Service), as detailed in the CCD entitled: “Data
Centre Operations Service, Service Description” (SVM/SDM/SD/0003), shall be
reported to one (1) decimal place; and

* SLT achievement for Data Services SLTs shall be reported to two (2) decimal
places.

2.1.1.4. SLT achievement will be colour coded as follows:
(a) green: SLT met — no issues to report;
(b) amber: SLT missed — one off incident with action plan in place or not required; and

(c) red: SLT missed — root cause unknown at this point or no action planned to resolve
the issue and could re-occur.

2.1.2 Summary Service Overview

2.1.2.1. Fujitsu Services will deliver a summary service overview to Post Office within ten (10)
Working Days of the end of the relevant calendar month. This will be a summary of the
previous month's delivered service. The summary service overview will contain:

(a) the SLT performance, by SLT group (e.g. Service Desk, Engineering etc.) for the
reported month showing the number of SLTs falling into the RED, AMBER or
GREEN category as described in section 2.1.1.4 of this document;

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 8 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

(b) the SLT performance, by SLT group (e.g. Service Desk, Engineering etc) for the
reported month when compared with the rolling twelve month average. This will
record whether the reported month is either “UP” i.e. showing a higher performance
than the rolling twelve month average, or “Down” i.e. showing a lower performance
than the rolling twelve month average;

(c) the monthly performance of the Services delivered to Branches which includes the
parts of the system operated by both Fujitsu Services and Post Office suppliers;

(d) a brief description of the service high or low points from the reported month.

2.1.3. Provision of Information

2.1.3.1. Fujitsu Services will deliver the management information described in POL MIS AIS
(EA/IFS/006).

2.1.3.2. Fujitsu Services will deliver APS Client Transaction management information to Post
Office. The information to be provided is as follows:
(a) _ the number of Transactions completed, (in respect of APS at APS Client level) each

day throughout the Branch network; and
(b) _ the file delivery profile of those Transactions, (in respect of APS at APS Client level)
against the number of files delivered each day.

2.1.4 Miscellaneous Data Queries

2.1.4.1. Post Office will be entitled to request and receive data from Fujitsu Services in addition to
that described within sections 2.1.1 to 2.1.3 above, subject to section 2.4 of this
Management Information Service, Service Description.

2.1.4.2. If the Post Office intends to make a request as described in section 2.1.4 above, it will
submit a Miscellaneous Data Query request via the Fujitsu Services ‘Ad-hoc query’
mailbox. Detail of the Miscellaneous Data Query request process is defined in the Working
Document reference: “M/S — Joint Working Document” (SVM/SDM/PRO/001 1).

2.1.4.3. Fujitsu Services will log all Miscellaneous Data Query requests for future reference and
audit requirements.

2.1.4.4. In the event that Post Office submit a Miscellaneous Data Query request in respect of the
Superstock Services, then this will attract a charge as described in section 2.6.3 of this
Management Information Service, Service Description.

2.1.5 Supporting Liquidated Damages Calculations

2.1.5.1. On a monthly basis Fujitsu Services will provide Post Office with the data that has been
used by Fujitsu Services to calculate the financial payments associated with any liquidated
damages.

2.1.5.2. Post Office will advise Fujitsu Services if it considers any payment to be incorrect and both
Parties will attempt to resolve any dispute at the operational level.

2.1.5.3. If a dispute cannot be resolved at the operational level, the issue will be escalated to the
Service Management Relationship for discussion and resolution.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 9 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

2.1.6 Access to Real Time Management Information

Fujitsu Services shall supply Post Office with real time access to available management information
reporting via the Service Management Portal in the manner defined within the Working Document
entitled: “M/S — Joint Working Document” (SVM/SDM/PRO/0011).

2.1.7 Service Management

2.1.7.1 Continuous Service Improvement

Post Office and Fujitsu Services will, as part of ITIL service management best practice work together
to identify opportunities for elimination of duplicated effort and rationalisation of processes with the
aim of delivering improved efficiency and / or cost savings as referred to in section 1.4 of the CCD
entitled "Service Management Service, Service Description" (SVM/SDM/SD/0007).

2.2 Service Availability

The Management Information Service will be available from 9:00hrs to 17:30hrs Monday to Friday
excluding Bank Holidays.

