HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

PLAN

High Level Test Plan

Not Applicable

This document details the approach to proving Business Continuity

and the Integrity of the HNG-X Solution.
DRAFT

Steve Bansal/Alan Child

Name ‘ole Signature Date
Pete Dreweatt HNG-X Test Manager

Andrew W Thompson _I Post Office Ltd (Test Manager)

Tony Wicks Business Continuity Manager

Note. See Post Office Account HNG-X Reviewers/Approvers Role Matrix (PGM/DCM/ION/0001) for guidance.

(*) = Reviewers that returned comments

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence Ref
Version:
Date:
Page No:

TST/SOT/HTP/0006
0.2

19-Oct-07

1 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

0 Document Control

0.1 Table of Contents

0 DOCUMENT CONTROL.

nv

0.1 Table of Contents.. 2
0.2 it 4
0.3 4
0.4 Document 4
0.5 Review Detail 4
0.6 Associated Documents (Internal & External). 5
0.7... 7
0.8 1
0.9 Changes Expected. 13
0.10 Accuracy... 3

3

0.11 Copyright.

1 INTRODUCTION
1.1 Principles... 4
1.2 Definitions. ~15
1.3 5
1.4 ry 7
1.4.1 Data Backup and recovery. 7
1.5 DR Testing... 8
2 SCOPE...
2.1 Features to Be Tested.
2.1.1 Counter..... :
2.1.2 I Counter Business Applications. 2
2.1.3. Branch Access Layer. 6
2.1.4 Online Services. 29
2.1.5 Batch Application:
2.1.6 Branch Database.. 5
2.1.7 Technical Networl 37
2.1.8 Platform and storage.

2.2 Other Area’s.
2.2.1 Storage Area Network (SAN
2.2.2 System Qualities.
2.2.3 Estate Managemen
2.2.4 Time Synchronisation.
2.2.5 Active Directory...
2.2.6 Domain Name Servic
2.2.7. Remote Support and Diagnostics
2.2.8 Branch Support Database.
2.2.9 Aurora Console Access.
2.2.10 Authorisation Services..
2.2.11 File Transfer Managed Service (FTMS)

2.3 Features Not to be Tested....
2.3.1 (Hydra) ‘Migration States’ Integrity Testin:

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 2 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

3.1. Hardware and Software Risk Issues.
3.2. Planning Risks and Contingencies.

A QUALITY... ce eeeesssesesessessseseseseneenensatsnsnensstecssassusussesceesseesensarersnsenenseseseentenseasasene® 92

5 APPROACH.......sssssssssssessssessssensssesscsssenenssnssesassucassusansaceessseesseeseneaseneaeassnsaeensenses 92

5.1 General.......
5.2 DR Test Cycle:
5.3 Test Case Analy:
5.4 Test Case Execution.
5.5 Approach to Resilience. 94
5.6 Approach for DR....

6 ENVIRONMENTAL NEEDG...........cscscsesesesseeessssssssseesescseseseseeesenestsnenesestesasessenees 95
7 RESPONSIBILITIES..........s:scscssesesessesesesessenssesensnsassenecsesescsenseneseeseceesesesacasenssenees 95
8 DEPENDENCIEG..........scsssssessssesssessessesseesecsesessescscsssesesneasaeanasstseneateracsueaeenacaseeanes 95
F: 101g I 1 2) 0) Bt ee 95
10 RESOURCEG........ccsssssssessssssssesesesnenscsesnesecesesssesssacsesssseecaranecseesensensnesessssenecesenen 96
11. ENTRY CRITERIA........ccssssssssssssescsesssssssssseseessesssnsseanenssenssesssnenensonscessesusaneesseeneets 96

12 EXIT CRITERIA.

13. TEST PASS / FAIL CRITERIA.........c:scsssssssesssssssessssssessesescereneeneeeneessessenssseneceeenen 97

A APPENDIX — MANUAL TESTING. .......cccccssscsssssssssssesssessesesesseensssenseeneanseecaseeseee 98

A.1 Explicit Requirement:
B.1 Counter Architecture.
C.1 Branch Access Layer.
D.1 Online Services.. 104
E.1 Batch Applications.
F.1 Branch DB..
G.1 Counter Business Application:
H.1 Technical Network.....

