Reference: RS/REQ/009
Issue: 2.0 APPROVED
Date: 20th April 1999
Abstract: This document examines the management of keys within Pathway; it analyses
how they were managed in Release Ic, and defines the requirements for key
management in NR2+.
Approver: Barry Procter

Signature & Date:

Controlled by: Tom Parker

Electronic repository: Pathway Library

Location: HOM99

This is a controlled document. This issue is definitive if itis the latest, which has gained the approver’s
signature.

Check with the document controller (below) that this is the latest issue. An out-of-date issue or a non-
approved issue is not definitive.

Phone.

Distribution:

BRAOI
BRAOI
IRE11
FELO1
FELOI
FELOI
BRAOI
BRAOL
FELO1
FELOI
BRAOI

Rob Arthan
Roy Birkinshaw
Vince Cochrane
Alan D’ Alvarez
John Dicks
Stephen Doyle
Belinda Fairthorne
Peter Harrison
Mark Jarosz
Peter Jeram
David Johns

RESTRICTED-COMMERCIAL

FELOI
BRAOI
FELOI
BRAOI
FELOI
BRAOI
FELOI

FELOI

David Jones
Tom Parker
Barry Procter
Alex Robinson
Glenn Stephens
Chris Sundt
Peter Wiles

Pathway Library

Page I of 68
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

DOCUMENT CONTROL

Changes in Version 0.6

Comments received on the previous version have been responded to.

Terminology definitions have been expanded to clarify the meaning of entries in individual key tables.
The section on Riposte keys has been expanded.

Requirements on key algorithms, sizes and expiry have been added.

Requirements arising from the Pathway Access Control Policy [ACCPOL] have been added.

The “Social System” section has been greatly extended and brought up to date.

Changes in Version 0.7
Comments received on the previous version have been responded to.

Although internal keys CK and KI are described for completeness, no specific requirements are
identified for them, since these are merely a part of the anticipated solution, and may be replaced by
alternative solutions (though this is unlikely).

The key tables have been updated with new information, and a summary table of what keys are supported
where has been added as an Appendix.

The requirements for CHAP keys now mention the possibility of VPN as a substitute for at least some
post offices.

Key Custodian and Key Handler perspectives have been added.

Changes in Version 0.8

Version 0.8 included minor amendments in response to informal comments, and was the input document
to the formal review procedure.

Changes in Version 1

Includes amendments resulting from the formal review procedure. This version is intended to be the first
approved Version.

Changes in Version 2

In outline, these are:

1. The scope is more precisely defined, focusing on functional business requirements only.

2. VPN related requirements have been added, along with an outline description of the VPN functions
being supported. Superseded CHAP requirements have been taken out.

3. AP signed messages no longer need to retain their signatures beyond the campus agent that receives
them from the post offices. The requirements have been changed to reflect this.

4. There is no requirement to sign data transmitted from AP clients. The requirements have been
changed to reflect this.

5. An additional physical protection requirement for CAPR has been added.

6. The requirements for CAPU handling have been clarified, maximum verification frequency is still to
be decided.

7. The POK requirements now describe current thinking on usage of POK.
Page 2 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

8. A description of the new TK key has been added, though since this is an internal key it gives rise to
no additional business requirements.

9. There are no CA keys in use in NR2. Requirements relating to this have been deleted.

10. The description of the KMA key’s usage has been changed to reflect its use now via the mirrored
KMC server database.

11. The generic requirements originally described as an extract from [CRYPARCH] have been more
loosely related to [CRYPARCH]

12. Requirements relating to the social system view of system management have been revised to reflect
that use of Riposte instead of Tivoli for key material.

13. The network management requirements have been significantly changed — they were mostly related
to CHAP change synchronisation, which is no longer an issue. However new requirements arise in
relation to VPN.

14. A new requirement asking for the management link to the KMC server to have high security has been
added.

15. Changes reflecting the need for the Pathway Key Manager to delay revocation based on a business
risk decision have been made.

16. A migration requirement relating to VPN has been added — “no manual intervention”.
17. CA failure recovery requirements have been clarified.

18. A requirement that routine key change procedures should be simple and well defined for the
postmaster has been added.

19. A requirement that technical support must not be prevented from doing their job, while at the same
time live key material should not be compromised has been added.

20. Requirements stemming from the perspective of the post office trainee (in training mode) have been
added.

21. A variety of textual changes have been made to correct errors and bring the document in line with
latest design thinking.

Changes in Version 3

1. Changes responding to comments received.

2. New section on L&G (now Siemens Metering) key material

3. VPN split off into a section of its own.

Changes in Version 4

1. All requirements are now numbered, with explanatory text provided in the Organisation part of the
Introduction to describe the numbering scheme.

2. As part of the review occasioned by the numbering operation, repetition of requirement statements
has been removed as far as has been practicable. Repeated general requirement statements against
each specific key type for NR2+ have been replaced with a single statement for that key type along
the lines of: “X must be supported in a manner that meets all applicable general requirements”.

3. Requirements relating to CA keys in NR2 (intended to have been removed in the previous version,
but left in error) have been removed. There are no certificates and no CA keys in use in NR2. Current
thinking for NR2+ CAPUs is to deliver a brand new set as a part of the migration operation and then

Page 3 of 68
RESTRICTED-COMMERCIAL
FUJ00117491
FUJ00117491

The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

er nws

2

2

2

2.

immediately perform an integrity check using the standard NR2+ CAPU checking mechanism. A
requirement for this integrity check to be made before the new CA keys can be used has been added.

There are section number changes that have resulted from the insertion of new ones.
A number of minor wording corrections have been made.

There is an additional change forecast, relating to Belfast home working.
Outstanding issues are now all collected together at the end of Changes Forecast.

The requirement for VPN keys to be unique is now only in relation to post offices (campus servers
can share a private VPN key).

The requirement that AP application code must not need to be changed, which is a hangover from
when we were planning to support AP signing in NR2, has been removed.

0. A new Section 2.17 has been added, spelling out requirements relating to additional FTMS
protection domains, with specific requirements to support keys for Archive Servers in NR2.

1. An anticipated frequency of checking CAPUs has been added to Section 2.10.4.

2. The different stages in the key management process for AP, FEK, FTMS and POCL TIP keys have
been described in outline, consistent with similar descriptions for other key types.

3. The Requirement in Section 2.15.5 that each AP client has a different FTMS key is wrong and has
been removed. A different key is required only in the case of symmetric encryption keys and for
clients that themselves are signing things. Neither of these apply in NR2+; only Pathway sign data on
the way out to clients, so no client can compromise another one as a result of having poor security.
There is a corresponding change to the FTMS key table (only one key needed instead of one for each
client).

4. A requirement to support seasonal and permanent closures of post offices has been added as Section
3.1.4.

5. The requirement in Section 3.4 has been generalised so that there is no longer any implication that a
Key Custodian must have access to the KMA’s logs.

6. In Section 5.1.1 the text no longer implies that if a CD-ROM is supported on a platform, the key
management system must provide key material on a CD-ROM.

7. In Section 5.4.1 a requirement to preserve the security of broken CAWs has been added.

8. In Section 5.10.1 a requirement to be able to support post office PMMC recovery when the
connection to the central campuses is down or the KMA is not available, has been added.

9. The description of TK in Section 2.14 has been modified to reflect the extension of the use of the
term to manually transmitted red keys to non-post office destinations.
0. A requirement has been added to Section covering the revocation of AP and VPN keys of post

offices that close, and the removal of the post office as a destination for key issue from the KMA
database

1. L&G is now referred to as Siemens Metering, and supporting the statements in the contractual
statements document associated requirements has been added as an explicit requirement.

2. There may be changes to the way the Siemens Metering DLLKA is handled, so the wording of the
requirement relating to the split between DLLKA and DLLKB has been generalised to accommodate
this possible change.

3. The requirement for post offices to report back on keys that have been installed, and for the KMC
react to late installation notifications has been added to Section 5.1.1.

Page 4 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

24. Some requirements were present against the KMA key, despite the fact that non-business key
requirements have been declared out of scope. They have now been removed.

25. Section 3.1.3 on Routine Key Expiry has been merged into the section preceding it, as there was
some duplication of requirement.

26. The requirement in Section 4.3, that access to campus LANs is confined to being through VPN
servers, is out of scope and has been removed.

27. In view of the new requirement that recovery from lost PMMCs must be possible if the
communications link or the KMC is down, requirements on KMC resilience for this purpose have
been removed.

Changes in Version 5

1. The Autoconfig signing servers are now explicitly mentioned in the descriptive part of Section 2.7 on
SI keys. There are no requirement changes.

2. Bullet 3 of Section 5.1.1 contained a requirement for warning reports on automated key changes.
Alex had concerns about the value of these, with which I agree. The bullet (bullet 3) has been
changed to: “For keys whose management is not fully automatic, the system must prompt a month in
advance of key change being due (Req’t: G50), and then, until the key change is confirmed
complete, again on the day the key change is due (Req’t: G51) and daily thereafter (Req’t: G52” in
response to Alex’s concern that a report of an imminent automatic key change. There is a matching
change in Section 5.14.1.

So Req’ts G50, G51 and G52 in Section 5.1.1 have changed slightly - they except fully automated
keys.

3. The wording of the requirement to check CAPU values has been changed to reflect the requirement
rather than a specific solution (which was different from the one being implemented!).

Errors in the text describing TK have been removed. There is no requirement change.
The text describing Siemens Metering values has been cleared of minor errors.

The GDK filestore protection requirement no specifies which crypto key has to be used to encrypt it.

ID ws

Some additional issues have been added to the box at the end of “Changes Forecast”.
Changes in Version 6

1. Two of the VPN requirements had not been annotated with requirement numbers. The annotations
have now been added (Req’ts $104 and $105). These requirement numbers had been provisionally
earmarked for requirements related to VPN policy files, but it has now been agreed that policy files
are not a KM responsibility.

2. At the suggestion of Peter Robinson, a mention is made of VPN PIN values, though this has
generated no additional requirements. See Section 2.4.

3. Many of the issues identified in Changes Forecast have been resolved. The resolutions are reflected
in the relevant Version 6 changes listed below.

4. A requirement G114 has been added to ask for duplicate floppies to be made, avoiding single point
of failure problems.

Page 5 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5. Requirement $36 in Section 2.10.4 has been deleted, permitting Tivoli to deliver CAPUs, provided
that they have been verified before use. This has also caused a subtle change to $37.

6. On the basis that it has been agreed that the VPN policy file is outside the scope of the KM system,
the associated issue has been removed.

7. Anew requirement to be able to split DLLKA/B in a different way for a post office, following a
possible key compromise, has been added (S106).

8. Text explaining the way in which requirement numbering is affected by changes in requirements has
been added to Section 0.7

9. The requirements for key uniqueness when adding new FTMS links have been clarified - see $46,
$47 and $48 in Section 2.17.2

10. Requirement $96 demanded the ability to recover not only when the post office is on line, but also
when the KMA is not available. The latter is not a requirement and has been removed.

11. An index of requirements has been added.
12. There have been a number of minor wording changes responding to comments.

Changes in Formal Issue 2.0

In this issue we start to use (for the first time!) the correct formal numbering scheme. Since the last
formally approved version was Issue 1, we now call this version Issue 2.0. The changes below were made
following comments received at a formal inspection of Version 6, held on the 31° of March 1999. The
requirements identified in the list of changes that follows below follow the numbering used in Version 6.
Of those requirements that remain, many have now been renumbered.

1. The current terminology for release versions is now used throughout (viz: NR2 and NR2+).

2. The scope has been refined to focus on NR2+ requirements. NR2 requirements have been left in as
historical information, but are no longer numbered.

3. A new requirement that live confidential keys must not be used in testing environments has been
added.

4. Requirement G71 now gives outage times and references the relevant contractual document.
5. The locations of Help Desks are now correctly identified in Section 4.7.

6. In Section 5.1.2, requirement G62 has been reworded to focus on the underlying rationale for the
requirement, and requirement G63 has been made more precise.

7. The title of the POCL TIP Section has been corrected - it now reads “POCL TIP Link”.

8. The type of extensibility in requirement $50 (relating to support for key material for future
applications) has been refined to be able to be “via incremental development”.

9. Requirement numberings have been reset to contiguous values, and a new category type of P for
procedural has been added. As many of the old numbers as possible have been retained.

10. The nature of permitted channel split has been clarified in Requirement G63.
11. Some other minor clarifications have been made.

12. Requirement $37 for integrity verification of dynamically installed CAPU values has been slightly
relaxed to fit with what is possible.

Page 6 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

13. The requirement over the roles involved in key management administrative processes has been
expanded into three different requirements. Their technical, as opposed to procedural, nature has
been emphasised. See Section 4.4.

14. Requirement G3 (that Red Pike keys should be 64 bits long) has been removed - it is a fact of life not
a requirement.

15. Two new requirements relating to additional FTMS links have been added in Section 2.17.2: one to
explicitly bring out the need for a signing key to be different if it is held at a different physical site,
the other to require control over acceptance of private keys used for signing backup copies of live
material.

16. Implications of perfect synchronisation between the KMC’s and a post office’s view of which key
changes have occurred at the post office have been removed from requirements G9 and G50.

17. The Siemens Metering requirement not to hold both DLLKA and DLLKB on a post office PC’s
filestore has been qualified to permit this if one of them is encrypted. Other minor wording changes
have been made to bring these requirements in line with the contractually agreed [STAT].

Changes Forecast

The changes identified below, if needed, will be made under formal change control procedures.

1. Requirements for management of key material for the protection of links from home working support
staff in Belfast will be added when proposals in this area have been accepted and stabilised.

Page 7 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref: RS/REQ/009
SOLUTION Requirements for Key Management Issne: 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999
Document history

Issue Date Reason

0.1 1.10.97 Draft for internal comment

0.2 21.10.97 Draft for internal comment

0.3 22.10.97 Draft for Distribution

0.4 17.11.97 Re-drafted to incorporate comments and re-structure

0.5 10.05.99 Comments included for wider circulation

0.6 3.2.98 Document taken over by Tom Parker. Comments received on Version 0.5

included. Further requirement refinements added as described in “Changes
in this version” above .

0.7 3.3.98 Changes as described above

0.8 March 1998 Changes as described above

1 8.5.98 First approved version

2 30.9.98 This unapproved version, brought up to date with current design ideas

3 16.11.98 Responding to comment, now needs re-approving.

4 18.12.98 Responding to further comment and new requirements. Many requirement

statements restructured as part of the introduction of requirement
numbering — needs re-approving.

5 22.02.99 Various changes responding to comments and events.
6 18.03.99 Various changes in response to formal comments prior to inspcetion.

Issue 2.0 07.04.99 For Approval - updated to reflect further comments received in formal
inspection.

