POA Operations Major Incident Procedure
Procedure Definition
HNG-X
This document describes the POA Operations Major Incident
Management Procedure.
APPROVED
Tony Wicks— POA Operations
As listed on pages 4 and 5 for
Mandatory Review
Optional Review
Issued for information
For information
Dave Hulbert (POL), Steve Beddoe (POL), Antonio Jamasb(POL)
Security Risk YES
Assessment Confirmed
Approval Authorities:
Name Role Date
Nana Parry POA Tower Lead BAS See Dimensions for record of approval.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
0 Document Control
0.1 Table of Contents
0 DOCUMENT CONTROL.....
0.1 Table of Contents.
0.2 Document History.
0.3 Review Details..
0.4 Acceptance by Document Re
0.5 Associated Documents (Internal & External
0.6 Abbreviations.
0.7 Glossary...
0.8 Changes Expecte
0.9 Accuracy.
0.10 Security Risk Assessment.
2
4
INTRODUCTION.
cer =
pa
2 MANDATORY GUIDELINES...
3 DEFINITION OF A MAJOR INCIDENT.
3.1 Incident Classification...
3.2 Influencing Factors in call
3.3. Major Incident Triggers...
3.3.1 Network Triggers.......
3.3.2 Infrastructure Components Trigger:
3.3.3 Data Centre Triggers.
3.3.4 Online Service Triggers.
3.3.5 Security Triggers.......
4 SECURITY MAJOR INCIDENTG...........s:ssssssssssssssssssesesesssseseseseesateneseessseseeaseneeees 14
5 CALLING THE MAJOR INCIDENT.
PROCESS FLOW.
6.1 Process Description......
7 COMMUNICATION...
7.1 Technical Bridge..
7.2 Service Bridge..
7.3 i
7.4 Major Incident Communication
7.5 Major Incident Progress Template..
7.6 Escalation Communication Protocol.
7.7 Core Major Incident Management Team.
7.8 Corporate Alert....
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 2of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
FORMAL INCIDENT CLOSURE & POST INCIDENT REVIEW.
8.1 Calculating potential LD liability for Major Incidents.....
9 FUJITSU ROLES AND RESPONSIBILITIES DURING A MAJOR INCIDENT.....37
9.1 Role of the HSD IM
9.2 Role of the Major In nt Manager.
9.3 Role of the Technical Recovery Manager.
9.4 Role of the Problem Manager.
9.5 Role of the Communications Manage
9.6 Role of the SDUs: (Technical Teams /SMC/IMT & Third Parties).
9.7 Role of the Service Delivery Manager owning the affected service.
9.8 Role of the Tower Lead.
10 APPENDICES
10.1 List of Templates.......
10.2 Daytime Duty Manager Contact Details. 42
10.3 Out of Hours Duty Manager Contact Details. 42
10.4 POA Service Delivery Contact Details. 43
10.5 Special Situations...
10.5.1 Personnel Absenc:
10.5.2 OOH... =
10.5.3 Duty Manager Change Over.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 3of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
0.2 Document History
Date Summary of Changes and Reason for I
Reference
04 03-Oct-06 First draft — to detail the Major Incident Escalation process. Draft
taken from Horizon Document CS/PRD/122, V1.0.
1.0 11-Oct-06 Revision following comments from Reviewers
2.0 02-Sep-08 ‘Changes for Acceptance by Document Review: insertion of
Section (0.4) containing table of cross references for Acceptance
by Document Review and addition of note to front page. No other
content changes.
24 24-Feb-2009 I Changes made for Acceptance by Document Review by Fiona
Woolfenden including the removal of references to CS/PRD/O74
which has been Withdrawn and replaced by SVM/SD/PRO/0018
and other tidying up changes.
Other changes to update Contact details.
22 14-Apr-2009 Some Personnel Name changes and POA to POA +
Abbreviations. Security Updates to sections 5.1, 6.3, 8.2.1, 9.0,
23 3-June-2009 —_I Some Personnel Changes and minor changes following review in
May 2009
3.0 7-duly-2009 Following security audit 2 minor changes. Alan Simpson now on
distribution and 6.3, an extra bullet entry added at end of list
3.0 T-duly-2009 Following security audit 2 minor changes. Alan Simpson now on
distribution and 6.3, an extra bullet entry added at end of list
34 14-Jan-2010 I Changes following director failing to sign off v3.0, plus minor
contact changes.
4.0 26-Mar-2010 I Approval version
44 18-May-2010 I Following team restructure, the process has been significantly
reviewed.
42 03-Jun-2010 I Updated following minor comments provided during review cycle
of version 4.1. This version will be presented for approval at v5.0
5.0 07-Jun-2010 _I Approval version
60 14-Sep-2010 I Approved version following updates to personnel and table in
10.4 and section 10.8
64 15 July-2011 Updates to personnel and changes from ‘Process’ to Procedure’
62 05-Sept-2011 I Updates following changes requested by Bill Membery from 6.1,
plus clarification of TRM role
63 14-Oct-2011 I Cosmetic changes mainly changing RMGA with POA and also
updating abbreviations
64 21-Dec-2011 I Updating of details for a Service Bridge.
Also some POL requests.
Despite this being an internal POA document, all external
comments that can improve the document are considered.
6.5 16-Jan-2012 Updated, following review and cosmetic changes in relation to
version 6.4
7.0 02-Jan-2013 Changes in relation to Personnel and also Tower Leads and other
cosmetic changes
7A 04-Feb-2013 Changes in relation to Personnel and revisions around
Communications
‘©Copyright Fujitsu Services Lid 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref. ‘SVM/SDMIPRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 4of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
FUJITSU
72 17-Sep-2013 I Major update to align with Business Assurance Management
procedures and for organisational changes.
(This version was originally identified as version 8.1)
8.0 18-Oct-2013 _I Updated for minor changes from Nana Parry.
