oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL
Document Title: HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
Document Reference: COM/MGT/REP/4167
CP/CWO Reference: N/A
Abstract: Explanation of how the delivery of Fujitsu services is measured to
support a criteria based view of HNG-A robustness.
Document Status: APPROVED
Author & Dept: Fujitsu
External Distribution: Restricted. See section titled Information Distribution.
Information See section 0.8
Classification:
Approval Authorities:
Name Role
Fujitsu Horizon Audit Team (POA) See Dimensions for record
OC ht Fujitsu 2021
‘opyright Fujitsu FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 1 of 34.
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT .
FUJITSU FUJITSU CONFIDENTIAL

Table of Contents

0 DOCUMENT CONTROL 4
0.1. Document History 4
0.2 Review Details ...... 4
0.3 Associated Documents (Internal & External) 4
0.4 Abbreviat 4
0.5 Glossary 5
0.6 Changes Exp 5
0.7. Accuracy... 5
0.8 Information Class 5
1 EXECUTIVE SUMMARY .......ccssssssssssesssesesnsse sesssesnenssesessesnenceeseenean sesseeanensaeeeten 6
2 PURPOSE & SCOPE........ccesssssssssssesnsasse seseseensseseeseecsncsesceacasen seseeceeeseeeesransnenss 7
3 BACKGROUND & INTRODUCTION ........ccssssssssssessessseses cotssesesessceesesrensnenseeees 7

4 APPROACH...

5 SERVICE DELIVERY METRICS

5.1 Operational Metrics..........
5.2 Service Operations Metrics.
5.2.1 Operations Highlights.
5.2.2 Incidents...
5.2.3. Major Incidents. 10
5.2.4 Service Dashboard
5.2.5 APPSUP.............
5.2.6 Horizon Known Errors Review Forum.
5.3 Key Interaction:
5.4 The Reports ..

5.5 Business Continui 14
6 FORMAL AUDIT REPORTS......c.cccscsssesssssssessseses cosseesescseceeseeseersnensecses cosseseees 15
7 CONCLUSIONS. ........cscsesessssesnsstscses cossecseseessasseesescsnenssesee sensseaeansasaenseesscesensnee 16

8 RECOMMENDATIONS.

9 INFORMATION DISTRIBUTION........ssscssesssssssessessses cossessnssesesesesseeesenesnsane erase 16
APPENDIX A — SERVICE MANAGEMENT REVIEW REPORT EXTRACTS......... 18
APPENDIX B — POL HORICE QUERIES..........ssssssssesssssssssesees snssessessesseseessneaseenseeeee 21
APPENDIX C — HORICE SCREENSHOTS ........sssssssesssssseesssesee caesssssessnseceesseaseneeees 28
© Copyright Fujitsu 2021 FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 2 of 34
FUJ00232717

FUJ00232717
oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL
APPENDIX D — RECOMMENDATION G..........scssscsssssssssssesees seseeesssnesssenesetsneneneeees oo 34
© Copyright Fujitsu 2021 FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 3 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

0 Document Control

0.1 Document History

Version No. Date ‘Summary of Changes and Reason for Issue Associated Change

CWO, CP, CCN or
Peak Reference

1.0 12/03/2021 Approved for release N/A

0.2 Review Details

Mandatory Review

Role Name

Horizon Audit Team Fujitsu

0.3 Associated Documents (Internal & External)

Reference Version Date Title Source
COM/MGT/REP/4162 I Latest Latest Expanded Table of Contents for the HNGA Dimensions
Robustness (Service Delivery Metrics) Report
COM/MGT/REP/4168 I Latest Latest The SDLC Report Dimensions
COM/MGT/REP/4166 I Latest Latest The Testing & QA Report Dimensions
COM/MGT/REP/4165 I Latest Latest The RA Report Dimensions
COM/MGT/REP/4169 I Latest Latest The BED Report (29 BED AS IDENTIFIED BY I Dimensions
FRASER J)
COM/MGT/REP/4184 I Latest Latest The BED Current Process Report Dimensions
0.4 Abbreviations
AWS: Amazon Web Services
BAU Business As Usual
BED Bugs, Errors and Defects
BIF Business Impact Forum (Fujitsu attendees)
CBA Counter Business Application
ccD Contract Controlled Document
HORIce Horizon Information Centre
ISMF Information Security Management Forum
ITDSD IT Digital Service Desk (POL 1* line service desk)
ITSCM IT System Configuration Management
MAC. Major Account Controllers
OBC Operational Business Change
POA Post Office Account
POL Post Office Limited
RA Remote Access
© Copyright Fujitsu 2021 FUJITSU CONFIDENTIAL Ref, COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 4 of 34.
FUJ00232717

FUJ00232717
oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

Abbreviation Definition

RAB Release Acceptance Board

RAM Release Acceptance Meeting

SDLC Software Delivery Life Cycle

SLT Service Level Target

SMC Fujitsu Systems Management Centre

SMR Service Management Review

SPM POL subpostmaster

0.5 Glossary

Term Definition

APPSUP. Fujitsu elevated privilege (see RA Report for explanation)

HNG-A The HNG-X Counter Business Application adapted to run on Windows operating
systems other than NT4, providing all of the functionality of the HNG-X Counter
Business Application

HNG-X HNG-X was a project that replaced the Horizon message-based branch network with
the Horizon on-line branch service. Also known as Horizon Online. This was rolled
out in 2010

Tivoli IBM Tivoli Monitoring is a suite of products performing operating systems monitoring,
database monitoring and user defined monitoring. Tivoli agents are able to take local
corrective action to resolve monitoring issues and also send monitoring data to a
central system where it can be viewed and used for reporting purposes

0.6 Changes Expected

0.7 Accuracy

Fujitsu endeavours to ensure that the information contained in this report is accurate but, while every effort is
made to ensure the accuracy of such information, it accepts no liability for any loss (however caused) sustained
as a result of any error or omission herein

0.8 Information Classification

The author has assessed the information in this document for risk of disclosure and has assigned an information
classification of FUJITSU CONFIDENTIAL. This report is also subject to the Information Distribution statements
in Section 9.

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 5 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

1 Executive Summary

The purpose and scope of this report is to explain how the delivery of the HNG-X services provided by
Fujitsu is currently measured. This report provides POL with information to understand how Fujitsu
currently provides this capability for the live environment.

On 20 August 2020, POL requested an audit of the HNG-X services by sending a letter to Fujitsu titled
“Horizon Audit”. Following a number of discussions between POL and Fujitsu, it was agreed by POL
that Fujitsu would prepare a set of reports on key topic areas identified by POL.

This report explains how the delivery of the HNG-X services provided by Fujitsu is currently measured
(“HNG-A Robustness (Service Delivery Metrics) Report”). It follows the “Expanded Table of Contents
for the HNG-A Robustness (Service Delivery Metrics) Report” (COM/MGT/REP/4162) which was
shared with POL on 09 December 2020.

The adaptation of the HNG-X Counter Business Application (CBA) to work with Windows devices
other than NT4, known as HNG-A, was rolled out with the Branch Counter Refresh in 2017 and 2018.

HNG-X has been built and improved jointly with POL over many years. It is a large and complex IT
solution that integrates with POL and its other third party suppliers. Fujitsu believes that the HNG-X
services it provides are delivered effectively.

A compilation of recommendations for improvement is contained in Appendix D. The list in Appendix
D collates the various action items into a single list so that POL and Fujitsu can work jointly to act on
these recommendations.

POL is invited to comment on this report to seek any additional clarifications it needs. Fujitsu will
endeavour to respond to any comments or clarifications requested and may, if it deems necessary,
provide an updated version of this report.

Fujitsu welcomes the opportunity to provide this report.

