Notes: of the PDA / Pathway Progress Review Meeting.
Held on 6 November 1996 at Terminal House
PDA Peter Crahan (Chair) Pathway John Bennett
Pat Kelsey Terry ne
Bruce McNiven Steve Muc!
John Meagher Tony Sociim
Bob Burkin (notes) In
Introduction Por
Peter Crahan welcomed everyone to the mecting. The purpose of the
meeting was (i) to review ‘drop down’ issues and to agree action that
should be taken to achieve the contract extrapolation date of 15
November and (ii) to review Pathway’s development progress.
It was noted that:nothing stated or agreed-at the meeting should be
deemed or construed as affecting existing contractual obligations
* between ICL.Pathway, the DSS and/or POCL:
21
Action 1
2.2
noteGL I doc
Drop Down Issues
A list of 15 ‘drop down’ issues was-tabled at the meeting for review
(copy attached). It was confirmed that this was the entire list and that
no further additions would be made or permitted.
Contractua] Issues:
Release-2+ (Relief)
The concept was understood and a way forward had been discussed
with the CNT. Language was being drafted. This issue had to be
discussed in the PDA in conjunction with Release I contents, the two
issues being interdependent.
Pat Kelsey to ensure drafting completed by Monday 11 November. I
Agreements to Agree Relief I
ICL Pathway had_a concern that they might be held responsible for
omissions in their services due to failure of “agreements to agree”. It
had previously been agreed to make explicit that this would not be the
case. Lawyers were drafling suitable text. It was expected to be
page I of 6
FUJ00079000
FUJ00079000
available for review by the end of the week.
Action2 Pat Kelsey to provide draft for review - date to be confirmed with
Lawyer
2:3. Drop Down - Split Requirements
No problems were foreseen in resolving this issue before the current
‘drop down’ date. Currently with Programme Lawyers as a drafting
issue.
Action3 Pat Kélsey to provide draft for review -.date to.be.confirmed with
. Lawyer
n
C ial Issues (4 issue
2.4 Remedy Aggregation, EVP Timings (Schedule B08), OBCS
(Commercial) and A6 (Commercial)
All these commercial issues are subject to'a new Pathway proposal to
be issued to the PDA (delivery to Keith Baines) on Monday 11
November. Urgent discussions would then be.held with Tim Brown
(POCL) with a response back to Pathway expected by close of: play
Tuesday 12 November.
Actiond — Pathway to issue new.proposals covering all the commercial issues to
PDA on Monday 11 November.
SLA Issue
2.5 SLA Transaction Tiines
Due to “agreements to agree” Schedule B3.has.been incomplete as.to
the transaction times against which service.levels may be monitored.
Pathway would issue a paper (version 3), incorporating PDA comments
on an early draft, by Friday 8 November: The general feeling was that
the PDA were‘comfortable with the status-reached and expected the
‘issue to’ be resolved and not impact the “drop:down’ date:
Action 5 Pathway paper to be issued to PDA by Friday 8 November.
CCN Issue
2.6 CCN Agreements
A list of the 39 CCN’s raised by Pathway was issued at the meeting
(copy attached). These CCN’s, which would bring the SADD and
note6 I L.doc page 2 of 6 i
FUJ00079000
FUJ00079000
Requirements:into line, were ‘known changes’ and were therefore
expected to be'cleared quickly - and John Savage (Pathway) and
Bernard Jenkins (PDA) were working closely to finalise before the 15
November. Pathway confirmed that there-weré no further CCN’s to be
forthcoming as part of the ‘drop down’ process.
It was noted that:the number of CCN’s raised by all parties should be
kept to a minimum with zero changes being the.aim.
Action 6 Pat Kelsey and John Bennett to ensure completion of the CCN process
by 15 November.
Programme Issuiés
2.7 Pathway Release 1 Content
The three main documents specifying R1 content were:
V4 detailed applications (BES / AP)
V5 referred to additional Fraud & Risk-Management and
Security measures
V0.6 takes into account early PDA comments on V4
The process to be followed.to resolve this issue was:
(i) final PDA comments on V4 to Pathway by Friday 8
November
(ii) PDA comments on V5'by Friday 8 November
(iii) Contents to be brokered / negotiated with Stakeholders
(initial views already obtained from POCL)
(iv) Further negotiations with Pathway
This issue was unlikely to be resolved by 15 November. During the
meeting:20 November was stipulated.as resolution date.
Action? — Peter Crahan and John Bennett to ensure their respective teams are
focused on progressing this issue to an early resolution
2.8 Release Policy Document
A PDA review meeting to be held on Friday 8 November with.
comments back to Pathway on Monday 11 November. A further review
to be:arranged for early next week with resolution of all issues by 13
November.
2.9 Acceptance Specs. (BES)
No problems foreseen with the current document. PDA to write to
Pathway early w/c 11 November to confirm acceptance. I
I
\
nate I doe page 3 of G
FUJ00079000
FUJ00079000
=
Action 8 — John Meagher to confirm acceptance.
