FUJ00079935 - POA Customer Service Problem Management Process Details V5.0

Evidence on official site

Fujitsu Services

FUJ00079935
FUJ00079935

POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

Document Title:

Document Type:

Release:

Abstract:

Document Status:

Originator & Dept:

Contributors:

Internal Distribution:

POA Customer Service Problem Management Process Details
Process Definition

N/A

This describes the Customer Service Problem Management
Process

APPROVED

Mike Stewart Customer Service Operations

Rob Milner, Peter Thompson

Peter Thompson, John Holman-Dine, Carl Marx, Tony Wicks,
Mike Woolgar, Dean Felix, Ian Daniel, Julie Welsh, Graham
Mockridge

External Distribution:

Approval Authorities: (See PA/PRO/010 for Approval roles)

Name

Position Signature Date

Carl Marx

Infrastructure & Availability
Manager

Dave Baldwin

Director Customer Services

COMPANY-IN-CONFIDENCE Page: I of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935

FUJ00079935
Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0
COMPANY-IN-CONFIDENCE Date: 20-JAN-2005
0.0 Document Control
0.1 Document History
Version No. I Date Reason for Issue Associated
CP/PinICL
1.0 05/11/97 ICL Pathway Problem Management Process
11 16/04/98 Update
1.2 25/05/98 Update
13 19/07/98 Update
14 03/12/98 Update
1.5 02/04/99 Update
1.6 29/07/99 Updated following internal review and
comments
2.0 26/08/99 Stored in PVCS as “Version Complete”
2.1 15/05/00 Updated following a review of the CS Problem
Management Operation
3.0 13/11/00 Updated with comments from version 2.1, and
developed for approval.
3.1 19/11/01 Updated following annual process review, and
incorporation of the CS divisional alert process.
40 27/11/01 Updated with comments from review of version
3.1 and developed for approval
4l 05/11/04 Updated with a complete rewrite of the Process
after workshops within the POA Support
Groups. To support the change in Post Office
Business for On-Line Services
5.0 20/01/05 Updated following internal review and

comments

0.2 Review Details

Review Comments by :

Review Comments to :

Mandatory Review Authority Name
Infrastructure & Availability Manager Carl Marx
COMPANY-IN-CONFIDENCE Page: 2 of I

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0
COMPANY-IN-CONFIDENCE Date: 20-JAN-2005
Director Customer Services Dave Baldwin
Optional Review / Issued for Information

Peter Thompson Data Centre & Operations Manager

John Holman-Dine Network Service Manager

Tony Wicks Business Continuity Manager

Mike Woolgar Problem & Availability Manager

Dean Felix Service Delivery Manager

Julie Welsh Service Delivery Manager

Tan Daniel Service Delivery Manager

Graham Mockridge Service Transformation Manager

( * ) = Reviewers that returned comments
0.3. Associated Documents

Reference Version I Date Title Source

PA/TEM/001 8.0 19/12/02 Fujitsu Services Document I PVCS.
Template

CS/IFS/008 1.0 23/12/02 POA/POL Interface I pvcs
Agreement for the Problem
Management Interface

CS/PRD/074 2.0 05/11/04 POA Incident Management I pycs
Process

CS/PRO/110 2.1 11/10/02 POA Problem Management I pycs
Database Procedures

PA/PRO/001 10.0 02/02/04 Change Control Process PVCS

CS/QMS/001 1.0 04/11/04 Customer Service Policy I pycs
Manual

Unless a specific version is referred to above, reference should be made to the current

approved versions of the documents.