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 6 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

2 Purpose & Scope

The purpose and scope of this report is to explain how the delivery of the HNG-X services provided by
Fujitsu is currently measured. This report provides POL with information to understand how Fujitsu
currently provides this capability for the live environment.

POL is invited to comment on this report to seek any additional clarifications t needs. Fujitsu will
endeavour to respond to any comments or clarifications requested and may, if it deems necessary,
provide an updated version of this report.

Fujitsu welcomes the opportunity to provide this report and looks forward to a constructive dialogue
with POL.

3 Background & Introduction

On 20 August 2020, POL requested an audit of the HNG-X services by sending a letter to Fujitsu titled
“Horizon Audit”. Following a number of discussions between POL and Fujitsu, it was agreed by POL
that Fujitsu would prepare a set of reports on key topic areas identified by POL.

The spirit of the discussions between POL and Fujitsu in relation to these reports was to share
content that would allow both organisations to confirm the efficiency of the current ways of working
together, and to identify ways to make meaningful improvements that would enhance the working
relationships and experience for the POL branches and their postmasters. Fujitsu believes in
collaboration and welcomes constructive suggestions from POL.

This report explains how the delivery of the HNG-X services provided by Fujitsu is currently measured
(“HNG-A Robustness (Service Delivery Metrics) Report’). It follows the “Expanded Table of Contents
for the HNG-A Robustness (Service Delivery Metrics) Report” (COM/MGT/REP/4162) which was
shared with POL on 09 December 2020.

The adaptation of the HNG-X Counter Business Application (CBA) to work with Windows devices
other than NT4, known as HNG-A, was rolled out with the Branch Counter Refresh in 2017 and 2018.

Fujitsu operates the HNG-X services to the service standards contractually required by POL.

Fujitsu’s monitoring systems and processes seek to proactively identify faults, log them as Incidents,
and then work to resolve them promptly following the agreed Incident management processes. Fujitsu
also relies on Incidents being reported to them by POL. These reported Incidents are also logged and
worked on to identify their cause and resolution options. Thousands of Incidents have been logged—
as would be expected of a system of this complexity and size.

As a general comment, it should be noted that Fujitsu is only one supplier involved in the overall
delivery of end-to-end services to POL in relation to HNG-X. The HNG-X application also relies on the
working partnership between POL and its chosen partners— such as Verizon, Computacenter and
Atos — as well as external service providers such as banks and affiliated organisations. This applies to
both the IT systems and the operational processes in HNG-X.

Although every effort has been made to avoid confusing technical jargon in this document, the very
nature of this aspect of the service delivered to POL necessitates the use of many acronyms and
phrases that may need expanding upon to ensure the correct understanding. Fujitsu accepts that
further explanation may be necessary and encourages POL to seek these clarifications.

Fujitsu has endeavoured to ensure that the content of this report is correct as at the date of issue.
This report has been prepared with the input of numerous Fujitsu individuals and attribution of any
statements made in this report should be made to Fujitsu only. In preparing this report, the authors
have collectively characterised and summarised many internal Fujitsu documents. They have abo.
described processes and procedures which have been established over many years and may not be
in written form. Many of the documents, processes and procedures described in this report are
continuously updated and Fujitsu reserves the right to make changes to the way it works in the
ordinary course of its operations and business without obligation to update this document. POL should
verify the position with Fujitsu before relying upon any information or content from this document in

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 7 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

the future, as well as bearing in mind the requirements set out in “Information Distribution” at Section
9 below.

4 Approach

Fujitsu acknowledges that it is important to measure the service that is being delivered to POL (and
hence to the SPMs). In doing so, Fujitsu can show how well the HNG-X system is working.

The starting point for any consideration of HNG-X should be to look at the wider end-to-end processes
and platforms.

There are some major factors to consider when reviewing the HNG-X services provided by Fujitsu:
e HNG-X is a large and complex IT solution.

e HNG-X is running on aging platforms — many of which are out of manufacturers’ support — and
this is likely to continue until the migration to AWS has completed

« HNG-X is a dynamic system that is subject to continual change.

POL and Fujitsu have worked collaboratively to create the version of HNG-X in use today based on
the POL defined requirements. The management of the HNG-X services provided by Fujitsu is an
ongoing activity and is necessary to keep HNG-X working. Logging and efficiently dealing with issues,
whether identified by pro-active monitoring or by calls from users, helps to remove or reduce the risk
of re-occurrence. Routinely handling issues assists in supporting the capability of the system and
ensures that the contract obligations and SLTs are met. This is described in the Service Delivery
Metrics sections below.

5 Service Delivery Metrics

This section describes 5 areas that comprise the Service Delivery Metrics:
e Operational metrics — the contracted SLTs and the visibility of system activity metrics.
e Service Operations metrics — the contracted service delivery obligations.

e Key Interactions — the numerous interactions (meetings & reports) between POL and Fujitsu
on key topics that review and influence operations.

e The Reports — the 6 Reports delivered to POL (of which this is one) that provide further
insight into Fujitsu's operations.
e Business Continuity — the obligations Fujitsu holds and how they are reviewed.

POL will have access to other data and information, both from their own systems, and those of their
other suppliers, with which to supplement the contents of this report.

5.1 Operational Metrics

Fujitsu system monitoring (via IBM Tivoli software) is constantly checking platform availability and
events. Events are reviewed by Fujitsu SMC and Incidents are raised. Event data is also used to
report on the numerous Service Level Targets (SLTs) stipulated in the HNG-X contract. The monthly
Service Management Review (SMR) meeting report shows Fujitsu's performance against those SLTs
for the current month and prior months.

Appendix A shows extracts from the January 2021 SMR meeting report.

In addition, Fujitsu developed the Horizon Information Centre (HORIce) to enable its specialist support
staff to see more detailed information on how the HNG-X systems are operating.

HORICce receives events from system monitoring tools and also queries the contents of some HNG-X
data stores to obtain helpful information. This allows visibility into the functioning of HNG-X and not

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 8 of 34
FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU CONFIDENTIAL

Fe)
FUJITSU

just whether the system components are operational. Aspects of HORIce are monitored by Fujitsu
SMC who review the information presented and raise Incidents. Although HORIce was developed as
a support tool for Fujitsu specialist support staff, many features have been made accessible to various
personnel in POL. There are currently 238 queries that POL can run to review important metrics
related to HNG-X. POL utilised 66 of the available queries in the month of February 2021. Appendix
B shows the range of queries available to POL. Appendix C shows screenshots from HORIce's
graphical user interface. HORIce provides insight for both POL and Fujitsu into HNG-X with a
combination of near real-time data and historic querying capabilities.

HORIce assists Fujitsu and POL in reviewing and identifying potential issues early so they can be
raised as Incidents and actioned to reduce or remove impact on the systenis performance, availability
or usage, or on branch operations.

5.2 Service Operations Metrics

The Fujitsu service management toolsetis used to record and track Incident, Major Incident, Problem
and Change activities undertaken by Fujitsu. These activities are reported on, and reviewed if
necessary, at the monthly SMR meetings. Important matters are discussed as they occur and do not
wait for the SMR meeting.

5.2.1. Operations Highlights
The SMR meeting report provides an Operations Highlights view showing agreed high-level statistics.
Figure 5.2.1.4 - SMR meeting report — Operations Highlights

SMR PACK January 2021

0 rtaor incident ¥TD
0 ncidents where restence has worked by design and service has continued with minimal impact TO
> 83 opecational changes completed YTD

20 Patches deployed to ve service

10 AV scans completed

-ulnerabilty scheduled scans performed on 389 platforms

internal Pen Tests completes

(0.8¢ walkthroughs and Operation tests completed YID

Percentage of GREEN and RED SlTs by Month

ULUTTUUTT

“February 2020- Bins was un-suspended to early which caused the BM to pas the Bhour period by 1 hour 8 minutes.