0.3 Review Details
04/10/13
Tony Wicks
Review Comments by
Review Comments to
Mandatory Review
Role Name
POA Tower Lead BAS Nana Parry
POA Acceptance Manager David Cooke
POA Lead Problem and Major Incident Manager Steve Bansal
Optional Re
ie)
Role Name
POA Infrastructure Operations Manager
Andrew Hemingway
POA Business Continuity Manager
Sathish Ramalingam
POA POLSAP and Online Services SDM
Gaby Reynolds
POA Credence and Sales force SDM
Victoria Hancock
POA Problem Manager
Stephen Gardiner
POA Lead SDM End User Services
Leighton Machin
POA Lead SDM Online Services
Yannis Symvoulidis
POA Senior Ops Manager HNS Alex Kemp
Fujitsu HSD Operations Manager Mike Clive
POA SMC Manager Catherine Obeng
POA Security Manager Kumudu Amaratunga
POA SDM HSD Sandie Bothick
POA Quality Compliance and Risk Manager Bill Membery
POA Network Infrastructure SDM
Roger Stearn
ied for Inform Please
distribution list to a minimum
Position/Role Name
POA CISO Brad Warren
POA Unix Team Leader Fiona Lennox
Fujitsu NT Team Leader lan Gibson
Fujitsu DC Operations Manager John Hill
(*) = Reviewers that returned comments
0.4 Acceptance by Document Review
The sections in this document that have been identified to POL as comprising evidence to support
Acceptance by Document review (DR) are listed below for the relevant Requirements:
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: Sof 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
Internal FS P Document
NFR Ref
SER-2200 SER-2178 Whole Document
SER-2202 SER-2179 Whole Document
SEC-3095 SEC-3266 3.3.5 Security Triggers
SEC-3095 SEC-3266 10.5 Security Major Incidents
0.5 Associated Documents (Internal & External)
Re Ti Source
PGM/DCM/TEM/0001 Fujitsu Services Royal Mail Group Account I Dimensions
(D0 NOT REMOVE) HNG-X Document Template
CS/IFS/008 POA/POL Interface Agreement for the Dimensions
Problem Management Interface
SVM/SDM/SD/0025 POA Problem Management Procedure Dimensions
PA/PRO/O01 Change Control Process Dimensions
CS/QMS/001 Customer Service Policy Manual Dimensions
SVM/SDM/SD/0001 Service Desk — Service Description Dimensions
266/FRM/HSD/001 HSD Business Continuity Activities Plan Dimensions
SVM/SDM/PLA/0001 HNG-X Support Services Business Continuity I Dimensions
Plan
SVM/SDM/PLA/0002 HNG-X Services Business Continuity Plan Dimensions
SVM/SDM/PLA/0030 HNG-X Engineering Service Business Dimensions
Continuity Plan
SVM/SDM/PLA/0031 HNG-X Security Business Continuity Plan Dimensions
SVM/SDM/SD/0011 Branch Network Services Service Description I Dimensions
SVM/SDM/PRO/0018 CS Incident Management Procedure Dimensions
C-MSv1.3 Manage Incidents Process BMS
C-MSv_roles Service Management Process Roles and BMS
Responsibilities
SVMISEC/STD/1823 LINK information security standard issued Dimensions
January 2001 (subject to such dispensations
from that standard as LINK may grant from
time to time).
IMo02_MAJOR 5.0 23/05/2013 I Manage Major Incidents Procedure BMS
INCIDENT
MANAGEMENT
PROCEDURE
FJ- BMS- 1-AB1.6 6.0 24/04/2012 I Fujitsu Services Business Management BMS
Systems Process: Conduct Root Cause
Analysis
Unless a specific version is referred to above, reference should be made to the current approved
versions of the documents.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 6 of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
0.6 Abbreviations
Definition
Advice & Guidance
BCP Business Continuity Plan
BMS Business Management System
HSD Horizon Service Desk
IMT Incident Management Team
Iso International Standards Organisation
ITIL Information Technology Infrastructure Library
KEDB Known Error Database
KEL Known Error Log
MBCI Major Business Continuity Incident
MIM Major Incident Manager
MICM Major Incident Communications Manager
MIR Major Incident Report
msc Manage Service Change
MsU Management Support Unit
ocPp Operational Change Proposal
PCI Payment Card Industry (as per Security Standards Council)
PO Post Office
POA Fujitsu Post Office Account
POL Post Office Limited
RFC Request For Change
SCT Service Continuity Team
SDM(s) Service Delivery Manager(s)
(NB: Throughout this document SDM refers to a person responsible for the Service,
and the SDM could work in, but not limited to, the Service Delivery, Service Support,
and Release Management or Security teams).
SDU Service Delivery Unit
SLT Service Level Targets
SMC ‘Systems Management Centre
SMS ‘Short Message Service (as known globally within Mobile Telephone Networks)
SRRC Service Resilience & Recovery Catalogue
ssc System Support Centre
TB Technical Bridge
TP Third Party or Third Parties
TRM Technical Recovery Manager
VIP VIP Post Office, High Profile Outlet
0.7 Glossary
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
Term Definition
T Time of incident occurring
T#3 Time Incident Occurred plus 3 minutes
0.8 Changes Expected
Changes
Changes to reflect process and organisational changes.
This is expected to be changed for the OSR Messaging release.
0.9 Accuracy
Fujitsu Services endeavours to ensure that the information contained in this document is correct but, whilst every effort
is made to ensure the accuracy of such information, it accepts no liability for any loss (however caused) sustained as a
result of any error or omission in the same.
0.10 Security Risk Assessment
Security risks have been assessed and it is considered that there are no security risks relating specifically to this
document.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 8 of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
1 Introduction
1.1 Owner
The owner of the Major Incident Management process at the local POA level is the Fujitsu POA Lead
SDM, Problem and Major Incident.
Objective
The key objective of the procedure is to ensure effective and efficient management of Major Incidents,
through:
e Improvement of communication channels
e Clarification of the need to communicate awareness of potential incidents
e Improved accuracy of reporting of incident status
e Allowing technical teams the right amount of time to diagnose and impact an incident
e Avoiding unnecessary alerting of the customer
« Demonstrating a professional approach to the Post Office
e Provision of clearly defined roles and responsibilities
e Defined reporting and updating timelines throughout a major incident.
« Improved governance
e Assessing which incidents are major and which are ‘Business as Usual’
1.2 Rationale
This document outlines the communication and management procedure and guidelines to be used for
Major Incidents impacting the live estate.
The methodology defined within this document augments the existing SMS framework procedure
presently deployed within the live estate.
The aim of the document is to provide a pre-defined procedure for future major incident communication
and management.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: Qof 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
2
Mandatory Guidelines
It is important to maintain a balance between:
a) Allowing the technical teams the right amount of time to diagnose and impact an incident
b) Avoiding unnecessary alerting of the customer
c) Assessing which incidents are major
The following guidelines should be adhered to.
During the HSD IMT Core Hours (Monday — Friday 07:00 — 19:00 and Saturday 08:00 - 14:00)
the HSD IMT should be the first point of operational contact between Fujitsu and the end user.
Outside these hours the HSD Telephones will be diverted to FJ Wakefield from 19:00 to 23:00
weekdays, Saturday 14:00 — 23:00 and Sunday 08:00 — 17:00 whilst SMC can also be contacted
24 x7 x 365.
Any activity detailed in this document which is assigned to the HSD IMT is handed over to the
SMC outside the HSD IMT Core Hours, with the exception of the above.
The relevant technical teams who are aware of and monitoring a potential major incident must
page / call the appropriate Major Incident Manager (Duty Manager out of hours) as soon as
possible. This is not limited to major incidents alone, but applies wherever a state other than
Business as Usual has been detected. The Major Incident Manager must in turn communicate
the potential incident, to the POL Service Desk for awareness and monitoring in POL. This is
usually done via the HSD IMT in core hours or via SMC out of hours.
The Major Incident Manager (or Duty Manager out of hours) is responsible for communicating
both up the Fujitsu organisation and across (see appendix 10.3) to their counterpart in POL.
Where this is impractical (e.g. leave, out of hours, unavailable), the initiative should be taken to
jump up the organisation. Of prime importance is that the customer is informed in a timely
manner and at the correct touch point. This communication should be by voice or direct SMS.
The communication should include the date, time, name, nature of problem, severity, if service
affecting, likely impact, and the Fujitsu owner to contact.
