SCHEDULE B4.4
EXISTING SERVICE LEVELS
Version History

Version No. Date Comments

1.0 31/08/06 Agreed version as at date of signature of CCN
1200

1.4 26/09/06 Minor corrections by PO

1.2 11/10/06 Further minor corrections from FS.

1.3 19/01/07 Further minor amendments

1.4 22/01/07 Further minor amendments

2.0 25/01/07 Baseline copy of 1.4

24 27/06/07 Applying CCN1202

3.0 09/07/07 Baseline copy of 2.1

3.1 12/06/09 Applying changes as per CCN1252a

6.0 06/07/09 Moving all schedules to V6.0 as agreed with
Fujitsu

7.0 26/04/10 Moving all Schedules to v7.0 as agreed with
Fujitsu

8.0 21/02/12 Moving all schedules to v8.0 in accordance
with CCN1294d

9.0 13/01/14 Moving all Schedules to v9.0 in accordance
with CCN1349

10.0 10/09/15 CCD reference updates and moving all
Schedules to v10.0 in accordance with
CCN1506

11.0 31/03/16 Applying changes as per CCN1427 and
moving all Schedules to V11.0 as per
CCN1604

12.0 03/07/17 Moving all schedules to V12.0

13.0 Updating as per CCN1616b and moving all
Schedules to v13.0

Schedule B4.4 Version 13.0
Page 1 of 51
CONFIDENTIAL

4.41

1.2

1.3

24

SCHEDULE B4.4
EXISTING SERVICE LEVELS
INTRODUCTION

The provisions of this Schedule B4.4 shall apply to the HNG-X Services (other than
the BCSF Service) from the Amendment Date and shall cease to have effect on
commencement of the relevant Trigger Event as set out within the tables in
Schedule B3.1. For the purposes of determining which existing Service Levels are
affected upon the occurrence of such Trigger Event, Annex 6 to this Schedule B4.4
sets out each existing Service Level, as described in this Schedule B4.4, and its
corresponding Service Description.

This Schedule B4.4 defines up to three thresholds in respect of each Service Level
as follows:

1.2.1 the level of Service (“Service Level Target” or “SLT”) required from
Fujitsu Services by Post Office;

1.2.2 the level of Service which, if not achieved by Fujitsu Services, shall give
rise to payment of liquidated damages by Fujitsu Services (the
“Liquidated Damage Threshold” or “LDT”). Payment of liquidated
damages notwithstanding, a failure of any LDT shall not (on its own)
constitute a Default; and

1.2.3 the level of Service below the SLT and (if applicable) the LDT which if not
achieved by Fujitsu Services shall give rise to payment by Fujitsu
Services of Post Office Additional Costs or liquidated damages as
described (where relevant) in this Schedule (the “Additional Remedy
Level” or “ARL”).

For the avoidance of doubt, the Parties agree that not all SLT failures shall give
rise to payment of liquidated damages. The SLT failures that do not give rise to
payment of liquidated damages are set out in each relevant Service Description
CCD.

GENERAL PRINCIPLES

The purpose of remedies (liquidated damages or any other additional remedy
specified in a Service Description) is that Post Office shall not be disadvantaged
by failures of Fujitsu Services to provide the Services to the agreed specification
and reliability.

Schedule B4.4 Version 13.0
Page 2 of 51

POL00027937
POL00027937
CONFIDENTIAL

2.2

2.3

24

25

26

3.1

For the avoidance of doubt, liquidated damages shall be based upon the applicable
fixed amounts or rates stated in this Schedule B4.4.

The performance of the Services against the SLT, LDT and ARL applicable in
respect of each Service Level shall be measured and reported and success or
failure against each shall be judged over Service Level Measurement Periods
defined for each Service. Additionally, all levels of service shall be monitored on a
weekly and monthly basis and any failure to meet a Service Level assessed over
that month shall be reported to Post Office by means of the Service Review Book
produced on a monthly basis detailing all Service Levels and the actual levels of
service achieved in that month.

In respect of any SLT that has a Service Level Measurement Period equivalent to
a SLT Calendar Year or a Service Level Measurement Period that is otherwise
defined with reference to a SLT Calendar Year, in the event that the remainder of
the term of the Agreement after the last SLT Calendar Year of the term of the
Agreement in relation to that SLT (“Final Period”) is less than six (6) months then
Fujitsu Services shall:

2.41 continue to measure and report performance against that SLT during the
Final Period; and

2.4.2 not be obliged to take any remedial action should that SLT fail to be
achieved at any time during the Final Period.

The values applicable to each SLT are set out in the Annexes to this Schedule
B4.4.

Subject to any provisions to the contrary in this Schedule B4.4 in respect of a
particular Service Level, where Service Levels are expressed in terms of

performance required by a particular “Day”:

2.6.1 “Day A” means the day of the specified triggering event (such as the date
of a Transaction);

2.6.2 “Day B” means the day following Day A; and
2.6.3 “Day C” means the day following Day B and so on.
SERVICE LEVELS

The Annexes to this Schedule B4.4 define the SLTs, LDTs and ARLs for the
following groups of Services:

3.1.1 Service Desk services (Annex 1);
3.1.2 Data Delivery services (Annex 2);

3.1.3 Banking services (Annex 3); and

Schedule B4.4 Version 13.0
Page 3 of 51

POL00027937
POL00027937
CONFIDENTIAL

44

4.2

3.1.4 Miscellaneous services (Annex 4).
SERVICE LEVEL RELIEF - VOLUMETRIC LIMITS

Annex 5 to this Schedule B4.4 sets out the limits for certain Operational Services
(the “Volumetric Limits”) which if exceeded over the period specified in the table
in Annex 5 (the “Relevant Period”) will entitle Fujitsu Services to adjust the
measurements of performance in respect of the Service Levels (SLTs and (if
applicable) the LDTs and ARLs) affected by that excess (the “Affected Service
Levels”). Such adjustment shall be made on the following basis:

4.14 if the Relevant Period for a Volumetric Limit is a calendar month and that
limit is exceeded, Fujitsu Services shall identify for joint consideration with
Post Office the days in that month on which the average daily volume
(based upon measurements of actual volumes over the previous three
months, or otherwise as agreed by the Parties (acting reasonably)) has
been exceeded and shall specify for joint consideration the reasons for
that excess if caused or contributed to by Fujitsu Services.

4.12 if the Relevant Period for a Volumetric Limit is a day and that limit is
exceeded, Fujitsu Services shall specify for joint consideration the reason
for that excess if caused or contributed to by Fujitsu Services.

4.1.3 for each day on which the average daily volume referred to in paragraph
4.1.1 or the Volumetric Limit referred to in paragraph 4.1.2 is exceeded:

(a) as a result of Default by Fujitsu Services, no adjustment shall be
made to the performance measurements for the Affected Service
Levels in respect of that day; or

(b) for any reason other than a Default by Fujitsu Services, the
performance measurements for the Affected Service Levels in
respect of that day shall be disregarded and replaced with an
average measurement for that day (based upon actual
performance measurements over the previous three calendar
months, or otherwise as agreed by the Parties (acting
reasonably).

Following each Service Level Measurement Period the Parties will assess
whether, on average, over the relevant Service Level Measurement Period any of
the Volumetric Limits has been exceeded by 10% or more. In making that
assessment the Parties shall consider the cause of any daily peaks in excess of
daily averages during that period, and disregard the measurements in respect of
those days where the peaks have arisen as a result of Fujitsu Services’ Default. If
having made such assessment, the Parties agree that a Volumetric Limit has been
exceeded by 10% (and in the case of monthly Volumetric Limits, those limits have
been exceeded in any three consecutive months), the Parties shall meet to discuss
and agree (acting reasonably) appropriate changes to the Volumetric Limits and
any change to the applicable Service Levels.

Schedule B4.4 Version 13.0
Page 4 of 51

POL00027937
POL00027937
CONFIDENTIAL

5.1

5.2

5.3

5.4

6.1

6.2

SERVICE LEVEL/OBLIGATION RELIEF - BUSINESS VOLUMES CCD

The CCD entitled “Horizon Capacity Management and Business Volumes”
(PA/PER/033) (the “Business Volumes CCD”) defines various limits on numbers
of Transactions or instances of Service as “Contracted Volumes” or “Design
Limits” for EPOSS, APS, LFS, Message Broadcast Service, Reference Data
Management Service, NBS, DCMoP and on-line Transactions.

On each day that any of the Contracted Volumes referred to in the Business
Volumes CCD is exceeded, the measures of Fujitsu Services' performance for the
Service Levels (SLTs and (if applicable) the LDTs and ARLs) listed in the Business
Volumes CCD shall be disregarded and replaced with an average measurement
for that day (based upon actual performance measurements over the previous
three calendar months, or otherwise as agreed by the Parties (acting reasonably)).

If the Contracted Volumes referred to in the Business Volumes CCD are exceeded,
Post Office and Fujitsu Services shall jointly consider the reasons for such excess
and whether it is temporary or is or is likely to be continuing. If such excess is or
is likely to be continuing Fujitsu Services shall be entitled to make a reasonable
and proportionate adjustment to the relevant Contracted Volume and/or the
affected Service Levels or obligations specified in the Business Volumes CCD,
such adjustment to be agreed with Post Office under the Change Control
Procedure.

If any of the Design Limits specified in the Business Volumes CCD are exceeded
then the measures of Fujitsu Services’ performance for any Service Level or other
service target involving data processing (requiring either automated or manual
processing or both) shall be disregarded to the extent that Fujitsu Services can
demonstrate to Post Office's satisfaction (Post Office acting reasonably) that
failure to meet the Service Level and/or service target, as the case may be,
occurred as a result of a Design Limit being exceeded. Fujitsu Services shall use
reasonable endeavours to meet those Service Levels and/or service targets during
the period when the measures of Fujitsu Services’ performance are disregarded.

OTHER SERVICE LEVEL/OBLIGATION RELIEF

The Parties shall agree (such agreement not to be unreasonably withheld)
appropriate relief from Service Levels if any new facilities or products are
introduced, by agreement, with less testing than would otherwise be required to
safeguard Fujitsu Services’ position.

For the periods in which the NBS and/or any of the Horizon Applications (other
than NBS) or Infrastructure Services are suspended in accordance with paragraph
3.4.15 of the CCD entitled “Service Management - Service Description”
(SVM/SDM/SD/0007) (formerly “Service Management Service - Service
Description” (CS/SER/014)), measurements of Fujitsu Services’ performance in
respect of all Service Levels detrimentally affected by such suspension (in respect
of those Horizon Applications and Services) shall be disregarded and Fujitsu
Services shall be released from those of its obligations in respect of those Horizon

Schedule B4.4 Version 13.0
Page 5 of 51

POL00027937

POL00027937
CONFIDENTIAL

6.3

7A

7.2

7.3

74

Applications and Services which it is unable to perform as a result of such
suspension.

If Fujitsu Services fails to achieve any Service Level or service target (as the case
may be) and can demonstrate to Post Office's reasonable satisfaction that such
failure occurred as a result of a fault or problem within the QAS Software, such
fault or problem requiring the Third Line Support Service or Application Support
Service (Fourth Line) in order to be resolved, then the measures of Fujitsu
Services’ performance in respect of such Service Level and other service target
shall be disregarded for the period affected by the QAS Software fault or problem.

RECTIFICATION PLAN

In the event that an ARL specified in this Schedule B4.4 is failed, Fujitsu Services
and Post Office shall agree a method of rectification and timetable for the
resolution of the cause of that failure (a “Rectification Plan”). For the avoidance of
doubt, Fujitsu Services shall remain liable for financial remedies payable in
accordance with this Schedule B4.4 in respect of that failure.

In the event that the Rectification Plan involves a change to the provision of the
Services, such change shall be agreed under the Change Control Procedure and
shall be made at no charge to Post Office.