2.10 Security Functional Specification
It was noted that security was paramount and that fraud reduction was a
Key objective of the Programme.
A form of words which would allow the FS to be signed off by the
PDA, (with-normal process to be followed for subsequent.controlled
documents), was reviewed and agreed at the meeting.
Action 9 — Pat Kelsey to ensure sign off process of Security Functional
: Spécification, having confirmed with PDA colleagues that there are no
remaining issues
Action. 10 Outside of the meeting, Bruce McNiven to follow up the issue of FRM
& Security with Gareth Lewis to see if the Release 1 content:can be
signed-off
2.11 Acceptance Criteria
Following a lengthy discussion it was agreed that the requirements
must be delivered using ICL Pathway’s solutions:as known and agreed.
There was concern'that to achieve this, the relevant'parts of the
solutions would need to be'mapped on to the various Acceptance
Criteria as submitted by ICL, Pathway and that was a significant
amount of work. However, Schedule C3 (Authorities’ Agreement)
confirms that requirements that must be satisfied by means of the
solutions, was seen as being sufficient. In addition, ICL Pathway
offered the PDA use of their ‘Access Database’ as a’“‘navigational tool”
in linking test. scripts, the FS:and the SADD
Action.11 Pathway to make their database available to the PDA
2.12 Severity Levels - Generic/BES
ICL Pathway had submitted examples of Severity Levels using BES as
a template. There has been much discussion on this subject: with the
CNT and it had been previously agreed that Severity Levels would
apply to incidents rather then criteria.
It was agreed that there would be joint working, using BES.as ari
illustrative example to resolve the issues of definition. The PDA
confirm this would not be a “sign-off” for BES.
Action 11 John Meagher and Terry Austin to progress jointly. .
Action 12 Pat Kelsey to ensure a CCN to reflects the change from ‘criteria’ to
‘incidents’.
nate6 Loc page 4 of 6
2.13
Action 13
Action 14
3.1
3.2
Action 15
3:3
Action 16
noteG Hl dae
Summary
In:summary, it was noted that a.lot of work was‘required in order to
clear‘all issues,.and the I S‘-November date was not.achievable in some
instances. The 29 November was believed to bée-a-more realistic
completion date.
Pat Kelsey and Tony Oppenheim to prepare a note to extend the
contract extrapolation date to 29 November. Subject to final
confirmation from the Programme Director, this would be signed by 15
November by Pat Kelsey and John Bennett.
Peter Crahan to broker the revised forecast complétion.date with
Stakeholders.
Development (update on-main deliverables)
OBCS and AP
Progressing to plan. Both products have moved into Pathway’s Product
Acceptance Testing phase.
EPOS
Product.reviews (by PDA)-that were planned to be completed at end of
October were ongoing. The impact of this was'to be assessed.
Terry Austin to report to John Meagher the:results of the impact
assessment on 7 Noveniber.
BES
Pathway work is currently 6 days behind schedule..A review of testing
timescales to be:carried out (including the joint testing. team) to
determine options/ impact of slotting BES testing in at a later than
planned date.
There appears to be a differing view between the PDA and Pathway as
to what work, has been done and what is curreritly. available for PDA
review. Terry Austin was reviewing the.position and would arrange for
a presentation of BES Ao selected PDA staff (to include Colin Odout).
Terry Austin to inform Peter Crahan of date of presentation.
page 5 of 6
FUJ00079000
FUJ00079000
41
Action. 17
5.1
nnte6 HI doe
Accommodation
The possibility of accommodation at Feltham for PDA staff was
discussed.
Peter Crahan to review PDA requirements and discuss with John
Bennett. outside of the meeting
Training
There was differing of viéws between Pathway and the PDA. regarding -
training needs. This issue was to be discussed and progressed at a
meeting arranged for Monday 11 November.
Conclusion
Peter Crahan thanked everybody for their positive input to the meeting
which he believed had been a. good and useful exercise.