2.3 Service Levels and Remedies

2.3.1 General Principles

2.3.1.1. The performance of the Management Information Service against the Operational Level
Targets (OLT) applicable in respect of the Management Information Service shall be
reviewed via the Service Management Relationship.

2.3.1.2. The values applicable to each of the Management Information Service OLTs are identified
within section 2.3.6 of this Management Information Service, Service Description.

2.3.2 Service Level Relief

This section is not applicable to the Management Information Service.

2.3.3 Rectification Plan

See section 7.1 of Schedule C1 of the Agreement.

2.3.4 Service Levels for which Liquidated Damages Apply

There are no specific SLTs for which liquidated damages apply.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 10 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

2.3.5 Operational Level Targets
Table 1

Report

Service Review Book Close of business the 10 Working Day
following the calendar month being reported

Miscellaneous Data Query By mutual agreement depending on the
complexity of the query, and following
receipt by Fujitsu Services of a specific
Purchase Order from POL authorising
payment for the work days required. As 2.4

Where circumstances outside the normal course of business impact on the timing of provision of a
Management Information Service report to Post Office then such report shall be provided to Post
Office as soon as reasonably practical after the end of the period covered by the Report. Fujitsu
Services shall notify Post Office as soon as reasonably practicable after becoming aware of
circumstances that will delay preparation or provision of a Management Information Service report.

2.3.6 Performance Metrics
There are no performance metrics associated with the Management Information Service.

2.3.7 Design Targets

There are no design targets associated with the Management Information Service.

2.4 Service Limits and Volumetrics

There are no specific service limits or volumetrics associated with the Management Information
Service. If in order to comply with a Miscellaneous Data Query request, the Management Information
Service is unable to complete the request, and Fujitsu Services, acting reasonably, expects to incur
additional incremental costs, i.e. resource or systems costs, the Management Information Service will
discuss the detail with Post Office and agreement will be reached as to the extent of the data to be
supplied by the Management Information Service or any additional cost to be agreed by Post Office
prior to the request being actioned.

2.5 Assets and Licences

2.5.1 Assets

There are no assets specific to the Management Information Service.

2.5.2 Licences

The Management Information Service will ensure that all third party software licences from time to
time required by Fujitsu Services to provide the Management Information Service are maintained to

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 11 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

ensure they are current and valid for the version of third party software being used at the time. Where
a licence or its associated support and maintenance is due to expire, and Fujitsu Services determine
that renewal is required, the Management Information Service will ensure that the appropriate
renewal process, as defined by the appropriate software vendor or licensor, is completed and a new
licence is concluded prior to the expiry date to ensure continuity of the service.

2.6 Charges

2.6.1 Operational Fixed Charge

See Schedule D1 of the Agreement.

2.6.2 Operational Variable Charge

There are no operational variable charges applicable to the Management Information Service.

2.6.3 Additional Operational Variable Charges

Additional Operational Variable Charges may be agreed between Post Office and Fujitsu Services on
an ad-hoc basis in respect of Miscellaneous Data Requests where an incremental resource or
systems cost may be incurred by Fujitsu Services in carrying out the request, as described in section
2.4 of this Management Information Service, Service Description.

In the event that Post Office submit a Miscellaneous Data Request in respect of the Superstock
Service, then this shall attract a charge of £592.31 per request.

2.7 Dependencies and Interfaces to Other Operational
Services

Any changes agreed between Post Office and Fujitsu Services to the scope or availability of the
Management Information Service and/or any of the other Operational Services will be agreed in
accordance with the Change Control Procedure. As at the Amendment Date, this Management
Information Service interfaces with all of the Operational Services.

2.8 Post Office Dependencies and Responsibilities

In addition to those Post Office responsibilities set out in Schedule A5 of the Agreement, Post Office
will make Miscellaneous Data Query requests using the standard Miscellaneous Data Query request
form via the agreed route as described in section 2.1.4.2 of this Management Information Service,
Service Description.

2.9 Business Continuity

This section defines the measures taken to minimise the risk of not being able to provide the
Management Information Service and sets out what Fujitsu Services is required to provide in terms
of business continuity specific to the provision of this Service. Detail of the MIS business continuity
plan is defined in the Working Document entitled: “HNG-X Support Service Business Continuity Plan
— Joint Working Document” (SVM/SDM/PLA/0001).