Without prejudice to Post Office's rights to remedies provided in this Agreement,
during the period the Rectification Plan is being implemented Fujitsu Services shall
maintain performance of all other Services in accordance with the Service Levels
specified in this Schedule B4.4 unless otherwise agreed with Post Office as part
of the Rectification Plan.

In the event that the Rectification Plan is not agreed by the Parties (acting
reasonably) within three (3) calendar months of the occurrence of an ARL failure
or the Rectification Plan fails to resolve the cause of the ARL failure to which it
relates, such that the ARL failure occurs again and is persistent, the following
provisions shall apply:

7.4.1 Post Office shall have the right to conduct, and require Fujitsu Services
to co-operate and assist with, a tender process for sub-contracting by
Fujitsu Services of the Operational Services in relation to which the ARL
failure has occurred to an alternative service provider (the “Service
Provider’). If the Parties agree that it would be more appropriate for
Fujitsu Services to conduct, and Post Office to co-operate with, the tender
process, then the Parties shall procure the same.

7.4.2 Without prejudice to the generality of the foregoing, Fujitsu Services shall
disclose to any bona fide potential Service Provider (subject to the same
executing an Agreed Form NDA or any other form of non-disclosure
agreement mutually agreed by Post Office, Fujitsu Services and such
bona fide potential Service Provider) Confidential Information to the

Schedule B4.4 Version 13.0
Page 6 of 51

POL00027937
POL00027937
CONFIDENTIAL

9.1

extent that such disclosure is reasonably required to enable any potential

Service Provider to prepare a reasonably detailed tender proposal.

7.4.3 If the outcome of any tender process is that Fujitsu Services were to sub-
contract the Operational Services in question to a Service Provider
identified in the tender process, the performance in respect of the failed
ARL for that Operational Service would be improved then Post Office
shall have the right to require Fujitsu Services to sub-contract such
Operational Service to such Service Provider at no higher cost to Post
Office than was previously the case.

DISPUTE RESOLUTION

Any dispute arising in connection with the application of this Schedule B4.4 shall

be resolved in accordance with the Dispute Resolution Procedure.

ASSOCIATED DOCUMENTS

The following CCDs are associated with this Schedule B4.4:

Document Reference

Document Title

4 CS/SER/002

Horizon Systems Helpdesk:
Service Description

2 Withdrawn in CCN1616b

3 CS/PRD/058

Fujitsu Services / Post Office Ltd
Interface Agreement for
Operational Business Change -
Reference Data

4 CS/SER/004

Message Broadcast: Service
Description

5 BP/SPE/035

NBS Definition

6 CS/SPE/011

Network Banking End to End
Reconciliation Reporting

7 NB/PRO/002 On Line Services
Reconciliation & Incident
Management

8 SVM/SDM/SD/0011 Branch Network: Service
Description

9 CS/SER/015 Management Information

Service: Service Description

10 I EF/SER/001 (Replaced )

Debit Card MoP Functional
Description (Replaced )

Schedule B4.4 Version 13.0
Page 7 of 51

POL00027937
POL00027937
CONFIDENTIAL
REQ/GEN/REP/1091
Mapping Schedule B3.2 to the
HNG-X Solution
11 EF/IFS/002 Horizon — Streamline Application
Interface Specification
12 EA/IFS/030 (Replaced) Technical Interface Specification

POLSAP/DES/GEN/SPE/0002

Impact Programme: POL F S
S80 Technical Interface
Specifications (Replaced)

POLSAP Technical
Specification

Interface

13 PA/PER/033 Horizon Capacity Management
and Business Volumes

14 CS/SER/014 (Replaced) Service Management Service -
Service Description (Replaced)

SVM/SDM/SD/0007 Service Management - Service

Description

15 CS/PRO/163 Closure of Associated NBX
Circuits

16 CS/SER/010 Transaction Benchmark Service:
Service Description

17 Withdrawn in CCN1616b

9.2 There are no CRDs associated with this Schedule B4.4.

Schedule B4.4 Version 13.0

Page 8 of 51

POL00027937
POL00027937
CONFIDENTIAL

21

22

2.3

2.4

ANNEX 1 TO SCHEDULE B4.4 - SERVICE DESK SERVICE LEVELS
INTRODUCTION

The SLTs for the Service Desk Service are specified in this Annex 1 to Schedule B4.4.

In respect of the Service Desk Service there are no SLTs with associated LDTs or ARLs.
The SLTs with no associated LDTs, and in relation to which no liquidated damages or
other express contractual remedy is payable, are set out in paragraph 2 of this Annex
dle

For the purposes of the SLTs set out in paragraph 2 of this Annex 1, all timing
measurements for Service Level purposes in respect of calls left on the Service Desk
Voicemail Service shall commence at 08:00 hours on the Service Desk Day following
that call.

Fujitsu Services shall be entitled to suspend a Service Desk call for reasons which shall
include the time that the call is with British Telecom for action, provided there is evidence
of management controls and checks on British Telecom by Fujitsu Services during this
suspension.

SERVICE LEVEL TARGETS FOR WHICH NO LIQUIDATED DAMAGES APPLY

Fujitsu Services shall provide the Service Desk Service which shall act as a point of
contact for Post Office staff and staff of Post Office Clients having a direct interface with
the Horizon Service Infrastructure provided.

Telephone answering Service Levels will be measured from the point the redirected
telephone call enters the Service Desk telephone switch.

Hours of Service

2.3.1 Fujitsu Services shall provide a continuous Service Desk Service during each
Service Desk Day.

2.3.2 The Service Desk Voicemail Service shall be provided outside of Service Desk
Days with Service Desk ring back commencing at 08:00 hours on the following
Service Desk Day.

2.3.3 Arrangements for Bank Holidays shall only vary from a normal Service Desk
Day where agreed with Post Office, having regard to their applicability
throughout the United Kingdom.

2.3.4 Fujitsu Services shall ensure that calls made to the Service Desk outside
specified hours are accepted by Fujitsu Services which may be by the Service
Desk Voicemail Service.

To the extent that such notification is required by law, Fujitsu Services shall be
responsible for ensuring that Service Desk staff are properly notified that calls will be

Schedule B4.4 Annex 1 Version 12.0
Page 9 of 51

POL00027937

POL00027937
CONFIDENTIAL

recorded and Post Office shall be responsible for ensuring that Users (and others who
call the Service Desk on Post Office business) are properly so notified.

25 Service Level Targets

2.5.1

25.6

Fujitsu Services shall answer at least 80% of all calls to the Service Desk within
thirty (30) seconds and the average time to answer in each Service Level
Measurement Period shall be less than ten (10) seconds.

The percentage of “calls not answered” shall be less than five (5). This includes
calls where the line is busy as well as calls answered which are put on the
“waiting queue” that ring off after 40 seconds.

Until 31st March 2015, Fujitsu Services shall resolve at least 95% of calls
assigned to the “first level” (also known as “Level 1”) (as described in the CCD
entitled “Horizon Systems Helpdesk: Service Description” (CS/SER/002))
within five (5) minutes. The average time to resolve first level calls in each
Service Level Measurement Period shall be less than three (3) minutes.

Until 315t March 2015, Fujitsu Services shall resolve at least 95% of calls
assigned to the “second level” (also known as “Level 2”) (as described in the
CCD entitled “Horizon Systems Helpdesk: Service Description” (CS/SER/002))
within thirty (30) minutes and the average time to resolve second level calls in
each Service Level Measurement Period shall be less than ten (10) minutes.

The Service Desk Voicemail Service shall be available during all periods
outside of Service Desk Days. Fujitsu Services’ performance against this
obligation shall be reported in the Service Review Book.

Fujitsu Services shall ensure that all calls recorded by the Service Desk
Voicemail Service will be raised as calls on the Fujitsu Services call logging
system on the next Service Desk Day following the recorded call. Fujitsu
Services’ performance against this obligation shall be reported in the Service
Review Book.

Reboot Incidents

(a) Fujitsu Services shall use all reasonable endeavours to ensure that the
number of Reboot Incidents reported to the Service Desk and in relation
to which the Service Desk has not (whilst acting reasonably) refused
authorisation shall be less than the number equal to 1 multiplied by the
average number of open Counter Positions in any period of four months.

(b) Fujitsu Services shall be entitled to carry out planned reboots outside
Working Hours. Such planned reboots shall not count as Reboot
Incidents and shall not exceed one per Counter Position per calendar
month.

26 Service Level relief

Schedule B4.4 Annex 1 Version 12.0

Page 10 of 51

POL00027937
POL00027937
CONFIDENTIAL

2.6.1

If for any reason other than a Default by Fujitsu Services, the Service Desk
becomes unavailable for use, the Service Levels in paragraph 2 of this Annex
1 of Schedule B4.4 will be suspended for the period of such unavailability
subject to a maximum period of either:

(a) three hours; or

(b) the remainder of the Service Desk Day,

whichever is the shorter period.

Schedule B4.4 Annex 1 Version 12.0

Page 11 of 51

POL00027937
POL00027937
POL00027937
POL00027937

CONFIDENTIAL

ANNEX 2 TO SCHEDULE B4.4 - DATA DELIVERY SERVICE LEVELS

1. INTRODUCTION
1.1 The data delivery SLTs for the following are specified in this Annex 2 to Schedule B4.4:
1.4.4 APS;

1.1.2 Transaction loading onto Configured POL FS;

1.1.3 LFS;

1.14.4 delivery of Transaction Correction Records;

1.4.5 delivery of HR SAP Files;

1.1.6 APS Client data;

1.1.7 Reference Data;

1.1.8 Message Broadcast Service;

1.1.9 delivery of Reconciliation and Settlement Reports;

1.1.10 dispatch of REC Files;

1.1.11 Not used; and

1.1.12 delivery of Client Transaction summary (CTS) files.
1.2 In respect of each of the above:

1.2.1 the SLTs with associated LDTs and/or ARLs are described in paragraph 2 of
this Annex 2; and

1.2.2 the SLTs with no associated LDTs, and in relation to which no liquidated
damages or other express contractual remedy is payable, are set out in
paragraph 3 of this Annex 2.

1.3 Where Fujitsu Services is obliged to arrange and undertake a visit to a Branch to recover
Transaction records as described in the CCD entitled “Engineering Service: Service
Description” (SVM/SDM/SD/0002) in order to avoid the Day J Service Levels (SLTs and
LDTs) set out in this Annex 2 being failed (each a “Recovery Visit’), in assessing
whether there has been a failure of those Service Levels the following principles shall
apply:

1.3.1 For the purposes of such assessment, the following shall be disregarded from
all relevant Service Level measurements in respect of the Branches in
question:

Schedule B4.4 Annex 2 Version 12.0
Page 12 of 51
CONFIDENTIAL

(a) days on which Fujitsu Services has been unable to contact a Branch
(despite reasonable endeavours to do so) to arrange a Recovery Visit,
which includes days on which that Branch is not open for business;

(b) each day of delay caused by a Branch declining the earliest offered date
for a Recovery Visit (provided the Recovery Visit offered on that date
would not extend beyond the end of Post Office Core Day or, if later, the
normal business opening hours of that Branch), which includes days on
which that Branch is not open for business;

(c) each day of delay caused by a Branch cancelling, refusing or otherwise
preventing an arranged Recovery Visit but excluding days on which a
Recovery Visit is prevented by a Branch from being completed as a result
of that visit extending beyond the normal business opening hours of that
Branch without prior agreement of that Branch; and

(d) each day that a Recovery Visit, which by prior arrangement with a Branch
is scheduled to take place or continue beyond the hours that Branch is
open for business, is prevented from being completed by that Branch
contrary to that arrangement.

For the purposes of such assessment, the period commencing on the day on
which Fujitsu Services becomes aware that a Branch does not have the PSTN
telephone capability or “plug-in” PSTN telephone capability required for a
Recovery Visit and ending on and including the day on which an ISDN or ADSL
connection is re-established to that Branch, shall be disregarded from all
relevant Service Level measurements in connection with the application of the
Service Levels in this Annex 2 to that Branch.