B APPENDIX - AUTOMATED TESTING..

C APPENDIX — PLATFORMS/COMPONENT...........:s:scsssssessssssseesssssssseseeeseeteees 106

14 SOrverS...-seseeseeseeseee + 106

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07
Page No: 3 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

108
108

0.2 Figures

Figure 1 BladeFrame resilient network architecture.
Figure 2 Platform Definitions in HNG-X.............

Figure 3 Server Placements for Active/Active Services...

Figure 4 DNS service resilience overview.....

Figure 5 Remote Access Framework...

Figure 6 Services Speat.............::0c008

0.3 Tables

Table 1 SLTs for overall availability.

Table 2 Branches and counter availability... 62
Table 1 Maximum Target Recovery Time..... 65
Table 2 Service availability at DR....... .. 66
Table 3 Recovery mechanisms for essential Business Systems... .. 67

Table 4 EM recovery and resilience requirements for each platform......... Error! Bookmark not defined.
Table 5 Bladeframe Failure Effect and Action.. 72

0.4 Document History

Version No. Date Summary of Changes and Reason for Issue Associated Change -
CP/PEAK/PPRR
Reference

04 Initial Release

02 Incorporation of comments and updates

0.5 Review Details

Review Comments by Wednesday 12" December 2007

Review Comments to steve.bansal@
RMGADocumentManagemen}

Mandatory Review

Role Name
HNG-X Solution Design David Harrison
©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 4 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

oO
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

HNG-X Testing Peter Dreweatt

Optional Review

Role Name
HNG-X Development Graham Allen
HNG-X Test Design Peter Robinson
HNG-X Test Design George Zolkiewka
HNG-X System Test Harjinder Hothi
HNG-X RV Manager James Brett
TE Manager Peter Rickson
HNG-X SV&l Manager Sheila Bamber
HNG-X Programme Manager Phil Day
Tester Hamish Munro
HNG-X Testing Peter Dreweatt
ING-X C Ed Ashford
HNG-X V&i Manager Peter Rickson
Test Manager Lee Farman (POL)
Test Manager Andrew W Thompson (POL)
Test Manager Chris Young (POL)
Acceptance Analyst Wayne Roberts (POL)
HNG-X Service Transition ‘Steve Godson
Security Architect Jim Sweeting
Core Services Pat Lywood
System Qualities Architect Dave Chapman
Counter Architect Jeremy Worrell
Branch Access Layer Architect Wille Faler
Online Services Architect Andy Williams
Batch Application Architect Roger Barnes
Branch Database Architect Nasser Siddigi
HNG-X Joint Test Team John Halfacre

Note: See Post Office Account HNG-X Reviewers/Approvers Role Matrix (PGM/DCM/ION/0001) for guidance.

(* ) = Reviewers that returned comments

0.6 Associated Documents (Internal & External)

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 5 of 108
2
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

PLAN

COMMERCIAL IN CONFIDENCE

POL00029327
POL00029327

Reference Version ate Title Source

PGM/DCM/TEM/0001 Fujitsu Services Post Office Account HNG-X I Dimensions

(D0 NOT REMOVE) Document Template

VAL/GEN/PRO/0003 HNG-X HLTP Definition Report Dimensions

TST/GEN/STG/0001 HNG-X Testing Strategy Dimensions

PGM/PAS/PRO/0005 Test Planning and Preparation Dimensions

TST/GEN/WPD/0005, HNG-X Work Package for Non-Functional Testing I Dimensions

TST/GEN/HTP/0002 HNG-X Disaster Recovery/Business Continuity I Dimensions
Testing — Scoping Document