It is worth noting that the second bullet refers to “Incidents where resilience has worked by design and
service has continued”. An important feature of any well-designed solution is a degree of automatic
resilience. This Incident count is included to show the number of occasions when HNG-X has
automatically handled an issue and avoided service impact to POL and/or its branch operations.

5.2.2 Incidents

Incident data is presented to show the work of the Fujitsu Major Account Controllers (MAC) &
Operational Business Change (OBC) teams. Significant Incidents are also listed and discussed.

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021
STORED OUTSIDE DIMENSIONS PageNo: 9 of 34
FUJ00232717
FUJ00232717

oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~
FUJITSU FUJITSU CONFIDENTIAL

Figure 5.2.2.A - SMR meeting report - MAC & OBC: Operational Performance

‘SMR PACK January 2021
‘MAC & O0C : Operational Pesformance
Ieoues & Escalations

> Workon-goingo reduce cuscanding ircden: and reece incident with POL ITD
onc
> notsves

iw Laptop on oder by POL, Cure Flic Nave laptop: being cated between Kc

Measure Reference ‘Augen Sep20 0120 Now eco Jana
Incidents wating POL action 20 2 a ie B 20
ale Sesion @ 2 2 3 Ey 2
‘No of Branch changes Proceed 3 % 2 7 Fy 38
No of 0621 Prceised 2 3 @ « o 1
‘08: Not Raqured and Not charged 10 5 16 a cH 0
ejecta nese a a ar EZ a 2

Aged incidents POL Closed Incldents January

Incidents raised by POL relating to Fujitsu’s obligations have averaged 26 per month in the last 12
months. Fujitsu understands that the POL IT Digital Service Desk (ITDSD) receives considerably
more Incidents which are not within Fujitsu’s scope of support to resolve e.g. printer issues. There are
no SLTs for Incident management.

Figure 5.2.2.B — Incidents raised on Fujitsu MAC by POL ITDSD

Incidents raised on Fujitsu MAC by POL ITDSD

80 57 9
60 39-35
40 I 19
20 I I

0 8

oO oO oO cs) o
oP PS SS
PF SC KL Ky

5.2.3 Major Incidents

Major Incidents are also reported and discussed. The following table is taken from the January 2021
SMR meeting report showing Major Incidents during 2020. There were no Major Incidents in January
or February 2021. There have been 8 since January 2020 and all of these have been closed with no
open actions outstanding.

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 10 of 34
FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT .

Fe)
FUJITSU FUJITSU CONFIDENTIAL

Figure 5.2.3.A - SMR meeting report — Major Incidents 2020

iirsu SMR PACK January 2021

70

scons
‘aeons sn npr re pat oe) a eS

Comptes

‘svwsomannsaoes I itemet Connectivity issue WREIT 8] 29.98 2020 I 6 6 ° “Version 1.0 ~ published CLOSED.

ssn ‘REL9 20008 2020 * ” “

SaaS I — RET Bes — TOROS I Eve] I an aa

‘smasoww ja I 18 102020 and 21 102029 I ig.10.2020I & s 0 Version 3.0 - ‘cuoseD

SiMSOMINRICTS [WIGS TT DORONRP Pronyiwe ['ORTV20R0 6 I « 7 ‘Version 2.0 - pablished aos

5.2.4 Service Dashboard

The Service Dashboard reports on a number of high-level service operations metrics. It shows
Change performance and other agreed service metrics. Customer Satisfaction (CSAT) scores (where
provided by POL) are also shown. When the CSAT scores are provided, the supporting feedback is
reviewed (it is also included later in the SMR report), and where needed, actions are set by Fujitsu.

Figure 5.2.4.4 - SMR meeting report —- Service Dashboard

UNITSU SMR PACK January 2021

Service Dashboard

RC

An expected outcome of OR test

** Overall Operational Service Qt Score{19/20}~ 8.1 (Release & Change and Security scores not provide).

‘Overall Operational Service Q2(20/2) Score — 7.0 (1 Security score not provided),
‘7+ overall operational service G3 (20/21) Score 7.5 (F Service Contimuty scores not provided)

© Copyright Fujitsu 2021 Ref

Version:

UNCONTROLLED WHEN PRINTED OR Date:
STORED OUTSIDE DIMENSIONS Page No:

FUJITSU CONFIDENTIAL,

COM/MGT/REP/4167
1.0

12-MAR-2021

11 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

5.2.5 APPSUP

At POL's request, Fujitsu also performs non-balance impacting actions to make corrections (such as
stock unit associations, emergency branch opening, or monthly tidying of despatch reports) This
requires the temporary assignment of the privileged APPSUP role (see the “RA Report”
COM/MGT/REP/4165). APPSUP is not used to correct branch balance discrepancies or to amend
financial transactions. The use of APPSUP requires the prior approval of POL.

POL have requested Fujitsu to use the APPSUP elevated privilege an average of twice per month
since January 2020.

Figure 5.2.5.A - Extract from the January 2021 Fujitsu Security Report

Date APPSUP I Date APPSUP I Date APPSUP
Us Now rel, requested was Granted revoked
INC4391361 06/01/20 06/01/20 06/01/20
INC4424596 09/01/20 09/01/20 10/01/20
INC4578838 29/01/20 29/01/20 29/01/20
INC4739526 17/02/20 17/02/20 18/02/20
INC4823722 28/02/20 28/02/20 02/03/20
INC4824263 28/02/20 28/02/20 03/03/20
INC4810249 28/02/20 28/02/20 28/02/20
INC4879692 06/03/20 06/03/20 06/03/20
INC5069711 01/04/20 01/04/20 01/04/20
INC5112767 07/04/20 07/04/20 07/04/20
INC5908612 06/08/20 06/08/20 06/08/20
INC5938493 11/08/20 11/08/20 11/08/20
INC5948682 12/08/20 12/08/20 12/08/20
INC5960310 13/08/20 13/08/20 13/08/20
INC5999291 19/08/20 19/08/20 19/08/20
INC6103727 02/09/20 02/09/20 02/09/20
INC6605309 05/11/20. 05/11/20 05/11/20
INC6639576 10/11/20 11/11/20 11/11/20
INC6795573 01/12/20 01/12/20 01/12/20
INC6802704 02/12/20 02/12/20 02/12/20
INC7016469 18/01/21 19/01/21 21/01/21
INC7175823 27/01/24 27/01/21 27/01/21
INC7163052 25/01/21 25/01/21 25/01/21
INC7124061 19/01/21 19/01/21 21/01/21

5.2.6 Horizon Known Errors Review Forum

POL also operate the weekly Horizon Known Errors Review Forum attended by Fujitsu. Incidents (for
which Knowledge Base articles will have been raised) with the following high-level classifications are
presented at the forum:

¢ SPM Financial Impact - entries containing information which has the potential to cause
financial impact to subpostmasters; and

e SPM Experience - entries containing information which has the potential to impact the
subpostmasters’ user experience.

On average throughout 2020, one new Incident per month was raised at the Horizon Known Errors
Review Forum as having the potential to impact branch operations. A number of these were also
outside of Fujitsu's scope of obligations and needed to be addressed by POL or its third party
suppliers.

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 12 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

5.3 Key Interactions

There are a number of jointly-attended POL-Fujitsu meetings covering a broad array of topics. These
interactions are important. Routinely working well together and acting on actual and/or perceived
issues will help to support the capability of the system. In order to be effective, these meetings should:

* Occur regularly and when scheduled;

¢ Be properly attended;

e Be purposefully chaired;

e Document agreed minutes and actions; and

« Ensure actions are carried out in a timely manner.

