FUJ00117496 - Management & Support for System Penetration Testing

Evidence on official site

FUJ00117496

FUJ00117496

ICL PATHWAY CHANGE PROPOSAL I CP NO: 1987

CP TITLE: DATE RAISED:
Management & Support for System Penetration Testing I 17th May 1999

DATE BY WHICH CP TO BE IMPACTED: ORIGINATOR:

24" May 1999 Barry Procter

RELEASE BY WHICH CP TO BE SPONSOR:
IMPLEMENTED: Barry Procter

LT2

CP CLASSIFICATI Line Manager Approval
FE “URGEN Martyn Bennett (RE VED)

RELATED PinICL’s: _ Not Applicable

1. Description of Change Proposed:

The NR2 Delivery Forum approved the penetration testing exercise [overview below] on
Monday 1‘ March 1999. (Penetration testing refers to both technical penetration testing and
counter penetration testing.)

The attachment to this CP includes resource, rig, timing and budgetary information provided
by Chris Wannell and Pete Dreweatt. The current Admiral assumption is that they may not be
able to complete testing by 11 July — an impact statement is required from Systems.

Technical Penetration Testing:

Admiral Management Services Ltd [AMSL] to undertake independent technical penetration
testing of ICL Pathway New Release 2 as described in their ‘Penetration Testing High Level
Test Plan’ [HLTP]. ICL Pathway Security have provided advice for the development of this
plan, which ensures that the proposed penetration testing will address the three major issues
described at [2] below. The following framework is proposed:

That ICL Pathway provides a test rig during LT2 [see attachment]. Full technical penetration
testing may then be applied in and end to end environment - fully exploiting all known, and
potential, technical fraud and denial of service weaknesses;

At the end of testing, full configuration files are to be captured from the test system. No actual
attack tests will be applied to the service in Live Trial, but test rig configuration files should
be compared to ensure the live environment is an exact duplicate of the tested system.

Testing has been scoped around known technical vulnerabilities in a card-based payment
system. The original BA-POCL ‘Threat Schedules’ have been reviewed to reflect the system
as it has evolved. These threats, together with the application of contemporary technical attack
tools, will form the framework to assure that no significant technical weaknesses exist in the
Live system.

In addition to the provision of a test environment, ICL Pathway are responsible for:

Page: I

FU,

FUJ00117496
00117496

The provision of access to the test environment for the testers;

“A technical point of contact who will be available to assist the testers with such matters as
installing test tools, creating and accessing test data (including user accounts), and.
interpreting IP network addresses;

A facility for testers, on a daily basis, to verbally inform the ICL Pathway IT Security
Manager of any vulnerabilities found during testing;

(1 The design and implementation of a counter (or solution), if any, to each vulnerability
found during testing if required.

Counter Penetration Testing:

Counter Penetration Testing (CPT) is being undertaken to ensure that within reason, ICL
Pathway has identified, prior to rollout, the counter processes where it may be exposed to an
increased risk of attack from those seeking to perpetrate a fraud. The purpose is to identify
where the documented (CS/PRO/023) counter procedures, when not adhered to, potentially
open the system to fraud.

Testing is limited to NR2 functionality. The primary objectives are to determine for both
Payment Card Distribution Facility (PCDF) and Benefit Encashment Service (BES) if fraud
threats can be realised. This may be by deliberate or accidental actions of either Post Office
counter staff or BA cardholders. Once threats have been identified then further testing will be
undertaken to establish if they can be exploited.

Counter Penetration testing will need to be carried out during live trial and in a stable end to
end test environment. Logically this could be the test rig set up for the purpose of conducting
Technical Penetration testing. Transaction Management Service (TMS) records should also
be available to enable tracking of the data elements of the various test scripts.

FRM staff will undertake the testing which is anticipated to take no more than ten days.
Summary of Requirements

An end to end environment incorporating multi post office and counter positions.
Population of the environment with, users, card batch details, customer records,
payments records etc.

“ PUNS, payment cards, temporary tokens.
Support for the environment and technical backup.
Access to the TMS Journal for the system to allow the examination of events.

