FUJ00003254
FUJ00003254
co Central Network Service: Service Description
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
Document Title: Central Network Service: Service Description
Document Type: Service Description — Contract Controlled Document
Release: HNG-X
Abstract: Service Description of the Central Network Service provided under
contract to Post Office
Document Status: APPROVED
Originator & Dept: Chris Harrison, Fujitsu Services: Networks Service Delivery
Manager
External Distribution: (For Document Management to distribute following approval)
Security Risk Assessment YES, security risks have been assessed, see section 0.7 for details.
Confirmed
Approval Authorities:
Name Role See Dimensions for record
Dionne Harvey IT Contracts Manager, Post Office Ltd
Alex Kemp Senior Operations Manager, Fujitsu
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIALIN per. SVM/SDW/SD/0012
Limited 2006-2017 CONFIDENCE)
Version: 8.0
UNCONTROLLED WHEN PRINTED OR _Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 1 of 4
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
0 Document Control
0.1 Document History
Version No. I Date Reason for Issue Associated
CP/PEAK/PPRR
Reference
1.0 31/08/06 Agreed
11 03/02/09 General cleanup to reflect the current design
Updated the Author, Approval and Reviewers
2.0 21/05/09 General Update to include HNG-x.
24 21/10/09 General Update and issued for review
3.0 21/01/10 Approval version
34 05/01/12 Update to replace ‘Streamline’ with ‘Merchant CP0665 (MA)
Acquirer’. Update to replace ‘Alliance and Leicester’ to
‘Santander’. Changed the Operational Change
Proposals to Operational Change (MSCs). Fixed
numbering in section 2.7. Removed pre HNG-X
transition states. Updated names/roles and document
references.
CP0701 (Santander)
3.2 04/10/2013 General review and update:
Added abbreviations and re-ordered alphabetically
Provided more detail in Service Summary 1.1
Added Connection to 3MCogent/Phoenix Data Centres I CP5319
for Application, Enrolment and Identity (AEl)
CCN1308b
Minor changes/tidying
4.0 16/12/2013 Approval version - POL Rejected
44 13/01/2014 Changes following Post Office feedback:
Removed reference to Service Integration Service in
2.1.1.1 and 2.1.1.4 as this service has been
withdrawn.
42 07/02/2014 Changes following Post Office feedback:
Removed the words “for each Availability Period”
from 2.3.5.1 heading and 2.3.7.1 heading. It will
default to 2.3.1 (b).
5.0 13/02/2014 Approval version
5.1 18/03/2014 Updated to reflect CCN1400 by adding section 1.8 CCN1400
6.0 14-May-2014 Approval version CCN1400
6.1 09/10/2015 Removal of Dependency with Service Desk Service CCN1409a
due to termination ccNn1429
Removal of connection to Maidstone DR datacentre
and updated reviewers. CCN14230
Removal of Dependency with Engineering Service due
to termination
6.2 16-Dec-2015 Revised following internal review of above changes
7.0 30-Nov-2016 Approval version
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIALIN peg. SVM/SDM/SD/0012
Limited 2006-2017 CONFIDENCE)
Version: 8.0
UNCONTROLLED WHEN PRINTED OR Date: 18-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 2of4
FUJ00003254
FUJ00003254
co Central Network Service: Service Description
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
71 02-06-2017 Updated to reflect CCN1609d - Termination of the CCN1609d
POLSAP Applications Support Service
7.2 24-Jul-2017 Section 1.8 Removed reference to POLSAP CCN1609d
Applications Support Service.
Section 1.8 Removed reference to Salesforce Service. I CCN1601b
Section 1.8 Amended Credence / MDM “Service” to CCN1602a / CT2237
“Hosting Support”.
Section 2.9.2 Corrected reference to HNG-X Business
Continuity Framework.