A Terms of Reference should ensure that their purpose is clear and that there is limited overlap with
other related meetings. Each meeting should be reviewed against the above proposed criteria (see
Recommendation 1 in Appendix D).

The main touch points are listed below (in no particular order). A joint list should be reviewed and
validated. See Recommendation 2 in Appendix D.

1. ITSCM Progress Management Meeting (formerly Business Continuity Planning Review):
Monthly meeting to address continuity and contingency plaming

2. Horizon Known Errors Review Forum: Weekly meeting to review potentially branch impacting
Incidents

3. Customer Business Impact Forum: Weekly meeting to discuss items that have been identified
at BIF for discussion

4. Patch Approval Board: Monthly meeting to discuss and agree the infrastructure and security
patching actions required

5. Change Advisory Board (formerly Change Process Working Group): Monthly meeting to discuss
changes

Commercial and Relationship Meeting: Monthly meeting to address commercial issues

Cross Supplier Problem Review: Fortnightly meeting to resolve issues that affect multiple POL
suppliers

8. Release Acceptance Meeting (RAM): Per selected release to confirm the requirements have
been met

9. Release Acceptance Board (RAB): Per project release to confirm that both Fujitsu and POL
service organisations are ready for live deployment

10. Acceptance Dispute Board: Ad hoc meeting to consider and resolve RAM/RAB disputes
11. Weekly Priority Meeting: Weekly joint leadership meeting to review priority topics
12. Monthly Risk Review: Monthly meeting to identify and discuss risks

13. Enterprise Architecture Group: Weekly meeting (if needed) to review and approve High Level
Designs and Key Design Decisions

14. Information Security Management Forum (ISMF): Monthly meeting to discuss security related
topics

15. Joint Programme Board: Programme reviews aligned with Release Acceptance Board

16. Demand Planning Forum: Quarterly review of service development plans and high-level
planning assumptions

17. Problem Records Review: Fortnightly meeting to review progress of Problems

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 13 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

18. Programme Review and Steering Board Meetings: Meeting of senior staff to review activities
for defined programmes (frequency appropriate to programme of work)

19. Service Management Review: Monthly service review meeting to discuss contractual service
performance

20. IT Ops Lead: Weekly meeting for cross supplier service directors to review operational topics
21. OBC19: Weekly meeting to review Post Office Data Gateway activities

22. Customer Service Improvement: Monthly meeting to review SIP actions progress

23. Service Relationship: Fortnightly meeting to discuss updates on issues and hot topics

24. Capacity Operational Review Forum: monthly review with leads from POL Service/Finance &
Telecomms.

Some of the meetings above are contractual so these should be reviewed as a priority. Some of the
meetings above may also be appropriate to add to the contract andso this should also be reviewed.
See Recommendation 3 in Appendix D.

5.4 The Reports

Fujitsu has provided six reports to POL to provide further insight into Fujitsu operations. All six reports
(of which this is one) offer information and recommendations that could be used to improve the ways
of working. The reports are as follows:

1. The SDLC Report — [COM/MGT/REP/4168]
« Explanation of the Software Delivery Life Cycle used for Horizon Applications.
2. The Testing & QA Report - [COM/MGT/REP/4166]
« Explanation of how Testing & QA is performed for Horizon Applications.
3. The RA Report — [COM/MGT/REP/4165]
e Explanation of the various current forms of Remote Access.
4. The BED Report (29 BED AS IDENTIFIED BY FRASER J) — [COM/MGT/REP/4169]

e Areport to Post Office Ltd describing the 29 Bugs, Errors and Defects as identified by
Fraser J.

5. The BED Current Process Report — [COM/MGT/REP/4184]

e A report to Post Office Ltd explaining the current process for the management of
Bugs, Errors and Defects.

6. The HNG-A Robustness (Service Delivery Metrics) Report—- [COM/MGT/REP/4167]

e Explanation of how the delivery of Fujitsu services is measured to support a criteria
based view of HNG-A robustness (this report).

5.5 Business Continuity

The Fujitsu Business Continuity framework outlines the contractual obligations for HNG-X. HNG-X
has been designed and built to meet those Business Continuity (BC) requirements.

«The Business Continuity Framework CCD SVM/SDMW/SIP/0001 describes the contract obligations.
«  Anannual BC report is produced — latest is SVM/SDM/REP/4071.
e  Anannual Failover & Failback Report is produced — latest is SVM/SDM/REP/4111.

In the final quarter of the year, a review of the calendar year's tests and exercises is held and, based
on feedback from POL, Fujitsu undertakes a planning exercise and circulates a first draft proposal of

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 14 of 34
FUJ00232717
FUJ00232717

oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~
FUJITSU FUJITSU CONFIDENTIAL

continuity tests due for the following year, allowing POL the opportunity to review and comment where
required.

The forward schedule is then updated to reflect any comments received from POL. The agreed tests
are subject to change based on business demands / calendar contention, BAU operational issues and
Incidents where resilience has been proven.

A review of the previous month, as well as the forward schedule, should be discussed in a formal
monthly review with POL (ITSCM Progress Management Meeting — formerly Business Continuity
Planning Review). The monthly progress report also goes directly into the monthly SMR report for
discussion at the monthly meeting if required. See Recommendation 4 in Appendix D.

Figure 5.5.4 — SMR meeting — Business Continuity

FUIITSU SMR PACK January 2021

ess Continul

Bus

HNG-Branch Database -BDB to BDS in Live January 15th toJan 17th Deferred on 8th Jan 20201 during major CAB discussion last Friday POL requested forthe re time this
exercise.

HNG- Branch Database exercise got New dates 12th And 13th Feb 2021- Fujitsu raised change RequestCHG0216825 and got approval from POL cab.

> HNG-Branch Database BD8 to BDS in Feb 12th and 13th.
> HNG-Business continuity test SAN switch 21st March 2021
> HNG -Central Network-PI1 1NSW201 BC Test 28th March 2021

Work continues on updating 8¢ documents relate to campus failover.
‘Due to Pandemic issue, FJ UK and GDC India team invoked BC plan to work
from home.

B/C plans during january 2021

vy

‘Reason for use of Contingency

17 January 2021 05:00 (178) to 17:00 (188) I __8C Contingency Slot
10% April 2021 10:00 to 17:00 BC Contingency Slot
25% July 2021 13:00 to 17:00 BC Contingency Slot
24 October 2021 11:00 to 17: BC Contingency Test

‘OF HNG-X ACTIVE DATA-CENTRE (IRET1)
S CONTINUITY TEST PLAN

‘SVMISDM/PLA0003 ‘BUSINESS CONTINUITY TEST SCHEDULE ‘APPROVED - revision 3.3
PLANNER,

‘SVA/SDM/PLAIO005 POA LOSS OF HNGXACTIVE DATA-CENTRE I APPROVED - revision 9
(REI 1) BUSINESS CONTINUITY TEST PLAN.

‘SVMISDM/PLAIO006 NG-X CENTRAL HOST SERVER BUSINESS I APPROVED - revision 5
‘CONTINUITY TEST PLAN

‘SVM/SDM/PLAIO007 THNG-X BRANCH DATABASE BUSINESS "APPROVED ~ revision 3
‘CONTINUITY TEST PLAN

The SMR report also includes the forward schedule of tests that are performed every month to
validate conformance to the Business Continuity obligations.

At the end of the calendar year, the 12 reports from the SMR meetings are consolidated into a formal
annual report.