The Major Incident Manager (Duty Manager OOH, who covers Monday to Friday 17:30 to 09:00
and from 17:00 Friday though to 09:00 Monday) should also initiate communication using SMS
via the HSD IMT (07.00 to 19.00 Monday to Friday, and Saturday 08.00 to 14.00). Outside of
these hours the SMS should be via the SMC. The SMS distribution list used is titled ‘SMS
Internal’ and amongst others includes the appropriate members of the POA Operations
Management Team.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 10 of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
3 Definition of a Major Incident
3.1 Incident Classification
As a general rule a Major Incident will be an incident rated as a Business Critical Incident as shown in
the following
- The ‘CONTRACT’
= Sections 3.2 and 3.3 below.
- POA Operations Incident Management Procedure document (SVM/SDM/PRO/0018).
- Aseries of connected lower severity incidents which combine to have a significant business
impact.
However not all incidents rated as Severity 1 qualify as a Major Incident as the severity levels do not
always reflect the overall business impact to POL. For example a single counter post office which is
unable to trade, regardless of its business volumes, is rated as a Severity 1 incident.
For simplicity, incidents are classified into three impact levels: High, Medium and Low.
High — An Incident that has occurred with a significant and potentially prolonged adverse impact on POL
business. Typically these incidents will initially require a significant amount of reactive management
before they can be controlled and resolved.
Medium — An incident that has the potential to cause significant impact to POL business but can be
controlled and contained through effective management.
Low — An Incident that requires business attention but if managed effectively will not have significant
impact on POL business.
3.2. Influencing Factors in calling a Major Incident
It is important that a Major Incident is defined in accordance with section 3.3 Major Incident Triggers, as
such, because of its business impact on the day when it occurs, rather than simply being defined as a
Major Incident because it appears on a list. However the following parameters will also feed into the
consideration of whether a major incident should be called:
e Duration, i.e. how long has the vulnerability to service already existed?
e Impact across the estate, including consideration of whether a service is merely degraded or
actually stopped
e Time at which the event occurs in relation to the 24 hour business day
e Time of year — e.g. Christmas / Easter / End of month / quarter
e Anticipated time before service can be resumed
e Impact to POL branches, customers, clients or brand image
e Business initiatives e.g. product launches
3.3. Major Incident Triggers
The following criteria could trigger a major incident, however as detailed in 3.2, the influencing factors
must also be considered. As such the list below is not exhaustive, whilst if an incident occurs which is
not detailed below, e.g., legislative, it should not necessarily be precluded from being declared a major
incident.
It should be noted that any call trends in relation to the following, should be reported to the POA Duty
Manager as soon as the agreed threshold levels have been breached.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 11 of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
3.3.1 Network Triggers
Network Major Incident triggers are as follows:
e Complete or significant outage of the Central network, e.g. failure of both 3750 stack Catalyst
switches in totality for the Core layer in IRE11.
« Complete or significant outage of the Talk Talk network
e Complete or significant outage of VSAT sites
e Complete or significant outage of the ISDN network (whether C&W, BT or Kingston Comms)
3.3.2 Infrastructure Components Triggers
Infrastructure component Major Incident Triggers are as follows:
e Total loss of environments providing individual online service capability
« Breach of access to data centres
e Breach of security
« Virus outbreak
3.3.3. Data Centre Triggers
Data Centre Major Incident triggers are as follows:
e Network / LAN outage
e Loss of Data Centre, or significant loss of Data Centre Components
e Breach of security
3.3.4 Online Service Triggers
Online services Major Incident Triggers are as follows:
e Online service unavailable within the Data Centre (not counter level)
e Number of Branches without Communications Services —- as defined by POL and in accordance
with Ping script thresholds.
e Third party provided service failure — e.g. DVLA, Link, Moneygram, Santander etc
N.B Once the third party service provider has been deemed to be the source of the Major
Incident; it will be managed by either POA or POSD in accordance with whichever organisation
manages that supplier relationship.
3.3.5 Security Triggers
Security major incident triggers are as follows:
e Actual or suspected attacks on the Fujitsu Services Buildings and its resources, POA Network
or Information Systems
e Theft of IT equipment / property, and in particular PIN Pads
«= Theft of software
e Any PIN Pad Issues that are in breach of FIPS 140-1 level 3 and ISO 9564 1st Edition 1991
section 6.3.1 as specified in the LINK information security standard issued January 2001 (subject
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 12of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
to such dispensations from that standard as LINK may grant from time to time). The main criteria
being as follows:
The purpose of this Standard is to protect the LINK Network, its Members and their
cardholders and ATM owners from attacks designed to compromise sensitive data or
defraud financial institutions and their cardholders. This protection takes into account not
just the direct financial losses that may be incurred but also the potential reputational
damage to the LINK ATM Scheme and its Members and its impact on customer
confidence in LINK and ATMs in general. It is intended to protect the Link Brand:
+ The interests of the Members
+ The interests of the Members' customers
* The reputation and integrity of the UK cash handling infrastructure
In the event of a Security Major Incident (which may also include PCI Incidents), the POA Security
Manager MUST be alerted who will then follow the Security Incident Management processes, as detailed
in both:
SVM/SDM/PRO/0018 Appendix A
SVM/SDM/PLA/0031 HNG-X Security Business Continuity Plan (defines the actions to be taken
if security violations are identified).
In the event of a Major Incident Security trigger for Fujitsu Services Buildings and its resources, the POA
Security Manager MUST inform the Group Property Security Team who will be alerted either by
telephone on a 24/7 basis or the next working day via our Incident Reporting process and the actual or
potential impact of the incident dictates which route is followed.
The Group Property Security Team will then take responsibility for interfacing into the corporate process
by entering reports on to the corporate system.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 130f 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
4 Security Major Incidents
In the event of a security major incident, the incident procedure as detailed in the POA Customer
Services Incident Management Procedure (SVM/SDM/PRO/0018 Appendix A) must also be followed.
SVM/SDM/PLA/0031 HNG-X Security Business Continuity Plan defines the actions to be taken if
security violations are identified.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 140f 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
5 Calling the Major Incident
During business hours the Major Incident Manager declares and manages the Major Incident (with
handovers to the POA OOH Duty Manager where applicable.)
Where the impact of the incident is not immediately obvious, and it is not clear if a Major Incident should
be called, escalation and discussion with the POA Operations Management Team should occur, and a
collective decision made. If a Major Incident is not called, the incident should be monitored until closure,
to ensure that the impact does not increase to that of a Major Incident.
In the event that multiple services are impacted, multiple Major Incident Managers may be appointed by
any Tower Lead and will remain in their roles until incident closure.
Out of hours the POA OOH Duty Manager is responsible for declaring a Major Incident.
Section 9 of this document specifies the roles and responsibilities during a major incident. The Major
Incident Manager, see section 9.2, is referred to the Manage Major Incident Procedure and must
endeavour throughout the life of a major incident to adhere to the principles of that procedure.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 15of 1
FUJ00080239
FUJ00080239
(oe) POA Operations Major Incident Procedure .