General:

Penetration testing is being carried out solely as an ICL Pathway activity and it is neither an
Acceptance activity nor a contractual requirement. The results of the testing will be for ICL
Pathway information only.

Following discussion with Chris Wannell, the preference is for this Penetration testing activity

Page: 2

FU,

FUJ00117496
00117496

to take place in Bracknell.

2. Reason for Change:

Technical Testing:
The degree of confidence provided by existing technical security testing in Bracknell is
constrained because:

Technical security testing is unit based - it is not applied in an ‘end to end’ environment.
Each test failure is assessed for business impact, but a combination of test failures across
domains may create a greater risk than the sum of the parts.

L) All testing is undertaken in a changing test rig environment. It is impossible to guarantee
that every test rig configuration will be wholly duplicated in the live environment. Any
errors or omissions may introduce security weaknesses not present in testing.

The multiplicity of SFS and ACP requirements is an indication of the system’s security
complexity. The technical test team’s reports remark on ICL Pathway’s implementation
against requirements but technical testing does not identify any unforeseen shortcomings
in ICL Pathway’s security controls.

Technical penetration testing will supplement technical security testing. No duplication of
effort will take place.

Counter Testing:

The nature of fraud is such that it constantly evolves and changes shape as those seeking to
commit a fraud change targets and modify their methods to take advantage of perceived or
identified weaknesses in systems. Counter testing is therefore solely for the purpose of

providing an additional level of assurance to ICL Pathway concerning possible fraud risks.

3. Consequences if Not Approved:

ICL Pathway will be less able to assure the absence of potentially significant weaknesses in
the Live system.

4, Pathway Impact Assessment Distribution:

*Requirements, *Design, *Development, *Implementation, *Test & Integration, *PIT, *Quality
Management, *Architecture, *Customer Service, Y2000, Security, Risk & Fraud Management,
Commercial & Finance

*MANDATORY IMPACT ASSESSMENT

5. External Impact Assessment Distribution:

Name: Organisation: Contact No:

Page: 3

FUJ00117496
FUJ00117496

N/A N/A N/A
6. Impact On Pathway WBS
WBS Code. I Man-days* Man-days* Capital Schedule
(CP Analysis) I (CP
Implementation)
TOTAL

7. Impact On Products

Product Description Version to  be/I Version to I Schedule
Identifier Changed be
Delivered
N/A /A N/A N/A N/A
8. Impactor Recommendation/Comments:
APPROVE/REJECT/NO COMMENT
IMPACTORS NAME:
EXTENSION NO: DATE:

Change Administration Use Only

SCP No:

CR No:

CCN No:

Page: 4

PA/TEM/004 Version 6.0
CHANGE PROPOSAL
ID: PWY_CP_1987 Create Date: 17-MAY-1999 1 244
Status: WITHDRAWN Originator: Lisa Morcom (Change Management)
Title

Management & Support for System Penetration Testing

Related Items

Info

1 PWY:CP_01987_1.A-CDATTACH:1 (Info) Lisa Morcom (Change Management)
(CP_01987_I.doc)
CP 1987 ATTACHMENT 1

Related Child Change Documents

Related Parent Change Documents

Impact Notes

Commercial & Finance

CS: Service Support
Service Delivery
Security & Risk
Service Introduction
Service Transformation
Core Services

DEV: ACE
AASS
Agent No Impact
APOP Admin WS.
Athene
Audit
AutoConfig & CurSched
Counter APS.
Counter EOL
Cryptography
Data Warehouse No Impact
DELT
Design Authority
FTMS
Host APOP
Host APS

Page: 5

FUJ00117496
FUJ00117496
Host DRS

Host LFS

Host NPS

Host RDMC

Host TES

Host TPS
Infrastructure
MTAS

Maestro

Message Broadcast
Networks

OCMS

Ops Documentation
Proxy Delivery Service
Reference Data
Secure Builds

SMG

Tools & Emulators
VPN

ITU: RV
Support
SVI
TD

PMSP: Planning
Project Mgmt
Sofiware CM

Quality & Audit

Fujitsu Reference Data Required
Post Office Reference Data Required
Post Office Dependency Exists