6 Formal Audit Reports

POL commissions an annual ISAE3402 audit as well as quarterly PCI Prioritised Approach audits on
POA. Both audits examine aspects of the scope of this report from slightly different perspectives and
to varying degrees of detail. Furthermore, POA are periodically requested to contribute to internal
Fujitsu corporate audits to support Fujitsu UK in attaining and maintaining a variety of certifications
such as 1S027001, 1SO9001 and 1SO22301.

© Copyright Fujitsu 2021
pyrigl i FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 15 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

7 Conclusions

HNG-X has been built and improved jointly with POL over many years. It is a large and complex IT
solution that integrates with POL and its other third party suppliers. Fujitsu believes that the HNG-X
services it provides are delivered effectively.

Fujitsu consistently achieves its SLT obligations and provides a breadth ofinformation to POL, both at
the SMR monthly meeting and via access to the HORIce platform. Through the consistent delivery of
Incident and Change, and by the effective management of Major Incidents and Problems, Fujitsuand
POL acknowledge issues and aim to resolve them promptly. POL CSAT average scores and
feedback from the POL identified functions required to contribute are consistently above 7 out of 10.

POL ITDSD have raised an average of 26 Incidents per month to Fujitsu in the last 12 months and
one Incident on average per month throughout 2020 was raised at the Horizon Known Errors Review
Forum (and some of these were Incidents that needed to be addressed by POL or its third party
suppliers).

There have been eight Major Incidents since January 2020. All actions arising from Major Incidents
were addressed promptly and none remain outstanding at this time.

The privileged role of APPSUP has been used on average twice per month in the last 12 months to
make POL requested and approved corrections.

The Business Continuity obligations are also regularly tested and the forward planning schedule is
reviewed jointly at the monthly SMR meeting.

There is also an extensive schedule of key meetings which allows POL and Fujitsu to work effectively
together to ensure the HNG-X services are delivered efficiently and that issues and ideas are
addressed.

8 Recommendations

A compilation of recommendations for improvement is contained in AppendixD. The list in Appendix
D collates the various action items into a single list so that POL and Fujitsu can work jointly to act on
these recommendations.

Fujitsu strives for continual improvement and is committed to having an open dialogue with POL on
additional recommendations that can be considered as appropriate.

9 Information Distribution

This report and any enclosed materials (the “Audit Materials”) are being provided to Post Office
Limited (“POL”) pursuant to POL’s request for an audit of the HNG-X services Fujitsu provides (the
“Audit”). The Audit Materials comprise work product prepared by Fujitsu pursuant to requests from
POL. Fujitsu has confined this report to the specific requests from POL and accepts no responsibility
for any other matters. The Audit Materials relate to the current HNG-X environment.

The Audit Materials are confidential and provided to POL for the sole purpose of the Audit. The Audit
Materials may only be shared by POL with KPMG, the external auditors appointed by POL in
connection with the Audit. POL shall take all necessary precautions to ensure that any Audit Materials.
are: (i) not used for any purpose other than the Audit and; (ii) not disclosed to any third party (apart
from KPMG), without Fujitsu’s express consent in writing. In particular, it should be noted that:

(i) the Audit Materials may contain highly confidential and sensitive information which, if
disclosed, is likely to significantly increase the risk of cyber and engineering attacks on the
HNG-X environment;

(ii) the Audit Materials may contain personal data within the meaning of the General Data
Protection Regulation (“GDPR’"); and

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 16 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

(iii) any system architectural content may be subject to copyright and/or other intellectual property
rights and cannot be shared or disseminated.

Prior to making any permitted disclosure of the Audit Materials (or any part thereof), POL shall provide
Fujitsu with reasonable advance notice of such intended disclosure and shall permit Fujitsu the
opportunity to redact information including but not limited to any privileged information, personal data
and/or other commercially sensitive or proprietary content.

This report refers to various documents that are confidential and internal to Fujitsu. Such confidential
documents are proprietary to Fujitsu and are not intended for sharing outside of Fujitsu. Fujitsu in no
way waives or intends to waive confidentiality in these documents by describing, referring to,
reproducing extracts of, or in any way referencing these documents in this report. Where extracts of
such documents are reproduced in this report, redactions have been applied b protect personal and
sensitive information.

The Audit Materials, or any part thereof, may not be altered or amended without Fujitsu's express
consent in writing. Under no circumstances shall any Fujitsu personnel be named or identified in any
reports or other documents created by POL based on information from the Audit Materials (or any part
thereof). Attribution of any Audit Materials shall be to Fujitsu only.

Unless agreed specifically in writing to the contrary Fujitsu does not accept any duty of care or any
other legal responsibility whatsoever to any person or entity in relation to this Report, any related
enquiries, advice or other work. Any person who receives a draft or copy of this Report (or any part of
it) or discusses it (or any part of it) or any related matter with Fujitsu, does so on the basis that he or
she acknowledges and accepts that he or she may not rely on this Report or any related information
given by Fujitsu for any other purpose.

© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 17 of 34
FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT “

FUJITSU CONFIDENTIAL

Fe)
FUJITSU

Appendix A — Service Management Review Report
Extracts

The following has been extracted from the January 2021 SMR meeting report. This shows the extent
of the Service Level Targets Fujitsu is required to meet as well as demonstrating consistent
attainment of the targets.

Figures A.A to A.E - SMR meeting report extracts

‘SMR PACK January 2021 F BOST.

‘Service Review Book ~ Monthly Charts

“Target I Jann FEOF Mav20" Ap M2 Ju TARDY GRD: I SERRE I OAD NOWTR-DED: "Jane
SUA :

led to Major nda on 05/11/2020 - NCO N90

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COMIMGT/REPI4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 18 of 34
FUJ00232717

FUJ00232717
eo HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~
FUJITSU FUJITSU CONFIDENTIAL
SMR PACK January 2021 @
cae
An eoecedoamesf Rt
FUJITSU SMR PACK January 2021
I REC Files willbe delivered to I
Gooby sath moar
I REC Flas willbe delwveredto I
‘Send by Des oy 8
Teal eae TO
© Copyright Fujitsu 2021
‘opyright Fujitsu FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR —_ Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 19 of 34
FUJ00232717

FUJ00232717
oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT “
FU ITSU FUJITSU CONFIDENTIAL
FUS Trsu SMR PACK January 2021
Data Centre rations
availability beween,
rota ao at
ae donne st
fevered 15 hrs
“aap coe Ti Be Pld nT eh 720 an Gy en? Mah 200.
redecorate 0 abd Penny 0 ad ang NANT? ne pathyn
++i tg nn op /1/220 NOSIS 795 NETS
Fujitsu SMR PACK January 2021 @
Inte oY cnanpex Damar pepe pepe pepe ys
ane OF Canes Tht Find Tage On a
OCCT TES Tom woe I wa
= rewn ascenTarpet tox [oom I oom
Recondition
Eouings hous Src
aor
febedint howe
fonmaeiaceam I
proceso Wang Oar, I 95%
Faby Ba En phe few sre.
Ff Treas eal wih hasbeen pw epoch hh eta Van bing prove Thre was mpc ths dato amy econiaton
© Copyright Fujitsu 2021
pyright Fuji FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 20 of 34
Fe)
FUJITSU

FUJITSU CONFIDENTIAL

FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT

Appendix B — POL HORIce Queries

The following list of queries are available to POL as at 8 March 2021. This provides POL with
considerable insight into the areas it has requested to be able to see.

QUERY NAME

QUERY DESCRIPTION

Archived uncashed vouchers

Uncashed vouchers value by accounting period

Archived vouchers all states

Archived vouchers value by accounting period

POR2 archived in range v2

Archived Postal Orders that were archived in the selected date range

POR2 archived on da)

Archived Postal Orders that were archived on the selected day

POR2 Expired vouchers

Postal Orders that have expired including the date they were sold

POR? Total Expired by Date Range

Expired vouchers from the Sale date

APS file schedule

Active client agreements and the days when files are delivered

APS Reconciliation Totals By Value.

