Ref ISSUE STATUS
11 Taking into account the changes that are to be introduced at S80 to branch accounting Clive Read confirmed working assumption for CD
processes and reporting, confirmation is required concerning the evidence required to verify would be that requirement satisfied by:
branch conformance to POL accounting standards. Q_ signed copy of SU Balance Report retained at
In summary, the following changes are proposed at S80: branch (unchanged from current process)
a The POL Ledgers will be fed on a daily basis from trading information automatically Q__ signed copy of BTS retained at branch with
generated by Horizon. The Cash Account will no longer be used in the construction of wording (to be supplied by POL) detailing
the POL Ledgers undertaking associated with signature
Q_ the existing weekly Cash Account process will be withdrawn. This process currently Q_ event sent to central systems (inc. MIS)
produces a report that is signed with one copy sent to POL and a second copy retained indicating BTS produced by branch
at the branch Action: PB to incorporate working assumption in
Q Balance reports are also produced weekly at the branch for each Stock Unit, a copy of CD. Issue Closed
which is signed by branch office staff and retained at the branch
a> anew Branch Trading Statement is to be introduced that the branch will be required to
produce on a monthly basis. Requirements for signing and retention of reports to be
confirmed. The conditions governing the process for producing this report are broadly
similar to that for the existing Cash Account (see CD for full details)
Action: Tony Utting to confirm POL requirements. Response required by 18/2/04.
1.2 Taking into account the requirements for a monthly Branch Trading Statement, confirmation FS provided assessment to Clive Read/ David
is required concerning the impact on the Horizon infrastructure of increasing the retention of I Parnell on 12/2/04. Following POL review of cost
transaction data at the branch from the current 35 days to 49 days. In particular, the impact implications, Clive Read requested (24/2) impact
assessment should consider branch and central storage requirements and processing times I assessment of 49 days data retention at branch and
for branch reports. 35 days at data centre to try and avoid data centre
storage upgrade. GJ issued notes (26/2) reporting
investigation results with options for POL
consideration.
Action: Clive Read to review GJ notes and confirm
working assumption for CD.
1.3 Confirmation is needed concerning the POL requirement to use the rem out Proposal circulated by Philip Godden on 10/2/04.
dockets/vouchers functionality. It is understood that some sub-set of the following may be Consideration needed regarding POL FS
involved: requirement for rems. Suggestion that could
‘i assume no rems and drive from cut-offs.
1 Losses (various categories) and gains
3 Patt ech empense / purchases Action: Ben Gildersleve/Chris Allen to confirm
4. Robbery & Burglary clearance working assumption for CD (also need to address
related issue 1.4 below).
Vsn 9.0 Page I of 5 27/02/2004
IMPACT R3 Branch Trading Issues

