Major Incident Report for Network Banking Failures on Monday
5® January 2004
Report
Report covering the partial loss of all on-line services for 30
minutes in the morning of 5/1/2004, followed by total loss of the
Network Banking Service for an hour and a half in the afternoon.
Approved
Mike Woolgar and Peter Burden - POA Customer Service
Julie Welsh, Dave Tanner, Colin Johnson,
John Samuel (Energis)
Distribution for draft - as per section 0.2
Distribution for Approved version - as above plus Pete Jeram,
Liam Foley, Colin Lenton-Smith, Ian Lamb, Richard Brunskill,
Jan Morrison, Bill Mitchell
Dave Hulbert
(see PA/PRO/O10 for Approval roles)
Name
Position
Signature Date
Martin Riddell
FS POA Service Director
Company-in-Confidence Page: I of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
0.0 Document Control
0.1. Document History
Version No. I Date Reason for Issue Associated
CP/PinICL
01 15/1/2004 Initial Draft
0.2 16/1/04 Second Draft
0.3 16/1/04 Third Draft
1.0 23/1/04 Approved version
0.2 Review Details
Review Comments by :
Review Comments to :
Mandatory Review Authority Name
See Review Role Matrix in PA/PRO/010
Fujitsu Services Post Office Account Dave Tanner
Fujitsu Services Post Office Account Colin Johnson
Fujitsu Services Post Office Account Martin Riddell*
Fujitsu Services Post Office Account Julie Welsh
Fujitsu Services Post Office Account Tony Wicks
Fujitsu Services Post Office Account Mike Stewart
Fujitsu Services Post Office Account Dave Law
Optional Review / Issued for Information
( * ) = Reviewers that returned comments
0.3 Associated Documents
Reference Version I Date Title Source
Unless a specific version is referred to above, reference should be made to the current
approved versions of the documents.
Company-in-Confidence
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
Page: 2 of 16
Fujitsu Services
Major Incident Report Ref:
Version:
Company-in-Confidence Date:
POL00029278
POL00029278
CS/REP/177
1.0
06-FEB-2004
0.4 Abbreviations/Definitions
Abbreviation Definition
BCM Business Continuity Manager
CFM3 Core Services Networks
DM Duty Manager
FAD Financial Accounts Division (Post Office)
FRIACO. Fixed Rate Internet Access Call Organisation
HSH Horizon System Helpdesk
HSRP Hot Standby Routing Protocol
ISDN Integrated Services Digital Network
IVR Interactive Voice Response
NB Network Banking
NBE Network Banking Engine
OCP Operational Change Process
PIR Post Incident Review
PM Problem Manager
PMDB Problem Management Database
PO Post Office
POA Post Office Account
POL Post Office Limited
SMC Systems Management Centre
TSD Technical Services Desk
0.5 Changes in
this Version
Version Changes
0.1 This is the first draft
0.2 Updated following comments
0.3 Updated following comments
1.0 Procedure review frequency has been added. Also, actions due as specified
Company-in-Confidence
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
Page: 3 of 16
Fujitsu Services Major Incident Report
Company-in-Confidence
POL00029278
POL00029278
Ref: CS/REP/177
Version: 1.0
Date: 06-FEB-2004
in Section 7 have been updated.
0.6 Changes Expected
Changes
Company-in-Confidence
Page: 4 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
0.7 Table of Contents
1.0 INTRODUCTION..
2.0
3.0
4.0 DESCRIPTION OF THE FAULT AND SERVICE FAILURE.......ccssssssssssesseeenee 7
4.1 SYMPTOMS AND BUSINESS IMPACT.
4.1.1 Symptoms as seen by Branches..
4.2 DETAILED EXPLANATION OF THE INCIDEN
5.0 INCIDENT MANAGEMENT.
6.0 PROBLEM MANAGEMENT.
7.0 CORRECTIVE ACTIONS
Company-in-Confidence Page: 5 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
1.0 Introduction
This document reports on the issues that arose from two major incidents affecting the
Network Banking Service that occurred on 5" January 2004.