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
6 Process Flow
‘©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: ‘SVMISDM/PROI0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 16 of 1
FUJ00080239
FUJ00080239
oe POA Operations Major Incident Procedure 7
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
MAJOR INCIDENT-— Process, Information & Communication Overview a
HSD IMT I yigh-Level Major Incident Process I M@lorincident I Technical Recovery I Technical Teams
SMC ig i coe Manager ig Inc Third Parties
Seite ere
‘Sachacnrs
—
¥
z=
Tena
[65.1 mor iccee Manager maker et caractiih SOUS. #irpariestobethem and
aie ee dagn ntrten ee Tech ge
6,1 Fup ies
rita tte Te oe
(eazchar Tecra
Naan eM
[Seis verte Sammars
as ae EES
cnt Secs Bata, el I [ee srronan reamen
> coarne sta grea eee
“81min pat ‘cic Teas tt
-origton rear eotene
“Sinaia lan pores Gi ana oase
samen
3 spamePauso
2 ree
e — 87 Sampene eon etre ames
I I
Detaiis = Lisise with TRM airing:
ovat anh recon states
Tr cages vein shes ners
se — <a 681 cea tea eters re competed
See
N
Se “nau rectan
2 laren orem
6.101 Closure Tech eerie
§ scoxarnan trcoeny =
py rasianen et Sace
6s seven N
—
PS
Y I@ &
4 SZ UL
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: ‘SVMISDM/PRO/0007
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 17 of 1
FUJ00080239
FUJ00080239
oe POA Operations Major Incident Procedure ‘
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN
CONFIDENCE)
MAJOR INCIDENT-Process, Information & Communication Overview
\] J
tH
wy
a [oat crarTecnsnage II
Winget ee [2 Manage Technical
2 iat fena
3 II corse on
I
[a Completes Actors / ensures Tectrica sam actions,
nN Y
4
bd
fa
Sd
4 Perr rres
mrt coe
2 rt —
Ei eran
a — Stsustoror so
a
4
Prose I [#—— ‘Mar reget Rewer
I=
‘©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIALIN Ref: ‘SVMISDM/PROI0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 18 of 1
FUJ00080239
FUJ00080239
ir POA Operations Major Incident Procedure
FU ITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
6.1 Process Description
Major Incident I Incident identified, the definition of an incident is “Any event which is not part of the standard operation of a
Identified? service and which causes, or may cause, an interruption to, or a reduction in, the quality of that service.”
(SVM/SDM/PRO/0018). An incident may be reported from within POL domain, a supplier domain or other route
6.2 BC Incident? The Major Incident Manager will consult with the Business Continuity Plans I T+3 POA Duty Escalation as a
(see section 0 of this document) to identify if the potential MBC! or MBCI Manager (A) MBCI or Potential
triggers have been met, and inform the POA Business Continuity Manager MBCI is
if appropriate. undertaken if
required. (O)
63 Major Incident I An initial impact assessment of the incident is undertaken by members of I T+3 Major Incident I Major Incident
Triggers Met? I the POA Service Team taking into account impact on: 3 Manager (A) Manager assigned
All timescales (0)
Live Service, Financial Integrity, Business Image. quoted are ‘best
; 7 endeavours’
Refer to Section 3 of this procedure. arid Bie
If the incident is profiled as a Major Incident, including consideration of I dependent upon
influencing factors, e.g. time, geographical coverage, business impact, I circumstances
security, public perception, duration and relevant business initiatives T+
coinciding at POL then go to 6.3.1
If the incident does not meet the Major Incident criteria go to 6.4.
6.3.1 Initial The POL Service Desk will be informed by the IMT or Major Incident Major Incident I Potential Major
c ‘cati Manager of the incident, and this will also be escalated to POA Service Manager (A) Incident advised.
oo i” Management / POA Service Operations team managers, if this has not (O)
already been done. In the event of either a potential Major Incident or a
Major Incident in its own right, the POA Major Incident Manager will
escalate to the POL Live Service Manager and advise accordingly.
6.3.2 With agreement from the POA SDM for the affected service, or the Duty POA SDM or SMS sent when
‘©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIALIN Ref. 'SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 190f 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure ‘a
FU ITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
Manager out of hours, an SMS will be sent to POA and POL Management POA Duty agreed
alerting to the potential existence of a Major Incident. Manager(A) (0)
6.3.3 POA Service Operations Manager or POA Duty Manager to send out an POA Ops SMS sent calling
SMS calling a Tech Bridge with a brief synopsis of the MI and Tech Bridge Mgr/POA Duty I TB. (O)
phone details. Manager (A)
Go to 6.5.
6.4 BAU Incident If a Major Incident is not declared then the BAU Incident procedure is followed — the POL I POA Duty POLSD advised.
Procedure Service Desk will be informed that there is no Major Incident and an SMS sent to the POA I Manager (A) SMS sent to POA
Management Team. The POA SDM for the service should ensure that the Incident is re- Management(0)
impacted during its lifecycle to ensure that the impact has not increased. If, subsequently the 9
incident is declared a Major Incident, go to 6.5.
6.5 Major Incident T+5
Investigation &
Diagnosis
6.5.1 Relevant internal SDUs / Third Parties contacted to initiate investigation Major Incident I Initial contact with
and diagnosis. Manager (A) SDUs & = Third
. < . Parties. (O)
Attendees at the Tech Bridge may include POA Service Management,
SDUs, Third Parties, POA Operations Security
Technical teams mobilised, diagnostics requested, further clarification on
the MI and symptoms, etc.
6.6 Tech Bridge T+10
6.6.1 Tech Bridge Before commencing the first and subsequent Tech Bridge calls, the Major Major Incident I MI Laminates
Incident Manager is to pickup the Major Incident Laminates from outside Manager (A) available for TB.
the POA ‘Parcel Room’ or from the desk of the Lead SDM for Problem and (Input)
Major Incidents.
6.6.2 Tech Bridge Once confirmed as a Major Incident the Major Incident Manager must T+15 Major Incident I The information
ensure that the information required for the Major Incident Report is
captured. See section 10.1 for details of the template.
The Tech Bridge agenda which covers: Roll call, Summary / Overview of
Incident, Current Impact, Investigation / Recovery Action, Remedial
Manager (A)
required to
progress the MI
investigation,
provide updates
‘©Copyright Fujitsu Services Ltd 2013
FUJITSU RESTRICTED (COMMERCIAL IN Ref: 'SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 200f 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure ‘a
FU ITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
Actions, Actions to carry forward to Major Incident Review and maintain
During the Technical Bridge the MIM and TRM must consider if any of the eens ml
following are required and invoke applicable POA local procedures
The need for a Problem Record
Potential work around activities
A normal or emergency change.
Sufficient details to populate both the Major Incident Progress Template
and Report Template
Consider if a Problem Record is required or if the major incident could
potentially be resolved via a work around or planned change
6.6.3 & I Tech Bridge The Tech Bridge is chaired by the Major Incident Manager with assistance Technical
6.6.4 from the Technical Recovery Manager (TRM). Recovery
The TRM is to ensure that the Technical Bridge aims are met as follows: ‘emai
. Ne iestes and agree the recovery, investigation and resolution of the Major Incident
jajor Incident Manager (A)
* To provide a forum for up-to-date progress reports
* To aid communication and support the MIM to produce a short term
technical recovery plan and if appropriate longer term corrective
actions. These will be included in the Major Incident report.