30 day APS totals by value

APS Reconciliation Totals By Volume

30 day APS totals by volume

Quarantined APS Transactions

Quarantined APS Transactions in BRDB

Agent to Fi Statistics thr

Display the Network Banking agent statistics for the selected agent for
the last hour from NBX Agent to Fl

Counter toAgent Statistics thr

Display the Network Banking agent statistics for the selected agent for
the last hour from Counter to NBX Agent

NON-TESQA transactions

Transaction which did not complete for selected branch in the selected
period.

NON-TESQA transactions (no PAN)

Transaction which did not complete for selected branch in the selected
period.

Response Code 10

Debit Card Referrals for the selected date

Response Code 56

Banking transactions declined by PinPad before R1

Branch Declaration Events

Cash/stamp declarations and variance check events between two dates

Branch Declaration Events (Live
Standby)

Cash/stamp declarations and variance check events between two dates

Cash History

Increase/decrease in cash holding

Closed Branch Declaration Events

Cash/stamp declarations and variance check events between two dates

Declarations

List all declarations at the branch

Despatch and Exception Reports

List all despatch reports at the branch

Failed User Sessions

List all branches which have a failed user session

Node Removal Check

Check the branch node has no outstanding sessions or recoveries

Opening figures

Branch opening Figures for the given TP_BP and stock unit

Rollover Reports

List all reports at the branch

Rollover Reports (closed branch)

List all reports at the closed branch

Suspense Account

Display the last suspense account details

Total Discrepancies

Check discrepancies accepted in each balance period

Branch Address Search

Search on part of branch name or address

Branch Information

Get Branch Details

Branch Name Search

Search by outlet name

Branch Postcode Search

Search by outlet postcode

Branch Telephone Search

Search by outlet telephone number

Branch Users

List all users at this branch (including any associated global users)

Counter Code Baseline

List the code version running on all counters at the branch

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021
STORED OUTSIDE DIMENSIONS PageNo: 21 of 34

Fe)
FUJITSU

FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU CONFIDENTIAL

QUERY NAME QUERY DESCRIPTION
EUM Branch Training Users in Branch
Memos List all memos at the branch for the last 6 months

Postal Barcodes

Daily summaries on a given day

Rep Events Allevents between two dates
Rep Events (Live Standby) Allevents between two dates
Stock Units List all stockunits at the branch

User Sessions (Active)

List active user sessions at the branch

Branch Bank Deposits

Summed Bank Deposits in a specified date range

Branch Change Giving

Summed change giving in a specified date range

Branch Transaction Totals

Read all Serve Customer transactions by terminal type

Closed Branch Session Data

Read all Session data between start and end times

Mails Despatch Status

Find all Despatched and non-despatched Mails status for this office
between start and end dates

NWB Txns

Read all NWB transaction data between start and end times

Pending Transfers

List all pending transfers at the branch

Pouch Despatch Status

Find all Pouch status for this office between start and end dates

Reversal Transactions

Read all Reversal transactions between start and end times

Session Data

Read all Session data between start and end times

Session Data (Cash)

Read all branch cash transactions between start and end times

Session Data (Remittances)

Read all branch remittances between start and end times

Session Data by Node

Read all Session data between start and end times for supplied node

Session Data by Product

Read all Session data and opening balance between start and end
times for supplied product

Session Data with AP and Pan (Faster)

Read all Session data between start and end times

Todays Bureau Transactions

Bureau transactions so far today

Transaction Acknowledgements

Read all Transaction Acknowledgement details

Transaction Corrections

Read all Transaction Correction details

Transfers

List all transfers at the branch

User Reversal Count

Count of reversals by user by mode

HNGA Cert Refresh Count

Count of HNGA Certificate Refresh by day

All Memos (last month)

How many branches have received each memo in past month and how
many branches have then read them

Branch Last Logon

Displays the time a user last logged onto a counter in the specified
branches

Branchs not Rolled for 60 days

All Branches that have not rolled the TP for over 60 days but have
logged on in the last 60 days

Global Users (from BRDB)

List all global users (engineers trainers etc)

HNGA Cert Refresh Counter List

List of HNGA Counter Certificate Refresh

Pouch Delivery

Pouch Delivery for selected delivery day

Pouch Delivery Full

Pouch Delivery for selected delivery day

Subfiles Held

Transaction Acknowledgement Subfiles

Transaction Count Comparison

Daily count of txns by connection type

NB101 Banking total by gateway

NB101 Banking for selected routing gateway on selected da

NB101 Payment total by gateway

NB101 Payment for selected routing gateway on selected day

Active Counters in last 30 min by minute

Active nodes for the last 30 min in 1 minute intervals

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021
STORED OUTSIDE DIMENSIONS PageNo: 22 of 34

Fe)
FUJITSU

FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU CONFIDENTIAL

QUERY NAME

QUERY DESCRIPTION

Bureau last hour transaction volumes.

Bureau Transaction Volumes for the last hour in 1 minute intervals
(UTC)

Counter Polling snapshot

Latest counters polling 20 minutes snapshot

Debit Card last hour transaction volumes

DCS Transaction Volumes for the last hour in 1 minute intervals (UTC)

EPOSS last hour transaction volumes

EPOSS Transaction Volumes for the last hour in 1 minute intervals
(UTC)

NWB last hour transaction volumes

NWB Transaction Volumes for the last hour in 1 minute intervals (UTC)

Active Sessions

Logon-Logoff events per 5 minutes

Branch Baskets

A graph of the total branch baskets (sessions) per day

Logoff events Graph

Logoff events per 5 minutes

Logoff events Graph 30min

Logoff events per 30 minutes

Logon events Graph

Logon events per 5 minutes

Logon events Graph 30min

Logon events per 30 minutes

HNG-T transactions today

Read all Session data HiH transactions today

Hourly PayZone Txns Counts Graph

Display the PayZone vend txn counts by hour

Monthly HIH Transactions

Monthly HIH

Payzone Node Info

Get All PZ Node Details

Payzone transactions

Read all EPOS and APS Payzone transactions for the selected day

PayZone Txn Count per 10 min

Transaction count for PayZone branches for 12 hours broken down by
10 minutes

PayZone Txn Value per 10 min

Transaction value for PayZone branches for 12 hours broken down by
10 minutes

Map ALL Branch Product Transaction

‘Combined transactions for Horizon and HiH for the selected product on
the selected day

Map HORIZON Branch Product
Transaction

Transactions for Horizon only for the selected product on the selected
day

Map PAYZONE Branch Product
Transaction

Transactions for PayZone only for the selected product on the selected
day

POL-BSP User Activity

POL BSP team user logon and query count

Receipt and Payments Mismatch 12-Feb-
2021

Accounting node reference data issue

Trading Branches_AM

Trading Branches 0700-1200

Trading Branches _PM

Trading Branches 1200-1700

ALL DRS NB101 reports (from
pbs_status)

All available NB101 reports

BRDB PBS Transactions

Extract from BRDB PBS transaction table

BRDB PBS UNDO Transactions

Extract from BRDB PBS UNDO transaction table

DRS by Status

DRS2 PBS records for a specific status

DRS count by Date and FI

DRS2 PBS records by date and Fl

DRS count by Date for Fl

DRS2 PBS records by date for a selected routing gatewa’

DRS count by Status DRS2 PBS records for a specific status
DRS Daily Files DRS2 PBS daily files and their totals
DRS History DRS2 PBS history records for the selected OTR

DRS NB101 report (from pbs_status)

NB101 report by settlement date

DRS NB101 report with clients (from
pbs_status)