73 29-Aug-2017 Changed POL approver to Dionne Harvey
8.0 15-Sep-2017 Approval version
0.2 Review Details
Review Comments by :
Review Comments to :
Chris Harrison & POA Document Management
Mandatory Review
Post Office Ltd: IT Vendor Manager
Dionne Harvey [dionne.harvey@
Atos: Service Manager — Post Office Account
Anna Schofield [anna.schofieldi
Post Office Ltd: IT Vendor Manager
Mark Nash [mark.nashi
Senior Operations Manager
Alex Kemp,
Senior Commercial Manager
Carol Dunford; Post Office Account Commercial Mailbox
SSC (for Configuration Management)
Steve Parker; sscdm@
Operational Change/Release Management
Alan Flack
Service Architect
Phil Boardman
Optional Review
Commercial Manager
Krishna Topan; Post Office Account Commercial
Security Architect
Dave Haywood
Application Development Manager Graham Allen
Business Continuity Almizan Khan
Systems Mgt & Global Cloud Jerry Acton
Infrastructure Operations Manager
Andrew Hemingway
Application Lead SDM, Risk and Service
Introduction
Yannis Symvoulidis
Operational Security
Stephen Godfrey (Security)
Document Manager
Matthew Lenton
POA BAS Lead
Steve Bansal
Management Information Service
Mark L Jones
Issued for Information
© Copyright Fujitsu Services
FUJITSU RESTRICTED (COMMERCIALIN Rog.
SVM/SDM/SD/0012
Limited 2006-2017
CONFIDENCE) Versi
ersion:
UNCONTROLLED WHEN PRINTED OR Date:
STORED OUTSIDE DIMENSIONS. Page No:
8.0
15-Sep-2017
Soft
FUJ00003254
FUJ00003254
co Central Network Service: Service Description
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
(* ) = Reviewers that returned comments
0.3 Associated Documents
Reference Version I Date Title Source
SVM/SDM/SD/0011 Branch Network Service: Service Dimensions
Description
SVM/SDM/SD/0003 Data Centre Operations Service: Dimensions
Service Description
SVM/SDM/SIP/0001 HNG-X Business Continuity Dimensions
Framework
SVM/SDM/PRO/0001 Major Incident Process Dimensions
SVM/SDM/PRO/0018 Incident Management Process Dimensions
SVM/SDM/SD/0007 Service Management Service: Service I Dimensions
Description
SVM/SDM/PLA/0001 HNG-X Support Service Business Dimensions
Continuity Plan
SVM/SDM/PLA/0002 pNex Services Business Continuity Dimensions
jan
Unless a specific version is referred to above, reference should be made to the current
approved versions of the documents.
N.B. Printed versions of this document are not under change control.
0.4 Abbreviations/Definitions
Abbreviation Definition
COTS Commercial Off the Shelf
ccD Contractual Controlled Document
CMT Communications Management Team
DNS Domain Name System
EDG Electronic Data Gateway
IMT Incident Management Team
ISDN Integrated Service Digital Network
IP Internet Protocol
MSC Fujitsu Services toolset for managing Operational Change
Pl Processor Interface
RADIUS Remote Authentication Dial In User Service
SMC Service Management Centre
TIP Transaction Information Processing
© Copyright Fujisu Services FUJITSU RESTRICTED (COMMERCIAL IN Pet SuwsoMso/0012
UNCONTROLLED WHEN PRINTED OR _ Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 4 of 1
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
FUJ00003254
FUJ00003254
0.5 Changes in this Version
Version
Changes
7A
Changed to reflect CCN1609d
0.6 Changes Expected
Changes
0.7 Security Risk Assessment
Security risks have been assessed and it is considered that there are no security risks relating specifically to
this document.
© Copyright Fujitsu Services
Limited 2006-2017
FUJITSU RESTRICTED (COMMERCIALIN per.