Cross References

Title Reference Issue Date
[SFS] Security Functional Specification RS/FSP/0001 3.4 August 98
[TED] Technical Environment Definition TD/ARC/0001 3.2 tbs.
[SADD] System Architecture Design Document- CR/FSP/0004 5.1 tbs.
[POKM] Post Office Key Management RS/DES/021_ 8 tbs.
[SEM] Security Event Management Requirements- RS/REQ/004 0.2 01/10/97
[HLD] Key Management High Level Design TSC/CRY/010 2.0 November
1998
[ACCPOL] Access Control Policy RS/POL/0003 2.21 November
1998
[CRYPARCH] Cryptography Architecture SD/DOC/002 0.2 May 1998
Page 8 of 68

RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management Issue 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999
[STAT] Statements on Security Objectives and RS/FSP/003. 4 March

Methods for the Protection of Siemens 1999

Metering Code and Data
[G10] Schedule G10 of the main contract

Page 9 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

Abbreviations

AP Automated Payment

APPR AP Private Key

APPU AP Public Key

BA Benefits Agency

CA Certification Authority

CAPR CA Private Key

CAPU CA Public Key

CAW Certification Authority Workstation

CAPS Customer Accounting and Payment Strategy

CHAP Challenge Handshake Authentication Protocol

CK Communications Key

CMS Card Management System

DLL Dynamic Linked Library

DLLEK The Siemens Metering DLL enabling key

DLLKA A key component which, together with DLLKB is used to form DLLEK

DLLKB A key component which, together with DLLKA is used to form DLLEK

DSA Digital Signature Algorithm

FEK Filestore Encryption Key

FTP File Transfer Protocol

GDK Global Distribution Key, the key under which Siemens Metering code is to be
encrypted in delivery

HAPS Host Automated Payment System

ISDN Integrated Services Digital Network

KI Key Issue

KIPR KI Private Key

KIPU KI Public Key

KM Key Management

KMA Key Management Application

KMC server Key Management Controller server

L&G Short for Landis and Gyr, the old name of the Siemens Metering company, but a term
that is still in general use in Pathway documents.

PA Payment Authorisation

PAS Payment Authorisation Service

PMMC Postmaster’s memory card

POK Post Office Key

PPP Point to Point Protocol

PRAW Post office Recovery Application Workstation
SHA Secure Hash Algorithm

SI Software Issue

Page 10 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491

The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

SIPR SI Private Key

SIPU SI Public Key

TIP Transaction Information Processing

TK Traffic Key

VPN Virtual Private Network

RESTRICTED-COMMERCIAL

Page 11 of 68
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

CONTENTS

0. INTRODUCTION...

0.1 SUMMARY...
0.2. BACKGROUND...
0.3 RELATIONSHIP TO [POKM.
0.4. TERMINOLOG
0.5 SCOPE...
0.6 APPROACH..
0.7 ORGANISATION...

1. BUSINESS SYSTEM

SING CRYPTOGRAPHY .

1.3 BUSINESS DOMAINS
1.4 SECURITY DOMAINS...
1.5 USE OF CRYPTOGRAPHY.

2. SPECIFIC KEY MANAGEMENT REQUIREMENTS..

2.1 CAPS KEy..
2.2 CMSKrY
2.3. CHAP KEY
2.4 VPNKEY.

25 Post OFFICE FIL ‘ORE ENCRYPTION KEY (FEK) 27
2.6 PAKEY,

2.7 SIKEY

2.8 RAMBUTAN KEYS

2.9 AP KEYS

2.10

2.11

2.12

2.13 COMMUNICATIONS KEY (CK).
2.14 TRAFFIC KEY (TR).....
2.15 FTMS KEY FOR POCL AP CLIEN
2.16 POCL TIP LINK.
2.17 ADDITIONAL FTMS DOMAINS
2.18 BELFAST KEY.......
2.19 POCL HAPS.
2.20 KMA KEY
2.21 KEY MATERIAL SPECIFIC TO SIEMENS METERING AND OTHER COUNTER APPLICATION!
2.22 INTEGRITY OF RIPOSTE APPLICATION SOFTWARE IN SITU.

3. GENERIC KEY MANAGEMENT REQUIREMENTS. .

3.1 REQUIREMENTS DERIVED FROM THE CRYPTOGRAPHIC ARCHITECTURE [CRYPARCH].
3.2 REQUIREMENTS ARISING FROM THE PATHWAY ACCESS CONTROL POLICY ..
33 KEY GE ATION
3.4 AUTOMATED KEY RI
35 CERTIFICATION AUTHORITY WORKSTATION
3.6 SECURITY EVENT MANAGEMENT.

4. SOCIAL SYSTEM

Page 12 of 68

RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

4.1 Day TO DAY SITE OPERATIONS
4.2 SYSTEM MANAGEMEN
43 NETWORK MANAGEMEN’
4.4 SECURITY MANAGEMENT..
4.5 CONFIGURATION MANAGEMEN
4.6 I MANUFACTURING AND LOG
4.7 HELP DESK...

5. PERSPECTIVES....

5.1 KEY MANAGER PERSPECTIVE
5.2 KEY CUSTODIAN PERSPECTIVE
5.3. KEY HANDLER PERSPECTIVE........

5.4. CERTIFICATION AUTHORITY PERSPECTIVE
5.5 DATA CENTRE OPERATOR PERSPECTIVE
5.6 KEY HOLDER PERSPECTIVE (DATA CENTRE AND ELSEWHERE)
5.7. SECURITY AUDITOR PERSPECTIVE.
5.8 EXTERNAL POST OFFICE AUDITOR/EMERGENCY MANAGER PERSPECTIVE
5.9 POST OFFICE ENGINEER PERSPECTIVE
5.10 POST OFFICE MANAGER PERSPECTIV1
5.11 Post OFFICE STAFF AND CUSTOMERS PERSPECTIVE..
5.12 POST OFFICE TRAINEE PERSPECTIVE .
5.13 HELP DESK OPERATOR PERSPECTIVE
5.14 ENTERPRISE MGT PERSPECTIVE (ICL PATHWAY AND POCL)
5.15 TECHNICAL SUPPORT PERSPECTIVE
5.16 APPLICATION DEVELOPER PERSPECTIVI

6. APPENDIX A: SUMMARY OF KEY USAGE...

Page 13 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

0. INTRODUCTION
0.1 Summary

This document examines the management of keys within Pathway, analysing how they are currently
managed, and what the requirements are for key management in NR2+.

0.2 Background

Cryptography is used in several parts of the ICL Pathway business system to support commercial
security. As in all cryptographic systems, integrity depends on adequate management of the keys. Fully
integrated, secure and centralised management of the keys is required for future versions of Pathway.

Key management on this scale is not yet common practice. There is no prior art and few theoretical
models. Within Pathway there are interim solutions at Release 1c which are largely manual and do not
form a consistent integrated system. Nevertheless, these solutions provide valuable lessons for the design
of an integrated system.

Given the scarcity of working models, the system requirements must be derived from scratch by
extensive analysis. This document is the record of that analysis.

0.3 Relationship to [POKM]
This document is being developed in parallel with the post office key management document [POKM].

The scope of this document is wider than the [POKM], which focuses in on management of keys at the
post office. That will be a major thread of key management in general, but this document ensures we
capture all the threads of key management. This is not incompatible with developing the detail of post
office key management.

0.4 Terminology

© Over the life of this document, the terms used elsewhere to describe the different releases have
evolved. What is now termed NR2 elsewhere, is called NR2 in this document. What is termed NR2+
elsewhere, is called NR2+ in this document.

e The term Key Management System (KMS) is sometimes used in different ways. In some people’s
understanding it means the general set of processes for Key Management, but to other people it brings
images of monolithic automation. In this document we do not use the term KMS at all, instead the
following terms are used with the following meanings:

Key Management (KM) embraces all the processes and resources, whether automated or human,
involved in managing the keys described in this document.

e The term Key Management Application (KMA) is used to mean the suite of applications that
implement the Key Management Controller, which is the applications and data that constitute the
central KM functionality that is distributed among the campuses and the Key Manager’s site.

¢ The term Key Management Controller server (KMC server) is used to identify the physical
instance of the part of the KMA that is executing at a central campus (with whatever hardware it
needs), accessed from the Key Manager’s workstation (KM workstation).

¢ In addition, a separate application will be required for off-line certification, this is termed the
Certification Authority Workstation (CAW).

e The private key component of an asymmetric key pair is managed split into two parts: a Black Key
Set consisting of the private key (and superfluously its public key) encrypted symmetrically using Red
Pike under a symmetric key, used only for that purpose, referred to as the Red Key. Each of these

Page 14 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

parts is referred to in this document as a part key. Neither part is of any value to an attacker without
the other.

e The document contains information in tabular form about where each key type is held and how many
copies are about. The following terms are used in the tables:

Key Type: Identifies the cryptographic algorithm with which the key is used
No of Concurrent Keys: The number of different key versions that exist at the same time

Copies of Each Key in Use: The number of operational copies of the key that exist (excluding hot
standby copies).

Record Copies: Copies kept for recovery purposes by the Key Generator

Boot-up Copies: Copies or part copies on exchangeable material needed for booting up
the platforms that use them

Frequency of change: A broad statement of how often the key value is routinely changed.

The counts given are those planned for NR2+ and are given only as a sizing guideline.

0.5 Scope

It is not the intention that this document should be specifying any requirements for cryptography, or
cryptographic protection, those have been specified and agreed elsewhere (see list of document cross-
references). This document is concerned solely with management of the NR2+ keys already identified to
meet those cryptographic requirements. With the exception of the vitally important Certification
Authority key, it does not identify any requirements specific to individual key protection keys, whose
presence and use are internal design matters. It does however give general requirements relating to the
protection of all key material and the impact on business of having to change or revoke any kind of key.

This analysis aims to identify the business and operational requirements for Key Management. It is not
the intention here to draw any conclusions about the design or engineering of the system. Neither are any
security quality requirements specified, so there is nothing said about any ITSEC or government security
evaluation levels that should be aimed for. The emphasis throughout this document is on functionality.

The primary target user of KM is the Pathway Cryptographic Keys Manager (ref. [ACCPOL]) who
controls the use of keys and is responsible for generation and distribution of all the keys, rather than the
Pathway Key Custodians who administer one or more keys in use at a site.

0.6 Approach

Following experience with the Managed Key Service at Release 1c we have drawn a hypothetical model
of Key Management and used this as a framework for exploring the requirements. This model is only
intended to be an aid. Where it has limitations that conflict with actual requirements, it will not constrain
articulation of those requirements.

We have held a series of brainstorming sessions with the Pathway Security product manager, structured
around the system model. At these sessions we have gathered a large number of observations about key
management problems and requirements. This raw material will be contained in a spreadsheet appended
to document [HLD].

This raw material has been sifted to remove repetition and to discover associated themes. We have
interpreted the observations and restated them in business-imperative and operational-imperative terms.
The resulting statements of requirement are presented in this document for review by Pathway
representatives.

Iterative review of this document will produce the agreed requirement set.

Page 15 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

0.7 Organisation

Section 2 gives some background to the business areas concerned. Section 3 analyses the requirements on
key management of specific keys, taking into account the historic state of key management for each key.
Section 4 and 5 state the generic requirements of key management from a broader point of view, and
from the various perspectives of those affected by key management.

Requirements are categorised into one of three categories, numbered sequentially within category. The
categories are:

¢ Prefix “G”: General requirements that apply to more than one key type, in many cases applying to all
key types.

¢ Prefix “H”: High level requirements that have an overriding effect on all other requirement types.
e Prefix “P”: Requirements on operational procedures.

¢ Prefix “S”: Specific to one key type or to one implementation component that affects no more than
one key type.

Each requirement is annotated with its reference number in the form (Req’t: Xnnn), where X is the type
and nnn is the number of the requirement within type.

From Formal Issue 2.0 onwards, requirement numbering starts at 1 within each category, with no gaps. If,
in future, a requirement is agreed not to apply, it will remain in the document, annotated as being no
longer applicable. Its number will not be reused. Other documents, when referring to requirement
numbers to show conformance, will continue to list the inapplicable ones annotated as such. If a
requirement’s meaning changes, the change will be highlighted in the changes lists at the start of this
document. The aim is to keep any such changes to a minimum, and to handle a change in this way only if
it is slight. It is also possible that, if the change is major, the old requirement will be lifted and replaced
by a completely new one with a new number.

Requirements are not necessarily listed in numerical order within type.

The highest numbered general requirement in this version of the document is G108.

The highest numbered high level requirement in this version of the document is H14.
The highest numbered procedural requirement in this version of the document is P9

The highest numbered specific requirement in this version of the document is $92

So this document identifies 223 requirements in total. A small degree of overlap may be noticed, but this
has been reduced as far as is practicable.

Page 16 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

1. BUSINESS SYSTEM

This section gives a deliberately brief overview of the business system in which cryptography is being
used, in order to lead into the specific requirements for key management which is the main concern of
this document. Cross-reference is made to other documents for detail, rather than repeating it here.
1.1 Business Elements Using Cryptography
The Key Business Elements in the system which require the use of cryptography are:

Benefits Payments System

Post Office Counter Infrastructure Services
These provide a series of business application services such as:

@ BES (Benefit Encashment Service)

@ PAS (Payment Authorisation Service)

™@ CMS (Card Management Service)

@ EPOSS (Electronic Point of Sale Service)

™@ APS (Automated Payment Service)

@ OBCS (Order Book Control Service)
These are described in detail in the [SADD].
In addition there are business requirements demanding cryptography around the administrative aspects of
the Pathway systems, in particular the remote sofiware issues and installation system.
1.2 Business Benefits

Cryptography is used in these business systems to counter security threats to the Pathway system,
ensuring authenticity, confidentiality and integrity of data in the system and limiting the financial risks in
running the system.

Different parts of the business, and of the architecture demand different types of cryptography depending
on whether the need is for confidentiality or integrity or both. This analysis has already been done (the
requirements are in [SFS]) and is not repeated here, as this document is analysing the requirements of
key management, rather than the requirements for cryptography.

The analysis/design of the cryptography gives rise to many keys, of different types, in use in the Pathway
system. Such sophisticated use of cryptographic techniques demands powerful key management
functions in order to realise the business benefits required of key management:

@ central key control, maximising the effectiveness of the cryptography in use (Req’t: H1)
™@ controlled key changes to minimise opportunity for key compromise (Req’t: H2)

™ managed key handling and distribution to ensure key compromise is minimised (Req’t: H3)
™ rapid response if a key is compromised, minimising the impact of the attack (Req’t: H4)

™ minimising the ongoing costs of managing keys (Req’t: H5)

™ minimising the disruption to the services of cryptography and key management (Req’t: H6)

The business benefits of smooth management of keys will only be realised if management of all the keys
is analysed.

Page 17 of 68
RESTRICTED-COMMERCIAL
The ICL Pathway Project
SOLUTION Requirements for Key Management
Centre RESTRICTED-COMMERCIAL

Ref.:

Issue:

Date:

FUJ00117491
FUJ00117491

RS/REQ/009
2.0
20" April 1999

1.3 Business Domains

Various parties are involved in the provision of these services including:

@ DSS Benefits Agency
@ POCL (Post Office Counters Limited)
@ POCL Clients:

™@ Utilities (Gas, Electric, Water companies)

@ BT (British Telecom)
@ TV Licensing Authority
@ Local Authorities
@ etc.