page 6 of 6
FUJ00079000
FUJ00079000
FUJ00079000
FUJ00079000
DROP DOWN ISSUES
NO. ITEM. COMMENT PATHWAY I CATEGORY
OWNER
~ Ii Release 1 Content TPA Essential é
~ I2 Release Policy. Document Mechanism. TPA Desirable e
“= [3° I Release 2 (+) Relief AEO Essential e
~™ [4 Acceptance Criteria Mechanism TPA Essential ¢
— [s Acceptance Specs. (BES) yA Mechanism TPA Essential 0
~~ {6 Severity:-Levels - Generic/BES: Mechanism TPA Essential 0
~
7 SLA Transaction Times Mechanism SM Essential sy.
< 8 Remedy Aggregation Timings AEO Negotiate Cor
9 EVP Timings - BO8 AEO Negotiate Cour
~ I 10 Agreements to Agree Relief AEO Essential a
i
I
I t1 I Drop Down - Split Requirements AEO Essential c
~~ I 12 I OBCS - Conimércial AEO Negotiate ow I
™ =I 13 I AO6 - Commercial AEO Negotiate lore
— I 14 I Security Functional Specification TPA Essential p
== 1/15 I CCN Agreements AEO Essential CON
jhb/Nov.96/5 14 - 4 Sth November 1996
ICL Pathway ange Control Notes (CCN) Summary Status Repe 6th. Novembe
06-Nov-96
CCN No CCN Title CCN Raiser «implementation Date Submitted
Live Trial Volumes Davies B 15/08/96 .___IYes
CAPS IGL Configuration Vaughan B 26/08/96 Yes I
[Automatic Replenishment of
Temporary Tokens Dicks J 18/10/96 Yes INo
Proxy Collection of ~~ ~] ~
ICards/Housebound PUN Holder
5 Dicks J 27/09/96 Yes: No _
6 FS5.0 to FS6.0 Dicks J 30/09/96 Yes ‘No
Encashment ID Format (IGL) — Oe Y
Howells D 21/10/96 Yes INo
Roll Out and Implementation =.
8 Agreement Davies B 01/04/97 Yes No
— Addition of CV's to management Oo
9 team details Page J 25/10/96 Yes INo
i. Requirement 895 - Iregular I an
IEncashment Patterns
King G Release 1 Yes No
Epos Transaction Input ICooke D Release I Yes INo
Bilingual BES Receipt/Atp Cooke D Release I Yes INo
~ OBCS Stop Record Archiving I TS
3 Cooke D Release I I
“4! Change from BT to Energis
[Clarification of PAS/BES ” ~ ~ ~
15 Service:Boundary Hollingsworth D 15/11/96 Yes _ No
ntroduction\of 'POCL MIS I — “pr
Reports: as.a controlled
16 document Hollingsworth D 15/11/96 . ‘WYes _INo.
“IUse of PAS Help Desk to ~ — . ° “ ~
compensate ‘for removal of
Monitor Usage Flag and Card
Alert file-from CAPS Version 6 I
7 Dicks J Release I Yes No
Page 1
FUJ00079000
FUJ00079000
96
FUJ00079000
FUJ00079000
ICL Pathway hange Control Notes: (CCN) Summary’Status Rep- 6th Novemb 796
CCNNo CCN Title CCN Raiser Implementation Date [Submitted _IPDA Response .
Foreign Encashments, removal. . I ~
lof Social Fund exception I
[Dicks Release 2 ___ yes No
Removal of PUN Receipt Dicks J Release I Yes No
~~ [Temporary Post Office Closures] Sp i a
20 Hollingsworth D 15/11/96 iYes No
- EPOSS Audit/retention of ~ — 4
21 records Cooke D Release 1 Yes INo
_ Internal Service Levels TMS — “T rn
22 Robinson'P 31/10/96 Yes No
—_ — Internal Service Levels CMS [— ~
23 Robinson P 31/10/96 iYes [No
po Internal Service Levels PAS i
24 Robinson P 31/10/96 Yes [No .
Order Book recall and
25 redirection transactions Cooke D Release I Yes No
— Card Wording and Requirement 1
26 962 Hollingsworth D 15/11/96 Yes INo
a ~ Changes to-control card OT ~ eT
27 population Dicks J 15/11/96 No
—— POCL a Pathway sub-contractor; ~ oo pe
28 Dicks J 15/11/96 {Yes No
eee Royal Mail. a Pathway I pe i
29 Subcontractor Dicks J Release I Yes INo
— “Amendment to Schedule E082 [~~ poe , ~~
APS Service Levels;and
30 Remedies livermee D Release} Yes [No Ll
~ — Proposed Mechanism for _ — — oe
Determining Counter I
Transaction Performance through 1
31 Benchmarks Muchow S 15/11/96 Yes _ [No
YalignmentofReq.914 I pees i 7 ~
Descriptions in Schedules BO]
32 and,BO2 with G10 Curley P 15/11/96 [ves No.
Page 2
ICL. Pathway “hange Control Notes.(CCN) Summary Status:Rep 6th Novemb
CCNNQ CCN Title Implementation Date [Submitted [PDA Response
IOBCS - Handling of Counterfei
33 Book CookeD 15/11/96 Yes INO
—_ Proposed Changes to POCL I an
Agreement D08 - BES Service
Levels and Remedies:
}34 Muchow S 15/11/96 Yes No
ee ScheduleB4POCL Agreement I = = en
35 Oppenhiem A 15/11/96 Yes INo
OO Amendment to Schedule H08 - I I
IOBCS Service Levels and
36 Remedies ICooke D IS/11/96 Yes No
Extended Verification Process rs ”
37 _IKingG 15/11/96 ___ Yes No_ I
Ey ae [Solutions Update Ks J —_ 15/11/96 Yes No
. ~~ Vnfringements of Restricted Post) === SSOSS”S*~C<S~S~Ss*=‘“‘“<‘“SS*~<CS~Ssti‘i‘“‘ < < ‘ <( rT
39 Office Hayward T 15/11/96. No No
eee ~ Amendment ofReq.521 inI ee a Ce J
40 Schedule BO! Curley P 15/11/96 INo INo
Page 3
FUJ00079000
FUJ00079000
™,