FUJ00096264 - Joint Progress Meeting HNGX Update

Evidence on official site

FUJ00096264
FUJ00096264

Copyright 2009 Fujitsu Services Limited
ie)

Joint Progress Meeting
HNGX Update

24'" June 10

FUJITSU

FUJ00096264
FUJ00096264

Agreed Baselines FUJITSU
 =Schedule
® V130.A00 draft

* (The plan that will be reported against from now onwards)
% V80.A00 check-pointed with the client

Requirements
® version 1.42

@ Testing Baselines
= VOL - MR 1.22.01 + BAL/OSR - 01.23.01
® LST - Data Centre 1.22 + Counters 1.23.01

Copyright 2009 Fujitsu Services Limited
1
FUJ00096264
FUJ00096264

HNGX Summary I

Red

No issues _

Major issue impacting timescales, cost or risk a
Major issue but with actions agreed to resolveFUJITSU

Current Descripti G2G Target
Resourcing Amber
tabisation ove service contruing. HVP [Complete HVP migrations 2506, continue
[Schedule Amber I Amber I restarted 09/06/10, will continue until 25/06. Imonitoning. Review results at RAB4/AGA. [90 une 10
Requirements
Architecture
Daly pionisaton of new issues om
Apps Development liveftest + Amber Alert issues. High volume I Daily tracking of progress against plan. }02 July 10
vcr tnes
Oye 9 stated 18/08, Key tess scheduled
}to complete 27/06. High volume of fixes in LST testing to be prioritised. 27 June 10
re
HVP restarted. Schedule for completion of
Migration amber I Amber IHVPagreod. Branch Router instalatonsn [Review esuts OFHVP, to confirm ralout Ig un 49
fat management
Ral a Votan WAN preggo
(ranoetranches completed) OAT tating IContim LST ext date fr VSAT solution +
Infrastructure Amber Jin 'ST. Revised plan issued. Van solution  Icompietion date for Vodafone rollout. 25 Jun 10
er vnWaN proposed
Service Transition Amber INo showstoppers on Service Readiness.

[Contract

loRs

Copyright 2009 Fujitsu Services Limited

2

FUJ00096264

FUJ00096264
Qo
Exec Summary FUJITSU
™ 1,183 branches (10.3%) migrated to HNGX, 5,380 counters migrated (17.8%) as of
23° June

High Volume Pilot
® 44 out of 45 Crown branches successfully migrated 22"° June (97%)

® 245 out of 254 Federation branches successfully migrated 23° June (96%, note
— 3 branches to confirm progress beyond PONR)

Red Alert Downgraded 21/06
@ Live service issues:-

# No Major issues impacting large numbers of branches over last 5 weeks during
core branch trading hours

®™ Oracle Resource Manager running Stats job at 3 p.m. 18" June caused Node 1
on Branch database to run slowly. Config change to Stats job implemented
18/06. Not classed as a major incident.

® Service stability monitoring continues.
» Shared Pool memory usage significantly improved.
® 11,368 Branch Router installations completed (99.2% of estate).

@ Milestones — 33 completed on schedule, 11 completed ahead of schedule, 66
completed behind schedule

Copyright 2009 Fujitsu Services Limited
3
FUJ00096264
FUJ00096264

2
Branch Database Issue FUJITSU
@ BRDB/Streams
= Plan B for recovering backlog for BRSS completed 20/06
i Oracle Branch Database Incident

= Changes implemented 30/05:
* Oracle patch 9734573
+ EMDB & Branch Database Queries using bind variables (RA1005.7)
+ BAL improve Heart Beat code (RA1005.9)
= Changes implemented 06/06:-
* Splitting of WKG_ working tables (RA1005.6a)
+ Re-build of AUD$ TABLE (RA1005.6b)
+ Resource Manager enabled (RA2605.2) — switched off 07/06, re-enablement tbc
® Changes implemented 09/06:
+ OSR Transaction Recovery Action (RA2605.3)
® Changes implemented 13/06:
+ Oracle Patch Set 4 (RA2605.1)
® Change implemented 20/06:
* Oracle LCK Patch

Copyright 2009 Fujitsu Services Limited
4
FUJ00096264
FUJ00096264

Milestones - 1

FUSITSU

solution in Model Office

office

Milestone Team IPtanned_I Forecast I Success Criteria Comment RAG.
High Volume Pilot [Blia I 25/06/40) 26/06/10 I Significant number of [21/96 - Ready far tonights migrations
technical migration branches in HVP trading [22/06 - 4$ of 45 successful migrations from the 21/06 schedule.
‘steps Completes Jusing HNGX solution 254 branches planned to start migration today.
123/06 - 245 of 254 successful migrations from 22/08 schedule.
17 branches planned to start migration today.