1.4 Fujitsu Services shall arrange and undertake Recovery Visits in order to achieve the
Day J Service Levels set out in this Annex 2, unless prevented from arranging such
visits or from undertaking them within Post Office Core Day or, if later, the normal
business opening hours of the Branch in question.

2. SERVICE LEVEL TARGETS FOR WHICH LIQUIDATED DAMAGES OR
ADDITIONAL REMEDIES APPLY

21 APS Service Levels with remedies
2.1.1 Availability

Unless otherwise agreed by Post Office, the APS shall be fully available in a
Branch whenever that Branch is open, either through normal procedures or in
fallback.

Application of APS Service Levels

The SLTs, LDTs and ARLs specified in paragraph 2.1 of this Annex 2 are of
generic application to APS Clients and the relevant performance

Schedule B4.4 Annex 2 Version 12.0

Page 13 of 51

POL00027937
POL00027937
CONFIDENTIAL

2.1.3

measurements for all APS Clients (for which services are being provided as
at the Amendment Date) shall be aggregated for the purposes of those SLTs,
LDTs and ARLs. All APS Clients introduced after the Amendment Date shall
be included in that aggregate unless it is specifically stated otherwise in the
applicable CCN.

Data File delivery

(a) Delivery of APS Transaction records shall not normally be before 03:00
on the day following the completion of those Transactions (referred to as
“Day B” in the tables below).

(b) Where Fujitsu Services is required to deliver APS Client files on specified
days, the terms Day B, Day C, Day D and Day J used in this paragraph
2.1 of this Annex 2 shall be construed as the days on which files could
have been delivered as specified in the relevant AP Client Specification.
If files may only be delivered Monday to Friday inclusive, then for
Transactions completed on Thursday, Day B shall be Friday and Day C
shall be Monday.

(c) The SLT, LDT and ARL for APS Transaction Data File delivery are as
shown in the table below:

POL00027937
POL00027937

Service SLT LOT ARL
Requirement

APS Transaction I 96.5% of all I 96.5% of all I 98% of all
Data File delivery I Transaction records I Transaction records I Transaction

delivered by 23:59 I delivered by 23:59 I records delivered
hours Day B; hours Day B; by 23:59 hours

97.5% of all I 97.5% of — al I PaYD-
Transaction records I Transaction records
delivered by 23:59 I delivered by 23:59
hours Day C (i.e. 1 I hours Day C (i.e. 1
Day after Day B); Day after Day B);

98.5% of all I 98.5% of all
Transaction records I Transaction records
delivered by 23:59 I delivered by 23:59
hours Day D (i.e. 1 I hours Day D (i.e. 1
Day after Day C); Day after Day C);

100% of all I 100% of all
Transaction records I Transaction records
delivered by 23:59 I delivered by 23:59
hours Day J (i.e. 6 I hours Day J (i.e. 6
Days after Day D). Days after Day D).

(d) For the purposes of paragraph 2.1.3(c) above, in relation to each AP
Client serviced by the APS via the EDG:

Schedule B4.4 Annex 2 Version 12.0

Page 14 of 51
CONFIDENTIAL

2.1.4

(i) the Transaction record file shall be deemed to be
delivered when it is delivered to the EDG and not the AP
Client; and

(ii) a successful Transaction record file delivery will be
deemed to have occurred when the file transfer software
running on the remote file transfer management service
(FTMS) gateway identifies that a successful transfer to the
EDG has occurred or cannot occur because of problems
within the EDG infrastructure.

Remedies

(a)

(b)

The liquidated damages for late delivery of APS Transaction Data Files
shall be calculated when the relevant LDT is breached as follows:

liquidated damages =

(((100 - actual level of Service by Day J) / 100) * total number of
Transactions * 1.46 pence) +

(((98.5 — (the greater of the ARL (98) and the actual level of Service
by Day D)) / 100) * (total number of Transactions - any also failing
at Day J) * 1.46 pence) +

(((97.5 - actual level of Service by Day C) / 100) * (total number of
Transactions - any also failing at Day D and Day J) * 1.46 pence) +

(((96.5 - actual level of Service by Day B) / 100) * (total number of
Transactions - any also failing at Day J, Day D and Day C) * 1.46
pence).

Where the level of service falls below the ARL specified in the table in
paragraph 2.1.3(c) Post Office shall be entitled to recover in addition to
any liquidated damages recovered under paragraph 2.1.4(a), the greater
of:
(i) liquidated damages calculated as follows:
liquidated damages =
((ARL (98) — the actual level of Service by Day D) / 100) *
(total number of Transactions - any also failing at Day J) *

1.46 pence; and

(ii) Post Office Additional Costs.

2.2 Transaction loading onto Configured POL FS

Schedule B4.4 Annex 2 Version 12.0

Page 15 of 51

POL00027937
POL00027937
CONFIDENTIAL

2.2.4

In respect of all Transactions undertaken on a particular day, the proportion of
Transaction records delivered from TMS to Configured POL FS following that
day (i.e. Transactions on Day A, delivery to Configured POL FS by 07:30 Day
B, Day C, Day D and Day J) shall be measured by Fujitsu Services.

Subject to paragraph 2.2.4, Fujitsu Services shall use reasonable endeavours
within the capacity and performance constraints of the POL FS System to
ensure that all Transactions occurring on Day A are loaded onto Configured
POL FS as set out in the table below:

Service Requirement Target

Transactions loaded from TMS I 96% of all Transaction records loaded onto
onto Configured POL FS. Configured POL FS by 07:30 hours on Day B;

97% of all Transaction records loaded onto
Configured POL FS by 07:30 hours on Day C
(i.e. 1 Day after Day B);

98% of all Transaction records loaded onto
Configured POL FS by 07:30 hours on Day D
(i.e. 1 Day after Day C);

100% of all Transaction records loaded onto
Configured POL FS by 07:30 hours on Day J
(i.e. 6 Days after Day D).

If Fujitsu Services persistently fails to achieve the targets described in
paragraph 2.2.2 as a result of lack of capacity or performance of the POL FS
System, then increases in capacity or performance required to address the
deficiency shall be dealt with by the Capacity Management Service.

The measurement of the targets in paragraph 2.2.2 shall not include:

(a) in the event that the QA/Test SAP System is used as the failover
system for the Production SAP System pursuant to paragraph
2.2.5, any Transactions required to be loaded onto Configured
POL FS during the period commencing from the day on which the
QA/Test SAP System is used and expiring on the day on which the
Production SAP System becomes available and Fujitsu Services
has completed the loading of all data onto the Production SAP
System from the QA/Test SAP System;

(b) any failure to load any Transaction onto Configured POL FS where
such failure is caused either by:

(

) the incorrect functioning of PRISM application code; or

(ii) the incorrect configuration of Configured POL FS
(including but not limited to missing FAD) provided that
such incorrect configuration is a result of configuration
activity that is not the responsibility of Fujitsu Services.”

Schedule B4.4 Annex 2 Version 12.0

Page 16 of 51

POL00027937
POL00027937
CONFIDENTIAL

2.2.5

2.3 LFS Service Levels

2.3.1

Business Continuity

(a)

(c)

Purpose

(i)

(i)

(iii)

In the event that an incident or a major failure of the
Production SAP System causes the Production SAP System
(situated in the live Data Centre) to be unavailable:

Fujitsu Services shall notify Post Office of such incident or
failure (in such manner as is practicable in the
circumstances) as soon as reasonably practicable and if
such notification is not in written form, shall confirm in
writing in accordance with the normal practice for incident
management between the Parties;

the QA/Test SAP System (situated in the DR Data Centre)
shall be used as the failover system for the Production
SAP System; and

the POL FS Services in respect of the QA/Test SAP
System shall be suspended for the duration of such
incident or failure.

Fujitsu Services shall ensure that the time taken for failover
referred to in paragraph 2.2.5(a) (measured between notice
being given by Fujitsu Services pursuant to section 2.2.5(a)(i)
and the QA/Test SAP System being re-configured for use as
the Production SAP System) does not exceed 48 hours. In
the event that such failover is required, it shall be permissible
for the POL FS Services to be reduced in terms of number of
concurrent users, response times and hours of service.

Fujitsu Services is not obliged to provide failover systems for
the QA/Test SAP System or the Development SAP System
and, in the event that an incident or a system failure causes
either the QA/Test SAP System or the Development SAP
System to become unavailable, the POL FS Services in
respect of the QA/Test SAP System and the Development
SAP System shall be suspended for the duration of such
incident or failure.

In the event that Fujitsu Services gives notice pursuant to
section 2.2.5(a)(i) above, Post Office shall ensure that the
QA/Test SAP System is available for failover within two hours
of such notice being given

Schedule B4.4 Annex 2 Version 12.0

Page 17 of 51

POL00027937
POL00027937
CONFIDENTIAL

Fujitsu Services shall provide the LFS at all Branches for all of the hours that
they are open for business.

2.3.2 Services Measures

The LFS measures are categorised as follows:

(a)

(b)

transfer of data from Branch to SAPADS; and

transfer of data from SAPADS to Branch.

2.3.3 Branch to SAPADS Data Transfer

The SLT and LDT for Branch to SAPADS data transfer are set out in the table

below:
Service Data available I SLT LDT ARL
Requirement I at the Branch
by:
Confirmation of I 19:00 on DayA I 97.2%, of pouch I 99% of pouch I N/A

pouch received
at Branch

confirmation
messages
available by
19:00 on Day A
to be delivered to
SAPADS. by
08:00 on Day B

confirmation
messages

available by
19:00 on Day
A to be
delivered to
SAPADS_ by
08:00 on Day
B

2.3.4 SAPADS to Branch Data Transfer

(a)

The SLT and ARL for SAPADS to Branch data transfer are set out in

the table below:

Service Data available I SLT LDT ARL
Requirement at the
SAPADS/ LFS
boundary by
Delivery of I 06:00 on DayA I 90% of planned I N/A 95% of
SAPADS orders available planned
Planned by 06:00 on Day orders
Orders to A to be at the available by
Branches Branch(es) by 06:00 on Day
08:00 on Day A; Ato be at the
Branch(es)
Ais aly by 12:00 on
Branch(es) by Day A.
12:00 on DayA. .

Schedule B4.4 Annex 2 Version 12.0

Page 18 of 51

POL00027937
POL00027937
CONFIDENTIAL

23.5

(b)

Delivery of SAPADS planned orders to Branches which occur by
06:00 on Sundays shall not be included in the calculation of the SLT
and ARL set out in the table above. On Sundays, Fujitsu Services
shall use reasonable endeavours to achieve the SLT set out in the
above table for delivery of SAPADS planned orders to Branches.

LFS Remedies

(a)

(b)

(c)

In the event that either of the Service Level Targets specified in the
tables in paragraphs 2.3.3 or 2.3.4(a) are not achieved, Fujitsu
Services shall provide Post Office with an analysis of the reason for
the failure. Fujitsu Services and Post Office shall agree a reasonable
rectification and improvement plan to address the failure.

liquidated damages in respect of failures to achieve the LDT for
Branch to SAPADS data transfer set out in the table in paragraph
2.3.3 shall be calculated as follows:

liquidated damages =

(L-(0.01 * T)) * £3.82, or zero if the result of that calculation is
negative, where:

L = the number of times (summed for all Branches) that a pouch
delivery confirmation entered at a Branch before 19.00 has been
delivered to SAPADS after 08:00 the next day; and

T = the number of times (summed for all Branches) that a pouch
delivery confirmation has been entered at a Branch before 19.00.

For the purposes of L and T, each delivery will have a single
confirmation, whether that delivery comprises one pouch or multiple
pouches.