Archived Impact Notes

CM_HARDWARE_IMPACT=No Impact
T_AND_I_IMPACT=No Impact
TSC_AGENTS_DEV_IMPACT=No Impact
DWH_DS=No Impact
CS_OTT_IMPACT=Impact
TMPLEMENTATION_IMPACT=No Impact
RISK_IMPACT=Impact
QUALITY_IMPACT=No Impact
PTU_OTT_IMPACT=Impact
APDU_AGENTS=No Impact
APDU_DWH=No Impact
PTU_LST_IMPACT=Impact
TIIMPACT=Impact
CS_REL_MGMT_IMPACT=Pending

‘New CP

Impact
Impact

No Impact

No Impact

Action Messages

Action Number: 4 Date May 20 1999 08:07:25 By: Hazel Salvat

Page: 6

FUJ00117496
FUJ00117496
FUJ00117496

FUJ00117496

IMPLEMENTATION DATACENTRES COMMENT (John Davies): No impact. 19/5/99

Action Number: 4 Date May 20 1999 08:22:48 By: Hazel Salvat
IMPLEMENTATION COUNTER HARDWARE COMMENT (lan Openshaw): No impact. 19/5/99

Action Number: 4 Date May 20 1999 08:37:45 By: Hazel Salvat
IMPLEMENTATION COMMENT (Billy Herd): No impact. 19/5/99

Action Number: 4 Date May 20 1999 09:16:58 By: Martin Bailey
CM - SOFTWARE : Zero impact, HARDWARE : Zero impact.

Action Number: 4 Date May 20 1999 12:59:08 By: Lisa Morcom

COMMENT FROM JOHN WRIGHT:Barry,Note: re Temporary Tokens, the service & infrastructure are not yet
established, thus DLR unable to produce TT's for any test purposes. Also am unsure whether counters can
currently process TT's. I leave you to check.Regards, John.20,5.99

Action Number: 4 Date May 20 1999 14:08:17 By: Neil Forde
TECHNICAL INTEGRATION: No PIT impact. BRAO! Technical Testing: 2 man days planning, estimated 6
man days to build over 4 days, 4 man weeks over 3 weeks for NT and N/W support.

Action Number: 4 Date May 20 1999 15:34:38 By: Lisa Morcom

Architecture impact (Alan Ward)Review of test plans and tests 2 daysReview of Interim findings (as
they occur) 4 daysReview of drafV/final report 2 daysComment & recommendations on pen test
vulnerabilities 3 days total 11 days20.5.99

Action Number: 4 Date May 21 1999 08:39:20 By: Lisa Morcom

SECURITY DEVELOPMENT IMPACT (Alan D'Alvarez):I have a number of concerns with this CP evolving
around allocation of resources for this exercise.Currently, the majority of security test resource, staff and
equipment, are 'tied up’ on supporting LT2 activity until the 16th June. Alongside this, there is an urgent
requirement for scoping NR2+ security testing to enable a fully supportable end to end Security Delivery Unit
plan to be baselined within the Programme Office.There are additional issues with regard to the equipment
allocation within the various Delivery Units to support technical testing. It is currently acknowledged that there
may be a likely shortfall and activities are currently in hand to scope and address this issue. However,
Penetration Testing will be a further requirement that needs to be part of this, Who has been assigned to manage
the penetration testing exercise? Before further comment can be made, I require access to a resourced plan for
this activity to understand how it may impact on the activities I require to be completed.20.5.99

Action Number: 4 Date May 21 1999 09:07:02 By: David Groom
QUALITY No impact

Action Number: 4 Date May 21 1999 09:25:31 By: Hazel Salvat
IMPLEMENTATION COMMENT (Dean Felix): No impact on training. 21/5/99

Action Number: 4 Date May 21 1999 17:24:52 By: Lisa Morcom
PR IMPACT (Anna Campopiano):No impact.21.5.99

Action Number: 4 Date May 24 1999 08:31:07 By: Hazel Salvat
TMPLEMENTATION MIGRATION TRANSITION COMMENT (Martin Taylor): No impact. 21/5/99