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 12 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

2.9.1 Maintaining the Access to Data

2.9.1.1 MIS Client Terminals

In the event that MIS Client terminals are unavailable in the Primary MIS Site, the MIS will re-locate
to another Fujitsu Services site where such MIS Client terminals are available.

2.9.1.2 Failover Timescale

Fujitsu Services shall ensure access to MIS Client terminals at the DR site are available to the MIS at
the commencement of the next Working Day following the initial failure.

2.9.1.3 Testing

Fujitsu Services will carry out a minimum of one (1) walkthrough and one (1) operational test per
calendar year is provided covering the MIS Client terminal availability, subject to agreeing the actual
dates for such tests with Post Office, such agreement not to be unreasonably withheld, as defined
within the Working Document entitled: “HNG-X Operational Test Plan — Joint Working Document”
(SVM/SDM/TP/0001).

2.10 Documentation Set Supporting the Service

The document set listed in section 0.3 of this Management Information Service, Service Description,
supports the delivery of the Management Information Services. Should any elements of the
Management Information Service be changed following agreement with Post Office, Fujitsu Services
will ensure these documents are also reviewed and amended where necessary in line with changes
agreed.

3 HNG-X Application Roll Out - Transitional
Period

3.1 Service Definition
3.1.1. See sections 2.1.1 to 2.1.7 of this Management Information Service, Service Description.

3.1.2. During HNG-X Project Workstream X4 (HNG-X Application Roll Out), Fujitsu Services will
provide HNG-X Application Roll Out Performance reporting as agreed between Post Office
and Fujitsu Services, such agreement not to be unreasonably withheld.

3.2 Service Availability

See section 2.2 of this Management Information Service, Service Description.

3.3. Service Levels and Remedies
3.3.1. See sections 2.3.1 to 2.3.8 of this Management Information Service, Service Description.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 13 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

3.3.2. During HNG-X Project Workstream X4 (HNG-X Application Roll Out), Fujitsu Services will
report via the Service Review Book in respect of Service Level Targets and remedies
applicable to each Operational Service as the migration proceeds. The format and content
of such reporting will be agreed between Post Office and Fujitsu Services no later than 2
(two) months prior to the start of HNG-X Application Roll Out.

3.4 Service Limits and Volumetrics

See section 2.4 of this Management Information Service, Service Description.

3.5 Assets and Licences

See section 2.5 of this Management Information Service, Service Description.

3.6 Charges

See section 2.6 of this Management Information Service, Service Description.

3.7. Dependencies and Interfaces with Other Operational
Services

See section 2.7 of this Management Information Service, Service Description.

3.8 Post Office Dependencies and Responsibilities

See section 2.8 of this Management Information Service, Service Description.

3.9 Business Continuity

See section 2.9 of this Management Information Service, Service Description.

3.10 Documentation Set Supporting the Service

See section 2.10 of this Management Information Service, Service Description.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 14 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

Annex A: Transaction Time Benchmarking Service

4.1. HNG-X

4.1.1. Summary

4.1.1.1. The Transaction Time Benchmarking Service provides a measure of Transaction time
performance for an agreed set of Transactions which may be varied at any time subject to
the Change Control Procedure and agreement between Post Office and Fujitsu Services.

The Working Document entitled: “Transaction Time Benchmarking, Joint Working

Document” (SVM/SDM/PRO/0017) gives details of these Transactions.

4.1.1.2. Performance measurement (or Transaction time benchmark evaluation) is limited to the
Business Capabilities and Support Facilities of the nominated Transactions, no account
being taken of any manual or human/computer interface components.

4.1.1.3. For the avoidance of doubt, this Transaction Time Benchmarking Service shall not include
the provision of video transaction time benchmarking.

4.1.2 Service Definition

4.1.2.1. Transaction time benchmark evaluation shall be carried out in accordance with the method
described in the Working Document entitled: “Transaction Time Benchmarking, Joint

Working Document” (SVM/SDM/PRO/0017).

4.1.2.2. Transaction time benchmark evaluations shall be auditable at all stages of the process.
4.1.2.3. Documents to be retained include:

(a) the data giving the record times of the Transaction time benchmark test
Transactions;

(b) a spreadsheet comprising the processed Transaction time benchmark results, the
data captured from the timing exercise and the intermediate processing, including
any agreed revision made thereto following review by Post Office; and

(c) _ the test scripts.