This report covers:
- How the problems came to light
- The impact on the branch service
- The investigation
- The resolution
- The root cause
- Actions and recommendations to prevent recurrence
2.0 Scope
The scope of this report is two major incidents that occurred on Monday January S" The first
affected all on-line transactions for some 30 minutes for a subset of the branch estate. The
second caused the loss of the Network Banking Service for an hour and a half to the full
estate.
3.0 Management Summary
The first incident caused 70 Post Offices to log calls stating that the Offline Indicator had
appeared on the screen. The advice from the HSH was to log off and log on again and this
resolved the Post Masters’ issue. The first call was logged at 11.45 and the problem was
cleared by 12.05. In that timeframe a further 400 calls were abandoned. The problem was
caused as a result of a software problem that Energis encountered while they were
undertaking maintenance work. The problem was overcome by Energis and this, together
with the availability of alternative routing, meant that the impact was minimised.
Correct escalation routes - including to POL - were followed.
The procedure agreed following the Off Line Indicator fails on 7" and 25" November was
invoked. This was to get a sample of FAD ISDN numbers to Energis within minutes. This
worked very successfully and ensured confirmation that the failures experienced by the Post
Offices which had logged calls were indeed amongst those which Energis would expect to see
affected by the problem that they had encountered.
The second incident in the afternoon of 5 January had the effect of losing the Network
Banking Service to the full estate for an hour and a half. It was caused by a failure in a Fujitsu
Services encryption router at IBM Warwick.
Company-in-Confidence Page: 6 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
Upon the failure of the primary encryption router, fail-over to the secondary encryption router
should occur automatically. This did not happen.
Attempts by the Core Services Networks team to enlist IBM's assistance in resolving the issue
were delayed because the wrong support route was invoked.
Service was resumed following a software reboot of the encryption router.
Some symptom similarities with the incident in the morning and the "relatively" low rate of
calls to the HSH - some 80 calls in a one-hour window (with, again, some 400 abandoned) -
also contributed to unsatisfactory handling of this incident, including an unacceptable delay in
briefing POL.
Corrective actions are identified in a later Section but the primary ones are as follows
- the Core Services Network team procedure for requesting IBM support has been
updated. It should be noted that all procedures are reviewed on an annual basis, with
urgent changes being made as required.
- a change to the Hot Standby Routing Protocol on the encryption routers, that will
cater for the type of failure that occurred on 5" January and ensure fail-over, is planned
for implementation over the weekend of 17/18 January
- a manual procedure to effect failover has been put in place. This can be invoked
should automatic failover not be successful.
- plans for enhancements to Business Continuity Testing in this area will be reviewed,
with initial proposals by 30th January. This will be followed by a wider review across
other areas.
- the necessity for promptly advising POL of such incidents has been re-inforced to POA
service managers
- Energis to propose revised criteria for advising Fujitsu Services of operational change
activity and how the likelihood of a change being service-affecting is assessed
4.0 Description of the fault and service failure
4.1 Symptoms and Business Impact
4.1.1 Symptoms as seen by Branches
In the first incident, from 11.45 for a period of some 20 minutes , 70 Post Masters called the
HSH as they were unable to perform on-line transactions on the Horizon equipment because
the Offline Indicator was present. The advice from the HSH was to log off and log on again
and this resolved the Post Masters’ problem. There would nevertheless have been some impact
on customers who were visiting Branches.
Company-in-Confidence Page: 7 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
In the second incident no Post Master, from around 14.50, would have been able to perform
any Network Banking transactions on the Horizon system, for about an hour and a half. This
would have had a corresponding impact upon customers who were visiting Branches.
No Network Banking transactions were processed through the NBE and onto the relevant
Banks.
4.1.2 Symptoms as seen by Fujitsu Services
On the first incident, HSH received 70 calls by 12.00 stating Off Line Indicator with a
further 400 calls being abandoned. SMC had seen Fatal Events on Warwick Encryption
Router 2. Energis saw a drop of FRIACO ports (a maximum of 3000) and then saw them
restore 10 minutes later.