6.6.5 Tech Bridge Where a Major Incident could be as a result of a Third Party, or require Third Parties Technical Support
their assistance in rectifying the issue, there input will be required in the (As applicable) I (I)
Tech Bridge
6.6.6 Tech Bridge If the outcome of the Tech Bridge is that the incident is determined Tech Bridge + Major Incident I Provide an SMS
Business As Usual (low) then an SMS communication will be sent stating
that the incident is not a Major Incident.
From this point forward SMS communication, including both timing and
delivery requests, becomes the responsibility of the Major Incident
Manager.
NB 30 minute updates should be the norm unless otherwise requested by
15
Manager (A)
update. (O)
‘©Copyright Fujitsu Services Ltd 2013
FUJITSU RESTRICTED (COMMERCIALIN Ref: ‘SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 21 0f 1
FUJITSU
POA Operations Major Incident Procedure
FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
FUJ00080239
FUJ00080239
POL
The Major Incident Manager will also distribute recovery actions (provided
by the TRM), during the conference call.
At the time agreed at the first Tech Bridge, subsequent Tech Bridges are
held as required. The same agenda is followed, and progress on actions /
recovery is provided.
Technical
Recovery
Manager (a)
Major Incident
Distribute planned
recovery actions.
Decision on need
If no clear recovery path is identified, the decision is then taken on whether Manager/ fonalSantica
to escalate for Service Bridge direction. (Invoking a Service Bridge) Technical Brid to}
Recovery ridge. (0)
Manager (A)
6.6.7 Tech Bridge If during the Tech Bridge a clear recovery path is identified, this should be
discussed and agreed alternatively further diagnostics and evidence will be Technical Define diagnostic
required. é rs
Recovery evidence required.
Schedule a follow-up Technical Bridge to co-inside with either the Manager (A) (O)
completion of the recovery activities, if these are expected to be completed
within one hour, or at appropriate ‘touch-points’ agreed with the Technical
Recovery Manager, for recoveries that cover an extended duration. Major Incident I Next Technical
" — Manager (A) Bridge time
For recovery go to 6.7 and for further investigation go to 6.8. agreed. (0)
6.7 Recovery T+x
6.7.1 Recovery The Technical Recovery Manager will liaise with the SDUs and /or third Technical Co-ordinating and
parties during the recovery. Recovery Managing the
Where appropriate technical conference calls may be arranged for Manager{2) io pipesees
technical discussions between SDUs and if applicable Third Parties.
The TRM is to advise the MIM if it is considered that the Recovery has pv iet9 ube MIM
'o call the MI
been successfully completed. The MIM is to call the MI Closure Tech
Bridge. Go to 6.10 Closure Tech
eget Sonaloatv: Bridge (0).
6.7.2 Recovery After the MI has been in-progress for one hour the MIM is to consult with I >T+ 60 Major Incident I Decision on
POA Service Management to ascertain if a Service Bridge is required. See Manager (A) holding Service
6.11 for Service Bridge details. Bridge (O)
‘©Copyright Fujitsu Services Ltd 2013
FUJITSU RESTRICTED (COMMERCIALIN Ref: ‘SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 220f 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure ‘a
FU ITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
6.8 Investigation T+x
6.8.1 Investigation The Technical Recovery Manager will liaise with the SDUs and /or third Technical Diagnostic
parties during the MI investigation. Recovery information, event
Where appropriate technical conference calls may be arranged for Manager(A) ne a
technical discussions between SDUs and if applicable Third Parties. SDUs and PP
The TRM is responsible for ensuring that the SDUs and Third Parties obtain a enue
the agreed evidence to enable subsequent Technical Bridges.
6.8.2 Investigation After the MI has been in-progress for one hour the MIM is to consult with I >T+ 60 Major Incident I Decision on
POA Service Management to ascertain if a Service Bridge is required. See Manager (A) holding Service
6.11 for Service Bridge details. Bridge (O)
6.9 Tech Bridge This procedure will be followed as per instructions, irrespective of how Major Incident I Individual Major
1+ (in the many MI's are running. Manager/ Incident Reports
event of . ‘ " " ‘ . Technical for individual Major
" . After the time agreed in section 6.6.7 the next Technical Bridge is to start. .
becca Mr All SDUs investigating the MI are to take the evidence they have obtained Recovery aan
n “ee ~ Manager (A)
following their investigations.
The MIM is to go to step 6.6 and ensure that they have copies of the Major
Incident Laminates to record the further details.
6.10 MI Closure T+X
Tech Bridge
6.10.1 MI Closure Once the incident is deemed to be resolved, a final Post Incident Review Major Incident I SMS sent
Tech Bridge (PIR) Technical Bridge is to be arranged to review the Major Incident. Manager (A) confirming that the
Major Incident has
been resolved and
the action taken to
resolve it. (O)
6.10.2 MI Closure The MIM is responsible for producing a Draft Major Incident Report and Major Incident I Produce the
Tech Bridge distributing this within one working day of resolution of the Major Incident. Manager (A) minutes of the
Therefore the MIM must ensure the results of this closure technical bridge Closure Technical
are documented. Bridge (O)
6.10.3 MI Closure The SDU and Third Parties are to provide updates on the actions taken to Major Incident I Actions
‘©Copyright Fujitsu Services Ltd 2013
FUJITSU RESTRICTED (COMMERCIALIN Ref: 'SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 230f 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure ‘a
FU ITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
Tech Bridge restore service and confirm that all actions have been completed and that Manager (A) Completed,
the affected end service has been restored. Service Restored
SDUs & TPs ()
(R)
6.10.4 MI Closure The MIM, in conjunction with the TRM, is to confirm that service has been Major Incident I MI Resolved
Tech Bridge restored and the MI resolved. For resolved Mls go to 6.10.5 Manager (A) Decision (O)
If there is any doubt about the status of the MI it shall still be considered
Open and a further Tech Bridge is required. Go to 6.6
6.10.5 MI Closure The MIM is to send an SMS communication confirming resolution of the Major Incident I SMS sent
Tech Bridge incident. Manager (A) providing agreed
The MIM is to produce the draft report which is to be sent to POL within one a Heralles
working day and a formal version 1.0 of the report within seven days.
Draft MI Report
Within one working
day (O)
6.11 Service Bridge I The nature of the incident determines which POA Service Team members I Timescale Major Incident I Relevant decisions
and POL Managers are involved in the Service Bridge but it would include I dependant upon I Manager (A) and information
all or some of the following: impact and " from the Service
nature of PORServics: Bridge(s) is to be
«POL (personnel as instructed by POL Live Systems Service Mgr) incident. Manager incliided inthe
* POA Tower Lead BAS (Chair Person) Major Incident
Report. (O)
* POA Other Tower Leads
« POALead SDM, Problem and Major Incident
« POA Business Continuity Manager
« POA Security Manager
* POA SDM owning the affected service
* POA Technical Recovery Manager
«Third Party Executives (if appropriate)
« Appointed working group representatives as appropriate
‘©Copyright Fujitsu Services Ltd 2013
FUJITSU RESTRICTED (COMMERCIALIN Ref: 'SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 240f 1
FUJITSU
POA Operations Major Incident Procedure
FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
FUJ00080239
FUJ00080239
HSD IMT Representative
The purpose of the Service Bridge is to:
Provide appropriate direction on incident resolution
Improve communications across Third Party business boundaries and
enable senior management in the respective organisations to address
any factors impeding a more timely resolution.