In the event that Fujitsu Services fails to achieve the ARL in respect
of SAPADS to Branch data transfer set out in the table in paragraph
2.3.4(a), Post Office shall be entitled to recover Post Office
Additional Costs from Fujitsu Services.

24 Delivery of Transaction Correction Records to Branches

244

The SLT and ARL for the delivery of Transaction Correction Records to
Branches are set out in the table below:

Schedule B4.4 Annex 2 Version 12.0

Page 19 of 51

POL00027937
POL00027937
CONFIDENTIAL
Service Data available I SLT LDT ARL
Requirement I for extraction
from
Configured
POL FS by
Delivery of I 23:59:59 on I For Transaction I N/A 95% of
Transaction DayA Correction Transaction
Correction Records Correction
Records to available by Records
Branches 23:59:59 on Day available by
A 23:59:59 on
90% to be at the per Alo he at
Branch(es) by the
- " Branch(es)
08:00 on Day B; by 12:00 on

25

96% to be at the Day B.
Branch(es) by
12:00 on Day B;

100% to be at the
Branch(es) by
23:59:59 on Day J
(i.e. 6 Days after
Day D).

2.4.2 Delivery of Transaction Correction Records which are available to be extracted
from Configured POL FS for delivery to Branches between 23:59:59 on
Saturdays and 23:59:59 on Sundays shall not be included in the calculation of
the SLT and ARL set out in the table above. Fujitsu Services shall use
reasonable endeavours to achieve the SLT set out in the above table for
delivery of such Transaction Correction Records to Branches.

2.4.3 In the event that any of the SLTs specified in the table in paragraph 2.4.1 are
not achieved, Fujitsu Services shall provide Post Office with an analysis of the
reason for the failure. Fujitsu Services and Post Office shall agree a
reasonable rectification and improvement plan to address the failure.

2.4.4 In the event that Fujitsu Services fails to achieve the ARL set out in the table
in paragraph 2.4.1, Post Office shall be entitled to recover Post Office
Additional Costs from Fujitsu Services.

Delivery of HR SAP Files

2.5.1 For the purpose of this paragraph 2.5, the term "Pay Run Date" means the
date on which Post Office processes Agents' remuneration as defined by Post
Office Reference Data.

25.2 The Service Levels for delivery of the HR SAP Files to the TIP Gateway are
as set out in the table below:

Schedule B4.4 Annex 2 Version 12.0

Page 20 of 51

POL00027937
POL00027937
POL00027937

POL00027937
CONFIDENTIAL
Service Notification by I SLT LDT ARL
Requirement I Post Office of
Pay Run Date
Delivery of I At least 14 days I HR SAP File I NA HR SAP File
HR SAP prior to the Pay I delivered to TIP delivered to
Files Run Date Gateway by TIP Gateway
21.30 on the by 21.30 on
Friday preceding the Friday
the Pay Run preceding the
Date Pay Run Date
2.5.3 In the event that the SLT specified in the table in paragraph 2.5.2 is not
achieved, Fujitsu Services shall provide Post Office with an analysis of the
reason for the failure. Fujitsu Services and Post Office shall agree a
reasonable rectification and improvement plan to address the failure.
2.5.4 In the event that Fujitsu Services fails to achieve the ARL set out in the table

3.1

in paragraph 2.5.2, Post Office shall be entitled to recover Post Office
Additional Costs from Fujitsu Services.

SERVICE LEVEL TARGETS WITH NO ASSOCIATED LIQUIDATED DAMAGES
THRESHOLDS OR ADDITIONAL REMEDY LEVELS

APS Client data

3.1.1

APS Client data is Reference Data created by an APS Client. Post Office shall
procure that such data is provided by the Client to Fujitsu Services, for
distribution to Branches.

All APS Client data received by Fujitsu Services by 20:00 hours shall be
available at all relevant Counter Positions in accordance with the Service

Levels set out in the table in paragraph 3.1.3.

The Service Level Targets for APS Client data are set out in the table below:

Service SLT (applicable in respect of APS Client data
Requirement received by 20:00 on Day A)

Delivery of APS 96% of Counter Positions can access the data at the
Client data start of the next Post Office Core Day (i.e. Day B);

97% of Counter Positions can access the data at the
start of the second Post Office Core Day following
DayA (i.e. Day C);

98% of Counter Positions can access the data at the
start of the third Post Office Core Day following DayA
(i.e. Day D);

100% of Counter Positions can access the data at
the start of the ninth Post Office Core Day following
DayA (i.e. Day J).

Schedule B4.4 Annex 2 Version 12.0

Page 21 of 51
CONFIDENTIAL
3.2 Reference Data
3.2.1 Post Office Reference Data shall be delivered to Fujitsu Services within the

lead-times specified in the CCD entitled “Fujitsu Services / Post Office Ltd
Interface Agreement for Operational Business Change - Reference Data”
(CS/PRD/058). Post Office shall be responsible for final validation and
authorisation of Post Office supplied Reference Data, the date of such
authorisation being referred to in this paragraph 3.2 as the “Authorisation
Date”.

For each delivery of Reference Data that is to be released to the live estate
Post Office and Fujitsu Services shall agree a release date (the “Agreed
Release Date”) which shall be at least one Working Day later than the
Authorisation Date and be the date on which Fujitsu Services initiates the
release of that Reference Data to the live estate.

The Service Level Targets for Post Office Reference Data are set out in the
table below:

Service Requirement SLT

Reference Data delivery 96% of Counter Positions will have received
the correct version of the Reference Data by
the start of Post Office Core Day on the day
following the Agreed Release Date (i.e. by
Day B);

97% of Counter Positions will have received
the correct version of the Reference Data by
the start of Post Office Core Day two days
after the Agreed Release Date (i.e. by Day C);

98% of Counter Positions will have received
the correct version of the Reference Data by
the start of Post Office Core Day three days
after the Agreed Release Date (i.e. by Day D);

100% of Counter Positions will have received
the correct version of the Reference Data by
the start of Post Office Core Day nine days
after the Agreed Release Date (i.e. by Day J).

Schedule B4.4 Annex 2 Version 12.0

Page 22 of 51

POL00027937
POL00027937
CONFIDENTIAL

3.3 LFS Service Levels

3.3.1 SLTs for Branch to SAPADS data transfer are set out in the table below:

Service
Requirement

Data available
at the Branch
by

SLT

Confirmation of
pouch received
at Branch

19:00 on DayA

97% of pouch confirmation messages
available by 19:00 on Day A to be
delivered to SAPADS by 22:00 on Day A;

100% of pouch confirmation messages
available by 19:00 on Day A to be
delivered to SAPADS by 22:00 hours on
Day I.

Details of
SAPADS pouch
Collected from
Branch

19:00 on DayA

97% to SAPADS by 22:00 on Day A;
97.2% to SAPADS by 08:00 on Day B;

100% to SAPADS by 22:00 hours on Day

Daily Cash on
Hand details

19:00 hours on
DayA

96.25% to SAPADS by 23:59 hours on
Day A.

3.3.2 SLTs for SAPADS to Branch data transfer are set out in the table below:

Service Requirement

Data available at I SLT
SAPADS / LFS
Boundary

Advice Notes
Branches

Delivery of SAPADS

to

18:00 on dayA 97% at the Branch(es) by

08:00 on Day C.

3.3.3 In the event that any of the Service Level Targets in this paragraph 3.3 are not
met, Fujitsu Services shall provide Post Office with an analysis of the reason

for the failure. Fujitsu Services and Post Office shall agree a reasonable

rectification and improvement plan to address the failure.

3.4 Message Broadcast Service

3.4.1 Introduction

(a) This paragraph 3.4 sets out the Service Levels which apply to the

Message Broadcast Service (“MBS”).

Schedule B4.4 Annex 2 Version 12.0

Page 23 of 51

POL00027937
POL00027937
CONFIDENTIAL

3.4.2

(b) Notwithstanding paragraph 2.4 of this Schedule B4.4, Fujitsu
Services shall not be required to report performance against the SLT
specified in paragraph 3.4.3.

(c) For the avoidance of doubt, there is no LDT or ARL applicable to the
MBS.

Hours of service
Fujitsu Services shall provide the MBS such that:

(a) I messages can be submitted at any time during the Post Office Core
Day;

(b) messages stored at a Branch can be viewed at the Branch at any time
that the OPS is available.

Message delivery

For valid messages successfully passed to Fujitsu Services in accordance
with the standards and procedures set out in the CCD entitled “Message
Broadcast: Service Description” (SVM/SDM/SD/0018) (formerly “Message
Broadcast: Service Description” (CS/SER/004)), the SLT shall be that all
messages shall be available for onward transmission to the Branches, within
three (3) hours of the “message receipt time” as defined in that CCD such that
valid messages would be expected to be available to be viewed in each
targeted Branch within four (4) hours of the “message receipt time”, provided
that the targeted Branch is operating and communicating normally. The three
(3) and four (4) hour targets only apply within the hours of the Post Office Core
Day, will not be reported upon and will have no associated remedies or
termination rights, but from time to time Post Office may monitor performance
by inspection. Fujitsu Services’ sole obligation with regard to the three (3) and
four (4) hour target times shall be to use reasonable endeavours to achieve
them.

Report delivery

The report of Branches which may have been unable to receive messages
shall normally be available to Post Office by 08:00 the following Post Office
Core Day.

Volumes

(a) As a minimum, the MBS shall have sufficient capacity to support:

(i) the submission of six (6) messages per day by Post Office; and

(ii) three (3) new messages for any given Branch per day.

Schedule B4.4 Annex 2 Version 12.0

Page 24 of 51

POL00027937
POL00027937
CONFIDENTIAL

(b) Fujitsu Services shall use reasonable endeavours to process messages
above these volumes, up to:

(i) the submission of a maximum of 13 messages per day by Post
Office; and

(ii) I amaximum of seven (7) new messages for any given Branch per
day.

(c) The message delivery service levels in paragraph 3.4.3 above shall only
apply to message volumes up to the limits set out in paragraph 3.4.5(a)
above. For message volumes above these limits, no service levels shall

apply.
3.5 Delivery of Reconciliation and Settlement Reports
3.5.1 Fujitsu Services shall deliver to Post Office the Reconciliation and Settlement
Reports generated from DRSH and TESQA.
3.5.2 The delivery targets for the Reconciliation and Settlement Reports are set out
in the table below:
LREC File received by I Delivery targets
Fujitsu Services
By 23:59:59 on DayA. Delivery of Reconciliation and Settlement
Reports to the TIP Gateway by 08.05 on Day B
(irrespective of whether any DRSH failure
occurs during the overnight batch window).
Between 00.00 and Delivery of Reconciliation and Settlement
01.59.59 on Day B Reports to the TIP Gateway by 08.05 on Day B
or where there is a DRSH failure during the
overnight batch window by 10.05 on Day B.
Between 02.00 and Reconciliation and Settlement Reports delivered
22.00 on Day B. pursuant to this SLT will not be enriched with
LREC data received from LINK until Day C.
However, delivery of the Reconciliation and
Settlement Reports (without the LREC
enrichment) will be made to the TIP Gateway by
08:05 on Day B or where there is a DRSH failure
during the overnight batch window by 10:05 on
Day B.
3.5.3 Subject to paragraph 3.5.4, the SLT is that the number of Reconciliation and

Settlement Reports which fail to deliver in accordance with paragraph 3.5.2

Schedule B4.4 Annex 2 Version 12.0

Page 25 of 51

POL00027937
POL00027937
CONFIDENTIAL

shall not (in respect of each delivery target above) exceed two (2) failures in
any SLT Calendar Year. Fujitsu Services will notify Post Office of any such
delivery failures using a manual (ie non automated) method (eg email).