COMPANY-IN-CONFIDENCE
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004

Page: 3 of 1
Fujitsu Services POA Customer Service Problem Management

Process Details

COMPANY-IN-CONFIDENCE

FUJ00079935
FUJ00079935

Ref: CS/PRD/021

Version: 5.0
Date: 20-JAN-2005

0.4 Abbreviations/Definitions

Abbreviation Definition

KEL Known Error Log

MSU Management Support Unit
PAM Problem & Availability Manager
PM Problem Manager

PMDB Problem Management Database
PO Post Office

POL. Post Office Limited

SDMs Service Delivery Managers
SDU Service Delivery Unit

SLA Service Level Agreement

SSC System Support Centre

0.5 Changes in

this Version

Version

Changes

5.0

Update with a few minor comments after internal review at Version 4.1

0.6 Changes Expected

Changes

None

COMPANY-IN-CONFIDENCE

Page: 4 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935

FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021

Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

0.7 Table of Contents

1.0 I PROCESS INTRODUCTION.

11

2.1

2.2

2.3

2.4
24.1
2.4.2
2.43
244
2.4.5

2.5

2.6

4.0 I REPORTING GUIDELIN

41

42.
421
4.2.2
4.2.3

PRINCIPLES OF PROBLEM MANAGEMENT...
2.0 IDENTIFY AND RESOLVE PROBLEMS..

FUNCTIONAL OVERVIEW.
PROCESS BENEFITS
SCOPE.

PROCESS DESCRIPTION...

PROCESS STEPS DIAGRA’
PROCEDURE DESCRIPTIONS

3.0 PROCESS INDICATORS.

REPORT INFORMATION.

Identify Potential Problems.
Raise and Assign a Problem Record.
Problem Investigation...............0.00:
Resolve the Problem.........
Problem Closure...

@YAAANAY ADA

oo

Problem Management Process...
Problem Management Effectiveness and Efficiency for ‘Problem Handling
Solution Resource Effectiveness and Efficiency for Problem Handling.

COMPANY-IN-CONFIDENCE Page: 5 of I
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935

FUJ00079935
Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0
COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

1.0 Process Introduction

The following terms are defined to assist understanding of this process:
e An Incident is defined as:

“Any event that is not part of the Standard Operation of a Service and that causes,
or may cause, an interruption to, or a reduction in, the quality of that Service’

e A Problem is defined as the underlying root cause of one or more Incidents.

e A Known Error is an Incident or a Problem for which the root cause has
been diagnosed and a work round or cure has been identified.

¢ A Trend is an identifiable pattern or tendency.

1.1 Principles of Problem Management

The principles of Problem Management may be stated as:

Problems are investigated and diagnosed in order to identify their
root cause and provide a resolution.

Problem Management must be centralised.
Problem Management will work reactively.

Problem Management will work proactively.

The Problem Management process provides the ability to identify and resolve the
root-cause of incidents quickly and effectively.

The process also provides a way of identifying problems that may cause several
incidents by proactively analysing incident and problem trends.

Problem Management must be closely related to Incident Management in order to
ensure end-to-end management of customer issues. It is responsible for accepting
unresolved incidents escalated from Incident Management.

Problem Management is focused on finding the solution, whereas Incident
Management is focused on restoring the service.

COMPANY-IN-CONFIDENCE Page: 6 of I
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

2.0 Identify and Resolve Problems

2.1. Functional Overview

The purpose of this process is to investigate and identify the root cause of
unresolved incidents and to provide resolutions to those problems. In the course of
these investigations, the process may also identify short-term fixes or workarounds
to resolve incidents.

Problems identified are thoroughly analysed using (where available):
© Problem correlation tools,
¢ Internal and external knowledge databases;
e Information from management information,

Until an accurate diagnosis can be made. A workaround is devised where the
resolution is unknown or there is a Known Error. In order to affect a resolution to
the problem, it may be necessary to raise a Change Request to implement the
necessary change.

2.2 Process Benefits

This process provides the following benefits:

e It reduces the recurrence of service affecting incidents;
. It reduces business impact of problems by timely resolution.
2.3 Scope

The scope of this process includes the investigation of the underlying root cause of
unresolved incidents and the provision of resolutions.

It does not include the implementation of resolutions, nor does it include the
management of changes necessary to effect those resolutions.