CONFIDENCE)
Version:
UNCONTROLLED WHEN PRINTEDOR —_ Date:
STORED OUTSIDE DIMENSIONS. Page No:
SVM/SDM/SD/0012
8.0
15-Sep-2017
Soft
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
0.8 Table of Contents
0 DOCUMENT CONTROL...
0.1 Document History.....
0.2 Review Details...
0.3 Associated Documents.
0.4 Abbreviations/Definitions.
0.5 Changes in this Ver:
0.6 Changes Expected.
0.7 Security Risk Asses:
0.8 Table of Contents...
OAAKRRON
1 SERVICE SUMMARY.
2 HNG-X.. 8
2.1 Service Definition...... 8
2.1.1 Incident Management 8
2.1.2 Major Business Continuity Incidents. 9
2.1.3 Operational Change (MSC). 9
2.1.4 Configuration Management. 9
2.1.5 Service Managemen' 9
2.2 Service Availability... 10
2.3. Service Levels and Remedies. 10
2.3.1 General Principles i?)
2.3.2 Service Level Relief. 11
2.3.3 Rectification Plan. .
2.3.4 Service Levels for which Liquidated Damages Apply.
2.3.5 Service Levels for which Liquidated Damages Do Not Appl
2.3.6 Operational Level Targets.
2.3.7 Performance Metrics.
2.3.8 Design Targets.....
2.4 Service Limits and Volumetrics.
2.5 Assets and Licences.
2.5.1 Assets..
2.5.2 — Licence:
2.6 Charges...
2.6.1 Operational Fixed Charg
2.6.2 Operational Variable Charge.
2.6.3 Additional Operational Variable Charge.
2.7 Dependencies and Interfaces with Other Operational Service:
2.7.1 Changes...... we
2.8 Post Office Dependen:
2.9 Business Continui'
2.10 Documentation Set Supporting the Service.
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIAL IN
Limited 2006-2017 CONFIDENCE) Ret SVM/SDM/SD/0012
Version: 8.0
UNCONTROLLED WHEN PRINTED OR _ Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 6 of 4
Fe)
FUJITSU
FUJ00003254
FUJ00003254
Central Network Service: Service Description
FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
1. Service Summary
14 Fujitsu Services shall perform the day to day operational control and management of the
following Central Telecom Infrastructure components using appropriately trained staff:
(h)
(i)
the Local Area Networks (LAN) within the main HNG-X Data Centres including
Fujitsu Services managed switches, routers and firewalls;
the Intercampus Links between the main HNG-X Data Centres;
the Central Telecom Infrastructure connectivity to the Branch Telecom
Infrastructure (part of the Branch Network Service);
the Wide Area Network (WAN) and remote Local Area Network (LAN) for
connecting the HNG-X Data Centres to some Post Office Clients;
= One connection to each of 2 x DVLA Data Centres for Motor Vehicle
Licenses.
= — One connection to each of 2 x Santander Data Centres for Network Banking.
= One connection to each of 2 x EPay Data Centres for Mobile Phone Top ups.
= One connection to each of 2 x 3MCogent/Phoenix Data Centres for
Application, Enrolment and Identity (AEl).
* — Two connections to RMG/CSC Northern (Huthwaite) Data Centre for Track &
Trace, EDG, TIP, Credence, POLSAP and Collect & Retums traffic.
= One connection to RMG/CSC Sungard Data Centre (business continuity
location for TIP).
= Connections to 2 x Transaction Network Services Data Centres from where
Post Office Ltd have arranged for onward Debit Card transaction routing to
HSBC Merchant Acquirer.
the Technical Interfaces to Post Office Client owned Wide Area Network (WAN)
connections to the HNG-X Data Centres:
= Connectivity to HP/JP Morgan for Network Banking (Card Account at Post
Office).
= Connectivity to VocaLink for Network Banking (Cash Deposits, Balance
Enquiries or Cash Withdrawal)
* — Connectivity to MoneyGram for international money transfers.
the Wide Area Network (WAN) and Local Area Network (LAN) for connecting the
HNG-X Data Centres to Fujitsu Services support locations;
the Wide Area Network (WAN) and Local Area Network (LAN) for connecting the
HNG-X Data Centres to the Live System Test (LST) environment which has
servers in the HNG-X Data Centres and counter hardware at Fujitsu Services
support locations;
The networks in the Solution Validation & Integrity (SV&I), Integration (INT) and
Component Integration Test (CIT) environments have been committed separately
outside of the Central Network Service most recently under CCN1328b.
the Internet connectivity for most Post Office Data Gateway file transfer clients,
remote support and some transaction types (Post Code Anywhere, Broadband
Checker, Neopost, Bank Of Ireland, etc).
the ISDN connectivity for other Post Office Data Gateway file transfer clients.