A further SLT is that 100% of the Reconciliation and Settlement Reports shall
be delivered by Fujitsu Services to the TIP Gateway (or other location agreed
by the Parties) by:

(a) 12:00 on Day B where the failure occurs on a system involved in the
generation of the Reconciliation and Settlement reports (excluding
DRSH or Transaction Enquiry Service) and the failure occurs during
the overnight batch window; or

(b) 18:00 on Day B where the failure occurs on the DRSH and / or
Transaction Enquiry Service, and the failure occurs during the
overnight batch window,

with the proviso that, if the LREC File is received by Fujitsu Services between
02:00 and 22:00 on Day B, then any such Reconciliation and Settlement
Reports will not be enriched with LREC data received from LINK until Day C.

For the purposes of the SLTs described in paragraphs 3.5.3 and 3.5.4, the
Service Level Measurement Period is each SLT Calendar Year.

3.6 Dispatch of REC Files

3.6.1

Fujitsu Services shall use reasonable endeavours to ensure that 100 % REC
Files are dispatched from Fujitsu Services’ server to CAPO and Santander by
00:10 on each day.

The Service Level Target is that, subject to paragraphs 3.6.3 and 3.6.4, all REC
Files shall be delivered to each of CAPO and Santander by 03:00 on each day
of each SLT Calendar Year.

Subject to paragraph 3.6.5, the number of REC Files which fail to be delivered
to CAPO in accordance with paragraph 3.6.2 shall not exceed two (2) failures
in any SLT Calendar Year.

Subject to paragraph 3.6.5, the number of REC Files which fail to be delivered
to Santander in accordance with paragraph 3.6.2 shall not exceed two (2)
failures in any SLT Calendar Year.

A further SLT is that, in any SLT Calendar Year, 100 % of REC Files shall be
delivered to CAPO by 16:00 on Day B and 100 % of REC Files shall be
delivered to Santander by 18:00 on Day B.

For the purposes of the SLTs described in this paragraph 3.6, the Service
Level Measurement Period is each SLT Calendar Year.

Schedule B4.4 Annex 2 Version 12.0

Page 26 of 51

POL00027937
POL00027937
POL00027937
POL00027937

CONFIDENTIAL

3.7 Not used

Schedule B4.4 Annex 2 Version 12.0
Page 27 of 51
CONFIDENTIAL

ANNEX 3 TO SCHEDULE B4.4 - BANKING SERVICES

PART A - NBS SERVICE LEVELS AND REMEDIES

NBS SERVICE LEVEL PRINCIPLES

This Part A of Annex 3 to Schedule B4.4 specifies the SLTs and ARLs and the
performance measurements required in respect of them for the NBS. No LDTs are
specified for the NBS in this Annex, but liquidated damages shall be payable by Fujitsu
Services in accordance with paragraph 3 and 4 of this Annex 3.

For the purposes of this Annex 3:

“Availability Period” means each period of six (6) months commencing on 1 January
and 1 July each SLT Calendar Year;

“Central NB System” means the elements of the NB System which enable on-line
Banking Transactions to be carried out, excluding all:

1.2.1 such elements in Branches (or other Post Office locations where the NBS is
available);

1.2.2 network components between each Branch (or other Post Office locations
where the NBS is available) and the Data Centres; and

1.2.3 network components between the Data Centres and the Banks;

“Core NB System Fault” means a fault in the Central NB System which causes the
NBS not to be available in any one or more Branches for the period that fault persists;

“Customer Critical Exception” means a NB Priority Exception in respect of which
Fujitsu Services has received a Disputed Banking Transaction Notice; and

“Non NB Core Hours” means all hours which are not NB Core Hours.

The Service Levels described in this Annex 3 relate to the performance of the NBS
within the NBS Service Boundaries as measured at the points and/or in the manner
described in this Annex 3.

All calculations (including percentages and averages) upon which the SLTs, ARLs or
other targets in this Schedule are based shall be calculated, and Fujitsu Services’
performance assessed, for the relevant Service Level Measurement Period or
Availability Period as a whole. Without prejudice to that calculation and assessment,
Fujitsu Services' performance against the Service Levels in this Annex 3 shall be
reported monthly for service monitoring purposes in the Service Review Book.

The architecture of the NB System shall be capable of supporting Banking Transactions
(in accordance with applicable Service Levels) carried out in each Branch during the
hours that Branch is actually open for business, except during the period from 2000 to
0800 each 24 hour period when Banking Transactions shall not be able to be carried

Schedule B4.4 Annex 3 Part: A version 12.0
Page 28 of 51

POL00027937
POL00027937
CONFIDENTIAL

241

out in Branches due to system management activities (including the introduction of
major Releases in accordance with paragraph 3.5.1 of the CCD entitled “Service
Management: Service Description” (SVM/SDM/SD/0007) (formerly “Service
Management Service: Service Description” (CS/SER/014))), activities in support of
software distribution, continuity tests and Reference Data update and such other
activities as the parties may agree). Such periods shall be scheduled by agreement with
Post Office in accordance with current practices used in respect of the Applications
(other than the NBS) and the Infrastructure Services, such agreement not to be
unreasonably withheld.

For the purposes of the NBS, in particular the NBS Service Levels described in this
Annex 3 to Schedule B4.4, the result of the following calculation:

« MCWP minus MAAWP,
(such result being referred to in this paragraph 1.6 as the “NB Additional Time”) shall
not be less than 15 seconds. Once set, or as otherwise specified in the CCD entitled
“NBS Definition” (BP/SPE/035), changes to the MCWP and/or MAAWP where the
resulting MCWP is less than or equal to 40 seconds and where the resulting NB
Additional Time is more than or equal to 15 seconds shall be subject to change under
Operational Business Change (as applicable in respect of product change), and
changes where the resulting MCWP is greater than 40 seconds and/or the resulting NB
Additional Time is less than 15 seconds shall be subject to agreement under the Change
Control Procedure.
This Annex 3 sets out five categories of performance measures:
1.7.1 NB Request and NB Authorisation transmission time measures;
1.7.2 NBS availability measures; and

1.7.3 Data Reconciliation Service measures.

Of these, paragraphs 1.7.1 and 1.7.2 above are subject to liquidated damages whilst
paragraph 1.7.3 is not.

PERFORMANCE MEASURES

NB Request and NB Authorisation transmission times

2.1.1 Banking Transactions referred to in this paragraph 2.1 shall be those for which
a NB Request is generated and a corresponding NB Authorisation is received
from the Banks before the earliest of:

(a) the MCWP has expired;

(b) the Banking Transaction is Declined by the Counter Clerk; and

(c) the Banking Transaction fails,

Schedule B4.4 Annex 3 Part: A version 12.0
Page 29 of 51

POL00027937
POL00027937
CONFIDENTIAL

POL00027937

POL00027937

and no other Banking Transactions shall be included in the calculation set out
in paragraph 2.1.4.

For each Banking Transaction, Fujitsu Services shall record the time (for the
purposes of this paragraph 2.1 referred to as “T1”) which elapses between the
NB Request being generated at the relevant automated Counter Position, and
the corresponding NB Authorisation being received back at that Counter
Position.

For each Banking Transaction, Fujitsu Services shall record the time (for the
purposes of this paragraph 2.1 referred to as “T2”) which elapses between the
NB Authorisation Agent generating each NB Request for routing to the Banks
and the corresponding NB Authorisation being received back from the Banks
by the NB Authorisation Agent.

Fujitsu Services shall calculate a value for “T” for each Banking Transaction as
follows:

T=71-T2.

The Service Level Targets are that the average Time for NBS Transactions
conducted in Branches using Fixed ADSL and Dialled Connections taken
together, for the periods such connections are scheduled to be established,
shall not exceed 2.5 seconds.

2.2 NBS availability measures

2:24

Central Systems Availability

(a) Subject to paragraph 2.2.1(b), Fujitsu Services shall record and/or
calculate the following:

(i) the number of Core NB System Faults which causes the
NBS not to be available in 20% or more of all Branches;
and

(ii) in respect of each Core NB System Fault, the average

period of time (“Average Branch Outage”) that the NBS is
not available in a Branch affected by that Core NB System
Fault, as follows:

Average Branch Outage = A multiplied by B,
where:
A= the period, excluding the first five minutes, that a Core

NB System Fault causes the NBS not to be available in
any one or more Branches;

Schedule B4.4 Annex 3 Part: A version 12.0

Page 30 of 51
POL00027937

POL00027937

CONFIDENTIAL

B = the number of Branches where the NBS is not
available as a result of that Core NB System Fault
expressed as a proportion of the total number of Branches.

(b) For the purposes of the recording and/or calculations referred to in
paragraph 2.2. 1(a) of this Annex 3 which are to be used for the purposes
of paragraph 2.2.1(c) of this Annex 3:

(i) Core NB System Faults that cause the NBS not to be
available for 5 minutes or less; and

(ii) all non-availability of the NBS due to any of the system
management activities referred to in paragraph 1.7 of
this Annex 3 or to any other system changes agreed by
the Parties,

shall be excluded, and
(iii) Branches referred to in paragraph 2.2.1(a) of this
Annex 3 are those Branches where the NBS is required

(subject to Clause 2.2) to be available.

(c) The Service Level Targets in respect of each Availability Period are set
out in the following table:

Service Level Measure Service Service Level
Level Targets for Non
Targets for I NB Core Hours
NB Core
Hours

The number of Core NB System I <=3 <=12

Faults which causes the NBS not to
be available in more than 20% of all
Branches shall not exceed:

The aggregate Average Branch I <=3 hours <= 15 hours
Outage shall not exceed: 25 minutes

(d) Notwithstanding any provision contained in this paragraph 2.2.1 but subject
to paragraph 2.2.1(e), Fujitsu Services shall use reasonable endeavours to
ensure that the targets in the following table shall apply in respect of each
period of three months commencing from month one and month four of
each Availability Period:

Schedule B4.4 Annex 3 Part: A version 12.0
Page 31 of 51
POL00027937

POL00027937
CONFIDENTIAL
Service Level Measure Service Service Level
Level Targets for Non
Targets for I NB Core Hours
NB Core
Hours
The aggregate Average Branch I <=3 hours 25 I <=7 hours 30
Outage shall not exceed: minutes minutes
(e) If Fujitsu Services persistently fails to achieve the targets described in
paragraph 2.2.1(d) as a result of a lack of capacity or performance of the
Horizon Service Infrastructure, then increases in capacity or performance
required to address the deficiency shall be dealt with by the Capacity
Management Service.
2.3 Data Reconciliation Service measures
2.3.1 Fujitsu Services shall measure the time taken to resolve each NB Priority

Exception, counting time within MSU Days only, as follows:

(a)

(c)

where no Disputed Banking Transaction Notice has been received by
Fujitsu Services and a Banking Transaction persists in system state
category number 4 or 12 as set out in the CCD entitled “Network Banking
End to End Reconciliation Reporting” (CS/SPE/011), such measurement
shall commence at 0800 on the second MSU Day following receipt by the
DRSH of the corresponding C4 Confirmation or D Message (as
applicable);

where a Disputed Banking Transaction Notice is received by Fujitsu
Services and a corresponding C4 Confirmation or D Message has been
received by the DRSH prior to the day of receipt of that Disputed Banking
Transaction Notice, such measurement shall commence at the time of
receipt of the Disputed Banking Transaction Notice (but not if already
commenced in accordance with (a) above, in which case (a) shall apply);
and

where a Disputed Banking Transaction Notice is received by Fujitsu
Services and a corresponding C4 Confirmation or D Message is received
by the DRSH on the same day as that Disputed Banking Transaction
Notice or on a subsequent day, such measurement shall commence at 0800
on the next MSU Day following receipt of that C4 Confirmation or D Message
(as applicable).

In each case above the NB Priority Exception shall be deemed resolved and
measurement shall stop at the time Fujitsu Services sends information to Post
Office sufficient to enable Post Office to settle that exception with the relevant
Bank, as described in the CCD entitled “Reconciliation Service: Service

Schedule B4.4 Annex 3 Part: A version 12.0

Page 32 of 51
CONFIDENTIAL

POL00027937

POL00027937

Description” (SVM/SDM/SD/0015) (formerly “On Line Services
Reconciliation & Incident Management” (NB/PRO/002)).