FUJ00126053

FUJ00126053

Ref ISSUE STATUS
5 Write offs (various categories)
6. Intruder Alarms (Directly managed only)
7. Counterfeit Notes (DM only)
8. MVLs to car hire companies (DM only)
9. Obsolete Stock (Agents only)
10. Customer Goodwill (Agents only)
11. Spoilt Postage Labels (Agents only)
12. Redeemed savings stamps (BBC, DVLA..)
This information is required to assess the impact on associated reporting, e.g. opportunities
to remove or implied change required to existing product specific reports. (see also FS CD
review comment 18/2 Nos. 2 & 4)
1.4 Confirmation is needed concerning how stock/ vouchers/ dockets items are required to be Action: Ben Gildersleve/Chris Allen to confirm POL
mapped onto accounting and will they be represented on branch reports/accounts. requirements (see related issue 1.3 above).
This information is required to help identify/confirm associated migration requirements.
1.5 Confirmation is needed regarding requirements concerned with the reconciliation of Notes produced from POL review (23/2) have not
transactions to be supported by Horizon automation. finalised requirement. POL/FS review (24/2)
This information is required to enable the assessment to progress with the identification of requested GJ to produce CD working assumption
scope for the reconciliation simplifications and associated cost savings anticipated by covering proposed APS/TPS merge.
Schedule 12 of the Fujitsu contract. (see also AW CD review comment 18/2 No. 3) Action: Gareth Jenkins to draft CD working
assumption
1.6 Confirm impact on solution costs of removing stock values from existing Horizon reports. Assessment provided to Clive Read and David
Gareth Jenkins to provide impact assessment by 18/2/04. Parnell on 12/2/04. Clive Read confirmed working
assumption for CD should be that stock values
should be removed from all Horizon reports.
Issue Closed
1.8 Confirm re-engineering of DVLA product, to enable it to be controlled by Horizon, is out of POLI/FS 24/2 review confirmed working assumption
scope for IMPACT and will be addressed by a separate CR if required, i.e. DVLA product will I for CD should be that MVLs are treated as a single
remain uncontrolled (non-value) at S80. stock type for the purpose of reporting to POL FS.
Investigations have shown that, compounded by S60 changes to DVLA product handling Action: PB to incorporate working assumption in
incorporating use of ADC, it cannot be changed to controlled stock simply by changing the cD.
associated reference data and would require non-trivial re-engineering to achieve the Action: Dave Parnell/Clive Read to investigate
change. within POL impact of working assumption.
21 Review and confirm resolution of design authority issues (as notified on 11/2/04) arising from I Individual items relevant to Branch Trading detailed
team review of 2/2/04 CD working draft. individually below (3.1-3.6). Issue Closed
2.2 Review results of updated assessment report on requirement scope issues provided to POL I Clive Read confirmed that working assumptions for
on 12/2/04 with the objective of confirming scope change or amending requirement. CD should include extended requirement scope
Vsn 9.0 Page 2 of 5 27/02/2004
IMPACT R3 Branch Trading Issues

FUJ00126053

FUJ00126053

Ref ISSUE STATUS
subject to data retention investigation detailed in
issue 1.2 above. Issue Closed

2.3 List of Horizon branch reports has been annotated by Ben/John/Sheena/Julie/Fujitsu with Feedback received from Ben. POL/FS 24/2 review
anticipated changes resulting from IMPACT 3 requirements. Fujitsu clarifications forwarded confirmed results should be included in CD.
to Ben 12/2/04. Action: PB to incorporate working assumption in

CD. Issue Closed

2.4 Following discussions between Tony Marsh and Clive Read, a review meeting has been To be addressed at Stakeholder review on 26/2
arranged for 18/2/04 to examine a proposal to remove the current method of posting Action: Clive Read to confirm requirement (27/2)
discrepancies into a branch Suspense account.

25 Following discussions with IMPACT Stakeholders, a review meeting has been arranged for POL/FS 24/2 review confirmed Horizon should
18/2/04 to examine a proposal to continue to report daily cash declarations to SAP ADS. continue to report daily cash declarations to SAP
Action: Clive Read to notify Phil Boardman of any revisions to associated requirement by ADS.

18/2/04 for inclusion in CD. Action: PB to incorporate working assumption in
CD. Issue Closed

26 Review meeting in London on 11/2/04 confirmed that TMS/AIS requirements are not As agreed at POL/FS 24/2 review, GJ issued note
expected to be completed on a timescale compatible with scheduled CD production. (27/2) detailing working assumptions and details of
Decision taken to include sufficient information in CD regarding TMS/AIS to enable solution “missing” information that needs to be in CD to
design work to proceed. (see also 3.5 below) enable DP/CT work to proceed in lieu of finalized

TMSI/AIS requirements.

Action: CR/DP to review/confirm working
assumptions for CD and to provide working
assumptions for “missing” information.

3.1 Confirm Horizon events POL require to be forwarded to POL MIS (Data Flow Item 2 from GJ forwarded (27/2) list of Horizon events to DP to
11/2 S80 design review). (see also JD/BG CD review comments 18/2 No. 40 & 41) assist with requirement identification.

Action: DP to confirm POL requirement

3.2 Confirm requirement regarding current CBDB feed to SAP ADS relating to DWP/ IR/ Clive Read confirmed (24/2) working assumption for

Girobank payments (Cash Account Line Values) (Item 6 from 11/2 S80 design review) CD should be that this feed is not to be carried
forward into TMS.
Action: PB to incorporate working assumption in
CD. Issue Closed

3.3 Horizon currently provides stock on hand information to SAP ADS which is not used. Clive Read confirmed (24/2) working assumption for
Confirm requirement to remove this feed as stock volumes are to be managed from POL FS. I CD should be that this feed to SAP ADS is not
(Data Flow Item 7 from 11/2 S80 design review) required to be supported by TMS.