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIALIN Rog. SVM/SDM/SD/0012
Limited 2006-2017
CONFIDENCE)
Version: 8.0
UNCONTROLLED WHEN PRINTED OR Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 7 of 4
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
1.2
1.3
1.5
1.6
1.7
1.8
Fujitsu Services shall perform the day to day operational control and management of the
following Fujitsu Services support contracts which form part of the Central Telecom
Infrastructure:
(a) Hardware maintenance for switches, routers and firewalls;
(b) Network Management Systems for the purpose of monitoring devices within the
Central Telecom Infrastructure; and
(c) Intercampus cards and switches.
Fujitsu Services shall also provide updated technical data to assist in the configuration of
the following Fujitsu Services infrastructure:
(a) RADIUS authentication servers; and
(b) External network firewalls.
The Central Network Service is based on remote unattended support, i.e. monitoring that
seeks to minimise interruptions to the normal business operation of the Central Telecom
Infrastructure components.
Fujitsu Services will manage access to the Data Centre resident secure access servers
from Fujitsu Services locations during Working Hours, or from support staff home locations
outside of Working Hours using secure workstation or laptop builds with encrypted
communications.
Fujitsu Services will manage a two (2) factor authorisation at the secure access servers with
onward access from the secure access servers to the Data Centre platforms and Counter
Positions using third party Commercial Off the Shelf (COTS) product management
interfaces and audited client access to all Windows and Unix platforms direct via IP or
proxies.
For the avoidance of doubt, from 01 April 2014 the Central Network Service excludes any
activity related to Credence or POLSAP systems. Such activity is included in the scope of
the Credence/MDM Hosting Support (CT2237), or the POLSAP Hosting Service Service
Description (SVM/SDM/SD/2191). This Central Network Service does, however, provide the
WAN connection to the RMG/CSC Northern (Huthwaite) Data Centre which is used by
Horizon, Credence and POLSAP.
HNG-X
2.1 Service Definition
2.1.1. Incident Management
2.1.1.1. The Central Network Service will work with the other Operational Services to ensure that
appropriate monitoring toolsets and processes are in place to identify Incidents within the
Central Telecom Infrastructure that have the potential to adversely impact the HNG-X
Services.
2.1.1.2 Having identified an Incident, the Central Network Service will ensure that that a new call is
raised via the Service Management Service that contains clear and concise information to
enable the Incident to be assigned according to its urgency and priority and resolved.
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIALIN peg. SVM/SDM/SD/0012
Limited 2006-2017 CONFIDENCE)
Version: 8.0
UNCONTROLLED WHEN PRINTED OR _ Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 8 of 4
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
2.1.1.3 The Central Network Service will assist the Branch Network Service, the Data Centre
Operations Service and the Systems Management Service and Fujitsu Services
Telecommunications Suppliers to resolve any Central Telecom Infrastructure related
Incidents in accordance with the Working Document entitled: “Incident Management
Process” (SVM/SDM/PRO/0018).
2.1.1.4. The Central Network Service shall inform Post Office of any Central Telecom Infrastructure
Incidents adversely affecting the HNG-X Services.
2.1.2 Major Business Continuity Incidents
2.1.2.1 In the event of a Major Business Continuity Incident (MBCI), as defined in the joint Working
Document entitled "HNG-X Services Business Continuity Plan" (SVM/SDM/PLA/0002),
within the Central Telecom Infrastructure, the Central Network Service shall ensure that the
Incident is logged and escalated as described in the Working Document entitled: “Major
Incident Process”, (SVM/SDM/PRO/0001).
2.1.2.2 As part of an on-going service assurance activity, the Central Network Service will
participate in Major Incident walkthroughs to take place at regular intervals.
2.1.3 Operational Change (MSC)
The Central Network Service will create and/or impact Manage Service Change (MSCs) for
operational changes in accordance with section 2.1.6 of the CCD entitled: “Service Management
Service, Service Description” (SVM/SDM/SD/0007).