In respect of each NB Priority Exception where Fujitsu Services requires:
(a) information from, or access to, a Branch; or
(b) information from the Post Office regarding Banks,

for that exception to be resolved, the following shall not count towards the time
for resolution of that exception:

(a) the period, if any, during which Fujitsu Services is unable to contact (by
telephone or other method agreed by the Parties) the Branch in question
or the Post Office regarding Banks in order to request that information or
access, provided that Fujitsu Services has used reasonable endeavours
to make such contact; and

(b) the period, if any, whilst Fujitsu Services waits for that information or
access to be provided by the Branch in question or the Post Office
regarding Banks, having requested it, provided that Fujitsu Services has
repeated such request at reasonably frequent intervals.

The discounting of the periods described in 2.3.2(c) and 2.3.2(d) above shall
be subject to Fujitsu Services providing reports to Post Office setting out the
reasons for discounting any such periods from the resolution time for a NB
Priority Exception and the duration of such periods.

In respect of each Disputed Banking Transaction Notice, Fujitsu Services shall
continue to check on each MSU Day following that notice whether a
corresponding C4 Confirmation or D Message has been received until either a
Customer Critical Exception arises and is resolved or Fujitsu Services and Post
Office agree alternative action.

For the purposes of paragraph 2.3 of this Annex 3:
(a) “day” means a period running for 24 hours from 00:00; and

(b) a C4 Confirmation or D Message received on a day by the DRSH after
21:30 on that day shall be deemed to have been received the next day.

The Service Level Target set out in paragraph 2.3.6 of this Annex 3 shall apply
in respect of:

(a) all Customer Critical Exceptions; and
(b) the first 500 NB Priority Exceptions (other than Customer Critical

Exceptions) occurring on each day (excluding those described in
paragraph 2.3.5(c)),

Schedule B4.4 Annex 3 Part: A version 12.0

Page 33 of 51
CONFIDENTIAL

but shall not apply in respect of:

(c) NB Priority Exceptions (other than Customer Critical Exceptions) arising
from a common cause, in each case where the number of NB Priority
Exceptions arising from such common cause is greater than 100.

2.3.6 The Service Level Target is that the resolution time (measured in accordance
with paragraphs 2.3.1 and 2.3.2 of this Annex 3) for 95 % of the NB Priority
Exceptions specified in paragraph 2.3.5 of this Schedule B4.4 shall not exceed
8 hours.
3. REMEDIES

3.1 Liquidated Damages

3.1.1

The liquidated damages payable by Fujitsu Services shall be based on a series
of measurements, accumulated over a range of Services. This paragraph 3
specifies the contribution made by the NBS.

In respect of each Service Level Measurement Period the liquidated damages
payable by Fujitsu Services for failures to achieve the SLTs set out in
paragraphs 2.1.5 and 2.3.3 of this Annex 3 shall equal:

(a) the sum of Remedies(Time) and Remedies(Reliability) as referred to in
paragraph 3.3 of this Annex 3 and Table 4 of the CCD entitled "Branch
Network: Service Description" (SVM/SDM/SD/0011) respectively for that
period, less

(b) the amount recoverable under paragraph 3.1.7(a) as liquidated damages
for any failures of the ARLs corresponding to those SLTs.

In respect of each Availability Period the liquidated damages payable by
Fujitsu Services under this Annex 3 shall equal the sum _ of
Remedies(Availability1) and Remedies(Availability2) as referred to in
paragraph 3.4 for that period.

In addition to the sums referred to in paragraphs 3.1.2 and 3.1.3 of this Annex
3 Fujitsu Services shall also pay liquidated damages calculated as set out in
paragraph 4 of this Annex 3.

The total cumulative sums payable for liquidated damages by Fujitsu Services
under this Agreement shall not exceed the limits set out in paragraph 2.7 of
Schedule C1.

Liquidated damages shall never be payable by Post Office under this Annex 3
and if the result of a calculation under paragraphs 3.1.2, 3.1.3 or 4 is negative,
Fujitsu Services shall not be obliged to pay liquidated damages in respect of
that Service Level Measurement Period or Availability Period (as the case may
be) and the negative sum shall be disregarded and not set off against

Schedule B4.4 Annex 3 Part: A version 12.0

Page 34 of 51

POL00027937
POL00027937
CONFIDENTIAL

liquidated damages payable by Fujitsu Services in respect of future Service
Level Measurement Periods or Availability Periods.

3.1.7 If Fujitsu Services fails to achieve the ARL specified in paragraph 2.3.4 of this
Annex 3 in a Service Level Measurement Period, Post Office shall be entitled

to recover in respect of that failure the greater of:

(a) liquidated damages equal to the sum of Remedies(Time) and
Remedies(Reliability) as referred to in paragraph 3.3 of this Annex 3 and
Table 4 of the CCD entitled "Branch Network: Service Description"
(SVM/SDMW/SD/0011) for that period, substituting, in making that
calculation, the figures in the second column in the following table with

the figures in the third column:

Term as defined in I Figure in Substitute
paragraph 3.2 below I defined term I figure
FixedC(NBS) 4 8
DialledC(NBS) 8 12
ADSLC(NBS) 5 9

F 99 95

D 97 90

A 99 95

and
(b) Post Office Additional Costs.

3.2 Definitions

In this paragraph 3.2 of this Annex 3, the following expressions shall have the following

meanings:

FixedT(NBS) The total number of Banking Transactions carried out using a
Fixed Connection in the relevant Service Level Measurement
Period.

DialledT(NBS) The total number of Banking Transactions carried out using a

Dialled Connection in the relevant Service Level Measurement

Period.

Schedule B4.4 Annex 3 Part: A version 12.0
Page 35 of 51

POL00027937
POL00027937
CONFIDENTIAL

ADSLT(NBS)

FixedC(NBS)
Dialledc(NBS)
ADSLC(NBS)
Reliability

(Dialled)

Reliability (Fixed)

Reliability (ADSL)

D
A

Counter
Transaction Time

Vv

T(B)

The total number of Banking Transactions carried out using a
ADSL Connection in the relevant Service Level Measurement
Period.

FixedT(NBS) multiplied by (Fixed Tave - 4).

DialledT(NBS) multiplied by (Dialled Tave - 8).

ADSLT(NBS) multiplied by (ADSLTave - 5).

Reliability in Branches using Dialled Connections taken
together, for the periods such Dialled Connections are
scheduled to be used.

Reliability in Branches using Fixed Connections taken together,
for the periods such Fixed Connections are scheduled to be
established.

Reliability in Branches using ADSL Connections taken together,
for the periods such ADSL Connections are scheduled to be
established.

99 — Reliability (Fixed) divided by 100.

97 - Reliability (Dialled) divided by 100.

99 — Reliability (ADSL) divided by 100.

30 Seconds.

Aggregate Average Branch Outage (NB Core Hours) — SLT
Average Branch Outage (NB Core Hours), or zero if the result
of that calculation is negative.

Total NB Core Hours in the Availability Period.

H - SLT Average Branch Outage (NB Core Hours).

Total number of Cash Deposit Banking Transactions.

Total number of Non-CAPO cash Withdrawal Banking
Transactions + Total number of Non-CAPO Cash Withdrawal

with Balance Banking Transactions.

Total number of Non-CAPO Balance Enquiry Banking
Transactions.

Schedule B4.4 Annex 3 Part: A version 12.0

Page 36 of 51

POL00027937
POL00027937
POL00027937
POL00027937

CONFIDENTIAL

3.3 NB Request and NB Authorisation transmission times

3.3.1 The formula for calculating liquidated damages for excess NB Request and NB
Authorisation transmission time shall be as follows:

(((Number of Fixed Transactions x (average number of Fixed
Transactions — 2.5)) +

((Number of ADSL Transactions x (average number of ADSL.
Transactions — 2.5)) +

((Number of Dialled Transactions x (average number of
Dialled Transactions — 2.5))) x 1.03p

3.3.2 The result of the calculation of Remedies(Time) may be a negative value.

3.4 NBS Availability

3.4.1 The formulae for calculating liquidated damages for non-availability of the NBS
shall be as follows:

(a) Remedies(Availability1) = {T(D) + T (W) x 0.8 + T(B)} x {V/A} x £0.37

(b) Remedies(Availability2) = {Number of Core NB System faults (Non-NB
Core Hours) - Service Level Targets Core NB System Faults (Non-NB
Core Hours)) x £2,538.

3.4.2 If the result of the calculation of Remedies(Availability2) is negative, a value of
zero shall be substituted as the value of Remedies(Availability2).

4. MIS BANK ANALYSIS REPORT

If the “MIS Bank Analysis Report” which Fujitsu Services is obliged to provide under
the CCD entitled “Management Information Service: Service Description” (CS/SER/015)
is not provided once a week electronically using “Business Objects” software (or such
other software as may be agreed by the parties in writing from time to time) within one
(1) Working Day after the end of the period covered by the Report or such later time as
Post Office may specify then Fujitsu Services shall pay to Post Office liquidated
damages calculated as follows:

4.144 Remedies (MIS Bank Analysis Report) = (number of Transactions on report in
question/1,000,000) x (number of Working Days report is late x£69.79).

4.1.2 There shall be no Service Level Targets or ARLs in respect of the delivery of
the MIS Bank Analysis Report.

Schedule B4.4 Annex 3 Part: A version 12.0
Page 37 of 51
CONFIDENTIAL

PART B - DEBIT CARD SERVICE LEVELS AND REMEDIES

5.1

5.2

5.3

5.4

PAYMENT FILE DELIVERY

Fujitsu Services’ obligations regarding transmission of Payment Files (as that term is
defined in the CCD entitled “Mapping Schedule B3.2 to the HNG-X Solution”
(REQ/GEN/REP/1091) (formerly “Debit Card MoP Functional Description”
(EF/SER/001))) to the MA shall be as specified in the CCD entitled “Mapping Schedule
B3.2 to the HNG-X Solution” (REQ/GEN/REP/1091) (formerly “Debit Card MoP
Functional Description” (EF/SER/001)). In the event that an attempt to transmit a
Payment File to the MA in accordance with that CCD fails then those provisions shall
be supplemented by paragraph 5.2.

Where Fujitsu Services attempts to transmit a Payment File to the MA and the attempt
is unsuccessful Fujitsu Services shall be required to make one further attempt to
transmit that file to the MA on that day. If such further attempt fails, Fujitsu Services
shall report the same to the Post Office. Thereafter, Fujitsu Services shall provide such
assistance and co-operation as set out in the Working Document entitled “DC
Operational Level Agreement’ for the purposes of procuring the transmission of that
Payment File to the MA as soon as reasonably practicable.

In the event that the process specified in paragraph 5.2 above has been followed by
Fujitsu Services, no payment of liquidated damages (as specified in paragraph 5.4
below) will be payable by Fujitsu Services due to the relevant Payment File not reaching
the MA.

Subject to paragraph 5.3 above, in the event that a Payment File is not received by the
MA by the time specified for such in the CCD entitled “Horizon — Streamline Application
Interface Specification” (EF/IFS/002) on the day after creation of the Payment File,
liquidated damages will be payable by Fujitsu Services to Post Office, by Fujitsu
Services issuing Post Office with a credit note, as soon as reasonably practicable
following the day on which the MA receives the Payment File. Such liquidated damages
(to be applied by way of credit) will be calculated in accordance with the following
formula:

liquidated damages per Payment File not received as stated above (£) =
{(X x Y/365} x Z

where:

X = the value (pounds sterling) of the relevant Payment File;

Y = the figure (expressed as a percentage) representing the base rate of Barclays Bank
Plc (prevailing on the day the Payment File is required to be delivered (as specified in
the CCD entitled “Horizon - Streamline Application Interface Specification”

(EF/IFS/002)) plus 3 per cent.; and

Z= the number of days from and including the date after creation of the Payment File
until and including the day on which the MA receives the Payment File.