2.4 Process Description

2.4.1 Identify Potential Problems

Problems can be identified from many sources: major incidents, recurrent incidents, incident
trends, requests from customers, requests from suppliers and, very importantly, through pro-
active investigation of management and incident data to look for possible new problems.

COMPANY-IN-CONFIDENCE Page: 7 of I
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

2.4.2 Raise and Assign a Problem Record

A request to raise a problem record has been received by the PAM, Problem &
Availability Manager or a recognised Service Manager who will manage the
Problem.

The Problem Manager will raise the problem on the PMDB, classify it as one of
three:

¢ Cross Domain Problem (Obtain a POL Reference Number to do this)
¢ Problem Branch
¢ Internal Problem

The PAM may well manage the Problem. If he assess, that the Problem is best handled by a
specific Service Manager, (one responsible for the Service area the Problem relates to), he will
allocate that Service Manager as the Problem Manager.

2.4.3 Problem Investigation

The assigned Problem Manager will initially investigate the problem to see if he can
identify the root cause of and a solution to the problem.

If he is unable to do this he will decide which support or development teams will be
able to assist. He will then manage these resources until the root cause has been
identified and a solution identified. A plan and timescale should be agreed with the
solution resources to ensure progress to conclusion.

2.4.4 Resolve the Problem
Following identification of a solution it must be implemented.

For technical changes this is likely to require a Change Request. In the case of
software changes this will mean liaising with Release Management.

For people and/or process change a change request is not necessarily required.

The required changes should be planned and implemented according to the plan.

Following implementation there should be an agreed period of monitoring and review in order
to ensure that all involved agree that the problem has been finally resolved.

2.4.5 Problem Closure

When it has been agreed by all parties that a problem has been fully resolved it
should be closed.

Also, when a problem is a duplicate or is not accepted as a problem it should be closed.

All relevant parties must be informed that the problem has now been closed.

COMPANY-IN-CONFIDENCE Page: 8 of I
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management
Process Details

COMPANY-IN-CONFIDENCE

FUJ00079935
FUJ00079935

Ref: CS/PRD/021

Version: 5.0
Date: 20-JAN-2005

COMPANY-IN-CONFIDENCE

Page: 9 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

2.5 Process Steps Diagram

Problem Management Process

tpicrth! Detection 2
Zs 7/——

Problem I

>

= ed

Yeo <K> > , <> ven coerce ee i Montore
11. 7 Mobis < ves 18
a ee cra Dis = ere
G)-I 8 ie eo) ‘gthton fen. <r trp veuo ose

1

The steps identified in the above process flowchart are described in more detail below. Examples of typical Inputs/Outputs and typical Data
Source/Repository are included.

COMPANY-IN-CONFIDENCE Page: 10 of 1
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management Ref:
Process Details
Version:
COMPANY-IN-CONFIDENCE Date:

FUJ00079935
FUJ00079935

CS/PRD/021

5.0
20-JAN-2005

2.6 Procedure Descriptions

Process Name:
Sub-Process:
Diagram Version:
Procedure Number:
Procedure Name:

Purpose and Scope:

Triggers:

Inputs:

Activities:

Outputs:
Interfaces:

Service Level Criteria:

Responsibilities:

Owner:

Comments:

Problem Management Procedures
Identify and Resolve Problems
1.0

1

Raise Problem

Record logged to capture details of an underlying

or exposure in order to enable further investigation.

A request is received to raise a Problem Record. This
may be due to the identification of an underlying fault
during Incident Management or as a result of proactive

Problem Management.

Incident Record (PowerHelp), Request (verbal, email),

Problem Management database, Management

Information from MSU, Trend Analysis from SDU,

Suppliers, PO Customer

Check existing Problem Records to avoid duplication.

Update existing Problem Record with details, if new

occurrence.

New Problem: log the details in the Problem
Management database.