4.1.2.4. Such documents shall be retained for a period of seven (7) years from the date of the
relevant Transaction time benchmark.

4.1.2.5. Transaction time benchmark evaluations shall be supported by this document and the
performance statement Fujitsu Services shall provide to Post Office in writing arising out of
each evaluation undertaken in accordance with the Working Document entitled: “Counter

Transaction Time Performance - measurement and results’.

4.1.2.6. The contracted Transaction time benchmark target times against which the Transaction
time benchmark evaluation shall be measured are stated within the Working Document
entitled: “Transaction Time Benchmarking, Joint Working Document”

(SVM/SDM/PRO/0017).

4.1.2.7. The Working Document entitled: “Counter Transaction Time Performance - measurement
and results” shall be up-issued following every benchmark evaluation and shall include:
©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 15 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

4.1.2.8.

4.1.2.9.

4.1.2.10.

4.1.2.11.

4.1.2.12.

4.1.2.13.

4.1.2.14.

4.1.2.15.

(a) amendment(s) to the Transaction time benchmark target time(s) arising out of
agreed Business Capabilities and Support Facilities changes resulting from the
implementation of a Change Request under the Change Control Procedure including
reasons for any such adjustment;

(b) the new Transaction time benchmark system component and aggregate times
relating to the Release under examination;

(c) the variance between the new Transaction time benchmark times and the
Transaction time benchmark target times; and

(d) the variance between the new Transaction time benchmark times and the previous
Transaction time benchmark times.

The data recording part of the Transaction time benchmark evaluation is carried out prior to
the implementation of a Release. This is not to say that the Software implementation is
dependant in any way upon the Transaction time benchmark exercise or the results arising
there from. It is the successful completion of testing, which is conducted under the control
and management of Post Office that leads to the implementation of the Software into the
live environment as described in the CCD entitled: TST/GEN/STG/0001 “HNG-X Testing
Strategy’.

The Transaction Time Benchmarking Service comprises Transaction time benchmark
evaluation of individual Business Capabilities and Support Facilities component times
defined in the Working Document entitled: “Transaction Time Benchmarking, Joint Working
Document” (SVM/SDM/PRO/0017).

The Business Capabilities and Support Facilities component times are generated from the
execution of a representative set of Transactions on a test rig within a test environment
representing a real Post Office Branch as far as is reasonably practicable, with normal
counter operation.

The outcomes of the Transaction time benchmark evaluation are compared against the
counter system component target times and the results of the previous Transaction time
benchmark evaluation. Any adverse variances are analysed and explained as far as is
practicable.

The initial Transaction time benchmark evaluation results shall be presented to Post Office
for review within six (6) weeks of the commencement of the implementation of the Release
in question

The final Transaction time benchmark results are formally presented to Post Office in
accordance with the Working Document entitled: “Counter Transaction Time Performance -
measurement and results”.

Regardless of whether the results of the Transaction time benchmarking exercise have
been delivered, in the event that a Release is implemented and there is an obvious
degradation in performance in terms of Transaction times and such degradation is visible to
Users at the Branch and reported to the Service Desk, the Incident identified by Fujitsu
Services as causing the degradation will be resolved in accordance with the Incident and
problem management process set out in section 2.1.2 of the Service Management Service,
Service Description and the Working Document entitled: “POA Incident Management
Process” (SVM/SDM/PRO/0018). To the extent that any such Incident is caused directly by
any action of Fujitsu Services in breach of its obligations under this Agreement, the
resolution of that Incident will be at Fujitsu Services’ cost.

The Transaction time benchmark target times, where applicable and carried forward to the
next Release are subject to a five (5) per cent uplift with each Release to accommodate the

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 16 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

4.1.2.16.

4.1.2.17.

4.1.2.18.

4.1.2.19.

4.1.2.20.

4.1.3

likely increase in system contention arising from increased functionality and complexity
inherent in the Release.

Whenever an agreed system change affects one or more of the measured system
components, the Transaction time benchmark target times shall be reviewed and amended
by agreement between Fujitsu Services and Post Office (such agreement not to be
unreasonably withheld or delayed).