2.1.4 Configuration Management
2.1.4.1 Fujitsu Services shall maintain an inventory of all Central Telecom Infrastructure
configuration items and understand the relationships between them.
2.1.4.2 The inventory includes any additions and amendments to, and removals from:
(a) Fujitsu Services' supported network platforms;
(b) changes in accordance with the Change Control Procedure to the configuration of
the existing Software / Hardware configurations across the Central Network
Service;
(c) management of all IP addressing;
(d) DNS management; and
(e) firewall rule base.
2.1.5 Service Management
2.1.5.1 Continuous Service Improvement
The Central Network Service shall work closely with the Service Management Service and Post
Office to identify and, where agreed, implement service or cost improvement initiatives as referred to
in section 1.4 of the CCD entitled: “Service Management Service, Service Description”
(SVM/SDM/SD/0007).
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/SD/0012
Limited 2006-2017 CONFIDENCE)
Version: 8.0
UNCONTROLLED WHEN PRINTED OR Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: Qf 4
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
2.1.5.2 Service Reporting
The Central Network Service shall, as required, provide service reporting for distribution to Post
Office as required under the Service Management Service described in the CCD entitled: “Service
Management Service, Service Description” (SVM/SDM/SD/0007).
2.1.5.3 Supplier Management
The Central Network Service shall manage all Fujitsu Services’ third party suppliers utilised in the
support of the Central Network Service. These activities include:
(a) — defining the services that the supplier delivers;
(b) — negotiating with the supplier;
(c) establishing a Contract with the supplier;
(d) monitoring the performance of the supplier;
(€) _ performing regular supplier reviews including service initiatives;
(f) managing problems relating to the supplier; and
(g) managing changes relating to the supplier.
2.1.5.4 Capacity Management
2.1.5.4.1. The Central Network Service shall continuously monitor the performance of the Central
Telecom Infrastructure with regard to the actual traffic across Central Telecom
Infrastructure. This will enable Fujitsu Services to manage the Central Network Service and
utilise capacity to its optimum to ensure the performance levels of the Central Telecom
Infrastructure are maintained to minimise the impact and occurrence of Incidents.
2.1.5.4.2. The Central Network Service shall liaise with the Service Management Service regarding
the actual performance of the Central Telecom Infrastructure within current traffic volumes.
2.1.5.4.3. The Central Network Service will review with the Capacity Management Service, the
forecasted traffic volumes to assess the future capacity requirements of the Central
Network Service.
2.2 Service Availability
2.2.1 The Central Network Service is a service internal to Fujitsu Services and is available 24
hours per day, every day of the year.
2.2.2 The Central Telecom Infrastructure will be available to enable a Branch to complete a
Transaction at any time other than during scheduled maintenance periods notified by
Fujitsu Services to Post Office in accordance with the Operational Change (MSC) process
as described in section 2.1.3 of this Central Network Service, Service Description.
2.3 Service Levels and Remedies
2.3.1 General Principles
2.3.1.1 Service Level Targets (SLTs) detailed in sections 2.3.4 and 2.3.5 of this Central Network
Service, Service Description, which do not specify a measurement period are:
(a) reported monthly via the Service Review Book (SRB); and
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIAL IN por. SVM/SDW/SD/0012
Limited 2006-2017 CONFIDENCE)
Version: 8.0
UNCONTROLLED WHEN PRINTEDOR _ Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 10 of 1
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
(b) measured over a Service Level Measurement Period equating to a Post Office
financial quarter; i.e.
e January to March;
e = April to June;
e July to September ; or
¢ October to December.
2.3.1.2 The Central Network Service shall be monitored on a weekly and monthly basis and any
failure to meet an SLT assessed over that month shall be reported to Post Office by means
of the SRB.
2.3.1.3. The values applicable to each of the Central Network Service SLTs are identified within
section 2.3.5 of this Central Network Service, Service Description.
2.3.2 Service Level Relief
This section does not apply to the Central Network Service.