DLR (De La Rue)

ICL Pathway

CFM (DSD)

CFM(ND

Oracle

Sequent

1.4 Security Domains

The business imperatives of the overall system and the diversity of parties involved have resulted in an
architecture with a number of linked domains supporting the operation of the business applications,
resulting in security requirements for data in those domains, and on the links between the domains.

The relevant security domains in place to support these applications, and the links between them are

shown in the following diagram:

Pathway

Corporate
Services
Domain

Me - =>

System I SM/SIS.

DSS Service
Environment Domain
DeLa
I CAPS Rue
(and ESNCS) Card
Links cms I Services
Link I Domain
PAS / CMS
Service Domain
TIP
Link
POCL Central — ) poet
Services Domain I and
Haps I PocL
{ we Clients
ISDN Link Dowieln

Management I _ Links
Service I*——>
Domain

Fs,
ar

Office Platform
Service Domain

RESTRICTED-COMMERCIAL

AP Client
Links

Page 18 of 68
The ICL Pathway Project Ref.
SOLUTION Requirements for Key Management inn
Centre RESTRICTED-COMMERCIAL Date:

FUJ00117491
FUJ00117491

RS/REQ/009
2.0
20" April 1999

The domains are described in detail in the [SFS].

1.5 Use of Cryptography

The cryptography requirements within the ICL Pathway system fall into 3 areas:
@ data on the communication links
™@ individual messages

@ data stored on physically insecure post office filestore

There is a requirement to contain the complexity of the cryptography management by provision of

automated key management facilities across these three areas (Req’t: H7).

The following sections cover these areas in more detail.

RESTRICTED-COMMERCIAL

Page 19 of 68
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2. SPECIFIC KEY MANAGEMENT REQUIREMENTS
2.1 CAPS Key

2.1.1 Overview

CAPS access service links are used to transfer files, containing mainly payment authorisations, stop
notices and customer personal details (including instructions to bring customers onto the service), from
BA’s (VME) CAPS systems to ICL Pathway’s (Sequent) CAPS Access Service (CAS). Information sent
back from ICL Pathway to CAPS includes benefit encashments and expired payments, but no encryption
is applied in this reverse direction.

The CAPS online service (at NR2) uses the same route and keys, but data is transferred directly, fully
encrypted, rather than in files which are partially protected by encryption techniques. This does not
affect key handling.

The Electronic Stop Notice Control System (ESNCS) used by the Order Book Control Service (OBCS)
will use one of the CAPS links.

The protection on the CAPS link is aimed at reducing the financial risk to ICL Pathway and the
Contracting Authorities. The purpose of this protection is integrity and origin authentication.

2.1.2 Background

The CAPS systems operate from up to 4 different Area Computing Centres around the country, each of
which can have more than one VME mainframe. (Note at RIc this is initially only one VME mainframe,
but during the life of Rc this will expand to the above).

ICL Pathway’s (Sequent) CAPS Access Service (CAS) runs on a Sequent machine located centrally.
(Note there are Wigan and Bootle machines for resilience, but they share one replicated data-store)

Data on the link is protected by encryption of selected (or all) fields, including financial totals under a
secret key (the CAPS Key) shared by all the machines on the link, with symmetric encryption by Red
Pike algorithm using Cipher-Block Chaining.

Key changes are expected to be approximately every two years, or on key compromise.

2.1.3 Key Management at Ric
2.1.3.1 Generation

Key material is supplied (on paper) from an off-line key generator, using an alphanumeric format. A
checksum is included in the key material to detect typing errors.

2.1.3.2. Deployment

Key material is loaded manually and locally into the Series 39 (VME) machines and Sequent platform at
each end of the CAPS links. This must be done on the Sequent first, which maintains a ‘key ring’ with
the new and old keys for a defined period of time.

Keys are installed, by the authorised custodians, who type them in. On the Sequent this involves logging
in as root.

2.1.3.3 Storage

Keys are stored (obfuscated) in a file with file access restricted by use of the operating system access
controls. Read and modify access are permitted for the approved custodian with no access permitted for
all other users.

Page 20 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

The above is true on the Sequent, on VME the key is maintained (obfuscated) in the system catalogue
with access (read and write) restricted to one VME username/logon. This username is used to manage the
keys and use the keys.

Both systems will have (obfuscated) key copies on system backups.

In addition the key generator maintains a copy of the keys generated. This is kept off-line on a floppy
disk in a physical safe. This is needed to encrypt the next key to be generated.

2.1.3.4 Usage

On the Sequent the cryptographic functions run in ‘privileged’ mode (i.e. they have access to a special
UNIX group which in turn allows them access to the key file). They access the stored keys on each usage
of the key.

On VME the cryptographic functions run in the username with access to the key, accessing the stored
keys on each usage of the key.

2.1.3.5 Deactivation

On the VME machines de-activation is immediate on replacement of a key. On the Sequent a ‘key ring”
is maintained with the new and old keys for a defined period of time, after which the old key is no longer
usable. This period is defined at key generation time of the new key.

2.1.3.6 Key Changes

Key changes are performed at intervals agreed with the Contracting Authorities, based on advice from
CESG, for integrity protection.

In practice this involves generating the new key on paper, copying and delivering the papers to
appropriate key custodians, and co-ordinating them to ensure the keys are changed in the correct
sequence and within the key de-activation period.

2.1.4 Key Management Requirement
In NR2:
1. Hardware CAPS key Generation was required to be introduced.
2. No other changes required, key changes continued to be manual.
In NR2+:

1. CAPS keys must be supported in a manner that meets all applicable general requirements
(Req’t: $1).

Page 21 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.1.5 CAPS Key characteristics summary

Key Type Red Pike Symmetric
Key Size 64 bits(handled as 13 character alphanumeric in places)
No of Concurrent Keys 1 (2 during change-over period)

Number of managed copies I 6 (one at each of four CAPS sites, and I at each Pathway central site)
in use

Record Copies Key Generator keeps 1 copy
Managed Key Clients CAS VME platforms
CAS Oracle Sequent platforms
Boot-up Copies None - the value issued on paper is destroyed after use.
Frequency of Change 2 years
2.2 CMS Key

2.2.1 Overview

CMS Links are used to transfer card production data and PUN information to the card producer, De La
Rue.

There is no explicit Contracting Authority requirement for protection of CMS links. The protection is
solely aimed at reducing ICL Pathway’s financial risk.

All data on CMS links is encrypted, for confidentiality and integrity, using Red Pike. This enables ISDN
lines to be used rather than dedicated links.

At the ICL Pathway end, the CMS file is transferred to a Windows NT platform where the entire file is
encrypted using Red Pike. The file is transmitted to the target platform, where it is decrypted again at
application level.

2.2.2 Background

The data is transferred from the CMS Host Central Server (located at Bootle or Wigan, each backing up
the other) to the De La Rue Interface Platform (NT server), located at Wigan/Bootle in clear, using NFS.

Once encrypted the data is sent to the remote machine in bulk.

The remote machines are located at Tewkesbury, and Sittard (in Holland), which acts as a backup. There
are two PC’s in Tewkesbury, one acting as standby.

Uses the CMS symmetric key (Red Pike).
Key changes are expected to be approximately every two years, or on key compromise.

See [TED] section 5.5

Page 22 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.2.3 Key Management at Ric

2.2.3.1 Generation

Key material is supplied (on a floppy disk) from an off-line key generator.
2.2.3.2 Deployment

Key material is loaded manually and locally into the NT machines at each end of the link by inserting
the floppy disk into the machine at the right time. This must be done on each boot of the machines

Keys are installed, by the authorised custodians.
2.2.3.3 Storage
Keys are stored on the floppy disks, and in memory (in clear) at each end of the link.

In addition the key generator maintains a copy of the keys generated. This is kept off-line on a floppy
disk in a physical safe. It is recommended that the key manager also stores a spare copy in a safe place.

2.2.3.4 Usage
The key is used from memory on each encryption/decryption.
2.2.3.5. Deactivation

Closing down the service (either end) will stop the system using the current key. After editing the
registry, that key is no longer active. Destruction of the floppy disks would complete deactivation.

2.2.3.6 Key Changes

Key changes are performed at intervals agreed with the Contracting Authorities, based on advice from
CESG, for integrity protection.

In practice this involves generating the new key on floppy disks, delivering them to the key custodians at
each end of the link, and co-ordinating them to ensure the keys are changed in a synchronised manner.
This involves closing down the service, editing the registry and re-booting the machines.

2.2.4 Key Management Requirement
NR2:
1. Hardware CMS key Generation was required to be introduced.
2. No other changes required, key changes continued to be manual.
NR2+:

1. CMS keys must be supported in a manner that meets all applicable general requirements
(Req’t: $2).

There is no specific requirement to change CMS key management to bring it in line with FTMS-based
key management, but it is likely that this will happen.

Page 23 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/O09
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.2.5 CMS Key characteristics summary

Key Type Red Pike Symmetric (also used to authenticate)
Key Size 64 bits

No of Concurrent Keys I

Number of managed copies I 4. One at each end of the CMS link from each Pathway campus

Record Copies Key Generator keeps I copy

Managed Key Clients CMS DLR local gateways
CMS DLR remote gateways

Boot-up Copies 4 - one at each end of each link

Frequency of Change 2 years

2.3 CHAP Key

2.3.1 Overview

Up to and including NR2, CHAP keys are used to protect the ISDN links between the POCL central
services domains to the Post Offices.

CHAP is a PPP challenge and authentication protocol that ensures at call set-up, and subsequent
handshakes, that there is a genuine caller at the other end.

2.3.2 Background

CHAP initial connection authentication is provided, with refresh, supplemented by CLI authentication of
the Post Offices from the ICL Pathway campus. CHAP re-authentication is applied to all calls (however
initiated).

The CHAP protocol is implemented centrally by Cisco routers, and at the Post Offices by ISDN Adapters
(EICON Cards) in each Gateway machine.

Other protection is/will be applied to individual messages sent across these link, namely:
@ Payment Authorisations (PA keys)
™@ Software issue (SI keys)
™@ Automated Payments (AP keys)

2.3.3 Key Management at Ric

2.3.3.1 Generation

Key material has been generated by The Solution Centre, as 40,000 CHAP values, supplied with an index
and supplied securely, on floppy disk, to the Boot-servers (via Tivoli) and CFM for configuration in the
Routers.

2.3.3.2 Deployment

The routers are configured with the values by CFM, under instructions supplied from the Auto-config
database.

Page 24 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

The Post Office machines receive their CHAP key (obfuscated) from the Boot server when the gateway
machine at the Post Office is brought on-line.

2.3.3.3 Storage

Pre-deployment, the CHAP keys are stored by CFM, and in the Boot server machines.

During use they are stored on the Cisco router, and on the Gateway PC. On the Gateway PC persistent
storage of the Chap key is achieved by recording it in the NT Registry.

If the current value of the Chap Key is Chap! then the value recorded in the NT registry is
Edes56k(Chap1), where Edes56k is the result of applying the Des algorithm in CBC mode using a 56 bit
key k. The key k is hard coded in the NDIS driver (.sys file).

2.3.3.4 Usage

Used directly by the Cisco router and the EICON card whenever authentication is performed.
2.3.3.5. Deactivation

None.

2.3.3.6 Key Changes

No key changes are possible

2.3.4 Key Management Requirement

NR2:

1. It was required that it should be possible to change the CHAP key on suspected key
compromise.

NR2+:
No requirement for CHAP, which is replaced by VPN.

2.4 VPN Key

CHAP is superseded in NR2+ by VPN technology. Under the VPN regime, all links between post offices
and the central campuses will be encrypted and channelled through central VPN Gateway Security
Servers (referred to below as VPN Servers). Participating post offices and VPN Servers will be
authenticated as valid members of the Pathway community. Post offices must not be able to masquerade
as VPN Servers (Req’t: $2). Post offices and VPN Servers authenticate using RSA private keys with
public key certificates (the combination is referred to as the VPN Key). Private keys destined for central
VPN servers are distributed over an automatic link under the protection of a PIN created by the VPN
product, the PIN being distributed manually. Post office private VPN keys are not dependent on PIN
protection, they are distributed under the protection of the key management scheme. The certificates will
be signed by a special purpose Certification Authority, different from the CA used for other Pathway
public keys. The symmetric VPN encryption key is generated dynamically by the bought-in VPN
technology as required, and is not separately managed by the Pathway key management regime. During
the boot phase of a new post office, a special global non-secret key value (the VPN Exception Key) is
transiently used to enable a post office to communicate via the VPN Servers to the KMC server and
obtain its regular VPN Key. Communication using the Exception Key must be limited at the centre to the
KMC server only, and then only if pre-authorised (Req’t: $4).

Page 25 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

Pre-NR2+

Deployment of VPN may be done before NR2+ during NR2 for non-security reasons. If this
happened, a requirement relating to such an early deployment would be:

1. A single global VPN key is acceptable, with no confidentiality requirement associated
with it, but it must be configured so that it can continue to be used in NR2+ for the
exception route into the KMC server, avoiding the need for a global replacement of
one key with another (Req’t: S6).

NR2+:

1. The CHAP authentication requirement is superseded by VPN technology, which is supported
on all post office links (Req’t: $7).

2. Routine VPN Key changes will be managed and performed automatically under the control of
the KMA (Req’t: $8)

3. Each post office member of the VPN community must have a different operational key value
(Req’t: $9).

4. Automatic VPN key changes occur at times in line with other Pathway key expiry periods
(Req’t: $5).

5. The Exception Key is required to be managed like any other configuration data (Req’t: S10).
There are no special confidentiality requirements relating to it and it is not considered further
in this document.

6. The VPN security regime must be able to recover from any communications breakdown that
the regime may erroneously cause, in particular through errors in key management, within
time-scales conformant to network serviceability commitments (Req’t: $16).

2.4.1 VPN Key characteristics summary

Key Type RSA private/public key pair, the public key being contained in a
certificate signed by the VPN CA.

Key Size 1024 bits

No of Concurrent Keys 20,000 + one shared between the central VPN servers

Number of managed copies I 1, at each participating VPN node.

Record Copies Key Generator keeps I copy, autoconfig keeps I

Managed Key Clients PO gateway workstations
VPN Servers

Boot-up Copies ] in the Key File of the VPN software on each gateway PC and VPN
Gateway Server

Frequency of Change 2 years

Page 26 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.5 Post Office Filestore Encryption Key (FEK)
2.5.1 Overview

Nominated files on Post Office workstations and gateway machines are automatically encrypted at disk
access level to preserve data confidentiality in the event of the workstation being stolen

2.5.2 Background

None of the NT workstations installed in Post Offices will have operable floppy disk drives (since, if
fitted, they will be physically blanked off and disabled in the BIOS). The workstations will be rolled out
to the sites with the majority of the software, including the cryptography software, pre-configured in the
factory.