Provide added impetus to restoration of service as quickly as possible
Define communication intervals to key stakeholders
Provide focused incident management in line with the impact and
severity of the incident
6.12 Post Incident
Review &
formal Incident
Closure
Hold a Post Incident Review of the Major Incident. Note there is no
predefined time in which the PIR is held as it is dependant upon follow-up
actions including Problem Records being addressed. Refer to section 8.0
for further details and give consideration to the following:
Lessons learnt
Incident definition
What went well
Timeline
Changes required to the infrastructure
A review of the Major Incident communications
Root Cause Analysis (if known at this point)
Business impact
Action plan, including any changes requiring MSCs
Service Improvement Plan update
Review any service risk(s) and update the Risk Register as appropriate
POA Lead
SDM, Service
Operations (A)
Finalise the Major
Incident Report
(using the output of
the PIR). (O)
‘©Copyright Fujitsu Services Ltd 2013
FUJITSU RESTRICTED (COMMERCIALIN Ref. ‘SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 250f1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FU ITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
6.13 Formal All remedial actions completed both short and long term. Including root POA Lead All PIR actions
Closure cause analysis, and also reviewing/closure with POL all associated SDM, Service I completed. (O)
Problem Records, including POL signing off the Major Incident.
Note: Within 'Key Timescales’ the reference made to T, = Time of incident occurring. hence T+3 = time incident occurred plus 3 minutes.
‘©Copyright Fujitsu Services Ltd 2013
FUJITSU RESTRICTED (COMMERCIALIN Ref. ‘SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 26 of 1
Operations (A)
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
7 Communication
7.1 Technical Bridge
This is a Fujitsu technical conference for Technical experts and SDU’s to discuss and analyse the
incident and to formulate an action plan to restore the service to POL without delay. It should enable the
Technical Recovery Manager to baseline the anticipated response, covering resolution, time and
resources required. This will also include the appropriate owning SDU of the service affected by the
Major Incident.
The Technical Bridge will be set up as required by the Major Incident Manager.
Invitations to the Technical Bridge will be via SMS, email or voice. The SMS will be sent to the
distribution list titled ‘SMS Technical Bridge’. The SMS text will be sent to all technical experts on the
POA and will include outline details of the Major Incident. Also dial in details and the start time will be
provided as part of the meeting invitation.
The Technical Bridge will be started at T + 15, and reconvened at regular intervals during the Major
Incident; the exact scheduling will be discussed and agreed at each preceding Major Incident Call.
Each Technical Bridge follows a set agenda which will be distributed with the meeting invitation where
possible. The conference call is chaired by the Major Incident Manager with the recovery managed by
the Technical Recovery Manager.
A request for a Technical Recovery Manager (TRM) will be made to the appropriate Tower Lead, who
will appoint one of his team to be the TRM.
Following each Technical Bridge, it is the responsibility of the TRM to publish any actions as follows
-Recovery / restoration actions (which should normally include associated MSC numbers),
-Service Improvement Plan recommendations
-Risk Register recommendations
-Recommendations for any ald to KELS / Alerting / Configuration changes
C IRRELEVANT “under Service Support
> Major Incident Reports.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 27 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
7.2 Service Bridge
This is a service focussed call for Service Management (including the Technical Recovery Manager if
appropriate) and POL to discuss the service impact of the Major Incident and to receive updates on the
progress towards resolution.
The purpose of the Service Bridge is to provide a focussed area from which strategic decisions can be
made regarding a Major Incident.
Attendance is made up of the following or their designated representative:
e POL (Personnel as instructed by POL Live Systems Service Manager)
« POA Tower Lead (Chair Person)
e POA other Tower Leads
e POA Lead SDM, Problem and Major Incident
e POA Business Continuity Manager
e POA Security Manager
« POA SDM owning the affected service
e POA Technical Recovery Manager
e Third Party Executives (if appropriate)
e Appointed working group representatives as appropriate
e HSD IMT Representative
Service Bridge responsibilities include:
e Agreement of a containment plan
e Documentation of all agreed actions and timescales with owners
e Consistent management of the Major Incident across all the locations involved
e Management of potential Major Business Continuity Incidents (MBCI’s) within POL and the
POA
e Co-ordinate meeting times and locations
In the event of a Major Incident requiring a Service Bridge, it is envisaged that this will be in place at
T+60 (or earlier if required by POL). Participants required in the Service Bridge will be contacted via
SMS as appropriate.
A POA Tower Lead will send out a text via IMT in order to organise a Service Bridge.
Invitations to the Service Bridge will be via SMS, email or voice. The SMS will be sent to the distribution
list titled ‘SMS HNGX External’
The SMS text should state such details as;
o An outline of the ongoing incident,
o Dial in details
o Start time.
e.g. ‘Your attendance is required at a Service Bridge to discuss the current Major Incident in relation to
Online Services. Please call articipant code: ###HHHH at 11.00 hrs.’
The chairperson’s code is held by the POA Tower Leads and the Problem and Major Incident Managers.
The chairperson, normally the POA Tower Lead will initiate the call.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 28 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
The TRM will attend meetings as required and provide appropriate root cause analysis and corrective
action detail.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 290f 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
7.3 Communication Process Flow
e On suspicion or confirmation of a Major Incident, the MIM will escalate to the Lead SDM for the
area, Problem and Major Incident Management SDM, and to the POA Tower Leads.
* The MIM will inform the POL Service Desk, via the HSD IMT, of the start of the service incident
alerting of potential issues — including date, time, nature of problem, severity and impact if
known and then directly inform the POL Live Service Manager
e All updates to the POL Service Desk are via the HSD IMT, within agreed timescales controlled
by the MICM
e The MICM will issue an SMS text to the POA via the HSD IMT, alerting of potential issues —
including date, time, nature of problems, severity, impact and name
« A POA Tower lead will inform the following within 10 minutes of start of the service incident
o POA Delivery Executive
o POL Senior Service Delivery Managers
And will coordinate and ensure consistency of response to POL and POA Senior Management
via The Service Bridge
e Periodic (interval to be determined depending on the nature of the issue but not more than 30
minutes for Major Incidents) SMS updates to be sent to the original SMS Dist list
e On final service restoration, an SMS text message must be sent to the original SMS Dist list
« The POA Tower Lead, will confirm understanding of Major Incident closure with POL
management and POA senior management, and agree next steps
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 30 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
Pe)
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
Diagram
Flow
ion
icati
7.4 Major Incident Commun
i JEusaU] SINS
yamL/SaW I «)
= <=>) =
am asiod LW
jre uu
v7 “>, 4e>
Ww) yepdn o t
a 1 i Wow
1
JaseueyI LWI
Anugnuos I T+ q IWS
pure ao1vias H T+ 1 IWS
aa pue gS10d eBEUEW I peaq Vv pea] Jamo
oy ayepdn pew py PPS I smo
as1od y 9An nsiims ad quawaseueyy
ayepdnanio, “¢ II 10d d juappuy soley)
aspug I @ n
auesayepdn 7 esp DION espug
He? SUL i adIAIO -
daysewajepdy ‘T I = s JE2!UYIeL
i i
_ ere I gy
JUoWoseUueL\ JUoWoseUeL\
10d nsyifn4
SVM/SDM/PRO/0001
8.0
Ref:
FUJITSU RESTRICTED (COMMERCIAL IN
©Copyright Fujitsu Services Ltd 2013
18-October-2013
31 of 1
Version:
Date:
Page No:
CONFIDENCE)
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
7.5 Major Incident Progress Template
POL agreed template to base MI updates on.