Schedule B4.4 Annex 3 Part: B Version 12.0
Page 38 of 51

POL00027937

POL00027937
CONFIDENTIAL
6. DEBIT CARD EXCEPTIONS
6.1 For the purposes of this paragraph 6:
6.1.1 “DC Exception” means a DC Transaction which is in system state category

6.2

6.3

6.4

number 1 or 6, as set out in the CCD entitled “Network Banking End to End
Reconciliation Reporting” (CS/SPE/01 1);

6.1.2 “DC Exception Reimbursement” means a DC Exception classified as such
by Fujitsu Services in the relevant BIM Report;

6.1.3 “DC Transaction Value” means the transaction value (in pounds sterling) of
the relevant DC Exception; and

6.1.4 “Relevant Data” has the meaning give to that term in paragraph 6.3 below.

In the event that a DC Exception arises solely as a result of the acts or omissions of
Fujitsu Services, Fujitsu Services shall send to Post Office a BIM Report in accordance
with the CCD entitled “Reconciliation Service: Service Description”
(SVM/SDM/SD/0015) (formerly “On Line Services Reconciliation & Incident
Management” (NB/PRO/002)).

Fujitsu Services shall include in the BIM Report submitted pursuant to paragraph 6.2
above the Merchant ID, the card number, Transaction amount, Transaction code and
Transaction date for the DC Exception in question. In addition, save in respect of each
DC Exception Reimbursement (in which case the provisions of paragraph 6.6 below
shall apply), Fujitsu Services shall use reasonable endeavours to obtain from the
relevant Branch the following data (the “Relevant Data”) (for inclusion in the relevant
BIM Report) from the receipt for the DC Exception in question:

6.3.1 issue number (to the extent that the issue number is required by the card
scheme issuer for manual settlement (as confirmed in the CCD entitled
“Reconciliation Service: Service Description” (SVM/SDM/SD/0015) (formerly
“On Line Services Reconciliation & Incident Management” (NB/PRO/002)));
and

6.3.2 Expiry Date.

Fujitsu Services’ obligation to obtain the Relevant Data as specified in paragraph 6.3
above shall cease in the event that:

6.4.1 Fujitsu Services has been notified by the NBSC of the closure of the Branch;
or

6.4.2 upon contacting the Branch, the information cannot be obtained (including,
without limitation, where the Receipt either does not exist, is damaged or the
information is illegible).

Schedule B4.4 Annex 3 Part: B Version 12.0
Page 39 of 51

POL00027937
POL00027937
POL00027937

POL00027937

CONFIDENTIAL

6.5

6.6

67

6.8

The detailed process for attempting to contact the Branch and attempting to obtain the
Relevant Data shall be documented in the CCD entitled “Reconciliation Service: Service
Description” (SVM/SDM/SD/0015) (formerly “On Line Services Reconciliation & Incident
Management” (NB/PRO/002)).

In respect of each DC Exception (other than a DC Exception Reimbursement), in the
event that:

6.5.1 Fujitsu Services fails to provide the Relevant Data;

6.5.2 the circumstances specified in sub-paragraphs 6.4.1 or 6.4.2 above have not
arisen; and

6.5.3 Post Office itself obtains the Relevant Data directly from the Branch,

Fujitsu Services shall pay Post Office the sum of £353.47 (representing Post Office's
costs of obtaining the Relevant Data and effecting manual settlement).

In respect of each DC Exception Reimbursement, Fujitsu Services shall pay to Post
Office an amount equal to the sum of the DC Transaction Value and £125.06.

Save where paragraph 6.5 applies (in which event the provisions of this paragraph 6.7
shall not apply), for each DC Exception (other than a DC Exception Reimbursement)
Fujitsu Services shall (provided manual settlement has been effected) pay to Post Office
the lesser of:

6.7.1 £125.06; and

6.7.2 £100.00,

in respect of Post Office’s costs of effecting manual settlement.

Save in respect of a DC Exception Reimbursement, in the event that:

6.8.1 due solely to the acts or omissions of Fujitsu Services the BIM Report referred
to in paragraph 6.2 is not delivered to Post Office within the time period (for the
purposes of avoiding “charge backs”) specified in the CCD entitled
“Reconciliation Service: Service Description” (SVM/SDM/SD/0015) (formerly
“On Line Services Reconciliation & Incident Management” (NB/PRO/002)) or
the BIM Report is delivered within that time period but it does not include the
Relevant Data in circumstances where Fujitsu Services is in Default of its
obligation in paragraph 6.3 above to obtain such Relevant Data or a payment
is required to be made to Post Office pursuant to paragraph 6.5 above; and

6.8.2 the Merchant Acquirer does not reimburse Post Office the DC Transaction
Value,

Fujitsu Services will reimburse Post Office the DC Transaction Value.

Schedule B4.4 Annex 3 Part: B Version 12.0
Page 40 of 51
CONFIDENTIAL

6.9

6.10

In the event that Fujitsu Services fails to deliver the BIM Report on time pursuant to
paragraph 6.2 above or the BIM Report is delivered on time but it does not include the
Relevant Data in circumstances where Fujitsu Services is in Default of its obligation in
paragraph 6.3 above to obtain such Relevant Data or a payment is required to be made
to Post Office pursuant to paragraph 6.5 above, it shall pay to Post Office liquidated
damages. The liquidated damages shall be calculated in accordance with the following
formula:

liquidated damages (£) = (N x TV x Y) / 365
where:

N = the number of MSU Days, including the day the BIM Report was due for delivery
pursuant to paragraph 6.2 above, that the BIM Report is delivered late;

TV = the DC Transaction Value; and

Y = the figure (expressed as a percentage) representing the base rate of Barclays Bank
Plc (prevailing on the day the BIM Report was due for delivery (as specified in the CCD
entitled “Reconciliation Service: Service Description” (SVM/SDM/SD/0015) (formerly
“On Line Services Reconciliation & Incident Management” (NB/PRO/002))) plus 3 per
cent.

The Parties acknowledge that the fundamental commercial assumptions underlying the
provisions of this paragraph 6 are that (i) the total number of DC Exceptions in any
calendar month shall not exceed 100 and (ii) the total number of DC Exception
Reimbursements in any calendar month shall not exceed 20. Accordingly, the Parties
agree that should these assumptions prove to be incorrect they shall review and in good
faith negotiate appropriate amendments to the provisions of this paragraph 6.

Schedule B4.4 Annex 3 Part: B Version 12.0
Page 41 of 51

POL00027937
POL00027937
CONFIDENTIAL
ANNEX 4 TO SCHEDULE B4.4 - MISCELLANEOUS SERVICES
1. IMPLEMENTATION - SERVICE LEVEL TARGETS: INSTALLATION OF SERVICE

INFRASTRUCTURE

General principles for creating Service Levels for each Implementation shall be agreed
between Post Office and Fujitsu Services on a case by case basis in accordance with
the Change Control Procedure.

2. SERVICE LEVELS AND OTHER TARGETS FOR TESQA
21 Availability
2.1.1 Fujitsu Services shall, upon the expiry of each SLT Calendar Year, measure

the time that TESQA was available to be logged on to by TESQA Users as a
proportion of the total time between 07:00 and 22:00 on each day of that year
("TESQA Availability").

The Service Level Target is that TESQA Availability in each SLT Calendar
Year shall be no less than 99.75% which equals less than or equal to 13 hours
30 minutes Downtime. Fujitsu Services shall notify Post Office of any failures
to achieve this target monthly on an exception basis.

For the purposes of the above SLT, the Service Level Measurement Period is
each SLT Calendar Year.

2.2 Query Time

2.24

Fujitsu Services shall use reasonable endeavours to ensure that the query time
for all properly constrained transaction queries (as defined below) between
07:00 and 18:00 is no longer than 20 seconds.

For the purposes of paragraph 2.2.1, a properly constrained transaction query
is one of:

(a) APAN and a date/time range of 31 days or less (rolling).
(b) APAN, an amount and a date/time range of 31 days or less (rolling).

(c) APAN, a Banking Transaction and a date/time range of 31 days or less
(rolling).

(d) APAN, a FAD, a frequency greater than 1 and a date/time range of 31
days or less (rolling).

(e) No PAN, but an amount greater than 4,999.98 and a date range of less
than 1 day.

Schedule B4.4 Annex 4 Version 12.0

Page 42 of 51

POL00027937
POL00027937
CONFIDENTIAL

(f) No PAN, but a frequency greater than 4 and a date range of less than 1
day

If Fujitsu Services persistently fails to achieve the target described in
paragraph 2.2.1 as a result of a lack of capacity or performance of the Horizon
Service Infrastructure, then increases in capacity or performance required to
address the deficiency shall be dealt with by the Capacity Management
Service.

Fujitsu Services shall make available a report of the TESQA query times to the
Service Management Relationship. The report shall show, for different periods
during 07:00 and 22:00 of each day, the query times for each type of query
(including for properly constrained transaction queries, unconstrained
transaction queries, data queries and count only queries).

TESQA will have the ability to decrypt encrypted PANs on an individual basis.
These requests shall be excluded from the measurement of achievement of
the target in paragraph 2.2.1 above.

For properly constrained transaction queries using a PAN as described in
paragraph 2.2.2 above, the target time in paragraph 2.2.1 above shall be
extended. Such extension to the target time shall be agreed between the
Parties and shall not exceed twice the target time in paragraph 2.2.1 above.
The extended target time shall apply from X2 (as described in Part 1 of Annex
1 of Schedule B5) until a date to be agreed between the Parties that shall be
a date after there are no more in clear PAN values within the Transaction
Enquiry Service.

2.3 Data Load

2.3.1

Fujitsu Services shall measure the time taken for data to become available for
interrogation to TESQA, measured from the time that the data is available within
the Data Centre either from an external source, or when an update to the status
of a Transaction is recorded in Transaction data by the Data Centre components
internally ("Data Load Time").

The Service Level Target in respect of the Data Load Time is that:

(a) Subject to paragraph 2.3.2(c), 97% of the data will be available within 15
minutes between 07:00 and 20:00 on each day of each SLT Calendar
Year, except in the event that the Transaction Enquiry Service fails or an
Incident occurs in which case the data will be available within two hours
(for 100% of all queries);

(b) Subject to paragraph 2.3.2(c), 97% of the data will be available within 40
minutes between 20:00 and 22:00 on each day of each SLT Calendar
Year, except in the event that the Transaction Enquiry Service fails or an
Incident occurs in which case the data will be available within two hours
(for 100% of all queries);

Schedule B4.4 Annex 4 Version 12.0

Page 43 of 51

POL00027937
POL00027937
CONFIDENTIAL

(c) 100% of the data will be available within four hours during each SLT
Calendar Year at all other times of the day; and

(d) For the purposes of the SLT described in paragraph 2.3.2, the Service
Level Measurement Period is each SLT Calendar Year.

24 After Hours Availability

2.4.1

Fujitsu Services shall use reasonable endeavours to:

(a) ensure that TESQA is available to be logged on to by TESQA Users under
normal operation on a 24 x 7 basis other than during periods of daily
overnight maintenance;

(b) notify Post Office in advance of the approximate start and finish times of
such overnight maintenance periods, such periods being no longer than
four hours in duration; and

(c) ensure that during such overnight maintenance periods TESQA is taken
off-line for a total period of no longer than 30 minutes duration.

3. SERVICE LEVELS FOR POL FS SERVICES

3.1 Availability

3.1.1

Fujitsu Services shall measure the time that Configured POL FS in live
operational use (as opposed to in development or testing environments) is
available to be logged into by POL FS Users as a proportion of the total time
between 07:30 and 19:30 hours on Working Days (“POL FS Availability”).