RGa Pre ralfoun) fiig I TiO340) THOS [Approval te proceed to (dar0G Date Confined
Branch Migration Rollout
commence rallaut
RABE Prerollou) [Mig I 11/03/10] 2805/90 [Approval te proceed wm [08/06 - Date confiemed
Branch Migration Rollout
commence rallaut
High Volume Pilot Iilig I 0W210I TONEAT [Satisfactory progress through
Compietes [AGS and review of HVP data

against

11 System Monitoring,

2.Migration Rag report,

3.Restart criteria
Counter rollout iiiig_I 124710) GOTO [First branches migrated THE - Pending successtal completion of HVP migrations by
commences 15108 and review of HVP results by AGS.
Branch Router rollout Iidig I 72/07/40] THU7AG [Completion of final branch [33/05 - 14365 branches have BR installed. 58.1% of estate.
complete router installation (excluding 2$ standard branches remaining {additionally

50 VSAT branches), The main 12 luggable co PHU and 50 VSAT branches}

body wilt complate 05/07 and

Ithe Phu 12/07
Branch Router VSAT [Hig I 247/10] 2170740] Solution available in Modal

Copyright 2009 Fujitsu Services Limited

5
FUJ00096264
FUJ00096264

Hilestone ‘Team IPianned I Forecast [Success Criteria Comment RAG
VOL Cycle 3 Fst 20570, TBC [All critical (agreed) texts for [17:06 . Start of Vol cycle 2 delayed fo 107 due to challenges
rollout completed, lencountered with environmental set up
18/08 - Vot cycle 3 testing started today.
22106 - Key tests for AGH at risk,
VSAT solution in Model [ig JWOTAD]!— 2HATMADI Model office migrated to
Office HNGX
‘Additional Fest fare [20070 TBC [Readiness of additional test _I17°06- Mid July is unachievable, Architecture team will feed
capability Tec capability back at the end of June. A new date will he confirmed at this
point.
Bilestone closed since fost report
Red let downgrade [Mgt HS] AGE [Downgraded to Ambar 17/06 - Dependaat o1 successil application ofLCK patch
2040
21:06 - LCK patch applied successflly, meeting at 1700hrs to
decide whether the Red Alert can be downgraded
22/06 - Decision taken to downgrade te Amber at 1700
meeting

Copyright 2009 Fujitsu Services Limited
6
FUJ00096264
FUJ00096264

Exec Summary — Development FUJITSU
@ Challenges:
= PEAK clearance:
« Focus on Red Alert issues now complete
* Continued focus on any other high priority issues raised

¢ Counter and OSR Releases now progressing fortnightly
» Release plans continuously flexed to support plan changes

@ Progress:
= No Release 1 software releases this period.
= Hot fixes processed as required
+ Including Counter 1.23.01.01

Copyright 2009 Fujitsu Services Limited

7
FUJ00096264
FUJ00096264

Infrastructure

li Challenges:
# Resourcing red alert as necessary
# Focussed on supporting Branch migration
# Addressing priority peaks

# Supporting Live services
# Implementing upgrades & fixes as agreed

f@ Progress:

# PAN Manager upgrades complete

FUSITSU

Copyright 2009 Fujitsu Services Limited

8
FUJ00096264
FUJ00096264

Challenges:

Deployment FUSITSU

Completing Red Alert and restart criteria.

RAG under continuous review & progressing well. Over the past week we have closed 5 Priority Aissues and 3 new
items have been added

Progress:
Branch Router

11,368 successful Router installs — 99.2% of the total estate.
Tail management continuing throughout June.

