POL00027965 - Schedule B3.4 - Branch Infrastructure (V1.0 dated 31/08/2006, V12.0 dated 03/07/2017)

Evidence on official site

CONFIDENTIAL

Version History

SCHEDULE B3.4

BRANCH INFRASTRUCTURE

POL00027965

POL00027965

Version No. Date Comments

1.0 31/08/06 Agreed version as at date of
signature of CCN 1200

14 26/09/06 Minor corrections

2.0 25/01/07 Baseline copy of 1.1

Bal 19/03/07 Applying CCN 1206

3.0 09/07/07 Baseline copy of 2.1

6.0 15/06/09 Moving all schedules to V6.0
as agreed with Fujitsu

7.0 26/04/10 Moving all Schedules to v7.0
as agreed with Fujitsu

8.0 21/02/12 Applying changes as_ per
CCN1294d and CCN1289a

9.0 13/01/14 Moving all Schedules to v9.0 in
accordance with CCN1349

10.0 10/09/15 Applying changes as per
CCN1421a and Moving all
Schedules to v10.0_ in
accordance with CCN1506

11.0 31/03/16 Applying changes as_ per
CCN1423c and moving all
Schedules to V11.0 as per
CCN1604

12.0 03/07/17 Moving all schedules to V12.0

13.0 Updating as per CCN1616b
and moving all Schedules to
v13.0

Schedule B3.4 Version 12.0
Page 1 of 6
POL00027965
POL00027965

CONFIDENTIAL

SCHEDULE B3.4
BRANCH INFRASTRUCTURE

1. INTRODUCTION

41 The purpose of this Schedule B3.4 is to:

1.1.4 record and specify the Branch Infrastructure that Post Office shall be
responsible for ensuring is in place in order for, Fujitsu Services to deliver
the Horizon Applications and the Business Capabilities and Support
Facilities, and thereby provide the HNG-X Services;

1.1.2 Paragraph removed by CCN1616b.

2. BRANCH INFRASTRUCTURE
21 Branch Infrastructure

2.1.1 Post Office Ltd shall provide equipment as specified in the CCD entitled “Counter
Hardware Design Specification” (BP/DES/003) in all Branches and any other Post
Office authorised location (the “Initial Branch Infrastructure”).

2.1.2 Changes to the locations and number of sets of the Branch Infrastructure
Equipment requested by Post Office shall be in accordance with the process
defined in the CCD entitled "Post Office Ltd Operational Business Change —
Branch, Interface Agreement” (SVM/SDM/STD/001).

2.1.3. Save as may be agreed under the Change Control Procedure, the use of
Equipment in non Branch locations (e.g. Head Office Counter Positions) shall not
require Fujitsu Services to undertake any additional software development,
testing or support, or any site modification or preparation beyond standard site
preparation.

2.1.4 PIN Pads

(a) Fujitsu Services shall ensure that all automated Counter Positions shall
have the capability to support the use of PIN Pads.

(b) Fujitsu Services shall provide and maintain firmware distribution facilities
to ensure the distribution of firmware from the Data Centres to PIN Pads.
The facility shall meet the software control requirements of ISOP 9564.

(c) Post Office accepts that there is a known risk that the existing PIN Pad
may not be suitable for use after 2010. The cost of replacing the PIN

Pad will be handled under the Change Control Procedure.

2.1.5 Peripheral and input devices equipment general requirements

Schedule B3.4 Version 13.0
Page 2 of 6
CONFIDENTIAL

2.16

2.1.10

Peripheral and input devices supplied as part of the elements of HNG-X
Service Infrastructure shall be capable of detecting contention, premature
removal and swapping of Smart Tokens.

Peripherals Flexibility

(a) The Branch Infrastructure shall have the flexibility for additional
peripheral equipment to be added in the future, including input devices
and printers.

(b) The capacity for connectivity of peripherals at each Counter Position

shall be set out in the CCD entitled "Counter Hardware Design
Specification" (BP/DES/003).

Future Flexibility for Sharing of Specialist Peripherals
The Branch Infrastructure shall support:

(a) the sharing of the back office printer between all Counter Positions in
the Branch; and

(b) the sharing of weigh scales between those Counter Positions that are
physically connected to the same weigh scales.

Any sharing of any other specialist peripherals between Counter Positions shall
be handled under the Change Control Procedure.

Appearance of the Branch Infrastructure Equipment

(a) With the exception of PIN Pads the standards for equipment livery to be
used within the Branch Infrastructure are defined in the CCD entitled
“Counter Hardware Design Specification" (BP/DES/003). The standards
for equipment livery for PIN Pads are defined in the CCD entitled "PIN
Pad Product Specification" (NB/PDN/010).

(b) The procedures required to maintain the appearance of the Equipment
shall be minimal and capable of being undertaken by the local Branch
Users. It shall be comparable to the cleaning required of any desk-based
office computer system.

Health, Safety and Legal obligations

All Branch Infrastructure Equipment shall comply with the health, safety and legal
requirements set out in Schedule A4.

Equipment Environmental Considerations

All Branch Infrastructure Equipment shall comply with the Equipment
environmental considerations set out in Schedule A4.

Schedule B3.4 Version 13.0

Page 3 of 6

POL00027965
POL00027965
CONFIDENTIAL

2.4.11 Paragraph removed by CCN1616b

2.1.12 Paragraph removed by CCN1616b

2.1.13 Paragraph removed by CCN1616b

3. TECHNOLOGY REFRESH

3.1 Paragraph removed by CCN1616b
(a)
(b)
3.1.2
3.2 Paragraph removed by CCN1616b
3.2.1
3.2.2

3.3 Assumptions

3.3.1 In relation to Services, Service Levels and Charges it is assumed:

Schedule B3.4 Version 13.0
Page 4 of 6

POL00027965
POL00027965
CONFIDENTIAL

(a)

(c)
3.3.2
3.3.3
3.3.4
3.3.5

3.3.6

(g)
3.3.7

that the reductions in the number of Branches and Counter Positions
during the term of this Agreement will take place in accordance with the
table in Part 1 of Annex A of Schedule D1;

Paragraph removed by CCN1616b
Paragraph removed by CCN1616b
Paragraph removed by CCN1616b

Paragraph removed by CCN1616b

Paragraph removed by CCN1616b

Paragraph removed by CCN1616b

3.4 Paragraph removed by CCN1616b

3.4.1

3.4.2

3.4.3

3.4.4

3.5 Paragraph removed by CCN1616b

Schedule B3.4 Version 13.0

Page 5 of 6

POL00027965
POL00027965
CONFIDENTIAL

4.

41

4.2

ASSOCIATED DOCUMENTS,

The following CCDs are associated with this Schedule B3.4:

Document Reference

Document Title

4 (Withdrawn in CCN1423c)

2 BP/DES/003

Counter
Specification

Hardware Design

3 SVM/SDM/STD/001

Post Office Ltd Operational
Business Change -—- _ Branch
Interface Agreement

4 NB/PDN/010

PIN Pad Product Specification

5 Withdrawn in CCN1616b

The following CRDs are associated with this Schedule B3.4:

Document Reference

Document Title

1 Withdrawn in CCN1616b

Schedule B3.4 Version 13.0
Page 6 of 6

POL00027965
POL00027965