Subject to paragraph 3.1.3, the Service Level Target for the POL FS System
is that:

(a) POL FS Availability in each Service Level Measurement Period shall be
greater than or equal to 98.5%.

(b) the POL FS System shall not be unavailable to be logged into by POL FS
Users on any single occasion in any Service Level Measurement Period
for more than four hours, or ten hours where offsite engineering expertise
or replacement equipment is required,

measuring time in relation to paragraphs 3.1.2(a) and 3.1.2(b) between 07:30
and 19:30 on Working Days only and excluding time required, following a
failure, to repair or recover Configured POL FS, the SAP Loading Applications
and/or the underlying database.

If the elements of the POL FS System used to support live operational use of
Configured POL FS become unavailable and failover occurs pursuant to
paragraph 5.2 of Schedule B2, the period of such unavailability shall not be

Schedule B4.4 Annex 4 Version 12.0

Page 44 of 51

POL00027937
POL00027937
CONFIDENTIAL

taken into account for the purposes of assessing Fujitsu Services' performance
in respect of the SLT set out in paragraph 3.1.2 above.

In the event that the SLT set out in paragraph 3.1.2 is not met, Fujitsu Services
shall provide Post Office with an analysis of the reasons for the failure. Post
Office and Fujitsu Services shall agree a reasonable rectification and
improvement plan to address the failure.

3.2 Data Loads

3.2.1

Fujitsu Services shall use reasonable endeavours within the capacity and
performance constraints of the POL FS System to ensure that all data from the
following sources, required to be loaded onto Configured POL FS, which is
received by the following times, is successfully loaded onto Configured POL
FS by 07:30 on Day B.

POL00027937
POL00027937

Data source Data received by Fujitsu Services from data
source by

SAPADS 05:30 hrs on Day B

RDS (Vendors) 23:59 hrs on Day A

RDS (Customer) 23:59 hrs on Day A

RDS (Products) 23:59 on Day A

RDS (Branch) 23:59 on Day A

When a new Client interface to the POL FS System is introduced by Post Office
the design target for “New Client” in paragraph 3.2.1 shall apply to data being
loaded from that Client provided that:

(a) no volumes in the CCD entitled “Horizon Capacity Management and
Business Volumes” (PA/PER/033) are exceeded; and

(b) no new physical link to the POL FS System is required.

The measurement of the design targets in paragraph 3.2.1 shall not include
any failure to load any data onto Configured POL FS where such failure is
caused either by:

(a) the incorrect functioning of PRISM application code; or

(b) the incorrect configuration of Configured POL FS (including but not
limited to missing FAD) provided that such incorrect configuration is a
result of configuration activity that is not the responsibility of Fujitsu
Services.

Schedule B4.4 Annex 4 Version 12.0

Page 45 of 51
CONFIDENTIAL

3.2.4

If Fujitsu Services persistently fails to achieve the targets described in
paragraph 3.2.1 as a result of lack of capacity or performance of the POL FS
System, then increases in capacity or performance required to address the
deficiency shall be dealt with by the Capacity Management Service.

3.3 Transaction Performance

3.3.1

For the purposes of this paragraph 3.3, “SAP System Time” means the time
that it takes for the SAP Software elements (excluding network and
communication links) of the POL FS System to complete any given transaction
that a POL FS User may perform using Configured POL FS.

The Parties shall agree from time to time (such agreement not to be
unreasonably withheld) and record a reasonable sample set of transactions
types that may be undertaken by POL FS Users (“Sample Transaction
Types”) using Configured POL FS and a target maximum SAP System Time
in respect of each such transaction type and each shall be specified, once
agreed, in this Schedule B4.4.

Fujitsu Services shall monitor the Sample Transaction Types to determine the
average SAP System Time for transactions of each Sample Transaction Type
in each Service Level Measurement Period.

Fujitsu Services shall use reasonable endeavours within the capacity and
performance constraints of the POL FS System to ensure that the average
SAP System Times for transactions of each Sample Transaction Type as
measured in each Service Level Measurement Period do not exceed the
applicable target maximum SAP System Times specified in this accordance
with paragraph 3.3.2 of this Schedule B4.4.

If Fujitsu Services persistently fails to achieve the targets referred to in
paragraph 3.3.4 as a result of a lack of capacity or performance of the POL FS
System, then increases in capacity or performance required to address the
deficiency shall be dealt with by the Capacity Management Service.

3.4 Data File Production

3.4.1

Provided that data is available to be extracted from Configured POL FS by the
times agreed for the commencement of the jobs to perform the extractions as
set out in the CCD entitled “POLSAP Technical Interface Specification”
(POLSAP/DES/GEN/SPE/0002) (formerly “ Technical Interface Specification
Impact Programme: POLFS S80 Technical Specifications” (EA/IFS/030)),
Fujitsu Services shall use reasonable endeavours to produce the following
data files from Configured POL FS by the following times:

Data file to be produced Data file to be produced by
NS&I File 100% produced by 23:59 Saturday
Santander File 100% produced by 23:59 Saturday

Schedule B4.4 Annex 4 Version 12.0

Page 46 of 51

POL00027937
POL00027937
CONFIDENTIAL

3.5

3.6

44

SAPADS File 100% produced 07:30 daily

3.4.2 The measurement of the design targets in paragraph 3.4.1 shall not include
any failure to extract any data from Configured POL FS where such failure is
caused either by:

(a) the incorrect functioning of PRISM application code; or

(b) the incorrect configuration of Configured POL FS (including but not
limited to missing FAD) provided that such incorrect configuration is a
result of configuration activity that is not the responsibility of Fujitsu
Services.

3.4.3 If Fujitsu Services persistently fails to achieve the targets described in
paragraph 3.4.1 as a result of lack of capacity or performance of the POL FS
System, then increases in capacity or performance required to address the
deficiency shall be dealt with by the Capacity Management Service.

Remedies

The targets specified in paragraphs 3.2.1, 3.3.4 and 3.4.1 are not SLTs, ARLs or LDTs
and there are no remedies applicable in the event of failure to achieve those targets or
the SLT described in paragraph 3.1.2, other than the remedies specified in this
paragraph 3 which shall be Post Office's exclusive remedy in respect of any such
failures.

Failover

If the elements of the POL FS System used to support live operational use of Configured
POL FS become unavailable and failover occurs pursuant to paragraph 5.2 of Schedule
B2, the period of such unavailability shall not be taken into account for the purposes of
assessing Fujitsu Services’ performance in respect of the design targets set out in
paragraphs 3.2, 3.3 and 3.4 above.

SERVICE LEVELS FOR POL MI HOSTING SERVICES
Availability

4.44 Fujitsu Services shall measure the time that Configured POL MI is in live
operational use (as opposed to in development or testing environments) ia
available to be logged into by POL MI users as a proportion of the total time
between 0700 and 1900 on Working Days excluding any pre-arranged system
outage agreed between the parties (“POL MI Availability).

4.1.2 Subject to paragraph 4.1.3, the Service Level Target for the POL MI System is
that:

4.1.2.1_POL MI Availability in each Service Level Measurement Period shall
be greater than or equal to 98.5%,

Schedule B4.4 Annex 4 Version 12.0
Page 47 of 51

POL00027937
POL00027937
CONFIDENTIAL

4.1.2.2. The POL MI System shall not be unavailable to be logged into by
POL MI Users on any single occasion in any Service Level
Measurement Period for more than four hours, or ten hours where
offsite engineering expertise or replacement equipment is required.,

measuring time in relation to paragraphs 4.1.2.1 and 4.1.2.2 between 0700
and 1900 on Working Days only and excluding time required, following a
failure, to repair or recover Configured POL MI and/or the underlying database.
For the avoidance of doubt, there are no remedies applicable in the event of
failure to achieve the SLT described in this paragraph other than the remedies
specified in this paragraph 4 which shall be Post Office’s exclusive remedy in
respect of any such failures,

In the event that the SLT set out in paragraph 4.1.2 is not met, Fujitsu
Services shall provide Post Office with an analysis of the reasons for the
failure. Post Office and Fujitsu Services shall agree a reasonable
rectification and improvement plan to address the failure.

If Fujitsu Services persistently fails to achieve the targets described in
paragraph 4.1.2 as a result of lack of capacity or performance of the POL
MI System, then increases in capacity or performance required to address
the deficiency shall be the responsibility of Post Office and until such
deficiency is resolved Fujitsu Services shall not be required to achieve the
targets described in paragraph 4.1.2.

Schedule B4.4 Annex 4 Version 12.0

Page 48 of 51

POL00027937
POL00027937
CONFIDENTIAL

ANNEX 5 TO SCHEDULE B4.4 - VOLUMETRIC LIMITS

Service

Volumetric Limit

Relevant Period

Affected Service
Levels

Reconciliation

100 exceptions

Per day

Annex 4 paragraph

Service 2
Service Desk I Financial I Limit Per calendar month Annex 1 paragraph
Service Year 2
(Branch
originated
Incidents
recorded at
the Service
Desk)
02/03 13000 Per calendar month
03/04 13000 Per calendar month
04/05 13000 Per calendar month
05/06 12750 Per calendar month
06/07 12500 Per calendar month
07/08 12250 Per calendar month
08/09 12000 Per calendar month
09/10 11750 Per calendar month

Schedule B4.4 Annex 5 Version 12.0

Page 49 of 51

POL00027937
POL00027937
POL00027937

POL00027937

CONFIDENTIAL

ANNEX 6 TO SCHEDULE B4.4

TABLE OF EXISTING SERVICE LEVELS AND CORRESPONDING SERVICE

DESCRIPTIONS
Existing Service Level Existing Service Level Corresponding Service
Reference in Schedule Description
B44
Service Desk Annex 1 Service Desk Service
APS Annex 2, paragraph 2.1 Data Centre Operations
Service
Transaction loading onto Annex 2, paragraph 2.2 Data Centre Operations
Configured POL FS Service
LFS Annex 2, paragraphs 2.3 and Data Centre Operations
3.3 Service
Delivery of Transaction Annex 2, paragraph 2.4 Data Centre Operations
Correction Records Service
Delivery of HR SAP Files Annex 2, paragraph 2.5 Data Centre Operations
Service
APS Client data Annex 2, paragraph 3.1 Data Centre Operations
Service
Reference Data Annex 2, paragraph 3.2 Reference Data Service
Message Broadcast Annex 2, paragraph 3.4 Message Broadcast Service
Delivery of Reconciliation Annex 2, paragraph 3.5 Reconciliation Service
and Settlement Reports
Dispatch of REC Files Annex 2, paragraph 3.6 Reconciliation Service
Delivery of Data Files to POL Annex 2, paragraph 3.7 Data Centre Operations
MIs Service
Delivery of CTS files Annex 2, paragraph 3.8 Data Centre Operations
Service
NB Request and NB Annex 3, paragraph 2.1 Data Centre Operations
Authorisation transmission Service
times

Schedule B4.4 Annex 6 Version 12.0

Page 50 of 51
CONFIDENTIAL

NBS Availability Measures

Annex 3, paragraph 2.2

Data Centre Operations
Service

Data Reconciliation Service
measures

Annex 3, paragraph 2.3

Reconciliation Service

NB Request and NB

Annex 3, paragraph 3.3

Data Centre Operations

Authorisation transmission Service
times
NBS Availability Annex 3, paragraph 3.4 Data Centre Operations

Service

MIS Bank Analysis Report

Annex 3, paragraph 4

Management Information

Service
Payment File Delivery Annex 3, paragraph 5 Reconciliation
Debit Card Exceptions Annex 3, paragraph 6 Reconciliation

TESQA Annex 4, paragraph 2 Data Centre Operations
Service
POLFS Annex 4, paragraph 3 Data Centre Operations

Service

Schedule B4.4 Annex 6 Version 12.0

Page 51 of 51

POL00027937