On the second incident, SMC saw Fatal Events on Warwick Encryption Router 1. This was
followed by the HSH receiving about 80 calls within an hour - with a further 400 abandoned.
No issues were visible to Energis.
4.2. Detailed explanation of the incident
The first incident was caused by maintenance work that Energis were undertaking to tidy
tables on a network router at Watford. This was expected to be routine work that should not
affect any live service. Hence none of their customers, including Fujitsu Services, should have
been affected. In undertaking this work, however, Energis encountered a software problem
and then had to revert the router to its previous state. The dial plan between Fujitsu Services
and Energis provides for alternative routing, which, along with the swift rectification by
Energis, explains why affected Branches were able to successfully retry their transactions.
The software problem referred to above is a Cisco problem. Energis have advised that in terms
of service impact it is safe to refrain from tidying the relevant network tables until further
information on the problem is obtained.
The second incident was attributable to a failure on Encryption Router 1 at Warwick and
the subsequent failure to fail-over to Encryption Router 2.
The delay in getting Encryption Router I back up and running was primarily due to the Fujitsu
Services Core Services Network Team not using the correct procedure for enlisting IBM's
assistance. Essentially the team contacted some IBM staff directly rather than using the
correct route which is via the TSD. It was unfortunate that the IBM staff who were contacted
initially were not able to assist, but it is recognised that the wrong procedure was used by
Fujitsu Services. By the time that the appropriate IBM staff were involved the router had
rebooted itself and the service was thus restored.
Company-in-Confidence Page: 8 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
Fujitsu Services
Company-in-Confidence
Major Incident Report
POL00029278
POL00029278
Ref: CS/REP/177
Version: 1.0
Date: 06-FEB-2004
The core dump from the failing router has been examined by Cisco. Their response has been
that from the evidence available they are not able to determine any cause for the encryption
router failure. Neither does the evidence assist as to the reboot.
The failure to fail-over to Encryption Router 2 is now understood (following the investigative
work undertaken over the weekend of 10/11 January) and an enhancement to the Hot Standby
Routing Protocol is planned that will deal with the situation that occurred on the afternoon of
5® January. This situation being that Encryption Router I had lost its encryption tunnels to the
Horizon Data Centre but in other respects was functional.
It is noted that Business Continuity testing across the link from the Horizon data centres to
Warwick has to date been effected by generating a hard fault (removing the cable) at the data
centre end. The incident in the afternoon of 5“ January has shown that some changes to future
Business Continuity testing are required and there is a corrective action in a later section to
cover this.
5.0 Incident Management
Date & I Avoidance, mitigation and I Communication and escalation I Business Impact
time resolution activities activities
INCIDENT 1
05/01/04 I SMC saw fatal events on Warwick
(all on I encryption router.
5/1/04)
11.34
SMC raised a call and passed to} SMC paged POA DM who I Extent unknown at this
CFM3 for investigation immediately appointed POA PM who I time:
1147 0401050573 informed acting POA BCM who
i ° informed POL BCM and POA
E-0401050601 Operations Manager.
11.48 Energis informed POA Network
Service Manager of a Router fault
at Watford and that the service
may be affected.
11.50 POA DM continually updating I POA Problem Mgr updating POA
POA PM that several PO's had) BCM
placed calls stating Off Line
Indicator showing
12.00 POA DM stated that 70 PO’s had HSH had received 70
logged calls and another 400 had
been abandoned. The HSH had
told the PO's to log off and then
log on again. This appeared to
calls from Post Office
branches at this time.
Company-in-Confidence
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
Page: 9 of 16
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: (06-FEB-2004
clear the fault.
12.05 TSD raised a call to state that} POA DM informed and then POA
possibly up to 25% of the estate I PM updated.
could be affected.