Vodafone WWAN Router Configuration. Rollout has been continuing on nightly basis with 1000 Branches being
targeted per night, (now including HNG-X branches). Currently 10,134 branches have received the deployment and
there are approx 400 remaining which will be targeted over the coming weekend

PHUs: 436 installed. Remaining branches being managed as part of tail management.

VSAT: LST completion date is currently 14/07/2010. This will be followed by MO and Pilot in July and Rollout to.
commence 02 Aug and due to complete by 15 Aug 2010.

WWAN in Vans: USB Key Solution proposed to enable faster switching between mobile network providers, meeting
on 23 June to discuss further.

Branch Migrations

30 CTO’s now open.
Counter release 25.8/9 —Rollout in progress and is at 99% complete with CTOs remaining.
Counter release 25.10/11 — Rollout in progress and at 99% with 1 counter remaining excluding CTOs.

Counter X0122 (including X0121) rollout in progress 97% and targeting sites once migrated.
Counter X0123 commenced Pilot on the 15/06/2010.

559 branches migrated successfully in HVP from 3 June to 22" June with an average of 93% success rate and
increasing. (wie 21* June is currently 96%)

Acceptance, Security and Decommissioning

AG4 date scheduled for 29" June. No showstoppers.

Copyright 2009 Fujitsu Services Limited

9
FUJ00096264
FUJ00096264

FUSITSU

+ Problems with the application of formal BAL 01.23.01 baselines resulted in one day's delay to
start of Cycle 3

Test issues with reports cut-off scripts took longer than anticipated to complete

Additional script variation added to BAL/BRDB tests introduced test data issues which required
investigation

LST:

+ Urgent fix for NCO Probes/heartbeat on counter failed test — fixes delivered and in test. Re

forecast 2 July

»  CNIM testing has identified changes required in counter rules — re forecast required

Identification of baseline content in readiness for Release 2 proving difficult

a Progress:

VOL:
Completed support for Red Alert VOL Test Plan

+ Completed preparation tasks for Cycle 3

Progressing AGé4 tests as per plan — results analysis urgently required

LST:

9 release notes successfully tested, including Red Alert fixes, REHL Upgrade to all platforms
with exception of DXC, Anti Virus upgrade , Hot Fixes: Audit Server , TIP repair tool, STMRA

> Red Alert complete as far as LST testing
Continue 1.23.01 testing —intercepted rate board fix
Progressing Release Notes in preparation for Release 2 change freeze

Copyright 2009 Fujitsu Services Limited

10
FUJ00096264

FUJ00096264

Risks FUJITSU
(GD HO)
HING-xROO81 — HNG-x R1 Richardson Critical Cycle 3 tests may not complete prior to AG4 20 4 02

Copyright 2009 Fujitsu Services Limited

11
FUJ00096264
FUJ00096264

Biotiy
Ara Rosana Veh iA) Heh (8)
SyelRune svei of @ I 4

RV Ace & Mig RY a (0) o
vei oo 1

eo I wm I 2s

oo 4a

w2 I I 82 (8) I 37 I toy 2 {0} (+8)
eo] @ [oe @i [afm] 3 oh
ve) Hi 5 @ [Ts Tet 3 0)
iD 2 o @f>ita@ti fa
iV Lie o 2 @ [2 Ta] 3 [o)
¥OL 12 71 {+4} 9 {+3} a (11)
POLES 15 3 1

Defect targeting

Peak targeted
Back with QC fest)

Test

Develusment

Grand Total

Subset of total Wah POL

Not targeted or released
Total

Copyright 2009 Fujitsu Services Limited
12
FUJ00096264
FUJ00096264

Defect Trend FUSITSU

aso verall defect trend
508 ie detec very aa Vn
hai test
2000

1603/2007
4805/2007
sso7r2007 {i
1§09/2007
45/1 1/2007
46M 2008
46032008
4570512008
4507/2008
1509/2008
15/1 1/2008
4501/2009
1602/2009
1505/2009
4507/2009
15/1 1/2009
4510112010
1803/2010
180512010

Copyright 2009 Fujitsu Services Limited
13
FUJ00096264
FUJ00096264

(oe)
FUJITSU

Copyright 2009 Fujitsu Services Limited
14
14