NB101 report by settlement date

ORS OTR status

DRS2 PBS status records for the selected OTR

DRS Status Table

New DRS Proof of concept table

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021
STORED OUTSIDE DIMENSIONS PageNo: 23 of 34

FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT

Fe)
FUJITSU

FUJITSU CONFIDENTIAL

QUERY NAME

QUERY DESCRIPTION

Available Trading Periods

All available trading periods for branches

Current Branch Trading Periods

List current branch Transaction Periods

Estate Product list

Allactive products

Expected Branch Trading Periods

Expected Trading Periods for all Branches

100 pound declarations

All declarations for 100 pound bank notes

Above 1000 pound unusable declarations
(coins)

All declarations for unusable coins greater than 1000 pounds value

Above 1000 pound unusable declarations
(notes)

All declarations for unusable notes greater than 1000 pounds value

AP Currency SELL transactions over
5000

All AP currency sell transactions over 5000.00 in the selected time
period

ATM sales

Daily ATM sales (product 7748)

Average ATM sales

Average weeks sales through ATM

Branch Bureau match

Calculated balance of Bureau products for POL

Branch Cash match

Calculated balance of Cash balance for POL

Branch Users not mapped to Smart Id

All HUIDs that are configured with a POID

Branch with Local Collect items awaiting
collection

All branches with barcode items awaiting collection including a count of
those more than 45 days old

Branches Not logged on

Branches that have not logged on today.

Branches not using Horizon but Open

Branches that have not logged on today with opening hours

BRS Transaction details for Product and
Business Day

The transactions totals for a selected product and date

BRS Transaction details for Product and
Trading Day

The transactions totals for a selected product and date

BRS Transaction totals by Day (recalc)

The aggregated totals from all branches in BRS for a Trading Day

BRS Transaction totals by Product by
Day (recalc)

The aggregated totals from all branches in BRS by Product by Trading
Da

Bureau Sales and Holding summary

Bureau average sales and stock holding for the estate

Closed Branch Cash match

Calculated balance of Cash balance for POL

Counters Active in Estate

All counter active in the last month

Counters Code Baseline Summary

Asummary of all counter code baselines and their numbers.

Counters Not Communicating

Counters that have not dialed into the BRDB for over 1 hour but has
been active within 1 month

Counters Not Communicating last 12
hours

Lst 12 hours history of counters that have not dialed into the BRDB for
over 1 hour

Counters Not Communicating last 7 days

List 7 days of history of counters that have not dialed into the BRDB for
over 1 hour

Dangerous Goods Details

List Dangerous goods transactions including AP data

Dashboard Counters Not Communicating

Percentage of Counters per branch that have not dialed into the BRDB
for over 1 hour but has been active within 1 month

DCS Response

12 hours of success Bank failed responses or Horizon failed responses

Declare Stock Button Used

Declare Stock button (23) used

Deleted User Account

User accounts deleted in the selected date range

Early Closing Branches

Branches that closed before the office hours

Estate ATM declaration details

ATM declarations for selected week

Estate ATM declaration details 2

ATM declarations for selected week

Estate ATM Declaration reports

Days for which the ATM report has been calculated

Estate ATM Declaration reports 2

Days for which the ATM report has been calculated

Estate Banking Deposits

Banking deposits for the selected day

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021
STORED OUTSIDE DIMENSIONS PageNo: 24 of 34

Fe)
FUJITSU

FUJ00232717

FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU CONFIDENTIAL

QUERY NAME

QUERY DESCRIPTION

Estate Branches

Allopen estate branches with number of counters and kiosks

Estate Bureau match details

Estate Bureau totals

Estate Bureau match reports

Days for which the Bureau report has been calculated

Estate Cash details

Cash balance by branch for selected week

Estate Cash match

Calculated balance of Cash for comparison with POL

Estate Cash match reports

Days for which the Cash match report has been calculated

Estate Change Giving

Summarised Change Giving transactions for the selected day

Estate Cheque match details

Estate Cheque totals

Estate Cheque match reports

Days for which the Cheque report has been calculated

Estate Counter monthly usage detail

Transaction count for each counter in the month selected

Estate Counter monthly usage reports

Months for which the Counter Usage report has been calculated

Estate Declaration Events

Declarations from REP Events for all branches in the time period

Estate Declaration Events 2

Declarations from REP Events for all branches in the time period

Estate Events

Allevents for a specified Eventid between start and end times

Estate Logon and Logoffs

A list of the first logon and last logoff for the select day across the estate

Estate month transactions count pt 1

Estate counters polling status and how many transactions they
completed in the last month

Estate month transactions count pt 2

Estate counters polling status and how many transactions they
completed in the last month

Estate Multiple Declaration Events

Multiple Declarations for all branches in the time period

Estate Packed Pouches

All Pouches with a status of Packed created in the period

Estate PinPad Properties

PinPad properties for each counter configured with a PinPad

Estate Pouch match details

Estate Pouch totals

Estate Pouch match reports

Days for which the Pouch report has been calculated

Estate Pouch reports

Days for which the Pouch Despatch report has been calculated

Estate product sales for a business date

Session data sales for the selected product

Estate product sales for a trading date

Session data sales for the selected product

Estate Stock Unit types

A breakdown of the types of stockunits at each branch

Estate Swipe Fallback

Number of pinpad swipe fallbacks on the selected day

Estate Trading hours

The actual hours against the expected hours

Estate Zero Declaration Events

Zero value Declarations for all branches in the time period

Excessive coins declared

List all branches declaring coins greater than the target quantity

Excessive ETU transactions

Count of ETU transaction by branch today

GlJ - Outstanding Transfers 1

Cash Transfers by branch for 27/03 12/04 26/06

GlJ - Outstanding Transfers 2

Cash Transfers by branch for 2selected date

GlJ - Outstanding Transfers 3

Cash Transfers by branch for selected date

Help Page Access by Page

Combined help page access counts for the selected page

Help Page Access one day

Combined help page access counts for the selected day

Inactive Rollover Events

Inactive Stock unit rollover events between two dates

Incomplete ONCH Sday summary

Branches that have an incomplete ONCH over the last 5 days

Incomplete ONCH Details

Incomplete ONCH report for the selected day

Incomplete ONCH Reports

Days for which the Incomplete ONCH report has been generated

Incomplete ONCH Stock Units

Stock Units that had an incomplete ONCH as of last night

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021
STORED OUTSIDE DIMENSIONS PageNo: 25 of 34
FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT

Fe)
FUJITSU

FUJITSU CONFIDENTIAL

QUERY NAME

QUERY DESCRIPTION

Long Transfers

Transfers that took a week or more to transfer in

Mails Despatch Search

Find the mails status for a specified Barcode

New HUID accounts

SMART ID HUIDS created on the selected date

Nodes startup and PowerOff events
summary

‘Summary by branch over the last 28 days

Old HUID accounts

HUIDS with no POID mapping

One Day of Transfers

Count of Transfers on the selected day by Branch stock unit, node, user

Orphaned declaration items

Declarations items that should have been archive but remain reported
to POL Cash Centre

Percentage of Branch counters not
comm pie chart

Percentage of Counters per branch that have not dialed into the BRDB
for over 1 hour but has been active within 1 month

Percentage of Counters Not
Communicating

Percentage of Counters per branch that have not dialed into the BRDB
for over 1 hour but has been active within 1 month

Postal Barcode items awaiting collection

Postal items awaiting collection by date range

Pouch Despatch details

Estate Pouch values for the selected period end

Quick balancing declarations

Declarations made with a discrepancy that then balanced perfectly
within a minute.