A unique Problem Record or an updated Problem
Record

MSU, PowerHelp, SDUs, PAMs, SDMs, POL,
Suppliers

Problem Management Team, Service Management

Team, PAM team

Problem Management Team Leader

fault

COMPANY-IN-CONFIDENCE

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004

Page: 11 of 1
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

Item Descripti

Process Name: Problem Management Procedures

Sub-Process: Identify and Resolve Problems

Diagram Version: 1.0

Procedure Number: 2

Procedure Name: Proactive Problem Detection (1)

Purpose and Scope: Detect possible problems through investigation of
incidents and management information

Triggers: Daily task.

Inputs: Management information from MSU, problem
management database and PowerHelp

Activities: Anomaly detection, trend analysis, incident age analysis

Outputs: Request to raise problem record.

Interfaces: MSU, PowerHelp, SDUs, PAMs, SDMs

Service Level Criteria:.

Responsibilities: Problem Management Team.

Owner: Problem Management Team Leader

Comments:

COMPANY-IN-CONFIDENCE Page: 12 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

Item Descripti

Process Name: Problem Management Procedures

Sub-Process: Identify and Resolve Problems

Diagram Version: 1.0

Procedure Number: 3

Procedure Name: Proactive Problem Detection (2)

Purpose and Scope: Detect possible problems through investigation of

incidents, management information and discussion with
relevant SDUs and suppliers

Triggers: Daily task.

Inputs: Management information from MSU, problem
management database, PowerHelp, SDUs & Suppliers

Activities: Anomaly detection, trend analysis, incident age analysis

Outputs: Request to raise a problem record.

Interfaces: Input from External Fault Management.

Service Level Criteria:.

Responsibilities: Service Delivery Managers
Owner: Problem Management Team Leader
Comments:
COMPANY-IN-CONFIDENCE Page: 13 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details

Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

Item Descripti

Process Name: Problem Management Procedures
Sub-Process: Identify and Resolve Problems

Diagram Version: 1.0

Procedure Number: 4

Procedure Name: Classify Problem

Purpose and Scope: Determine the category of problem
Triggers: Problem Record logged.

Inputs: Problem Record and categories of problem
Activities: Determine whether:

Cross Domain, Problem Branch or Internal Problem.
Outputs: Classified Problem
Interfaces:

Service Level Criteria:.

Responsibilities: Problem Management Team.
Owner: Problem Management Team Leader.
Comments:
COMPANY-IN-CONFIDENCE Page: 14 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

Item Description

Process Name: Problem Management Procedures

Sub-Process: Identify and Resolve Problems

Diagram Version: 1.0

Procedure Number: 5

Procedure Name: Analyse & Assign Problem

Purpose and Scope: Analyse the fault and determine the correct assignee
group (including external / customer group).

Triggers: Problem Record logged.

Inputs: Problem Record and valid assignees

Activities: Analyse fault.

Determine correct problem manager or reject fault.
Contact and assign to problem manager.
Outputs: Assigned record
Notification to assigned problem manager
(Potentially) Rejected Problem Record.
Interfaces:

Service Level Criteria:.

Responsibilities: Problem Manager.
Owner: Problem Management Team Leader.
Comments:
COMPANY-IN-CONFIDENCE Page: 15 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management

Process Details

COMPANY-IN-CONFIDENCE

FUJ00079935
FUJ00079935

Ref: CS/PRD/021

Version: 5.0
Date: 20-JAN-2005

Item

Process Name:
Sub-Process:
Diagram Version:
Procedure Number:
Procedure Name:

Purpose and Scope:

Triggers:
Inputs:

Activities:

Outputs:

Interfaces:

Service Level Criteria:
Responsibilities:
Owner:

Comments:

Problem Management Procedures
Identify and Resolve Problems
1.0

6

Investigate & Diagnose (Level 1)

A solution has not been found in the Problem database
or KEL, further diagnosis is required in order to

determine resolution.
Assigned Problem Record
Problem Record

Investigate the fault (including any diagnosis carried out
during Incident Record investigation if relevant).

Identify root cause analysis

Identify resolution details (or circumvention /
work-around if resolution may take some time).

Further review of Problem database or KEL may be

required if resolution not identified.