Protection of filestore will be applied after delivery on site (Req’t: S11).

The Post Office Manager (or authorised representative) will normally be the only person on site who has
the means of unlocking the key to the filestore encryption, and it must be technically possible to control
this (Req’t: $12). He/she is not, however, required to be IT literate since the procedures used will be
straightforward and well documented (Req’t: S13).

In general each workstation will be used by a different counter clerk who will use other authentication
data to sign on to the workstation. Counter clerks must not be able to unlock the filestore without
assistance from the Post Office Manager (Req’t: $14). Workstations are expected to be left running
continuously, twenty four hours a day seven days a week; power down causes filestore to be locked, and
this must be unlocked on power up, though the need to do this can be assumed to be an exceptional
occurrence (Req’t: $15). However, counter clerks will sign on and off at more frequent intervals.

2.5.3 Key Management at Ric

2.5.3.1 Generation

Key material is generated by software entropy on the Post Office gateway machine at rollout time.
2.5.3.2 Deployment

Deployment is done in two forms:

1. Having generated the key value, it is transferred to the postmaster’s memory card (PMMC) during
rollout, where it is protected by a PIN.

2. To deploy ready for use, the postmaster inserts the PMMC in each PC in the Post Office as it is
booted up.

2.5.3.3 Storage
The FEK is stored on the PMMC.

In the event of a PMMC or PIN being lost, the FEK can be recovered by use of the ‘verbal Diffie-
Hellman’ exchange. This involves the postmaster contacting the help desk, authenticating himself to
them, reading a series of 16 rows of 15 alphanumeric characters (the Recovery Code) to the help desk,
which uses the PRAW to generate a 15 character Recovery Key. This is then recited back to the
postmaster, who enters it into the PC. The FEK is then re-created and written to a new card.

2.5.3.4 Usage
Used from memory by the Team-Crypto software as encryption/decryption is performed.
2.5.3.5 Deactivation

None.

Page 27 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.5.3.6 Key Changes

No key changes are possible except by performing a recovery (See Section 2.5.3.3).
2.5.4 Key Management at NR2

2.5.4.1 Generation

As Rlc, but a Recovery value is transmitted to the help desk via Tivoli to ease recovery from a lost
PMMC.

2.5.4.2 Deployment

As Release Ic.

2.5.4.3 Storage

As Release Ic

2.5.4.4 Usage

As Release le

2.5.4.5 Deactivation

None.

2.5.4.6 Key Changes

No key changes are possible except by performing a recovery (See Section 2.5.3.3).
2.5.5 Key Management at NR2+

2.5.5.1 Generation

Key material is generated centrally and issued to post offices over the Interactive Channel.
2.5.5.2 Deployment

As earlier releases, except the key is delivered over the Interactive Channel to the gateway PC.
2.5.5.3 Storage

As earlier releases.

2.5.5.4 Usage

As Release Ic

2.5.5.5 Deactivation

None.

2.5.5.6 Key Changes

At prescribed intervals over the Interactive Channel.

2.5.6 Key Management Requirement

NR2:

1. The verbal Diffie-Hellman recovery mechanism was improved, to greatly reduce the volume
of numbers, which had to be exchanged.

2. There was a requirement to be able to change the FEK at NR2 on suspected compromise.

NR2+:

Page 28 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/O09
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

1. FEK keys must be supported in a manner that meets all applicable general requirements
(Regq’t: S18).

2.5.7 FEK Key characteristics summary

Key Type Red Pike Symmetric

Key Size 64 bits

No of Concurrent Keys 20,000

Number of managed copies I I per post office platform

Record Copies KMC server keeps I. (pre-KMA, the PRAW keeps root)
Managed Key Clients

Boot-up Copies 1 on the PMMC

Frequency of Change 2 years

2.6 PA Key

2.6.1 Overview

The PA Key is used to preserve the integrity of Payment Authorisations as they are transferred from the
Pathway central sites to the post offices, which process them,

2.6.2 Background

The PA key is public- private asymmetric key pair. The private key exists as a black key set, protected by
ared key.

PA signature keys reside on PA Agent servers. As the red key is kept off-line, it is introduced on each
boot of the servers. This involves co-operation of CFM key custodians (local) and server administrators
(remote).

This requires the Pathway key custodian to distribute red key floppy disks to a CFM key custodian for
each server/server location.

2.6.3 Key Management at Ric
2.6.3.1 Generation

The public/private key pair is generated by TSC. No certification is involved. Ten sets have been pre-
generated for Ric.

2.6.3.2. Deployment

The (first) private black key set is distributed by D2D (issued via CM) to the Vector server(s) and the PA
signing agent(s).

The (first) red key is copied (on floppy disk) by the Pathway key custodian to each CFM key custodian,
who introduces it on each boot of the server.

The public keys (all 10 of them) are distributed via CM and D2D to the post office (pre-configured)
2.6.3.3 Storage
Black key set I - in filestore on the servers using it. Others in secure storage held by TSC.
Page 29 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

Red Key 1 - on floppy disks in secure safes at each location. Others in secure storage held by TSC.
Public keys - on filestore in the post office machines. (All 10)
2.63.4 Usage

Used from memory by the signing agents as required for signing payment files, and by the post offices
from key file or key store as required to verify the payment files.

2.6.3.5 Deactivation

Only by explicit removal by manual intervention using Tivoli.
Red key floppy disks are destroyed.

2.6.3.6 Key Changes

A primitive form of key changing is possible at Rlc. It requires human intervention and co-operation
between TSC, the Pathway key manager, local CFM key custodians and server administrators.

TSC staff get a new black key set and red key from secure storage, and get the black key set issued via
CM to the PA signing server. Note it is not defined how this process is timed or how to check it has
completed. An administrator is required to check the black key set has arrived on the server.

The red key is then distributed by the Pathway Key Manager to the local key custodian, who can then co-
operate with the server administrator to close down the service, edit the registry to introduce the new key,
and re-boot the server to start using the key.

The post offices will then be able to check the signatures using any of the keys used so far, unless the
copy of the key at the post office is explicitly destroyed by manual use of Tivoli (i.e. there is no
automatic time-out of keys).

2.6.4 Key Management Requirement
NR2:

1. Hardware key generation was required to be introduced.
NR2+:

2. PA keys must be supported in a manner that meets all applicable general requirements
(Req’t: $20).

Page 30 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.6.5 PA Key characteristics summary

Key Type Public-Private Asymmetric DSA Key Pair
Key Size 768 bits
No of Concurrent Keys 1 active private key (2 during changeover period) with corresponding

public key certificate(s). . There may be a number of additional
certificates held at a post office in anticipation of yet to be used private
keys. This number may vary. Any corresponding private keys will be kept
in high security off line storage.

Number of managed copies I L copies of private key part pairs,
where L = the number of BPS payment loader platforms.

<40,000 copies of the certificate for each public key, one per post office
counter workstation in service.

Record Copies Key Generator keeps one copy
Managed key clients PO Counter workstations

BPS payment loader platforms
Boot-up Copies 2, one at each Pathway campus
Frequency of Change 2 years
2.7 Sil Key

2.7.1 Overview

The SI Key is used to preserve the integrity of Software issues as they are transferred from the Pathway
central sites to the post offices, and to other servers being configured. It is also used on personalised
autoconfig files sent to post offices at rollout.

2.7.2 Background

The SI key is public-private asymmetric key pair. The private key exists as a black key set, protected by a
red key.

SI signature keys reside on the SI signature server, located in Feltham and on an autoconfig signing
server at each of the central Pathway campuses. As the red key is kept off-line, it is introduced on each
boot of the servers. This involves co-operation of CFM key custodians (local) and server administrators
(remote).

In Release Ic, SI public keys reside on a number of verifying servers. The current list of these servers is
(or is expected to be during the life of RIc):

e All participating post offices

¢ CEM Sofiware Depot (Wigan and Bootle)
¢ Pathway CS Software depots (Bracknell)
e SSC Live rig (Bracknell)

¢ Live Support rig (Bracknell)

Page 31 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

¢ GiroBank NT ‘receiver’ box (for PMS/CMS help desks)
There are likely to be others later.
2.7.3, Key Management at Rlc
2.7.3.1 Generation
The public/private key pair is generated by TSC. No certification is involved.
2.7.3.2. Deployment
The private black key set is hand installed to the SI and autoconfig signing agents from a floppy disk.

The red key is copied (on floppy disk) by the Pathway key custodian to a CFM key custodian, who
introduces it on each boot of the server.

The public key is distributed via CM and D2D to the post office, and other servers using it.
2.7.3.3 Storage

Black key set - in filestore on the server using it.

Red Key - on floppy disk in secure local safe.

Public key - on filestore in the post office machines, and other servers using it.

2.7.3.4 Usage

Used (from installed black set and red-key floppy disk) by the signing agent when signing software issue
packages, and by the post offices (and other servers) from filestore/key store as required to verify the
payment files.

2.7.3.5. Deactivation

None - other than moving forward to new keys, and therefore abandoning old key files, unless the copy
of the key at the post office is explicitly destroyed by manual intervention using Tivoli.

Red key floppy disks are destroyed.
2.7.3.6 Key Changes

A primitive form of key changing is possible at Rlc. It requires human intervention and co-operation
between TSC, the Pathway key manager, local CFM key custodians and server administrators.

TSC staff get a new black key set and red key from secure storage, and get the public key issued via CM
to the other verifying servers (not the post offices which already have the public keys). Defining the
servers is a manual process. Note it is not defined how this process is timed or how to check it has
completed - presumably someone (e.g. administrator) would have to check the black key set has arrived
on each server.

The red key and black key set is then distributed by the Pathway key manager to the local key custodian,
who can then co-operate with the server administrator to install the black key set on the SI signing server
and edit the registry to introduce the new key to start using the new key. Re-booting is not necessary.

The post offices will then be able to check the signatures using any of the keys used so far, unless a key
is explicitly destroyed by manual use of Tivoli (i.e. there is no automatic time-out of keys). Note that
signed messages can exist for long periods (months) in depots and therefore messages can come through
with ‘old’ signatures on.

2.7.4 Key Management Requirement
NR2:

Page 32 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

1. Hardware SI key generation was required to be introduced.
NR2+:

3. SI keys must be supported in a manner that meets all applicable general requirements (Req’t:
$22).

2.7.5 SI Key characteristics summary

Key Type Public-Private Asymmetric DSA Key Pair
Key Size 768 bits
No of Concurrent Keys 1 private key part pair (2 during changeover period) with corresponding

public key certificate(s).

There may be a number of additional certificates held at a post office in
anticipation of yet to be used private keys. This number may vary. Any
corresponding private keys will be kept in high security off line storage.

Number of managed copies I Private Key part pairs: 3

<40,000 copies of the certificate for each public key, one per post office
counter workstation in service. One for each Tivoli-managed platform
other than post office ones.

Record Copies Key Generator keeps one copy

Managed key clients PO counter workstations
CM signing server platforms
Tivoli-serviced platforms on the Pathway LANs

Boot-up Copies 3 (private keys)

Frequency of Change 2 years

2.8 Rambutan Keys
2.8.1 Overview

Various links are protected by hardware encryption/decryption devices. The devices in ICL Pathway’s
solution are types ED600RTS and ED2048R3 supplied by Zergo.

These devices are certified products (ITSEC) and provide cryptographic protection using CESG designed
Rambutan crypto-kernel.

The links protected by these devices are:
e ICL DSD (help desk) links from STE04, LSAO1 and FCY03 to Wigan and Bootle.
« ICL CFM (systems mgt) links from Belfast and Ste04 to Bootle and Wigan.
e ICL Pathway HQ links from FELO1 to Wigan and Bootle
¢ POCL HAPS Link
2.8.2 Key Management at Rlc

The Zergo encryptors have in-built key management. The Zergo encryptors operating instructions contain
a section on key management and that has been incorporated as part of CFM’s operating instructions.

Page 33 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

CFM provide management of the Zergo units (and their keys) as a service. The keys are sourced directly
from CESG.

2.8.3 Key Management Requirement

Management of Rambutan keys should follow accepted practice already established in other contexts for
the products that use them (Req’t: P1). In NR2+ automated prompts to the Cryptographic Key Manager
to remind about the need for a key change are required (Req’t: $24).

2.8.4 Rambutan Key characteristics summary

nbutan
Key Type Rambutan
No of Concurrent Keys 2 per link
Copies of Each Key in Use I 2 (1 at each end)
Record Copies 0
Managed key clients The bought in product platforms come with their own key management
regime. The links that they protect are listed in Section 2.8.1.
Backup Copies 0
Frequency of Change 2 years
2.9 AP Keys

2.9.1 Overview

AP keys are used for protection of automated payment records. The AP private key is used at the post
office to sign the automated payment message, and the signature verified prior to it being stored on the
AP host with the signature removed.

2.9.2 Background

The AP key is public-private asymmetric key pair. The private key will exist as a black key set, protected
by a red key. The public key is contained in a certificate signed by the CA.

A message will be signed by the post office, using the private key (APPR), which should be unique to the
post office.

The AP message, having been signed by the post office is delivered to the Pathway central site as a
Riposte message, issued across the post office network, where it is received by the APS agent, which
verifies the signature, removes it, and then forwards the unsigned message on to the APS Host machine.

The APS Host will then forward it on to the appropriate utility using FTMS (See Section 2.15).
2.9.3 Key Management at Ric

None - AP keys are not used in Rle

2.9.4 Key Management at NR2

None - AP signing is not in NR2.

Page 34 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/O09
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.9.5 Key Management at NR2+
2.9.5.1 Generation

Public/private key pairs are generated by the KMC. The CAW creates a public key certificate for each
public key.

2.9.5.2, Deployment

The private component is distributed over the automatic channel to post offices, each post office having
its own unique key.

The public key certificate is distributed over the automatic channel to central campus verifiers.
2.9.5.3 Storage

The private key is held encrypted in the Riposte journal.

The public key is held in self-protecting certificates.

2.9.5.4 Usage

The private component is used at post offices to sign automated payment transactions. The public
component is used at for verifying these signatures at central campus verifying platforms

2.9.5.5. Deactivation
By certificate expiry and issue of new private keys and certificates as required.
2.9.5.6 Key Changes
Via the automatic channel at prescribed intervals.
2.9.6 Key Management Requirement
Releases Ic and NR2:
None — not implemented.
NR2+:

AP keys must be supported in a manner that meets all applicable general requirements (Req’t:
$25).

2.9.7 AP Key characteristics summary

Key Type Public-Private Asymmetric DSA Key Pair
Key Size 768 bits
No of Concurrent Keys Up to 20,000 key pairs (one per post office)

Number of managed copies I I private key part pair per counter workstation in the owning post office.

H copies of the public key certificate for an AP key,
where H = number of AP harvester agent platforms

Managed key clients PO counter workstations
AP harvester agent platforms

Record Copies 1

Page 35 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999
Boot-up Copies None
Frequency of Change 2 years
2.10 CA Key

2.10.1 Overview

The Certification Authority (CA) key is used to certify the public keys of various other asymmetric keys
by signature of a public key certificate. It certifies that the public key in the certificate is a genuine
Pathway key and not a spoof.