The Transaction time benchmark target times may also be changed as the result of an
agreement between Post Office and Fujitsu Services to change the Transaction time
benchmarking method. Under such circumstances Transaction Time Benchmark Credits
gained under the previous Transaction time benchmarking method shall be carried forward.

When, on completion of a Transaction time benchmark evaluation, the counter system
component timings prove to be greater than the Transaction time benchmark target times,
this shall be deemed a “Transaction Time Benchmark Time Discrepancy”.

In the event of a Transaction Time Benchmark Time Discrepancy the following provisions
shall apply:

(a) Post Office and Fujitsu Services shall agree (such agreement not to be unreasonably
withheld) a method of rectification, including a timetable, (a “Rectification Plan’) for
each Benchmark Time Discrepancy (which plan may involve the agreement of an
adjustment to the Transaction time benchmark target times);

(b) if the Rectification Plan requires changes to be made to the provisions of the
Agreement including any CCD or Contract Referenced Document (CRD) changes
shall be made pursuant to the Change Control! Procedure;

(c) any changes to the HNG-X Service Infrastructure required to rectify a Transaction
Time Benchmark Time Discrepancy shall be made at no charge to Post Office;

(d) each Transaction Time Benchmark Time Discrepancy shall not be a Default unless
the Transaction Time Benchmark Time Discrepancy is material and within ninety
(90) Working Days after the identification of that Transaction Time Benchmark Time
Discrepancy the Parties have failed to reach agreement upon a Rectification Plan
and the Transaction Time Benchmark Time Discrepancy has not been rectified by
Fujitsu Services. In such a circumstance that material Transaction Time Benchmark
Time Discrepancy shall become a Default upon expiry of that ninety (90) Working
Day period; and

(e) a failure by Fujitsu Services to comply with a Rectification Plan (and therefore fail to
rectify the Transaction Time Benchmark Time Discrepancy) shall be a Default.

Section 4.1.2.8 of this Management Information Service, Service Description shall be
without prejudice to Post Office's rights with respect to Release authorisation set out in
section 4.1.1.6 of the Service Management Service, Service Description.

Service Levels and Remedies

There are no Service Level Targets associated with the Transaction Time Benchmarking Service.

4.1.4
4.1.4.1.

Service Availability

The establishment of the test environment shall be scheduled in the Release plan so that
the Transaction time recording part of the Transaction time benchmarking exercise is
completed before implementation of the Software Release.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 17 of 18

CONTRACT CONTROLLED
FUJ00002276

FUJ00002276
oO Management Information Service: Service Ref: SVM/SDM/SD/0016
FUJITSU Description Version: 4.0
FUJITSU SERVICES Commercial in Confidence Date: 24-Nov-2010

4.1.4.2. The Transaction Time Benchmarking Service shall be provided upon request to Post
Office, (in a timescale to be agreed with Fujitsu Services) following the implementation of
an agreed change resulting from a Change Request under the Change Control Procedure.

4.1.5 Post Office Dependencies and Responsibilities
Post Office shall review and approve:
4.1.5.1. the Transaction Time Benchmarking Service results;

4.1.5.2. any revision to the contracted Transaction time benchmark target times or the latest
Transaction time benchmark times;

4.1.5.3. all other plans and documents to be submitted by Fujitsu Services pursuant to this Annex A
(Transaction Time Benchmarking Service) of the Management Information Service, Service
Description;

4.1.5.4. The Rectification Plan as described in section 4.1.2.19 (a) of this Annex A (Transaction
Time Benchmarking Service) of the Management Information Service, Service Description,

in each instance, such approval not being unreasonably withheld or delayed.

4.2 HNG-X Application Roll Out — Transitional Period

4.2.1. Summary

See sections 4.1.1.1 and 4.1.1.2 of this Management Information Service, Service Description Annex
A.

4.2.2 Service Definition
See section 4.1.2 of this Management Information Service, Service Description Annex A.

4.2.3. Service Levels and Remedies
See section 4.1.3 of this Management Information Service, Service Description Annex A.

4.2.4 Service Availability

See section 4.1.4 of this Management Information Service, Service Description Annex A.

4.2.5 Post Office Dependencies and Responsibilities
See section 4.1.5 of this Management Information Service, Service Description Annex A.

©Copyright Fujitsu Services Ltd 2010 (Commercial In Confidence) Page: 18 of 18