2.3.3 Rectification Plan
See paragraph 7.1 of Schedule C1 of the Agreement.
2.3.4 Service Levels for which Liquidated Damages Apply
There are no Central Network Service SLTs for which liquidated damages apply.
2.3.5 Service Levels for which Liquidated Damages Do Not Apply
2.3.5.1 Banking Authorisation Agent Availability
Fujitsu Services shall record the number of times and the duration that the connection between each
Banking Authorisation Agent and each Processor Interface (PI) is unavailable and causes disruption
to Post Office. For the purposes of this section 2.3.5.1 “unavailable” means a break of connection (at
the application or network level) or loss of service excluding all unavailability due to:
(a) any of the system management activities including the introduction of Software distribution,
continuity testing and Reference Data updates and other such activities or any other planned
outages as the Parties may agree from time to time. Such periods shall be scheduled by
agreement with Post Office in accordance with ITIL compliant service management practices
agreed by the Parties. Post Office shall not unreasonably withhold or delay agreement to the
period of scheduled unavailability or the process for scheduling such maintenance periods; or
(b) a failure of a PI (in respect of the particular connection which is unavailable) or any connection
for which Fujitsu Services is not responsible (including, without limit, those connections
relating to CAPO and LINK for which Post Office are responsible pursuant to Schedule B3.3).
Table 1
Description SLT
Number of PI outages for more than 2 minutes for same Bank <=1
Number of PI outages for more than 2 minutes for different Banks <=2
2.3.5.2 Santander Network Availability for each SLT Calendar Year
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/SD/0012
Limited 2006-2017 CONFIDENCE)
Version 8.0
UNCONTROLLED WHEN PRINTED OR Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 11 of 1
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
Table 2
Description SLT
2.3.5.2 Santander Network Availability >=99.95%
2.3.6 Operational Level Targets
There are no operational level targets (OLTs) associated with the Central Network Service.
2.3.7. Performance Metrics
2.3.7.1 Banking Authorisation Agent Availability
If Fujitsu Services persistently fails to achieve the performance metrics described in Table 3 below as
a result of a lack of capacity or performance of the HNG-X Central Infrastructure, then increases in
capacity or performance required to address the deficiency shall be dealt with by the Capacity
Management Service.
Table 3
Description PM
Number of PI outages for more than 1 minutes for same Bank <=1
Number of PI outages for more than 1 minutes for different Banks <=2
2.3.8 Design Targets
There are no design targets associated with the Central Network Service.
2.4 Service Limits and Volumetrics
There are no service limits or volumetrics associated with the Central Network Service.
2.5 Assets and Licences
2.5.1 Assets
Assets relevant to the Central Network Service are set out within the Asset Register.
2.5.2 Licences
The Central Network Service will ensure that all third party software licences from time to time
required by Fujitsu Services to provide the Central Network Service are maintained to ensure they
are current and valid for the version of third party software being used at the time. Where a licence or
its associated support and maintenance is due to expire, and Fujitsu Services determine that renewal
is required, the Central Network Service will ensure that the appropriate renewal process, as defined
by the appropriate software vendor or licensor, is completed and a new licence is concluded prior to
the expiry date to ensure continuity of the service.
2.6 Charges
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/SD/0012
Limited 2006-2017 CONFIDENCE)
Version 8.0
UNCONTROLLED WHEN PRINTED OR Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 12of 1
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
2.6.1 Operational Fixed Charge
See Schedule D1 of the Agreement.
2.6.2 Operational Variable Charge
There are no operational variable charges associated to the Central Network Service.
2.6.3 Additional Operational Variable Charge
There are no additional operational variable charges associated to the Central Network Service.
2.7 Dependencies and Interfaces with Other Operational
Services
2.7.1. Changes
Any changes agreed between Post Office and Fujitsu Services to the scope or availability of the
Central Network Service and/or any of the other Operational Services will be agreed in accordance
with the Change Control Procedure. This section describes the interfaces with other Operational
Services as follows:
2.7.1.1. The Branch Network Service
The Central Network Service works closely with the Branch Network Service in supporting the HNG-X
Telecommunications Infrastructure. If the scope of the Central Network Service is changed, the
Branch Network Service may need to manage the Central Network Service's responsibilities in
relation this.