The CA key is the most trusted key in the system.
2.10.2 Background

The CA key is a public-private asymmetric key pair. The private key will exist as a black key set,
protected by a red key. The public key is not contained in a certificate as no higher authority exists to
certify it.

The CA key is to be a longer key than other keys and therefore to have a significantly longer period of
validity than other keys in the system (e.g. 8 years instead of 2).

The CA private key (CAPR) is the most trusted and most protected key in the Pathway system, and
therefore is never allowed to go online to a networked machine. It is used solely in the off-line CA
workstation (CAW), and is kept locked up in the most secure safe available.

CAPUs will be pre-generated and issued in a batch (designed to last a very long time) to post offices and
other verification platforms as part of their pre-installed package, with the regular re-issue, for validation
purposes only, for checking they are still correct.

2.10.3 Key Management at Rle

A 768-bit CA key has been generated and the CAPU issued to all post offices, but the key is not used at
all. The CAPR is held in secure storage.

2.10.4 Key Management Requirement
NR2:

Not used.
NR2+:

1. CA keys must be supported in a manner that meets all applicable general requirements
(Req’t: $26).

There are also additional requirements in NR2+, specific to CA key material:
2. CA keys must be at least 1024 bits long (Req’t: $27).

3. The lifecycle for a CA key is longer than that of other keys (of the order of 8 years). The CA
signing key must be able to be changed with that frequency, and on suspicion of compromise
(Req’t: $28).

4. It must be possible to alert post offices, in a time-scale of the order of that taken by the
broadcast of an urgent Riposte message, that no further certificates signed by a given CA key
should be accepted (Req’t: S29).

5. This alerting must not be able to be spoofed (Req’t: S30).

Page 36 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

6. The confidentiality of CAPR must be protected such that it cannot be attacked on-line, and
that no single physical compromise of media or equipment could compromise the key’s
confidentiality (Req’t: $31).

7. Key changes timed by KMA or manually instigated must be possible, but only within the pre-
issued key stock (Req’t: $32).

8. Regular retransmission of check values for CAPU keys must be supported, for recipients to
ensure that local copies have not been tampered with (Req’t: $33). The frequency should be
configurable, but intervals of the order of 2 or 3 months are appropriate. Some degree of
randomnity should be able to be introduced either manually or automatically (Req’t: $34).

9. CAPUs are required to be supported on all platforms that verify certificates (Req’t: $35).

10.Post office platforms not possessing the full set of CAPU values can be sent them using
Tivoli, but the values must be integrity checked at installation time (Req’t: $37).

2.10.5 CA Key characteristics summary

Key Type Public-Private Asymmetric Key Pair

Key Length 1024 bits

No of Concurrent Keys 1 private key.
up to 10 public keys at each signature verification platform (see below for
list).

Number of managed copies I Private key part pairs - 1, on the CA workstation

Public Key - one copy for every platform that verifies signatures (post
office PCs, the CAW, AP Harvester Agents, Tivoli client platforms,
FTMS verification platforms, counter application client platforms, the
KMC server itself).

Record Copies None
Frequency of Change 8 years
2.11 KI Key

2.11.1 Overview

The Key Issue (KI) key is a key used to protect the integrity of the exchanges between the central key
management application and other servers communicating with it (mainly post offices). It convinces the
communicating servers that they are dealing with a genuine Pathway key management agent.

It is not a business-related key, but a part of the anticipated solution and is documented here only for
completeness.

2.11.2 Background

The KI key is public-private asymmetric key pair. The private key exists as a black key set, protected by
ared key. The public key will be protected by certification by the CA key.

2.11.3 Key Management at Ric
None - the KI key is not used at Rlc.

Page 37 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/O09
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.11.4 Key Management at NR2
None - the KI key is not used at NR2.
2.11.5 Key Management Requirement
1. As necessary to support other requirements.

2.11.6 KI Key characteristics summary

Key Type Public-Private Asymmetric DSA Key Pair
Key Length 768 bits
No of Concurrent Keys 1 private key part pair and corresponding public key certificate

(transmitted with the signed data it is needed for).

Copies of Each Key in Use I Private Key - 2, one at each Pathway site. Public Key — 2, one at each
Pathway site

Record Copies Key Generator keeps one copy
Boot-up copies none
Frequency of Change 2 years

2.12 Post Office Key (POK)
2.12.1 Overview

The post office key is used to authenticate the identity of a post office when it communicates with the
KMA. It is not used until NR2+.

2.12.2 Background

The POK will be a symmetric Red Pike key, with an associated key identifier (POKID), used to tell the
KMA which key has been used to authenticate.

It is expected that it will be delivered initially to the post office machines via the boot server, but since
this route can at best obfuscate its value during transmission, it must be immediately replaced by a
securely transmitted value from the KMA during a subsequent phase of rollout.

Changing of POKs is required to be controlled automatically by the KMA.
2.12.3 Key Management at Rie

© None - this key does not exist at Rlc
2.12.4 Key Management at NR2

¢ None - this key does not exist at NR2

Page 38 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/O09
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.12.5 Key Management Requirement
NR2

« None - this key does not exist at NR2
NR2+:

1. POKs must be supported in a manner that meets all applicable general requirements, except a
transient initial relatively insecure POK may be transmitted to the post office obfuscated,
instead of encrypted (Req’t: $38).

2. The first secure (properly encrypted in transmission) value of POK must be established during
rollout (Req’t: $39).

2.12.6 POK Key characteristics summary

Key Type Symmetric Red Pike

Key Size 64 bits

No of Concurrent Keys 20,000

Number of managed copies I 2 - one at the KMC server and one at the PO gateway PC
Record Copies none

Managed key clients PO Gateway workstations

Boot-up Copies 1, on the PMMC

Frequency of Change 2 years

2.13 Communications Key (CK)
2.13.1 Overview

The communications key (CK) will be used to protect confidential key data going up the line from the
KMC server to the post office over the interactive key distribution channel. It is not a business-related
key, but one anticipated as part of the final solution and is identified here only for completeness.

It will be created simultaneously at both ends of the link via a Diffie-Hellman exchange.

There will be CK generated and used for each interactive exchange for each post office in operation.
2.13.2 Background

The CK will be a symmetric red pike key directly derived from a Diffie-Hellman shared secret
2.13.3. Key Management at Rie

None - the key is not used at Ric.

2.13.4 Key Management at NR2

None - the key is not used at NR2.

2.13.5 Key Management Requirement

1. As necessary to support other requirements.

Page 39 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.13.6 CK Key characteristics summary

Key Type Symmetric Red Pike key dynamically generated using a Diffie-Hellman
exchange

Key Length 64 bits

No of Concurrent Keys 20,000

Copies of Each Key in Use I 2

Record Copies none

Managed Key Clients This is not a managed key in the sense that the other keys are managed; it
is a transient value, automatically generated and controlled and used for
one interactive exchange only.

Boot-up Copies none

Frequency of Change a new key is generated for every post office key management exchange.

2.14 Traffic Key (TK)
2.14.1 Overview

The traffic key (TK) will be used to protect confidential key material. It protects material transmitted
over the automatic Riposte channel from the KMC server to all destinations served by automatic
channels. It is not a business-related key, but one anticipated as part of the final solution and is identified
here only for completeness.

For post office destinations, it is transmitted over the interactive channel, protected using CK, from
where it is transferred to the PMMC. The PMMC is the medium by which it is transferred to the non-
gateway PCs where it is used to decrypt key material arriving via the Riposte based automatic channel. It
is transmitted to non-post office destinations by manual means on an exchangeable medium.

There will be TKs for each automatic channel in operation.
2.14.2 Background

The TK will be a symmetric red pike key.

2.14.3 Key Management at Rie

None - the key is not used at Rlc.

2.14.4 Key Management at NR2

None - the key is not used at NR2.

2.14.5 Key Management Requirement

1. As necessary to support other requirements.

Page 40 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/O09
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.14.6 TK Key characteristics summary

Key Type Symmetric Red Pike key generated at the KMC server

Key Length 64 bits

No of Concurrent Keys up to 20,000

Copies of Each Key in Use I 2

Record Copies none

Managed Key Clients Post office gateway and non-gateway PCs

Boot-up Copies 1, on the PMMC or non-post office equivalent, which may contain both

current and previous values

Frequency of Change of the order of two years.

2.15 FTMS Key for POCL AP clients
2.15.1 Overview

This key type will not be used until NR2+. It will be used to protect the integrity and data origin of data
transferred directly from Pathway central sites to the POCL AP clients (rather than via the POCL HAPS.
link as at NR2).

2.15.2 Background

The protection takes the form of signing of whole files, the public keys being held in certificates and
shipped with each file. It is the objective to make it as similar as possible to the POCL Tip link, though it
is only provided in the outward direction.

2.15.3. Key Management at Ric
None - not used until NR2+.

2.15.4 Key Management at NR2
None - not used until NR2+.

2.15.5 Key Management at NR2+
2.15.5.1 Generation

Public/private key pairs are generated by the KMC. The CAW creates a public key certificate for each
public key.

2.15.5.2. Deployment

Both the private component and its corresponding public key certificate are distributed over the
automatic channel to FTMS agent platforms on the central campus.

2.15.53. Storage
The private key is held encrypted in the Riposte journal.

The public key is held in self-protecting certificates.

Page 41 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/O09
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.15.5.4 Usage

The private component is used at FTMS agent platforms on the central campus to sign files of data for
transmission to remote AP client sites. The corresponding public key certificate is then transmitted with
each file to be verified. The public component is then used at for verifying the file signatures at central
campus verifying platforms.

2.15.5.5 I Deactivation
By certificate expiry and issue of new private keys and certificates as required.
2.15.5.6 Key Changes
Via the automatic channel at prescribed intervals.
2.15.6 Key Management Requirement
Releases lc and NR2
1. None — not used.
NR2+:

4. FTMS keys must be supported in a manner that meets all applicable general requirements
(Req’t: S40).

2.15.7 FTMS Key characteristics summary

Key Type Public-Private Asymmetric DSA Key Pair
Key length 768 bits

No of Concurrent Keys 1

Number of managed copies I 2 private key parts, one on each site client gateway

2 Public Key certificates, one on each site client gateway

Record Copies Key Generator keeps one copy
Managed key clients Pathway gateways

Boot-up Copies 2 - one for each site at the Pathway end
Frequency of Change 2 years

2.16 POCL TIP Link
2.16.1 Overview

The POCL TIP links are used to transfer information to and from POCL. They carry the entirety of
POCL’s outlet transaction business and stock data, plus reference data back to ICL Pathway. There is an
explicit Contracting Authority requirement for integrity protection of this link in both directions.

2.16.2 Background

The POCL TIP link is used to transfer files of data using an FTMS service between the central Pathway
sites, and Pathway-supplied NT boxes on the POCL site(s).

Page 42 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

The protection takes the form of signing of whole files, the public keys being held in certificates and
shipped with each file.

The POCL TIP receiving machines (at each end) will be able to check the integrity of the received files
using the public keys held in certificates verified by pre-installed CA public keys. A mechanism will be
required to enable the CAPUs to be checked periodically (similar to post office CAPU checks).

2.16.3 Key Management at Ric

None - this key is not used at Rlc.

2.16.4 Key Management at NR2

As for SI keys, though the destination platforms are the platforms that terminate the POCL TIP link.
2.16.5 Key Management at NR2+

2.16.5.1 Generation

Public/private key pairs are generated by the KMC. The CAW creates a public key certificate for each
public key. Each end of the POCL TIP link has a private public key pair generated for it.

2.16.5.2. Deployment

Both the private components and their corresponding public key certificates are distributed over the
automatic channel to their respective ends of the POCL TIP link.

2.16.5.3 Storage

The private keys are held encrypted in the Riposte journal.
The public keys are held in self-protecting certificates.
2.16.5.4 Usage

The private component at each end is used by that end to sign files of data for transmission to the other
end. The corresponding public key certificate is then transmitted with each file to be verified. The public
component is then used at for verifying the file signatures at the receiving end.

2.16.5.5 Deactivation
By certificate expiry and issue of new private keys and certificates as required.
2.16.5.6 Key Changes
Via the automatic channel at prescribed intervals.
2.16.6 Key Management Requirement
Release Ic
None
NR2
1. Manual key changes were supported, using couriered hard media.
2. Remote keys were changed by introducing new key media (private key).
3. Central keys were changed the same way.
There was no certification in NR2.
NR2+:

Page 43 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5. POCL TIP keys must be supported in a manner that meets all applicable general requirements
(Req’t: S44).

2.16.7 POCL Tip Link Key characteristics summary

PC p Key
Key Type Public-Private Asymmetric DSA Key Pair
Key length 768 bits
No of Concurrent Keys 2 (one for each direction)

Number of managed copies I Private key part pair - I (2 if at the Pathway end - one on each site)

Public Key certificate - 1 (2 if at the Pathway end - one on each site)

Record Copies Key Generator keeps one copy
Managed key clients POCL platform (TIP and Reference Data)
Pathway gateways for the above
Boot-up Copies 3. One at the client end, one for each site at the Pathway end
Frequency of Change 2 years

2.17 Additional FTMS Domains
2.17.1 Background

FTMS links are already used in a number of business and system contexts and the use of FTMS will be
extended into new areas over time. The management of the cryptographic keys to support the securing of
these new links will similarly need to be extended.

2.17.2 Key Management Requirement
NR2

It was required to be made possible to support the provision of key material for the FTMS link
between the Pathway campuses for the purpose of encrypting Archive Server traffic. This was a
first example of the more general requirement that applies in NR2+.

NR2+

It must be possible to support additional secure logical FTMS links between the same or other
physical endpoints in new protection domains, as a configuration change rather than a code
change within the KMA (Req’t: $46).

These additional links may require bi-directional signing, the signing party at cach end of the link
having a different private key. Different physical locations must use different signing keys
(Req’t: $17). However, it is a matter of individual risk analysis whether it is acceptable to use
the same signing key over multiple logical links from the same physical platform (it is expected
that in most cases such a multiple use of a signing key would be acceptable) (Req’t: $47).

Any private key used for signing backup versions of live data must not be accepted by verifiers
except through explicit reversible management action (Req’t: S19)

A key, unique to an individual physical link, providing traffic encryption, must be supported if
the link requires it. It is a matter of individual risk analysis whether a symmetric key can be used
for multiple logical links over the same physical link. (Req’t: $48).

Page 44 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

The functionality surrounding the management of key material (reminders, reporting, key
generation and issuance etc.) must be the same for all FTMS links, allowances being made for
the different types of protection provided (Req’t: $49).

2.18 Belfast Key

2.18.1 Overview

Operational control of ICL Pathway central site machines is performed from a CFM site in Belfast. This
link is protected by Rambutan hardware-level encryption, see Section 2.8.