Diagnosed Problem Record, Potential circumvention,

Identified Resolution plan OR

Unresolved Problem record.

Problem Manager

Problem Management Team Leader.

COMPANY-IN-CONFIDENCE

Page: 16 of I

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management

Process Details

COMPANY-IN-CONFIDENCE

FUJ00079935
FUJ00079935

Ref: CS/PRD/021

Version: 5.0
Date: 20-JAN-2005

Item Descripti

Process Name:
Sub-Process:
Diagram Version:
Procedure Number:
Procedure Name:

Purpose and Scope:

Triggers:
Inputs:

Activities:

Outputs:

Interfaces:

Service Level Criteria:
Responsibilities:
Owner:

Comments:

Problem Management Procedures

Identify and Resolve Problems (Level 1)

1.0
7

Mobilise Solution Resource

A solution has not been found in the Problem database
or KEL further diagnosis is required in order to

determine resolution.
Unresolved problem record
Problem Record

Determine which service or development team(s) is/are
most likely to be able to identify the root cause and

resolve the problem.

Discuss problem with resolving team(s) and agree plan

and timescales for resolving problem

Assigned solution resource

Agreed plan and timescales for investigation &

resolution
SDUs / Development

Problem Manager

Problem Management Team Leader.

COMPANY-IN-CONFIDENCE

Page: 17 of I

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management

Process Details

COMPANY-IN-CONFIDENCE

FUJ00079935
FUJ00079935

Ref: CS/PRD/021

Version: 5.0
Date: 20-JAN-2005

Item Descripti

Process Name:
Sub-Process:
Diagram Version:
Procedure Number:
Procedure Name:

Purpose and Scope:

Triggers:
Inputs:
Activities:

Outputs:

Interfaces:

Service Level Criteria:
Responsibilities:
Owner:

Comments:

Problem Management Procedures
Identify and Resolve Problems
1.0

8

Investigate & Diagnose (Level 2)

The problem manager has been unable to resolve or find

the root cause of a problem

Unresolved problem record or no root cause identified

Problem Record

Investigate the fault (including any diagnosis carried out
during Incident Record investigation if relevant).

Identify root cause

Identify resolution details (or circumvention /
work-around if resolution may take some time).

Further review of Problem database or KEL may be

required if resolution not identified.

Diagnosed Problem Record, Potential circumvention,

Identified Resolution plan OR

Unresolved Problem record.

Service Delivery Units / Development

Problem Management Team Leader.

COMPANY-IN-CONFIDENCE

Page: 18 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management Ref:
Process Details
Version:
COMPANY-IN-CONFIDENCE Date:

FUJ00079935
FUJ00079935

CS/PRD/021

5.0
20-JAN-2005

Item Descripti

Process Name:
Sub-Process:
Diagram Version:
Procedure Number:
Procedure Name:

Purpose and Scope:

Triggers:

Inputs:

Activities:

Outputs:
Interfaces:
Responsibilities:

Owner:

Comments:

Service Level Criteria:

Problem Management Procedures
Identify and Resolve Problems
1.0

9

Raise Change Request

Underlying problem requires a change to the system
configuration in order to resolve. Raise Change Request

to facilitate.

Identification of root cause of problem and identification

of resolution plan.

Problem resolution details.

Raise Change Request according to standard Change

Management procedure

Update the Problem Record with details.
New Change Request.

Updated Problem Record.

Output to Change Management.

Problem Manager / Solution Resource.

Problem Management Team Leader.

COMPANY-IN-CONFIDENCE

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004

Page: 19 of 1
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

Item Descripti

Process Name: Problem Management Procedures
Sub-Process: Identify and Resolve Problems

Diagram Version: 1.0

Procedure Number: 10

Procedure Name: Implement Change

Purpose and Scope: To implement the required changes to process,

technology or people to resolve root cause of problem.

Triggers: Identification of root cause of problem and identification
of resolution plan.

Approval from Change Management
Inputs: Problem resolution details.