2.7.1.2 The Systems Management Service
If the scope of the Systems Management Service is changed, the Data Centre Operations Service
may take over the System Management Service's role in supporting the Central Network Service.
2.7.1.3. The Third Line Support Service
If the scope of the Third Line Support Service is changed, the Applications Support Service (Fourth
Line) may take over the Third Line Support Service's role in supporting the Central Network Service.
2.7.1.4 The Data Centre Operation Service
If the scope of the Data Centre Operations Service is changed, the Systems Management Service
may take over the Data Centre Operations Service's role in supporting the Central Network Service.
2.7.1.5 The Service Management Service
If the scope of the Central Network Service is changed, the Service Management Service may have
to take over the role of managing the Central Network Service communicating directly with Post
Office the status and nature of faults within the Central Network and may have to take over the role
of managing the Central Network Service suppliers.
2.7.1.6 The Operational Business Change (Branch Change) Service
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/SD/0012
Limited 2006-2017 CONFIDENCE)
Version 8.0
UNCONTROLLED WHEN PRINTED OR Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 130f 1
FUJ00003254
FUJ00003254
Central Network Service: Service Description
Fs)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
The Central Network Service will support any OBC Branch changes delivered by the OBC (Branch
Change) Service. If the scope of the Central Network Service changed, the Service Management
Service would have to take over this role.
2.7.1.7 The Reference Data Management Service
The Reference Data Management Service will support the Central Network Service. If the scope of
the Reference Data Management Service is changed, the Data Centre Operations Service would
have to take over this role.
2.7.1.8 The Management Information Service
The Management Information Service may request data to support MIS Reports delivered internally
within Fujitsu Services or to Post Office. If the scope of the Central Network Service changed, the
Service Management Service may have to take over this role.
2.7.1.9 The Security Management Service
The Central Network Service will support the Security Management Service in ensuring the
appropriate levels of security are met in respect of systems access. If the scope of the Central
Network Service changed, the Third Line Support Service or the Systems Management Service
might have to take over this role.
2.8 Post Office Dependencies and Responsibilities
In addition to Post Office responsibilities set out in Schedule A5 of the Agreement, Post Office shall
act reasonably in agreeing outages under section 2.3.5.1 (a) of this Central Network Service, Service
Description.
2.9 Business Continuity
This section defines the measures taken to minimise the risk of not being able to provide the Central
Network Service and sets out what Fujitsu Services is required to provide in terms of Business
Continuity specific to the provision of this Central Network Service. Details of the Central Network
Service Business Continuity Plan are set out in the Working Document entitled: “HNG-X Support
Service Business Continuity Plan” (SVM/SDM/PLA/0001), and in addition Fujitsu Services shall:
2.9.1 provide failover in respect of the Central Network Service to enable all Branches to
continue to have the ability to settle Transactions and perform critical on-line services
(namely Banking and Payment Management (Debit Card)) within two (2) hours of failure of
a live Data Centre; and
2.9.2 carry out a minimum of one (1) walkthrough and one (1) operational test per calendar year
for the Central Network Service, subject to agreeing the actual dates for such tests with
Post Office (such agreement not to be unreasonably withheld). Such tests shall be carried
out in accordance with the Working Document entitled: “HNG-X Business Continuity
Framework” (SVM/SDM/SIP/0001).
2.10 Documentation Set Supporting the Service
The document set listed in section 0.3 of this Central Network Service, Service Description supports
the delivery of the Central Network Service. Should any elements of the Central Network Service be
changed following agreement with Post Office, Fujitsu Services will ensure these documents are also
reviewed and amended where necessary in line with changes agreed.
© Copyright Fujitsu Services FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/SD/0012
Limited 2006-2017 CONFIDENCE)
Version 8.0
UNCONTROLLED WHEN PRINTED OR Date: 15-Sep-2017
STORED OUTSIDE DIMENSIONS. PageNo: 14f 1