2.19 POCL HAPS
2.19.1 Overview

The link between ICL Pathway and the Host Automated Payments System (HAPS) is an interim solution,
whereby all AP data is sent to an existing POCL Tandem system sited at Farnborough. This HAPS
system is then responsible for onward routing the data to their AP clients.

This file transfer product runs on a dedicated ICL Pathway Windows NT platform at each campus and
POCL’s Tandem AP Host. Windows NT platforms are used, rather than Sequent, to avoid adding
complexity to the Sequent systems.

Confidentiality and integrity protection is provided for this POCL Famborough link using Rambutan
based encryption hardware. See Section 2.8 for details of handling of Rambutan keys.

This will be superseded by full links to POCL AP clients using FTP Keys over time - see Section 2.15.

2.20 KMA Key
2.20.1 Overview

In order to support the requirement stated in Section 5.1.2 there needs to be a key to encrypt data
transferred between different instances of the KMC server. A key is also required to protect sensitive
traffic between the KM Workstation and the KMC server. The KMA key is used for this. The KMA key
is not a business-related key, but one anticipated as part of the final solution and is identified here only
for completeness.

2.20.2 Background

The approach taken is to mirror the KMC server database across the two sites, data traffic between the
sites being automatically created via the database replication mechanism. Key material held on the
database is encrypted using the KMA key, a Red Pike Symmetric key. This has the effect that the traffic
of key material between the sites is encrypted.

2.20.3. Key Management at Ric
¢ Not used at Ric
2.20.4 Key Management Requirement
NR2
1. As necessary to support other requirements.
NR2+:

2. As necessary to support other requirements.

Page 45 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref RS/REQ/009
SOLUTION Requirements for Key Management inn 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2.20.5 KMA Key characteristics summary

Key Type Red Pike Symmetric

Key Size 64 bits

No of Concurrent Keys I

Number of managed copies I 3

Record Copies none

Managed key clients The two KMC servers and the KM workstation.
Boot-up Copies none

Frequency of Change yearly

2.21 Key Material Specific to Siemens Metering and other Counter Applications
2.21.1 Overview

The KM system must be extensible, via incremental development, to support delivery of key material
used by future counter applications to post offices supporting those applications (Req’t: $50). Some of
this material must be able to be held on the PMMC (Req’t: S51). The nature and purpose of this key
material will remain invisible to the key management code. Keys to encrypt confidential code and data
associated with these applications need to be able to be supported (Req’t: $52)

In NR2+ there is only one such application, an APS related application that has been dubbed the Siemens
Metering application.

Siemens Metering Limited also require that the confidentiality of the functionality of their application
software is preserved.

2.21.2 Background
The approach that is to be taken is twofold:

* to provide functionality to encrypt the Siemens Metering software on receipt from Siemens
Metering and to decrypt it only at its destination prior to installation in FEK protected filestore.
The single key used for this is called GDK. The key management system distributes GDK to post
offices along the automatic channel.

* to offer general functionality to transfer counter application key material over either the
interactive channel, the automatic channel or both in a manner that is as far application
independent as possible. In the case of Siemens Metering, there are two separately transmitted
components: DLLKA (sent over the interactive channel) and DLLKB (sent over the automatic
channel). These are combined together on each post office PC to create a DLLEK value.

Key Type Red Pike Symmetric (GDK only). The usage of other keys is not known
to ICL ICL Pathway.
Key Size 64 bits (GDK only)

Page 46 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management Issne: 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999
No of Concurrent Keys 1 GDK and 20,000 DLLKA and 20,000 DLLKB
Number of managed copies I 1 of each of GDK and the DLLKA/B pairs for each post office platform.
one copy of GDK at the point of encryption of the Siemens Metering
Software.
Record Copies KMC server keeps one of each
Managed key clients All post office PCs, For GDK, the platform on which Siemens Metering
code is encrypted prior to delivery to the ICL Pathway distribution centre.
Boot-up Copies 1 copy of DLLKA on the PMMC
Frequency of Change No changes required except as a consequence of product modifications.

2.21.3 Key Management Requirements
Releases Ic and NR2:

No requirement. There is no support for this key material in these releases.
NR2+

1. The requirements below are specific to Siemens Metering.

2. Siemens Metering code and data must be encrypted (using Red Pike) on receipt from
Siemens Metering (Req’t: $53).

3. The code and data must be decrypted only on the post office PCs where it is to execute
(Req’t: S54).

4. The key used (GDK) must be distributed encrypted to target post offices as a normal part of
the key management service (Req’t: $55).

5. Ata post office, Siemens Metering code and data encrypted under GDK must be decrypted
and installed directly into to a part of filestore subject to encryption under the filestore
encryption regime (Req’t: $56).

6. Pending its use for decryption, GDK must be held encrypted on filestore at the post office
(Req’t: S57).

7. The DLL enabling key must be split into two parts, neither of which, by itself, will reveal it
to an attacker. DLLKA and DLLKB must not both be held on a post office PC unless one of
them is encrypted under a key not itself held there. The split must be different for each post
office (Req’t: $58).

8. It must be possible to switch to a different combination of DLLKA/DLLKB for a particular
post office, should the ICL Pathway Security Manager feel that this is necessary, for example
due to a possible key compromise (Req’t: $21).

9. There is no requirement for routine changes to GDK or DLLKA or DLLKB. In particular,
Siemens Metering code will be encrypted once, on its introduction to Pathway. It is not
expected that it will be encrypted under a different key. However, it must be possible to
encrypt a later upgrade or a new release under a different key (Req’t: $59). It must also be
possible to issue a new release of the Siemens Metering code that uses a different DLL
enabling key, and for the KMA to deliver the new enabling key to post offices using the
same delivery mechanism as for the old one (Req’t: $60). Synchronisation logic to ensure

Page 47 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

that the different new components are compatible will be the responsibility of the Siemens
Metering code itself.

10. The contractual statements relating to Key Management in [STAT] must be supported
(Req’t: S61).

2.22 Integrity of Riposte Application Software in Situ
2.22.1 Overview

The cryptographic infrastructure supporting the integrity of Riposte application software in situ is
entirely separate from the Key Management Service that is the subject of this document, and the
requirements associated with Riposte software protection are not given here. The description below is
provided solely for information and completeness of coverage of the full cryptographic scene.

After installation, application software on PC’s must be protected against undetected changes in situ.
Standard Microsoft cryptographic techniques are used for this, the public key algorithm involved being
RSA with a 512 bit key size. Verification is done by Riposte infrastructure code calling Microsoft’s
CryptoAPI.

Microsoft has authorised Escher as an organisation that digitally sign, or can nominate other
organisations to digitally sign, software that NT will verify, when asked to do so through the CryptoAPI,
prior to permitting its execution.

To achieve this in the Pathway context, Microsoft’s public key is used first to verify Escher’s public key,
then to verify code signed by Escher, or to verify code signed by Pathway after checking the validity of
Pathway’s public key by validating a certificate for it signed by Escher. In this last case, a chain of trust
from Microsoft to Escher to Pathway is established.

So the keys involved are:

Microsofi’s public key - held embedded in the NT operating system
Microsoft’s private key - kept securely by Microsoft

Escher’s public key - held in a public key certificate signed by Microsoft
Escher’s private key - kept securely by Escher on a hardware storage device
Pathway’s public key - held in a public key certificate signed by Escher
Pathway’s private key - held securely by Pathway at a central site

The public key certificates are propagated to NT platforms running Riposte in persistent object Riposte
messages. The signatures for protected files are also held in similar Riposte messages.

2.22.2 Key Management at Rie
Not used in Release Ic.
2.22.3 Key Management Requirement

There are no specific requirements for key lifetimes, but it is envisaged that the Pathway private key will
change at intervals. No changes to the Escher or Microsoft keys are planned at present, though over the
years, procedures may evolve to enable such changes.

Page 48 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

3. GENERIC KEY MANAGEMENT REQUIREMENTS
3.1 Requirements derived from the Cryptographic Architecture [CRYPARCH]

The [CRYPARCH] document contains a philosophy of key management as well as a number of
requirements relating to cryptography and key management. We have used [CRYPARCH] as the source
of the requirements below. Where differences arise, this KMS Requirements document is to be taken as
the more up to date and is definitive.

3.1.1 Key Algorithms, Sizes and Expiry Times

The software algorithms to be used are the Secure Hash Algorithm (SHA), Red Pike and the Digital
Signature Algorithm (DSA) unless otherwise specified. The exceptions in NR2+ are the bought-in VPN
technology, which uses 1024 bit RSA, and the Riposte based code integrity regime, which uses 512 bit
RSA (Req’t: G1). Also, hardware units may use Rambutan for point to point bulk link encryption. The
requirements below should be seen as encompassing only the keys managed by the KMA, and therefore
exclude the Riposte based code integrity regime keys.

All DSA private keys must be at least 768 bits (Req’t: G2) except CA keys, which must be at least 1024
bits (See Section 2.10.4).

Red Pike keys are by their nature, 64 bits long.

Key management processes must cater for routine key changes of all keys except CA keys on a cycle
approximating to every two years (Req’t: G4). CA keys have a lifetime of the order of 8 years.

Certificates must contain expiry dates that are enforced (Req’t: G5).
Expiry and other dates must be Year 2000 compliant. UTC dates must be used (Req’t: G6).
3.1.2 Confidentiality and Integrity of key material

The confidentiality of private and secret key material must be protected at all times. In practice this
means that whenever such keys are exchanged over communications links they must be encrypted. This
includes delivery over the central LANs and delivery between central sites (Req’t: G7).

There are three permitted exceptions to this rule:

e¢ CHAP keys, which may need to be transmitted to the central Cisco routers in clear over the Pathway
campus LAN to which the router is connected. CHAP key requirements are lifted at NR2+ as CHAP
protection is superseded by VPN,

¢ the Red Key component of Red/Black key sets. These are by their nature transmitted in clear over the
link to their destination,

the initial transient POK value, which is distributed obfuscated but not encrypted from the boot server
to the post office.

The integrity of all keys, especially public keys, must also be preserved (Req’t: G8).

The KMA must keep track of the installation state of all of the keys under its control, and take steps to
ensure that key changes are fully performed, should delays (of configurable times) occur (Req’t: G9).
The accuracy of the record will depend on the availability to the KMC of acknowledgements from the
post offices concerned (See also Bullet 5 of Section 5.1.1).

Page 49 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

3.1.3. Post office closures
3.1.3.1 Seasonal Closures

A post office may be subject to seasonal close down for a period of e.g. six months. Key material at such
post offices must be managed so that, on reopening:

1. unexpired public key certificates are available where required, prior to restarting business
(Req’t: G10),

2. any confidential key values that are overdue for replacement are replaced (Req’t: G11),
3. the latest revocation notifications are applied (Req’t: G12).

3.1.3.2. Permanent Closures

A post office may close down permanently. This give rise to the following requirements:

1. When informed of a permanent post office closure, the KMA must cause the confidential key
values (in particular the POK, AP signing key and VPN private key) held at the post office to be
invalidated, from the point in time requested (Req’t: G13).

2. When informed of a permanent post office closure, the KMA must remove the post office from
its operational database, refusing to recognise it as a post office, and not scheduling further key
deliveries to it, from the point in time requested (Req’t: G14).

3.1.4 Key compromise

If a key compromise is suspected, it must be possible to take immediate steps to change to new values
and make the old values unusable (Req’t: G15). It must also be possible for such revocation not to be
done immediately (Req’t: G16). This is so that the operational costs of early revocation can be balanced
against the security risk of late revocation according to security policy.

3.1.5 Recovery from lost PO authentication data

Postmasters will from time to time lose the information necessary to boot up existing or install new PCs
in the post office. The system must to be able to recover quickly from these situations (Req’t: G17).

3.1.6 Poor maintenance of current crypto state by postmasters

Although new key material will from time to time be transmitted to post offices, it may happen that the
postmaster is slow to actually activate the new keys. A mixed key situation may arise. Normal working
and recovery procedures must cater for this (Req’t: G18).

It is required that a key change is enforced as far as possible, short of preventing normal post office
business, by stimulating the postmaster to take the necessary actions to enable the key change (Req’t:
G19).

See also Section 5.1.1.
3.1.7 Application-specific security requirements

Provision must be made for cryptographic key material for counter applications to be transmitted to the
post office from the KMC server and processed in post office PCs.

The application code itself may contain security information whose integrity and confidentiality must be
protected en route to the post office PCs

See Section 2.21 for specific requirements.

Page 50 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

3.2 Requirements arising from the Pathway Access Control Policy

The requirements below have been adapted from policy statements in [ACCPOL]. However, where a
requirement also duplicates one drawn from [CRYPARCH] it is not repeated here.

1. Confidential key material (symmetric keys, DSA private keys) should be held in clear only
when in physically secure environments (Req’t: G20).

2. Public keys (except the CA public key) should be held in certificates signed by the
Certification Authority (R2+) (Req’t: G21).

3. Symmetric keys should only be stored on filestore where necessary. Access to such keys
should be confined according to [ACCPOL] (Req’t: G22).

4. Part keys held in filestore must be in separate filestore (Req’t: G23). Access to such keys
should be confined according to [ACCPOL] (Req’t: G24).

5. New Key Encryption Keys should not be distributed solely under the protection of existing
key encryption keys (Req’t: G25).

6. Where a key is delivered in two parts (e.g. a red key and a black key), the parts should be
delivered by different routes (Req’t: G26).

7. Akey (or part key) that is handled manually must be held in a locked safe when not in use
(Req’t: P2). Access to this must be authorised and recorded in conformance with Pathway
procedures (Req’t: P3).
3.3 Key Generation
There is a requirement that from NR2 onwards, all central key generation be performed with the help of
the hardware random number generator, unless obtained from CESG (Req’t: G29).
3.4 Automated Key Records

At Release Ic key generation is recorded manually in Excel spreadsheet/paper key record logs. For every
key produced, the Key Production Log records the date and time of production, a unique identifier for the
key, the algorithm (e.g. DSA), description (e.g. PA signature), number of copies issued, how issued
(including label details of physical media), when issued and to whom.

Entries for CAPS Link keys also include details of the retention period used, and the previous key.

The key production log is used to record the delivery of keys and their Ids so that unique tags can be
assigned to each key and template.

The key production log is maintained (manually) using an Excel workbook with a separate work sheet for
each Key type (PA, SL CAPS ete.).

There is a requirement that this be automated so that key generation logs become automatically created in
a suitable electronic form, rather than paper-based (Req’t: G30). It must be possible for relevant parts of
the log to be updated, but this should be controlled and policed (Req’t: G31).

3.5 Certification Authority Workstation

It is required in NR2+ to have a Certification Authority Workstation (CAW) with the following
characteristics:

1. Any network to which the CAW is connected must be private, dedicated solely to the CAW’s
functions and must be physically secure. (Req’t: S62).