Action: PB to incorporate working assumption in
CD. Issue Closed
3.4 Requirements to be confirmed concerning carry forward into TMS of existing feed of Camelot _I Action: DP/CR to confirm requirement working
Vsn 9.0 Page 3 of 5 27/02/2004
IMPACT R3 Branch Trading Issues

FUJ00126053

FUJ00126053

Ref

ISSUE

STATUS

related data to Martins. (Data Flow Item 10 from 11/2 S80 design review)

assumption for CD. (see also issue 2.6 above)

3.5

Confirmation of DPI, Parcel Force TMS feed requirement (Data Flow Item 13 from 11/2 S80.
design review)

Action: DP/CR to confirm requirement working
assumption for CD. (see also issue 2.6 above)

3.6

Confirm requirements for mapping POL FS ledger entries back onto Horizon products for
POL FS to Horizon information flows (Data Flow Item 3 from 11/2 S80 design review)

GJ/PG confirmed mapping arrangements which are
to be implemented in TMS and driven from the
same ref data that is used for the TMS/POL FS flow.
Resulting requirement to be documented in POL
FS/TMS AIS.

Issue Closed

3.7

Confirm requirements for handling non-accounting data (including centrally identified
corrections). (“Other Functionality” note from 11/2 S80 design review)

Problems identified with proposal to handle in POL
FS. GJ provided note (27/2) detailing list of services
that require support for non-accounting data.
Action: Dave Parnell/Chris Allen to confirm
requirement working assumption for CD

3.8

Confirm data feed requirements from TMS to SAP HR (HP CD review comment 18/2 No. 50)

CR confirmed (24/2) working assumption for CD
should be feed is 1 month in arrears.

Action: PB to incorporate working assumption in
cD.

Action: Clive Read to check assumption with
business

Issue Assumed Closed

3.9

Amend Section 18.2, A.4.1.2.5 to reflect needs to be performed at transition from period B to
C (HP CD review comment 18/2 No. 55)

Action: PB to incorporate working assumption in
CD. Issue Closed

3.10

Confirm requirement details for handling “other stamps” by value rather than volume,
addressing the question of non-denominational stamps, e.g. Euro stamp (FS CD review
comment 18/2 No. 1)

CR confirmed (24/2) working assumption for CD
should be that non-denominational stamps, e.g.
Euro stamp, should be made a specific product, c.f.
1st and 2™ class stamps. Other stamps should be
denominational only, e.g. 28p, £1, etc, and to be
reported by value.

Action: PB to incorporate working assumption in
CD. Issue Closed

3.11

Confirm requirement concerning vouchers/dockets remaining at the end of a balance period.
(FS CD review comment 18/2 No. 3)

BG confirmed (24/2) check that all vouchers/dockets
rem’d out only applies at end of trading period not at
end of intervening balance periods.

Action: PB to incorporate working assumption in
CD. Issue Closed

Vsn 9.0

Page 4 of 5

27/02/2004
IMPACT R3 Branch Trading Issues

FUJ00126053

FUJ00126053

Ref ISSUE STATUS

3.12 I Confirm cheque handling requirements (FS CD review comment 18/2 No. 6) CR confirmed (24/2) comment “cheques should
work like this in future” should be removed from
section 10.1.2.5 (under automation entry) of the
draft CD.
Action: DP/CR to review POL cheque handling
requirements.
Action: PB to incorporate agreed working
assumption in CD. Issue Closed

3.13 I Confirm requirement for trigger condition that enables Horizon/OPTip feed to be switched Action: DP/CR to confirm requirement.

off(FS CD review comment 18/2 No. 8)
3.14 I Confirm requirement to remove Counter Weekly DVLA V10 and V11 reports CR confirmed (24/2) working assumption for CD is

to remove reports.

Action: DP/CR to confirm requirement with
business

Action: PB to incorporate agreed working
assumption in CD. Issue Closed