E-0401050624
12.05 Energis called Networks Service} POA PM advised Energis that a
Mgr to state fault had been cleared I sample of FAD ISDN Nos’ would be
and also that resilience kicked in I sent across for investigation
successfully
12.10 "High Call Volumes" IVR message
applied
12.10 SMC state problem completely I POA DM = informed POA PM of I HSH had by this time
resolved to POA DM situation ,and POA BCM informed. received 400
abandoned calls from
Post Office branches.
However the service
was now up and
running.
12.20 POA BCM advised POL BCM of
situation
12.30 CFM3 forwarded Sample of ISDN
No’s to Energis for investigation.
12.51 POA PM raises problemPM000447
for incident on PMDB, in order to
progress fault diagnosis and
ongoing investigations,
recommendations and resolutions
13.30 Energis confirm that symptoms
from ISDN Nos are as per the
problems they have evidence of,
INCIDENT 2
15.02 I Call 601 updated by SMC to say I TSD made aware. POA DM made
they have seen fatal event onI aware. POA PM made aware and
Warwick Encryption Router. This escalated to POA BCM.POA PM
was confirmed by CFM3 who had I also informs Energis that FAD ISDN
seen an encryption failure. Call is I No. samples will be coming across
subsequently upgraded from B to I and asks if Energis experiencing any
A, following earlier downgrade similar issues to the morning failure.
15.13 SSC contact TSD ref seeing NBE CFM attempt to contact IBM to
engine down reboot router
Call 624 updated, but also confirm
no call has been received from
IBM
1514 SMC give sample of FAD No’s to
Company-in-Confidence Page: 10 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: (06-FEB-2004
CFM4 in order to send ISDN NO’s
to Energis for investigation.
15.30 HSH have received calls from 30 30 Post Offices
Post Offices experiencing either
Loss of Network
Banking Service or Off
Line Indicator
showing.
15.40 IBM state that the connection to
Fujitsu appears to be OK, that
there are no outstanding issues in
their domain, but that the
incremental transaction counter
had stopped
15.42 CFM3 provide ISDN No’s to
Energis for investigation
15.45 POL Problem Manager calls POA
BCM and update is provided
15.45 HSH confirm that 50 Post Offices Energis confirm to POA PM that Total of 50 POs’ now
are now affected nothing untoward with ISDN No’s I affected and have no
provided. Network Banking
POA DM made aware by HSH and
POA PM
16.00 HSH confirm to POA DM that a POA DM updated POA PM who Total of 80 Post
total of 80 calls have now been updated POA BCM Offices have logged
logged calls that they have no
NB Service
16.10 POA PM escalates to Mgr of Mer of CFMB investiagting
CFM3
16.15 TSD chasing IBM for contact name
to reboot server
16.20 HSH had by this time
received 123 calls
from Post Office
branches (and a
further 400 calls had
been abandoned)
16.30 CFM state router has come back SMC, TSD,POA DM, POA
up at 16.24 and service starting to I PM,POABCM, POA OPS MGR all
come back up after producing informed
dumps
16.35 Energis confirm to POA PM that
all ISDN No’s for sample FADS
tested ok earlier.
16.40 I CFM3 sending diagnostic dumps to
NIL for investigation.
16.57 IBM confirm to CFM3 that there
Company-in-Confidence
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
Page: 11 of 16
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
was no hardware reboot performed
16.58 HSH having spoken to PM’s Confirmation that NB
affected, confirm that all is is back up and running
running OK at the affected PO's
17.00 POA BCM updates POL BCM
17.00 POA PM raises problemPM000448
for incident on PMDB, in order to
progress fault diagnosis and
ongoing investigations,
recommendations and resolutions
17.00 TVR message is taken off
17.09 SMC downgrade call to B priority
It should be noted that, additionally, senior management in POA and, onwards, senior
management in POL were advised of these issues during the day.
6.0 Problem Management
The first incident was well managed and appropriate procedures were followed. The
instigation of the timely provision of the ISDN numbers for affected Branches to Energis for
investigation was successfully used for the first time. There was timely escalation within POA
and into POL. Energis rectified the problem quickly. Problem (PM0000447) has been logged
for the incident.