Page 51 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

2. The CAW must be positioned in a highly secure area, with access restricted as agreed by the
Cryptographic Key Manager (Req’t: S63)

3. The CAW must only be capable of operation when a CA private key has been loaded onto it
(Req’t: S64)

4. The CA private key must be loaded onto the CAW in 2 parts by staff using two different roles
(Req’t: S65)

5. No individual should know the whole CA private key (Req’t: S66)

6. The CAW will be capable of receiving uncertified public keys on a suitable removable media
- e.g. floppy disk. It should be possible to present these in batches as well as singly (Req’t:
S67).

7. Will be capable of signing a public key (or batch of public keys) using the CA private key,
producing certificate(s) containing the signed public key(s) (Req’t: S68).

8. The certificate semantics will be based on X.509 standards, but need not be fully X.509
conformant (Req’t: $69).

9. The mechanism must allow the certificates to be generated with a defined date after which the
certificate is not valid (based on validity of CA keys and the validity of the private key
corresponding to the certified public key) (Req’t: $70). This must be tailorable by the CA
(Req’t: $71).

10.The CAW will be capable of writing the certificates to removable media (Req’t: $72).
11.The CAW must be capable of signing (batches of) revocation messages (Req’t: $73).

12.The CAW must require authentication that includes a physical authentication token or is of
similar authentication quality (Req’t: $74).

13.The CAW must time out if not used for a period of time, requiring re-authentication for re-use
(Req’t: $75)

14. Availability and performance - see Sections 5.1.4 and 5.1.5.

Note: It is Barry’s call whether requirement 2 above makes requirement 12 unnecessary (12 is not
currently planned to be satisfied). However, despite physical security considerations, I still
believe that 12 *should* be a requirement. Password authentication is not in my view
appropriate for a sensitive service like this one.

Page 52 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

3.6 Security Event Management
There are three general requirements:

¢ [SFS] conformant and SEM conformant auditing (elaborated below) and event logging to NT
event logs must be supported (Req’t: G32).

© No plain-text key values must appear in audit logs (Req’t: G33).

« Security copies of old key values must be kept in a physically secure place in case they are
subsequently needed for legal or audit investigations (Req’t: P4).

CAW events are handled outside the scope of SEM, so separate facilities must be provided for viewing
and printing off CAW logs (Req’t: $76).

This rest of this section expands on what is meant by SEM conformant auditing/event mgt.
The [SEM] highlights a number of major areas for consideration. These are:

1. User administration (log on/off, timed)

2. Security incidents

3. System administration events

. Administration logs

. Network Mgt logs

. Supporting events

YA ws

. Specific security events (e.g. key mgt)
8. Configuration events (e.g. KMC server switch-over)
‘View access must be logged as well as update access.

Riposte messages should be logged (note happens automatically)

In terms of Key Management this is understood to mean that the events required to be logged are:
General

e System start-up
¢ System restart
© Controlled System Shutdown
KMA
¢ logon/out, success and failed attempts
¢ Prompts and nags
Key change requests
« Key change confirmations
e Receipts of FAD data
¢ Key change activities in sequence, including key cancellation and key requests
« Loading of Key data
¢ Key creation events

Page 53 of 68
RESTRICTED-COMMERCIAL
The ICL Pathway Project
SOLUTION Requirements for Key Management
Centre RESTRICTED-COMMERCIAL

Ref.

Issue:

Date:

FUJ00117491
FUJ00117491

RS/REQ/009
2.0
20" April 1999

Key packages sent out

PO sign-in

PO recovery

Help desk activities

Viewing of keys

Changes to key time-outs
Certificates requested and sent out
D-H exchanges (stage by stage)
Revocation messages (in and out)
Any Security Failures
APP-specific material generation or receipt

Post offices

Key packages arriving, and actions taken as a result
Signing of a message

Verifying a key

Any security fails

Moving to new key

Revocation Messages and actions taken

All stages of key change processes

PIN Changes

Recovery process - stage by stage

Key Generators

Key creation
Key records

CA Workstation

Logon/logoff, success and fails.
Keys Received

Key certification

Certificates extracted
Revocation message certification

VPN Servers

Administrator logon/logoff, success and fails

Policy, Configuration and Key file changes

PIN submissions, good and bad

Session key establishment failures (except “encrypt if you can”)
VPN community member authentication failures

Verifiers (on campus)

Security fails

RESTRICTED-COMMERCIAL

Page 54 of 68
The ICL Pathway Project
SOLUTION Requirements for Key Management
Centre RESTRICTED-COMMERCIAL

Ref.

Issue:

Date:

FUJ00117491
FUJ00117491

RS/REQ/009
2.0
20" April 1999

e Events for handling public key material
Help Desk

« Recovery requests and action taken

¢ Postmaster verbal authentication successes and failures
Other (e.g. CAPS machines)

¢ Key changes (both ends)

RESTRICTED-COMMERCIAL

Page 55 of 68
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

4. SOCIAL SYSTEM

This section contains a summary of pertinent factors of the organisational and people-based operations of
the Pathway system. It looks at the business processes being operated in the work groups, in order to
bring out the effects on the requirements for key management, and way that key management may affect
them.

At Release 1c we observed that a large proportion of problems arose from mismatches between the
solution and the social system into which it was to fit. This section attempts to address this in order to
reduce the number of such problems.

4.1 Day to Day Site Operations
4.1.1 Background

Where a non-post office site hosts an NT platform that uses a private key, the value is sent encrypted
over the automatic channel using Riposte, the encryption key for it being sent separately on an externally
presented exchangeable medium. Although these machines are managed from one remote CFM site,
there are on-site CFM operations staff looking after the day-to-day functions that cannot be managed
remotely. The physical loading of the key encryption key, on booting up a machine, is one of those
functions.

There are separate administration arrangements for BA, PAS and DLR remote machines. It is assumed
that similar functions are performed at all of these sites, and that the staff involved will have broadly the
same access rights to the systems they are managing.

In the event of a system break of any kind, there are penalty clauses, which apply if a machine cannot be
brought back up within a pre-determined period of time. On some sites, recovery time-scale requirements
are too short to be able to depend on any off-site staff being brought in to perform the restart. People on-
site are generally network people - the only local operational role. They are not vetted security staff. On
other sites, ones that have only one Pathway PC on them, CFM may bring in external support to re-boot a
broken PC. However that individual will also be a network support person.

Ifa fault requires replacement of a PC, current policy is to have a replacement permanently available on
the site of the PC it is to replace. There is a general requirement to keep the sofiware on this backup
machine up to date. This cannot be done as a special exercise, downloading all Tivoli updates when it is
brought into service, because the CFM contract with Tivoli is for downloads to be available only in
working hours, and breakdowns can occur at any time. This means that updates both to the live PC and
the backup must be done at the same time, and consequently that the backup PC must be powered on and
linked to the Tivoli delivery network alongside the live PC, even though it will not otherwise be
operational. The consequence of this is that encrypted keys delivered via Riposte as part of a key change,
will be able to be transmitted to the backup PC at the same time as to the live PC.

Once the backup PC has been swapped in, a new, factory fresh backup will need to be brought in and
brought up to date as soon as possible.

Page 56 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
ly Froy
SOLUTION Requirements for Key Management Issne: 20
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999
[ACCPOL] defines the following Access Control Policy roles for administering cryptographic key
material:

Role Main functions

Cryptographic Key Manager Generating or obtaining cryptographic keys and
organising their distribution.

Cryptographic Key Custodian Initial installation of cryptographic keys where this
needs to be done manually. Periodic update of these
keys.

Cryptographic Key Handler Handling the part of a cryptographic key that is held
on an exchangeable medium when this needs to be
re-installed e.g. when a system is rebooted.

The requirements that follow are expressed in terms of these roles. [ACCPOL] also defines the role of
PO Key Recoverer. This role, used primarily by the Help Desk, is discussed in Sections 4.5 and 4.7.

4.1.2 Requirements

It must be possible for an operational staff member already on shift to (re-) boot an on-site machine
without having to call in external support. This means that on the affected sites, the person needs to be
sufficiently trusted and given sufficient access rights to take on the role of Cryptographic Key Handler, a
role which has access to the required part key, held in a key safe (Req’t: P5).

It must be possible for a Key Handler to be able to boot up a backup PC that is replacing a broken one.
This means that whenever a Key Custodian visits the site to install a new key, it must also be installed in
the backup PC so the two machines are in synch. It also means that the backup’s Riposte service must
have been run up, with the backup PC on line, sufficiently recently to have received the latest automatic
channel key component (Req’t: G36).

These people do not have, and must not need to be given, access to privileged logons (e.g. root) to
perform their duties, so the cryptographic aspects of boot-up must not require such access (Req’t: $23).

Also, because of the lack of security clearance of the individuals involved, an exchangeable medium
containing key material must be of no use, by itself, to an attacker. In practice this means that it should
contain only a key part, not the full in-clear key (Req’t: G37).

4.2 System Management
System management actions should not require any access to key material (Req’t: G38). However:

¢ if system management action requires a platform to be rebooted, the requirements relating to
speed of completing a re-boot, described in the previous sub-section, need to be considered
(Req’t: G39),

¢ if system management action results in the replacement of a machine, the security
management actions relating to the initial installation of key material need to be able to be
performed. When a new NT platform is installed to replace a broken one, Key Custodian
privileges will be required to initialise the machine with the current or replacement key values
(Req’t: G40). In particular it must be possible for a key part to be transmitted down the
communications link and installed on the machine within the contracted time allowed for
restoring service on that link (Req’t: G41).

Page 57 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

© old key material held on filestore of discarded equipment must be destroyed, or rendered
valueless (for example by destruction of a key’s exchangeable medium component, or by
revocation in the case of a private key), or must continue to be physically protected after
equipment removal (Req’t: P6).

4.3 Network Management
It is in relation to VPN that security requirements arise:

In NR2+, VPN policy files need to be set up and maintained with the correct IP addresses and security
settings.

Router settings, which ensure traffic passes through the appropriate VPN Servers, both inbound to the
campuses and outbound from them, must be securely managed. Their integrity is a security issue, though
not a key management requirement.

The VPN security regime must be able to recover from any communications breakdown that the regime
may erroneously cause, in particular through errors in key management, within time-scales conformant to
network serviceability commitments. See Section 2.4 for specific requirements.

4.4 Security Management

Key management is a part of security management in general. [ACCPOL] separates key management
duties into three main roles: Creation of new key material, done by the Pathway Key Manager,
installation of new key material, done by a Key Custodian, and re-activation of key material, done by a
Key Handler. Key Handler actions are also covered separately in Section 4.1.

The following technical requirements apply to controls over the administrative processes used to perform
routine key installation and changes:

© Separation of duty: the Key Handler role must not be able to create (using Pathway facilities)
or install a new key value (Req’t: G42).; the Key Custodian role must not be expected to boot
up a system and should not be able to create new key values (Req’t: G43).; the Pathway Key
Manager role should not be able to manually install values he or she has created, or re-boot an
operational business system (Req’t: G3). This does not mean to say however, that a suitably
vetted individual may not be given multiple roles should operational conditions require it.

¢ The Key Custodian role should not need to have privileged access to the system on which he
or she is installing a key, except to perform the specific installation function itself (Req’t:
G44). No actions unrelated to key installation and review should be available to the Key
Custodian role (Req’t: G45).

e Routine key changes must be possible without the intervention of anyone other than the Key
Custodian (Req’t: G46).

Alarm and Alert handling will depend on the general security event solution.

4.5 Configuration Management

Software distribution is done from CM at Feltham. The Key Management solution must be able to
support the distribution and ongoing maintenance of SI signing key material for this site (Req’t: $77).

Auto-config is currently controlled by the implementation unit at Feltham, but there are suggestions that
the process may move to the data centres (Wigan and Bootle). Some of the data downloaded to a post
office at rollout time is signed using the SI signing key. The Key Management solution must therefore be
able to support the distribution and ongoing maintenance of SI signing key material for these sites,
keeping these two and the Feltham sites sufficiently synchronised so that valid signed messages from all

Page 58 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

three sites will always be accepted at post offices and other target systems, even though the different sites
may transiently be using different signing keys (Req’t: $78).

Before NR2+, Initial CHAP key values are distributed from the implementation unit. The medium on
which they are stored was required to remain physically secure and backed up at all times. Whenever a
post office gateway PC is swapped out, it was primed with a new copy of the current CHAP key for that
post office.

The role that can ask for the new CHAP key has not been defined in [ACCPOL] but a suitable one would
be PO Key Recoverer. However if procedures in the implementation unit are such that too many staff
would be given this role (remembering that it is also empowered to recover post office filestore key
values), then it would be better to devolve this access privilege to one of the support engineer roles
associated with rollout.

There is an overlap here with the requirements of the next section.

4.6 Manufacturing and Logistics

Manufacturing produce PC’s tailored to a pre-defined configuration. All Gateway PC’s are produced to
the same configuration. This configuration can be tailored by CM (Tivoli) at installation time. At the
same time, installed key sets and any revocation information that may be extant need to be able to be
brought up to date before the PC is used for business transactions. This involves Tivoli at autoconfig
time (and at other times up to and including NR2, superseded by Riposte messages from the KMC server
in later releases). In NR2+, the current VPN Keys (both normal and exception) need to be sent to the post
office. The key value is obtained from the KMC server.

Post office installation is performed by installation engineers, who do not have the expertise to diagnose
installation problems. They are instructed to swap in a new PC if an installation fails. The VPN key
delivery process must not prevent a restart of the installation process on the new PC (Req’t: $82).

4.7 Help Desk

Help desks are located in Stevenage and Manchester. They help support the recovery of key material lost
from post offices. Only individuals permitted to play the PO Key Recoverer role should be able to
provide or initiate the provision by the KMC server of recovery key material (Req’t: G47). When the
KMA is implemented this will involve a Communication between the Help Desk and the KMC server.
The link used for this must be integrity protected to prevent false authorisations by wiretap (Req’t: $83).
The help desk individual must be authenticated and individually accountable for actions taken (Req’t:
S84).

Page 59 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5. PERSPECTIVES

This section expresses the requirements from the perspective of each ‘user’ of Key Management. The
term ‘user’ is used in a broad sense meaning all those parties with any interest in key management, and
its implementation in Pathway, not just the people who will be using it.

The perspectives are subdivided into aspects, some of which are common across perspectives. The
aggregation across the perspectives gives a requirement set for each aspect.

5.1 Key Manager Perspective

5.1.1 Functionality

1. Viewing of key information including key period (but not key value) must be possible,
including when a key went into service and when it due to be replaced (Req’t: G48).

2. Updating of key periods must be possible (Req’t: G49).

3. For keys whose management is not fully automatic, the system must prompt a month in
advance of key change being due (Req’t: G50), and then, until the key change is confirmed
complete, again on the day the key change is due (Req’t: G51) and daily thereafter (Req’t:
G52).

4. Post Office-specific keys should be changed without prompting the ICL Pathway Key
manager (e.g. POK, FEK, VPN, and AP), but it should still be possible to instigate a change
manually, and to control the process manually - e.g. to mark a PO to be excluded (Req’t:
G53).

5. The KMC must be kept informed by a post office of which keys have been installed on which
platforms at that post office (Req’t: G54).