Questions POL need to understand
Which Means? (Expand impact)
What has happened?
Where in the system has a fault occurred?
/s this in the Fujitsu domain or third party (ie. TTB)?
hen did it occur?
When did we become aware?
When were POL first notified?
What are we currently doing to resolve?
Tech Bridge / Who's investigating?
Who have we escalated to?
\Are third parties involved?
Have we introduced the VR? MBS?
When is it expected to be fixed?
Do we require third party assistance to resolve?
hy did it occur?
Has it been linked to a change/MSC?
‘©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIALIN Ref: ‘SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 320f 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
7.6 Escalation Communication Protocol
The primary principle:
Up”
and
“Across
Example:
The Major Incident Manager would escalate up to POA Lead SDM, Problem and Major Incident
Management, and across to the Post Office Service Desk.
Major Business Continuity Incidents (MBCI)
For HNG-X the MBCI triggers are listed in:
e HNG-X Support Services Business Continuity Plan (SVM/SDM/PLA/0001)
« HNG-X Services Business Continuity Plan (SVM/SDM/PLA/0002)
e HNG-X Security Business Continuity Plan (SVM/SDM/PLA/0031)
e HNG-X Engineering Service Business Continuity Plan (SVM/SDM/PLA/0030).
These documents should be referred to as appropriate in the event of Major Incident to determine if
Business Continuity needs to be invoked.
7.7 Core Major Incident Management Team
The MICM has the task to communicate to Fujitsu Core Major Incident Management team (MIMT) within
Resolution Management team (RMT) when an incident meets the criteria of a Major Incident.
* Monday-Friday 08:00 - 18:00 (GMT) -{__
¢ Out of Hours
7.8 Corporate Alert
Escalation to Corporate Alerts (in line with the Manage Complaints and Alerts Corporate Business
Improvement) is to be approved by POA Business Unit.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 33 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
8 Formal Incident Closure & Post Incident Review
The Post Incident Review is chaired by the Major Incident Manager and follows a set agenda which is
distributed with the Post Incident Review meeting invitation, along with the draft copy of the Major
Incident Report (if available).
The purpose of a Post Incident Review is:
e To understand the incident that prevented a Service or Services from being delivered.
e Toconfirm the impact to the business during and after the Incident and agree the number of
branches impacted and duration of Major Incident.
e To confirm the end-to-end recovery process and timeline, and identify that all documented
processes were followed.
e To analyse the management of the incident and the effectiveness of the governance process.
e To identify corrective actions, including agreed Third Party actions, to:
o prevent recurrence of the incident
o minimise future business impact
o improve the procedure for the management of incidents
Output: To confirm details provided in the draft MIR provided to POL, update with corrective actions and
redistribute. To also include any of the following as appropriate
- any activities for a Service Improvement Plan
- any Changes and associated MSC numbers
- any follow up that requires to be progressed via Problem Management
- any improvements to KELS, alerting and /or event management
The agreed impact of the Major Incident must be provided for inclusion in the Counter Availability SLT
Figures.
If this review highlights areas where improvements can be made, an agreed Service Improvement Plan
will be produced with appropriate actions, owners and timescales. It will also identify any ongoing risks to
the service, together with any changes. Service Management will track all actions to resolution. Third
party actions will be reviewed at Service Review meetings.
It is important that the number of branches impacted and the duration of the Major Incident is agreed at
the Major Incident Review. This information is required to calculate the impact on Branch and Counter
Availability and any associated Liquidated Damages (LD) liabilities
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 34 0f 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
8.1 Calculating potential LD liability for Major Incidents
Major Incidents which qualify as Failure Events are detailed in the Branch Network Service Description
(SVM/SDM/SD0011). A Failure Event is defined in this document as an event or series of connected
events which causes one or more Counter Positions to be deemed to be Unavailable due to a Network
Wide Failure or a Local Failure. Ongoing failures will be deemed to be part of such a Failure Event until
the Failure Event is closed in accordance with the Incident closure and Major Incident Review process as
detailed in section 7.0.
For a Failure Event the Incident Closure & Major Incident Review Process will require Post Office and
Fujitsu to agree the number of branches and counter positions affected and the duration of the outage
(rounded to the nearest 30 minutes as detailed in the Network Wide Rounding Table).
Network Wide Rounding Table
Duration of Incident Deemed duration for the
purposes of LD calculations
30 minutes or less 30 minutes
More than 30 minutes 1 hour
but less than 1 hour
1 hour or more but less 1 hour
than 1 hour 30 minutes
1 hour 30 minutes or 2 hours
more but less than 2
hours
N hours or more but N hours
less than N hours 30
minutes
N hours 30 minutes or (N+1) hours
more but less than
(N+1) hours
‘©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIALIN Ref: ‘SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 35 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
9 Fujitsu Roles and Responsibilities during a Major
Incident
This section defines the roles and responsibilities individuals and teams have as part of the Major
Incident Escalation Procedure. The following roles will be laminated and available for the MIM to assign
during a Major Incident.
9.1 Role of the HSD IMT
The role of the Horizon Service Desk Incident Management Team (HSD IMT) in the event of a Major
Incident is as follows:
e Receive and log calls from Post Masters, and communicate the progress of investigations to any
Post Masters who call into the desk.
e Escalation of any Call Threshold Breaches to the POA Duty Manager
e Applying and updating IVR, confirming times and details to Major Incident Manager (MIM)
e Send/update service impact details (to include calls offered, abandoned, queuing, trend analysis)
to the Major Incident Manager. These details will be fed into the Technical Bridge in real time as
requested, whilst details for the overall Major Incident will be provided to the Major Incident
Manager post the incident.
e Be responsible for sending communications as provided by the Major Incident Communications
Manager for the following:-
To call and attend all Technical Bridges
- SMS to SMS Technical Bridge
To call a Major Incident and provide updates for Major Incident progress, to the following
- E Mail POL SD
- Voice POL SD
- SMS to SMS Internal — POA Internal
- SMS to SMS TOWER - Senior Management
The above communications will be as per instructed by the Major Incident
Communications Manager
ALL should be identical, in order to avoid any misunderstandings.
This also of course includes notification to POSD and POA Management of the
restoration of service.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 36 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
9.2 Role of the Major Incident Manager
Major Incident Manager (MIM). This will by default be either the Day Time Duty Manager or OOH Duty
Manager (hours shown in 10.3). However a separate member of the Service Management team may be
appointed as the MIM depending on the situation. The primary role of the MIM in a Major Incident is to
facilitate the management of the Incident through investigation and diagnosis to resolution, with the aim
of making the process as efficient and effective as possible. Upon determining that a Major Incident has
been called, a request for a Technical Recovery Manager (TRM) will be made to the appropriate POA
Tower lead who will appoint one of his team to be the TRM. The Major Incident Manager acts as the
central point for communication and non-technical information flow, allowing the TRM to focus on the
technical situation and the resolution of the Incident. The Major Incident Manager is also responsible for
creating and maintaining all the associated documentation. For the process to be effective, all updates
and information regarding the incident must be fed to the MIM to update the timelines and report.