Energis did not consider that it was necessary to advise Fujitsu Services via an OCP of their
intention to carry out the tidying of the network tables. This was because it was not expected
to be service-affecting. As a result of this incident Energis have been asked to review the
criteria for determining the need for an OCP and how the likelihood of a change being service-
affecting is assessed. Their proposals are expected in a week's time.
The second incident (logged as PM0000448) was not well managed. In addition to the
technical failure that prevented automatic failover to Encryption Router 2, the use of incorrect
escalation routes into IBM delayed resolution. The delay in formally advising POL of the
problem was unacceptable. Fujitsu Services staff were endeavouring to fully understand all
aspects of the problem so that a complete picture could be given to POL, but got the balance
wrong between that and the necessity for early advice to POL. Corrective actions in these
areas have been identified and are recorded in the next section.
The fact that there were some similarities between the symptoms of the two incidents
undoubtedly clouded the issue.
A Post Incident Review was held the following morning between POL, POA and IBM and
actions were identified. For completeness the following section encompasses those actions.
Company-in-Confidence Page: 12 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
Further investigative work on the failure of the fail-over process was carried out on 11"
January. The result of this work has contributed to some of the corrective actions in the
following section.
7.0 Corrective Actions
Incident/problem Action to be taken By By Progress made
Issue Whom When
Incident One
Failure of Energis Energis to propose I Enersis 23/1/04 [23/1/04 — initial
to advise Fujitsu revised criteria for Manower response provided by
Services of advising Fujitsu Energis but further
operational change I Services of discussions being held]
y operational change
activity and how the
likelihood of a
change being service-
affecting is assessed
Incident Two 1. pod te confirm I Dave 10/1/04 I Completed. Run on
Following PIR, that one tion not I Tanner primary/secondary
was attended by all routers are run
relevant POA on I
persons and chaired Primaryisecond
by POL BCM., the load sharing
following actions 2. POAtoobtain I Colin 10/1/04 Cisco unable to
were agreed. report from Johnson determine the cause
NTL/Cisco as to from the evidence
why encryption
failed.
3. POA to explain Colin Following testing it
vy actions Johnson I 13/1/04 I as confirmed that the
didn't switch encryption within the
across fo the router had failed,
resilient router rather than the router
itself. The testing on
11th Jan showed that
by changing the Hot
Standby Routing
Protocol (HSRP) the
problem could be
overcome
Company-in-Confidence
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
Page: 13 of 16
©Copyright Fujitsu Services Limited 2004
POL00029278
POL00029278
Fujitsu Services Major Incident Report Ref: CS/REP/177
Version: 1.0
Company-in-Confidence Date: 06-FEB-2004
4.POA to confirm
promptly advising
POL of problems
(even if they are not
well understood at
the time)
whether the router Colin Confirmed as a
restoration of service Johnson 8/1/04 software reload
was a software forced
reload
5.CFM3 Operational
procedure to be updated I +; ae 5
in line with OLA for this cain s/iso4 I Confirmed as updated
service Johnson
6.POA to review
ongoing BC Test, to
create a ‘dirtier test’ at
a much lower partial Tony
level, rather than a solid Wicks 30/1/04
fail.
Failure to fail-over I HSRP to be Dave 17/18 [23/1/04 — Completed
automatically enhanced Tanner I Jan on 18/1/04]
Procedure in place Colin Complete
to allow manual Johnson
failover
Underlying cause of I If failure occurs Colin At time
encryption router again (and providing I Johnson I of next
failure not the service is being failure
understood provided
successfully through
the secondary
router) take
additional
diagnostics
Failure to promptly I Reinforce the Dave Complete
advise POL Law
Company-in-Confidence
Page: 14 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004
Fujitsu Services Major Incident Report
Company-in-Confidence
POL00029278
POL00029278
Ref: CS/REP/177
Version: 1.0
Date: 06-FEB-2004
Company-in-Confidence
Page: 15 of 16
(CONTRACT CONTROLLED - Leave Blank if Not Applicable)
©Copyright Fujitsu Services Limited 2004