Smart ID Confirmed identity

Rep events where a user must confirm their identity

Smart ID Curricula and product groups

All products under restricted trading

Smart ID Deny Identity

Rep events where a user denies the identity

Smart ID missing essentials

Rep events where a user has one or more missing essential curricula

Smart ID Prevented Sales

Rep events where a user was prevented from a sale

Smart ID prevented sales 2

Rep events where a user was prevented from a sale

Smart ID Soft Launch Products by
Branch

List all details for this branch

Smart ID to Branch Users mapping

All HUIDs that are configured with a POID.

Smart ID to Branch Users mapping part 1

All HUIDs that are configured with a POID

Smart ID to Branch Users mapping part 2

All HUIDs that are configured with a POID

Smart ID to Branch Users mapping part 3

All HUIDs that are configured with a POID

Smart ID to Branch Users mapping part 4

All HUIDs that are configured with a POID

Smart ID User Curricula expiry part 1

All smart IDs and their curricula dates

Smart ID User Curricula expiry part 2

All smart IDs and their curricula dates

Spoilt label count by branch

Number of spoilt labels form each branch in the selected date range

Stock Pouch Delivery Report

Stock Pouch Delivery for the selected day

Stock Unit Events

Stock unit create/delete events between two dates

Top 100 5-day Transfers

List count of 5-day transfers per branch in last month

Top 100 Transfers in last 30 days

List count of transfers per branch in last month.

Top 30 Pending Transfers

Count pending transfers older than 5 days by branch

Top 30 Pending Transfers (No Crown)

Count pending transfers older than 5 days by branch

Top 30 Pending Transfers by Value

Top pending transfers older than 5 days by value by branch

Top 30 Pending Transfers by Value (no
crown)

Top pending transfers older than 5 days by value by branch excluding
crown offices

TPS Transaction totals by Branch

The aggregated totals from all branches in BRDB (from TPS)

TPS Transaction totals by Branch
(recalc)

The aggregated totals from all branches in BRS

TPS Transaction totals by Product
(recalc)

The aggregated product totals from all branches in BRS

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021
STORED OUTSIDE DIMENSIONS PageNo: 26 of 34

FUJ00232717

FUJ00232717
oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL
QUERY NAME QUERY DESCRIPTION
TPS Transaction totals by Trading Day _I The aggregated totals from all branches in BRDB (from TPS)
List transactions for the selected branch and day that were made after
Transactions in wrong BP or TP. the TP/BP rollover
User first logon today First logon of each user today
Counter Reboots during the day - Node summary count of windows Startup Shutdown Poweroff events for
summary the last 48 hours
Slip/Tally printer initialisation failed
events HNG-A counter events for the selected node in last 7 days
© Copyright Fujitsu 2021
pyrigl i FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 27 of 34
FUJ00232717
FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT -
FUJITSU FUJITSU CONFIDENTIAL

Appendix C — HORIce Screenshots

HORIce is a graphical user interface that allows POL, and Fujitsu, to watch and query HNG-X
activities. The following are some screenshots that can be seen by running some of the queries
shown in Appendix B. Some include explanatory feature descriptions to aid understanding. Many of
the images are intentionally of old data for privacy reasons.

Figure C.A - Live Query

Sexe Ques
Estate Snapshe @ Favourne Quenes

Active COURTS Ay , Poni nt rite mere
acm, min by F a toe wanuacting’ counters each minute for the last 20 mvnutes, Note: The first and last minute may nat
S © Team ours
: totes Foren Ot Pay A)»
Banking (NWO, oe)
“Agent to FI Stati “Momsted Payment Service (275) pking agent statistics for the selected agent for the last hour from NBX Agent to FI.
7 Borin (HES) » Pista ar tae te et rf Rozon ager ancl ae Te ng
8 ae "Petz Snay idence (Seca) soc Shere arena a es ot) oo AP
Branch tats , a]
Cetra THO" anc tanec — F
Al Memos (lat Cone iso santos I Sresenersrrsy
vw ces west ofthe anwar ete
& Estate Snapshot > ransacton Corections
ante +I rant Acedia
Branch Details.
Branch Adress

QQ erreersewes I

Branch Balanct
Branch Deciaran, "Werte #2 brane, ad veranct check events betwedn wo dtes
‘ » fre secaesons, and variance cece events einean to dates. ceed by tock unt. For cash de
S Feisower beg decared i onea:n the compsrzon, cof mato te wre Gedbred he varance
Tra .
Branch

Figure C.B — Live Query — Parameters — Session Data

2

ve Goa. Serioy ce FE I
Dia waaactons por yt vet Kaeh betwen he speci dt rage, Wl recone wil pa of sl sen. Ts nes
{GD corerime, node, journal sequence, session is, ansaction id, product name, quantity and
samp ouput
Session Data: branch 002001

Predefined query
parameters for each query.

Results can be displayed
in the browser
or downloaded as Excel

© Copyright Fujitsu 2021
pyrigl i FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 28 of 34
FUJ00232717

FUJ00232717
oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~
FUJITSU FUJITSU CONFIDENTIAL
Figure C.C — Live query — Results - Session Data
Figure C.D - Dynamic graphs (CAPO)
— = Dynamic graphs
‘Menu listing available ‘live’ graphs
These are dynamic and resizable
Example showing the live data for CAPO service
I AVRIL AAA DASA
[As they ae dymamic ery useful for monitoring I Se eenee :
during outages
fF _ I erento ~
j aad I
L_
OC ht Fujitsu 2021
opynight Fujitsu FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 29 of 34
FUJ00232717

FUJ00232717
oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~
FUJITSU FUJITSU CONFIDENTIAL
Figure C.F —- Dashboard views
OC ht Fujitsu 2021
opynight Fujitsu FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 30 of 34
FUJ00232717

FUJ00232717
oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~
FUJITSU FUJITSU CONFIDENTIAL

Figure C.H — Lockdown comparison view

Figure C.J —- Maps

OC

‘opyright Fujitsu 2021 FUJITSU CONFIDENTIAL Ret: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 31 of 34
FUJ00232717

FUJ00232717

HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~

f U I FUJITSU CONFIDENTIAL
Figure C.K - Counters Offline
Stop -
‘opyright Fujitsu 2021 FUJITSU CONFIDENTIAL Ref: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 32 of 34
FUJ00232717

FUJ00232717
oe) HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT ~
FUJITSU FUJITSU CONFIDENTIAL
Figure C.N - Heat maps
OC ht Fi
‘opyright Fujitsu 2021 FUJITSU CONFIDENTIAL Ret: COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS Page No: 33 of 34
FUJ00232717
FUJ00232717

oO HNGA ROBUSTNESS (SERVICE DELIVERY METRICS) REPORT
FUJITSU FUJITSU CONFIDENTIAL

Appendix D — Recommendations

A compilation of recommendations for improvement options is contained here. This Appendix collates
the various action items into a single list so that POL and Fujitsu can work jointly to act on these
recommendations.

Fujitsu strives for continual improvement and is committed to having an open dialogue with POL on
additional recommendations that could be further considered where appropriate.

Ref I Recommendation

Review the scope and agenda for the key interaction meetings

Review and consolidate the Fujitsu and POL key interaction meetings lists
Update the contract to include any key interaction meetings currently not captured
POL to update the schedule for the joint ITSCM Progress Management Meeting
POL to identify any additional data that it needs

POL to review SPM training and processes for HNG-X and update if necessary
POL to review its usage of HORIce

NJo}a] a] oof]

© Copyright Fujitsu 2021

FUJITSU CONFIDENTIAL Ref. COM/MGT/REP/4167
Version: 1.0
UNCONTROLLED WHEN PRINTED OR Date: 12-MAR-2021

STORED OUTSIDE DIMENSIONS PageNo: 34 of 34