Page: 7
FUJ00117496

FUJ00117496

Action Number: 4 Date May 24 1999 16:05:40 By: Suzanne Gordon

BRAOITT: Two issues/impacts. The first is on the use of the Security/SysMan test rig for pen testing. The rig
has already been earmarked for end to end volume rollout testing in this timeframe. The pen testers will probably
not want to share a rig with other testers. Furthermore the recent reorganisation has identified issues with
allocation of BRAOITT kit and personnel whose resolution will affect the implementation of this CP. Secondly,
this pen testing has a strong business element to it. The current test rig has simple arrangements for simulating
the business environment, with small numbers of payments being injected in order to test the security facilities.
Some time would have to be set aside to introduce a representative business environment, say 20 mds. (CQ)

Action Number: 6 Date Jun 2 1999 09:19:25 By: Lisa Morcom

PCCB DECISION (MTG 130):DEFERRED - PCCB defer this CP as there are issues surrounding the allocation
of test equipment.Action: B Proctor to discuss and agree testing strategy and timescaleswith C Quinn and report
outcome to PCCB.2.6.99

Action Number: 6 Date Jun 2 1999 13:50:57 By: Hazel Salvat
IMPLEMENTATION SCHEDULING COMMENT (Steve Burgess): No impact. 2/6/99

Action Number: 6 Date Jun 3 1999 16:22:36 By: Lisa Morcom

COMMENT FROM BARRY PROCTOR/COLUM QUINN: Procter Barry:The requirement (my responsibility)
has been accepted; It strikes me that the action must now be within the Development Directorate to nominate a
Penetration Testing Manager who can resolve the kit allocation and any other
anomolies.Colum.Quinn(a)icl.com:Barry, I was surprised to be included in this action. At the PCCB I raisedthe
issue of allocation of kit because, due to the reorganisation, BRAO1TTwinds up its activities 16Jun and its
resources are being split between theDelivery Units and Business & Technical Conformance. It's not clear who
isgoing to sort this out so my understanding was that the issue was beingreferred back to you as the CP
sponsor/originator. I think the next step isfor you to identify and agree who is managing the pen testing
activity.3.6.

Action Number: 6 Date Jun 7 1999 14:03:14 By: Lisa Morcom
ACTION FROM BARRY PROCTOR:1 have written to Colum Quinn seeking clarification.7.6.99

Action Number: 6 Date Jun 9 1999 07:28:14 By: Jan Holmes
Suspend, since the scope of this should be reviewed following BA withdrawal

Action Number: 6 Date Jun 9 1999 08:51:43 By: Lisa Morcom

CUSTOMER SERVICE IMPACT (Janet Reynolds):(John Wright) Note: re Temporary Tokens, the service &
infrastructure are not yetestablished, thus DLR unable to produce TT's for any test purposes. Also amunsure
whether counters can currently process TT's. I leave you to check.(Mik Peach) The CP states that testing
facilities, rig ete will be provided,and that "Following discussion with Chris Wannell, the preference is forthis
Penetration testing activity to take place in Bracknell".On the assumption that this means the Solution Centre
rather than the SSC,then there is no impact on the SSC.If the implication is that CS need to find the rig, and
provide the requiredaccess facilities etc, then this would have a very significant impact on theSSC, and may not
be possible at all.(Barry Procter) Mik, The intention is for TSC-equivalent to host andresource these tests.(Janet
Reynolds) Zero Impact received from the following members of customerservice: Peter Robinson, Dave
Fletcher, Dave Wilcox, Mike Stewart, MikeWoolgar, Richard Brunskil.9.6.99

Action Number: 6 Date Jul 13 1999 14:35:31 By: Graham King

Risk - events have now passed this CP by - the removal of BES and PCDF invalidates the original counter test
objectives. This part of the CP needs review to ascertain whether the expenditure of resource on this activity is
viable.

Page: 8
FUJ00117496
FUJ00117496

Action Number: 7 Date Aug 5 1999 15:57:14 By: Sue Rutherford
PCCB DECISION (Mig NO.140):
WITHDRAWN: PCCB sanctioned the withdrawal of this CP. I-Honnor stated that due to the withdrawal of BES

the scope of this CP had changed, however, the requirement to test on other aspects of the system remains.
05/08/99

Page: 9