6. Failure to receive notification of installation within a policy defined period must be able to be
alerted to the Pathway Key Manager (Req’t: G55).

7. It must be technically possible to replace any key on a regular periodic basis, or rapidly on
compromise (Req’t: G56).

8. Key management should be as automated as possible (Req’t: H8).

9. Where keys are to be kept off-line they should be kept on floppy disks or memory cards or
CD-ROM, with non-removable labels (Req’t: G57).

10.Floppy disks should be duplicated for resilience purposes, but kept together at all times
(Req’t: P7).

11.Instigation of key part distribution over the wire via the KMC server must be supported
(Req’t: G58).

12.Confirmation of key changes are required (Req’t: G59).

13.The link between the Key Manager’s workstation and the KMC server needs to be a high
security one with mutual authentication (Req’t: $85). Particularly sensitive operations and
data transferred across that link must be cryptographically protected (Req’t: $86).

See also the requirements relating to the CA keys in Section 2.10.4.
5.1.2 Security
1. The CAW must be off-line at all times in a secure location with access restricted (Req’t:
S87).
Page 60 of 68
RESTRICTED-COMMERCIAL
FUJ00117491
FUJ00117491

The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5.1.4

5.1.5

5.1.6

2. The CAW must time out if not used for a period of time, requiring re-authentication for re-use

(Req’t: $36).

. From NR2+ onwards, all public keys except the CA’s itself must be protected in a certificate

signed by the CA (Req’t: G60).

. Suspected compromised keys should be able to be revoked immediately to prevent their

exploitation, though revocation must be able to be delayed by explicit decision of the Key
Manager to take the business risk on the grounds that immediate revocation would be more
costly. See Section 3.1.4.

. Keys should only be stored where necessary, and be held securely (Req’t: G61).
. No human being should need to see any confidential operational key value (Req’t: G62).

. Where a key is delivered in 2 parts (e.g. red key black key) the parts should be delivered by

different logical routes (e.g. one over the automatic channel and one over the interactive
channel) (Req’t: G63).

. A key should not be online until it is due to be used, or shortly before, since expiry is

considered to start at that point in time (except public keys) (Req’t: G64).

. Post office FEK, POK, VPN and APPR Keys should be replaced at a Post Office, by a

routine, automated key refreshment procedure, at intervals agreed with the Contracting
Authorities, based on advice from CESG (Req’t: G65).

10.Any key material passed between the Pathway campuses must be encrypted under Red Pike

using a key shared between the KMC servers at each campus (Req’t: G66).

11.From NR2+ onwards, the KMC server will be the source of the FEKs for all files except the

swap file, for which a new key will be dynamically established on each PC on each boot-up
(Req’t: S41).

Auditability

See Section 3.6.

Performance

Must cater for rollout rates (300/week) alongside migration of NR2 post offices (at a similar
rate) and routine key changes to already installed NR2+ post offices (Req’t: G67).

Availability

1.

The KMA functionality should be available to the key manager located in FELO1, with
controls over access and protection of key material that are broadly as strong as for
management access from within the ICL Pathway campus (Req’t: $42).

Migration

A mechanism must be defined to enable existing post offices to be moved smoothly onto
NR2+ key management mechanisms without loss of security (Req’t: G68).

Migration must be possible from NR2 PO’s (Req’t: G69).
Migration must not require visiting the PO except in rare situations (Req’t: G70).

The key management aspects of migration of a PO must not cause more than the contracted
loss of service, broadly this is 4 hours for a non-operational PO and 8 hours for a PO in
degraded mode. The definitive text can be found in [G10] (Req’t: G71).

Page 61 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5. Routine migration of a post office to NR2+ (using VPN) from NR2 (using CHAP) must not
require manual synchronisation of VPN encryption policy file information on every migrated
post office. Manual synchronisation should be required only in exception situations (Req’t:
G72)

5.1.7 Usability

1. A modern Key Manager GUI for normal operational activities must be provided (Req’t:
G73).

5.1.8 Reliability
1. Resilience to Key Manager finger trouble is required (Req’t: G74).

2. The ability to reset to a consistent state, so that communications can continue and subsequent
recovery is possible, if a communications or other failure cause a key mismatch during a key
change protocol (Req’t: G75).

5.2 Key Custodian Perspective
5.2.1 Functionality

1. Must be able to install and activate a new key at each site that is using part key material from
exchangeable medium in conjunction with matched values present on the system (Req’t:
G76).

2. Must be able to confirm that a key change attempted has been correctly achieved (Req’t:
G77).

5.2.2 Security

1. Secure storage is required, of part key material on exchangeable medium on all sites at which
the Key Custodian operates (Req’t: G78).

5.2.3 Auditability
1. [SFS]-conformant and SEM-conformant event logging to NT event logs. See Section 3.6.
5.2.4 Availability

1. Reinstallation of a lost key must be possible at all times that the system is operational
(Req’t: G79).

5.2.5 Usability

1. A modern Key Custodian GUI for normal operational activities must be provided (Req’t:
G80).

5.2.6 Reliability

1. Resilience to Key Custodian finger trouble is required (Req’t: G81).
5.3 Key Handler perspective
5.3.1 Functionality

1. Ability to obtain the necessary exchangeable medium to boot up systems on the sites the key
handler operates on (Req’t: G82).

2. Notification if the key in use is causing communications failures (Req’t: G83).

Page 62 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5.3.2 Security

1. Secure storage of part key material on exchangeable medium on all sites at which the Key
Handler operates (Req’t: P8).

5.3.3 Auditability
1. [SFS]-conformant and SEM-conformant event logging to NT event logs. See Section 3.6.
5.3.4 Availability

1. Reboot must be possible at all times that the system is required to be operational (Req’t:
G85).

5.3.5. Usability

1. A modern Key Handler GUI for normal operational activities must be provided (Req’t: G86).
5.3.6 Reliability

1. Resilience to Key Handler finger trouble is required (Req’t: G87).

5.4 Certification Authority Perspective
5.4.1 Security
@ as Section 5.1.2

@ a broken CAW should be kept physically secure until confidential key material on its filestore
can be erased (Req’t: $43).

5.4.2 Performance

1. CAW must be capable of coping with flow of certificates (average 300/week), and a sudden
rush of 20,000 over a two day period (in case a CA key is compromised) (Req’t: G88).

5.4.3, Availability

Since the KM workstation is used to prepare material for on the exchangeable medium that is used to
pass key material to and from the CAW, the CAW availability requirements extend to the KM
workstation.

1. In the event of a software failure, the CA, comprising in this context the CAW and the KM
workstation should be recoverable and able to issue revocations within one hour (Req’t: $45).

2. In the event of a hard CAW hardware failure, it should be possible to have the CAW running on an
alternative machine on the same site within 12 hours. In this case, the Pathway Key Manager may
choose to visit the CA on the other Pathway site in order to obtain quicker service (Req’t: $79).

3. In the event of a hard KM workstation failure, a substitute should be made available on the same site
within 12 hours (Req’t: $80).

5.5 Data Centre Operator Perspective
5.5.1 Usability

1. Key management must not require data centre staff not responsible for key handling to have
any knowledge of it (Req’t: H9).

Page 63 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5.6 Key Holder Perspective (Data centre and elsewhere)

5.6.1 Security
1. Keys must be held securely by the holder (Req’t: P9).

5.6.2. Usability
1. Keys must only be requested when absolutely needed (boot up and key change) (Req’t: G90).
2. Keys must never need to be asked for before the key holder has received them (Req’t: G91).

5.7 Security Auditor Perspective
5.7.1 Functionality
1. All security events must be logged (as per [SEM]). See Section 3.6.

2. Must be able to review underlying key data (e.g. status of keys but not their values) (Req’t:
G92).

3. Requires access to audit information (even off-line servers) (Req’t: G93).

5.8 External Post Office Auditor/Emergency Manager Perspective
5.8.1 Functionality
1. Requires features to examine PO key statistics (Req’t: G94).

2. Needs ability to get PO keys (specifically POK, FEK, and APPR) changed from the centre
(Req’t: G95).

3. Needs to be sure that nobody else can do this of their own accord (Req’t: G96).
4. Needs the ability to review audit logs (Req’t: G97).

5.9 Post Office Engineer Perspective
5.9.1 Usability
1. Must not require specialised knowledge of key handling (Req’t: H10).

2. Must be possible to install a replacement PC and get it serviceable in 30 minutes (Req’t:
G98).

5.10 Post Office Manager Perspective
5.10.1 Usability

1. Automatic recovery from loss of PMMC or PIN (via help desk phone call) (Req’t: $81),
even if the post office is not on-line (Req’t: 88).

2. The procedure must be simple and well defined, not requiring any IT knowledge (Req’t:
$89).

3. Routine key change procedures should be simple and well defined (Req’t: H11).
5.10.2 Reliability

1. Key mgt must not cause loss of service during opening hours (Req’t: H12).

Page 64 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5.10.3 Performance

No special requirements identified.

5.11 Post Office Staff and Customers Perspective
5.11.1 Usability
1. Key mgt should be totally invisible to these people (other than seeing the PMMC inserted at
boot-up by the postmaster) (Req’t: H13).
5.12 Post Office Trainee Perspective

5.12.1 Security

1. Training mode working at a post office must not compromise the security of operational keys
(Req’t: G99).

2. Training mode working at a post office must not compromise the cryptographic protection
provided by operational keys for operational data (Req’t: G100).
5.13 Help Desk Operator Perspective
5.13.1 Functionality

1. A help desk operator must be able to tell KMC server that a PO needs recovering (Req’t:
$90).

2. A help desk operator needs to be able to authenticate a postmaster over a remote voice link
(telephone line) (Req’t: $91).

5.13.2. Availability
None
5.13.3 Usability
1. A simple GUL is required for the Help Desk Operator - giving access only to authorised
functions (Req’t: $92).
5.14 Enterprise Mgt Perspective (ICL Pathway and POCL)
5.14.1 Security
1. All asymmetric keys must be revocable within hours rather than days (Req’t: G101),

2. Asymmetric keys should be made to expire through the use of certificate expiry dates, but to
prevent loss of service through late scheduled key changes, warnings for key types whose
refreshment is not fully automatic must be issued to the Pathway Key Manager for a policy
defined period prior to expiry. See Section 5.1.1.

3. the requirements of the Pathway access control policy [ACCPOL] must be met in terms of:
®@ logon procedures, for remote help desk and for key manager (Req’t: G102).
®@ accountability (Req’t: G103).
5.14.2 Reliability

1. Lack of reliability should not prevent the service from satisfying availability requirements
expressed elsewhere in this document (Req’t: H14).

Page 65 of 68
RESTRICTED-COMMERCIAL
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref. RS/REQ/009
SOLUTION Requirements for Key Management inn: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

5.14.3 Availability

1.

Changes of operational business keys should not require reboots of machines, but may require
reboots of Riposte Desktops (Req’t: G104).

. Ifa change to a key protection key is done via exchangeable medium, a reboot is acceptable,

but this must be able to be done at a time chosen by the local Key Custodian to minimise
business impact (Req’t: G105).

. Except ina rollout situation, unavailability of the KMC must not prevent a post office from

doing business (Req’t: G106).

5.14.4 Auditability
See Section 3.6.

5.14.5 Potential for Change

1.

The KM service must be extensible to cope with mgt of key material for post offices that is
specific to particular counter applications, without knowledge of the internal structure of that
key material. See Section 2.21.

. It must be flexible to cope with as yet undefined new symmetric and asymmetric key material

and its transmission, without changing the basic architecture the KMA (Req’t: G107).

. It must be flexible to cope with additional instances of clients for existing key types (for

example additional FTMS clients) where such additions are technically meaningful (Req’t:
G27).

5.14.6 Migration
See Section 5.1.6.
5.14.7 Installation

No special requirements identified.

5.15 Technical Support Perspective

1.

Any crypto protection provided for a pathway platform must not prevent technical support
staff from doing their job. In particular, it must not prevent support staff from running any
diagnostic software that current access control policy permits (Req’t: G28).

Unauthorised technical support staff should not be able to see, or otherwise obtain for future
use, any key material that is continuing to provide protection for operational data (Req’t:
G34). In some cases, it may be necessary for support staff to physically remove a platform
from its operational position. This should not compromise this requirement (Req’t: G35).

Support staff must be provided with enough information for problems arising from key
management related incidents to be accurately identified and fixed (Req’t: G84).

5.16 Application Developer Perspective

The key management system must be developed with a level of development security
consistent with good practice (Req’t: G89).

2. Live confidential key values must not be used in the testing environment (Req’t: G108).

Page 66 of 68
RESTRICTED-COMMERCIAL
The
SOLUTION
Centre

ICL Pathway Project

Requirements for Key Management
RESTRICTED-COMMERCIAL

Ref:
Issue:

Date:

RS/REQ/009

2.0

20" April 1999

6. APPENDIX A:

The following table is a matrix of keys and destinations (managed key clients) in NR2+. A tick shows that the key in that column must be distributed to the

platform on that row.

SUMMARY OF KEY USAGE

Managed Key
Client

Pr

AP SI PA

PKC I Pr PKC} Pr PKC

CA I FEK

POK

VPN

KI
Pu

CAPS

CMS

TIP/RD
Pr PKC

AP Client
Pr PKC

Post office gateway PC

Post office secondary PC

AP harvester

CM signing server

BPS loader agents

AIS

Vector server

Central VPN Security Servers

SISIS
NS

CAS VME platform

CAS Oracle db platform

TIP/RD Pathway gateway

TIP/RD POCL gateway

RD POCL gatewa

POCL Client sites

POCL Client Gateway

CMS local gateway

CMS remote gateway

All other Tivoli-managed

AISI STSTSTST SIS

NIST STSITSTSI SIS SS

Rambutan key values and the CK key are not shown as they are not managed by the key distribution service (though in the case of Rambutan, reminders for

key changes are supported by the KMA).

It will be seen that two keys, the SI public key certificate and the CA public key, must be distributed to many different types of client. It will also be seen that

the post office workstations (gateway and secondary) receive many different keys.

Page 67 of 68
RESTRICTED-COMMERCIAL

FUJ00117491
FUJ00117491
FUJ00117491

FUJ00117491
The ICL Pathway Project Ref.: RS/REQ/009
SOLUTION Requirements for Key Management Tamme: 2.0
Centre RESTRICTED-COMMERCIAL Date: 20" April 1999

Req’t
G001....... ™
G002....
G03,
G004
G05,
G006 .......
G007....
G08.
G009,
G010.......
G01...
G012
G13,
GO014.........
aai5 ......
G16...
G017
GO1B......
G019.......
G020....
G021
G022
G023..

025
026
G027.......
G028..

6029...
G030
G031
G032......
G33...
G034
035
036
6037 oo.
038...
039
G40...
G041......
G042...
043,
Goad

G102,
G103,
G04...
G10...
G106.
G107.

Goa7

048
049
G050......
G051...
G052
053
G54.
055

1003.
004.

Page 68 of 68
RESTRICTED-COMMERCIAL