Change Management process

Activities: Implement changes according to agreed plan
Outputs: Implemented change
Interfaces:

Service Level Criteria:

Responsibilities: Problem Manager / Solution Resource.
Owner: Problem Management Team Leader.
Comments:
COMPANY-IN-CONFIDENCE Page: 20 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management Ref:
Process Details
Version:
COMPANY-IN-CONFIDENCE Date:

FUJ00079935
FUJ00079935

CS/PRD/021

5.0
20-JAN-2005

Item Descripti

Outputs: Agreement that problem has been resolved OR
Additional investigation required
Interfaces:

Service Level Criteria:

Responsibilities: Problem Manager
Owner: Problem Management Team Leader.
Comments:

Process Name: Problem Management Procedures

Sub-Process: Identify and Resolve Problems

Diagram Version: 1.0

Procedure Number: 11

Procedure Name: Monitor & Evaluate

Purpose and Scope: Ensure that implemented change has successfully
resolved problem to the satisfaction of all.

Triggers: Implemented Change

Inputs: Implemented Change

Activities: Monitor status of problem symptoms over agreed period
of time

Evaluate and agree whether problem has been resolved

COMPANY-IN-CONFIDENCE
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004

Page: 21 of 1
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details

Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

Item
Process Name: Problem Management Procedures
Sub-Process: Identify and Resolve Problems
Diagram Version: 1.0
Procedure Number: 12
Procedure Name: Close Problem
Purpose and Scope: Problem resolved, so close the Problem Record
Triggers: Fault resolved to user’s satisfaction.
Problem Record not relevant (duplicate / not required).
Inputs: Resolved Problem Record.
Activities: Change Problem Record status to CLOSED.
Determine a Closure Code.
Report Closure to Reporter of problem
Outputs: Closed Problem Record.
Interfaces: Reporter of problem
Service Level Criteria:
Responsibilities: Problem Manager.
Owner: Problem Management Team Leader.
Comments:
COMPANY-IN-CONFIDENCE Page: 22 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management Ref:
Process Details
Version:
COMPANY-IN-CONFIDENCE Date:

FUJ00079935
FUJ00079935

CS/PRD/021

5.0
20-JAN-2005

Item Descripti

relating to the problem record

Agree problem resides with them

group
Outputs: Externally assigned problem
Interfaces: External groups
Service Level Criteria:
Responsibilities: Problem Manager.
Owner: Problem Management Team Leader.

Comments:

Process Name: Problem Management Procedures

Sub-Process: Identify and Resolve Problems

Diagram Version: 1.0

Procedure Number: 13

Procedure Name: Liaise with External Group

Purpose and Scope: To notify of problem which resides with an external (i.e.
supplier, POL or POL supplier) group

Triggers: Problem assessed as responsibility of external group

Inputs: Problem Record

Activities: Contact External group and feed them all information

Assign problem as residing with group in PM database

Monitor ongoing progress of problem with external

COMPANY-IN-CONFIDENCE
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004

Page: 23 of 1
Fujitsu Services

POA Customer Service Problem Management
Process Details

COMPANY-IN-CONFIDENCE

Ref:

Version:

Date:

FUJ00079935
FUJ00079935

CS/PRD/021

5.0
20-JAN-2005

3.0 Process Indicators

The introduction of an integrated Problem Management process and function should
have a noticeable impact on the levels of service provided to the users of the
infrastructure. It is however vital that the effectiveness of the process is measured
on a regular basis in order to highlight areas for attention as part of an ongoing
Service Improvement Plan.

The following are typical of Indicators that may be used to measure the
effectiveness of the Problem Management process.