The Major Incident Manager:
e Calls and chairs the Technical Bridge
e Has responsibility for creating the Major Incident Report, using the template defined in section
10.1 and ensuring that the applicable information is captured.
e Records the Technical Bridge attendees names so they can be documented in the Major Incident
Report.
e Identifies Business and Service impact though discussions with the users, the POL Service Desk
and the HSD IMT — providing this input into the Tech Bridge.
e Distributes the Technical Bridge actions provided by the TRM (if appropriate).
e In conjunction with the TRM considers if escalation into the Corporate Alert process is desirable
and recommends this when required, see section 7.8 above.
«Assists with communication internally within the POA
«Track time lines
e Along with the POA Problem Manager, ensures that the TRM provides regular updates on any
longer term corrective actions.
« Following the resolution of the Incident, schedules and chairs the PIR
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 37 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
9.3 Role of the Technical Recovery Manager
The primary functions of the Technical Recovery Manager are to co-ordinate and manage the restoration
of service, manage the technical teams, and act as the communication point for the technical teams and
third parties. The function will also include managing all longer term technical corrective actions, e.g.
recommendations for improvements to KELs, eventing and configuration.
The Technical Recovery Manager:
Manages the technical recovery of the Incident — liaising with SDUs and third parties.
Provides updates on the recovery, when technicians / representatives of technical teams are
unable to attend the Technical Bridge.
Is the only person to liaise directly with the technical teams, including technical third parties.
Provides summarised actions from Technical Bridge to the Major Incident Manager, including:
°
°
°
°
Current status including impact and risk
Advising on potential workarounds.
Planned recovery activities including timelines
Root Cause Analysis*, corrective actions, and their corresponding action owners and
timelines (where known)
The TRM will be responsible for attending any meetings and providing appropriate root cause analysis
and corrective action detail. This will also include managing any longer term technical corrective actions
that are documented in the Major Incident Report and will include where appropriate
- Any activities for a Service Improvement Plan
- Any Changes / MSC numbers
- Any Risks
- Any Configuration changes
- Any improvements to KELS, alerting and /or events
- Any associated Peak or TfS calls
For Root Cause Analysis refer to section 7.0 and Fujitsu Services Business Management
Systems Process: Conduct Root Cause Analysis.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 38 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
9.4 Role of the Problem Manager
The Problem Manager ensures that corrective actions / investigations are tracked and completed
following the major incident.
Any corrective actions arising from the Major Incident Review will be added to the Major Incident Report
and also a Problem Record if appropriate, and tracked with POL through to completion. The updates will
be distributed to POL as required, and in the case of a Security Major Incident associated with PCI
failures, the POL Security team will also receive a copy of the report.
9.5 Role of the Communications Manager
The Major Incident Communications Manager (MICM) will attend the Technical Bridge and produce each
update, where possible trying to ensure that updates are provided on time and following the agreed
Major Incident Progress Template. This will reduce any miscommunication and ensure all parties follow
process.
e Above all ensuring only one update is circulated
e Will ensure that updates are provided within the agreed times
e Updates will adhere to the agreed Major Incident Progress Template
e Update the master Tfs call with all updates
e Ensure update is provided to IMT to circulate through to POL SD
e Supply update to Service Bridge
e Manages all communication internally within the POA
« Communicate to Fujitsu Core Major Incident Management team
« Manages via IMT, the communication with the POL Service Desk on the progression of the
incident
9.6 Role of the SDUs: (Technical Teams /SMC/IMT & Third
Parties)
The role is to investigate the Incident, monitor the progress and feed into the Technical Bridge. Also in
the event of no pre-determined recovery options, suggest and evaluate potential recovery options to
resolve the Incident.
The technical teams should not be contacted by any party other than the Technical Recovery Manager.
The Technical Teams / SMC/ IMT & Third Parties should send an attendee to the Tech Bridge and the
associated Major Incident Review meeting. Where attendance on the Tech Bridge is not possible, a
suitable alternative resource should attend. If neither is possible then a full update MUST be provided to
the TRM to ensure that the Bridge can be updated.
9.7 Role of the Service Delivery Manager owning the
affected service
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 39 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
e Attends Technical Bridge
e Attends PIR
e Responsible for any further action proposed by the Problem Manager that falls outside the
Major Incident closure criteria.
e Responsible for any Service Improvement Plan actions
9.8 Role of the Tower Lead
e Appoint a Technical Recovery Manager
* POA Tower lead will inform within 10 minutes of the start of the service incident the
following-
o POA Delivery Executive
o POL Senior Service Delivery Managers
e Will coordinate and ensure consistency of response to POL and POA Senior Management
via the Service Bridge
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 40 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
10 Appendices
10.1 List of Templates
Alu temolates.are_stored_on.the_central share...
IRRELEVANT
under Service Support
> Major Incident Management Templates
NAME OF I DESCRIPTION / NOTES DISTRIBUTION
TEMPLATE
Major Incident I The Major Incident Report contains all the information about I POL
Report Template I a Major Incident. This document is distributed to POL.
POA Service Management & Service
Operations
POA All Tower Leads
Fujitsu Support Teams
10.2 Daytime Duty Manager Contact Details
e Steve Bansal —
e Steve Gardiner
e = Tony Wicks
10.3 Out of Hours Duty Manager Contact Details
« OOH Duty Manager Pager i
* 17.30 - 09.00 each day Monday PM to Friday AM
_) between the hours:
e 17.00 - 09.00 throughout Friday PM and all weekend to Monday AM
Outside these times, please contact the POA Duty Manager
Note: Names and phone numbers are correct at the time of document issue and subject to change. In
the event of difficulties refer to the Fujitsu Services Global Address List for the latest details.
©Copyright Fujitsu Services Ltd 2013 FUJITSU RESTRICTED (COMMERCIAL IN Ref: SVM/SDM/PRO/0001
CONFIDENCE) Version: 8.0
Date: 18-October-2013
PageNo: 41 of 1
FUJ00080239
FUJ00080239
POA Operations Major Incident Procedure
FUJITSU FUJITSU RESTRICTED (COMMERCIAL IN CONFIDENCE)
10.4 POA Service Delivery Contact Details
The Post Office Account service delivery contact details can be found on the Post Office Account Share
Point under Operations > BCP in a folder named Post Office Account Service Delivery Contact Details
10.5 Special Situations
10.5.1 Personnel Absence
e Inthe absence of a POA Tower Lead, an alternative Lead will be appointed.
e — Role cards have been produced and will be available to expedite the process
10.5.2 OOH
« The OOH Duty Manager will act as the Major Incident Manager
10.5.3 Duty Manager Change Over
«The Duty Manager at the beginning of the incident will be by default responsible for all MIM
communications responsibilities unless a different arrangement is made between the