Total effort for this process (FTEs)

Time Sheet data

Number of problems received (by priority)

Incidents and Problems database

Number of problems resolved (by priority)

Incidents and Problems database

Number of outstanding problems (by
bracket of elapsed time to date, by priority)

Incidents and Problems database

Resolution time (by priority)

Incidents and Problems database

Percentage of problems resolved within
agreed thresholds (by priority)

Incidents and Problems database

Number of incidents and problems to be
analysed

Incidents and Problems database

Number of incident / problem similarities
analysed

Problem Trends database

Number of problems raised by this process

Incidents and Problems database

Number of incidents / problems relating to
problems that were already raised (i.e.
incidents / problems relating to trends
identified during previous analyses)

Incidents and Problems database

Problem Trends database

Number of KEL updates made (i.e. entries
added / reviewed / removed)

KEL Database

Percentage of incidents resolved using
KELs

Incidents and Problems database

Percentage of problems resolved using
KELs

Incidents and Problems database

Total number of KEL entries

KEL Database

COMPANY-IN-CONFIDENCE

Page: 24 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004

FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021
Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

4.0 Reporting Guidelines
4.1 Pre-Requisites

For effective Management Information to be produced from the Problem
Management function, the following pre-requisites must be in place:

. It is important to understand what information Senior Management wants to
see and to fully comprehend why they want this information.

2.It is necessary to ensure that the Problem Management toolset is capable of
collecting the required information (and that it has been configured to do so!)

w

Reporting ownership needs to be accepted by:
e the Problem Management team; and
e the report recipients

4. Data extract and reporting tools need to be in place to collect the information
prior to report production (this functionality may form part of the Problem
Management toolset or may be provided by stand-alone tools)

my

Report structures needs to be agreed:
e Frequency
¢ Historical data needed:
o One year?
o Archive data?
o Archive reports
6. Targets should be agreed for the management of Problems (as opposed to
Incidents).
4.2. Report Information
Senior Management will typically require information detailing the effectiveness of:
e the Problem Management process;
e the Problem Management team and all Problem Managers; and

e the Support groups that contribute to the process (ie. Solution
Resources).

4.2.1 Problem Management Process
¢ What is the ratio of Incidents to Problems
e In total, and by Support Group, how many Problems per day are:
¢ Opened?

COMPANY-IN-CONFIDENCE Page: 25 of 1
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
FUJ00079935
FUJ00079935

Fujitsu Services POA Customer Service Problem Management Ref: CS/PRD/021

Process Details
Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005

4.2.2

4.2.3

¢ Closed?
¢ Carried over?
e Re-opened?

Where there are no specific SLAs applicable to Problem Control, there should be
targets based on the priority (likely impact, and likelihood, of recurrence). Reporting
should be on achievement against targets

Problem Management Effectiveness and Efficiency for Problem Handling
© How many Problems per day are:
o Opened?
o Closed?
o Carried over?
o Re-opened?
«© How many SLA breaches? In total & by Support Group?
e How many Problems, passed to Support Groups, are duplicates?
© How many Problems are raised for existing Known Errors?
© Do Problem Record updates occur according to defined criteria?
«© How many Problems are raised due to trend analysis?
Solution Resource Effectiveness and Efficiency for Problem Handling
e Is the Support Group successful? ... It is necessary to define success criteria
e Is the group failing to meet SLAs? If so, why?
e Is the group improving?
e Is there an action plan for improvement?

e How well does the group co-operate and communicate with other groups, the
Service Desk and third parties?

© Do ‘fixed’ faults recur?
e Are there customer complaints?
e Are the right skills deployed at the right time?

Does escalation to the next technical level occur pro-actively and at the right time
intervals?

e Are Problem Records updated according to defined requirements?
e In total, and by Support Group, how many Problems per day are:

o Opened?

COMPANY-IN-CONFIDENCE Page: 26 of 1
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004
Fujitsu Services POA Customer Service Problem Management
Process Details

FUJ00079935
FUJ00079935

Ref: CS/PRD/021

Version: 5.0

COMPANY-IN-CONFIDENCE Date: 20-JAN-2005
o Closed?
o Carried over?
co Re-opened?
COMPANY-IN-CONFIDENCE Page: 27 of 1

(CONTRACT CONTROLLED - Leave Blank if Not Applicable)

©Copyright Fujitsu Services Limited 2004