ARC/PER/ARC/0001 HNG-X Systems Qualities Architecture Dimensions

ARC/APP/ARC/0003. HNG-X Counter Architecture Dimensions

ARC/APP/ARC/0004 HNG-xX Architecture — Branch Access Layer Dimensions

ARC/APP/ARC/0009 HNG-X Counter Business Applications I Dimensions
Architecture

ARC/APP/ARC/0005 HNG-X Architecture - Online Services Dimensions

ARC/APP/ARC/0007 HNG-X Batch Applications Architecture Dimensions

ARC/APP/ARC/0008. HNG-X Branch Database Dimensions

ARC/NET/ARC/0001 HNG-X Technical Network Architecture Dimensions

ARC/PPS/ARC/0001 HNG-X Platforms and Storage Architecture Dimensions

ARC/SOL/ARC/0001 HNG-X Solution Architecture Outline Dimensions

ARC/SYM/ARC/0001 System and Estate Management — Overall I Dimensions
Architecture

ARC/SYM/ARC/0003 HNG-X System and Estate Management I Dimensions
Monitoring

ARC/SYM/ARC/0004 Remote Support and Diagnostics Topic I Dimensions
Architecture

ARC/SYM/ARC/0005 HNG-X Estate © Management Component I Dimensions
Architecture

©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref. TST/SOT/HTP/0006

Version: 02
Date: 19-Oct-07

Page No: 6 of 108
POL00029327

POL00029327
(oe) HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST ”
FUJITSU PLAN
COMMERCIAL IN CONFIDENCE
SVM/SDM/PLA/0003. HNG-X Business Continuity Test Plan Dimensions
TST/GEN/PRO/0001 HNG-X Testing Process — Entry and Exit Criteria Dimensions
TST/GEN/PRO/0003 HNG-X HLTP Definition Report Dimensions
TST/GEN/PRO/0004 ‘System Test Definition and Process Dimensions
TST/GEN/PRO/0006 Process for Creating Data for inclusion in HNG-x I Dimensions
High Level Test Plan Reports
TST/GEN/PRO/0010 HNG-X Defect Management Process Dimensions
TST/GEN/PRO/0012 HNG-X - Non-functional Testing Process Dimensions
TST/SOT/HTP/0003 HNG-X Performance/Stress High Level Test Plan I Dimensions
REQ/CUS/STG/0002 HNG-X Branch Exception Handling Strategy - I Dimensions
Agreed Assumptions and Constraints
DES/APP/HLD/0006 HNG-X Generic Authorisation Services High I Dimensions
Level Design
DES/INF/LLD/0016 HNG-X Backup and Recovery Low Level Design Dimensions
DES/PER/HLD/0001 HNG-x Resilience and Disaster Recovery High I Dimensions
Level Design
DES/SYM/HLD/0015 POA HNG-X Backup and Recovery High Level I Dimensions
Design
DES/APP/HLD/0051 File Transfer Managed Service Delta HLD Dimensions
DES/NET/HLD/0006 Domain Name System Dimensions
DES/NET/HLD/0007 HNG-x Storage Area Network (SAN) HLD Dimensions
DES/NET/HLD/0008 Data Centre LAN High Level Design Dimensions
DES/NET/HLD/0009 HNG-X WAN HLD Dimensions
DES/NET/HLD/0013 Time Synchronisation at HNG-X — High Level I Dimensions
Design
DES/NET/HLD/0014 HNG-X Branch Access Network High Level I Dimensions
Design
DES/PPS/HLD/0003 Active Directory HLD Design for HNG-X Dimensions
DES/SEC/HLD/0001 Strong Authentication High Level Design Dimensions
DES/SYM/HLD/0017 Remote Support Secure Access Server High I Dimensions
Level Design
DES/SYM/HLD/0020 AURORA CONSOLE ACCESS HIGH LEVEL I Dimensions
DESIGN
DES/APP/HLD/0023, Branch Support Database High Level Design Dimensions
DES/GEN/STD/0001 Host Applications Design and Development I Dimensions
Standards (HADDIS)
DEV/APP/LLD/0026 Host BRDB Capture of Instance Unavailability I Dimensions
Low Level Design
TST/GEN/WPD/0003 HNG-X Work Package for Disaster Recovery I Dimensions
Scenario Testing
CS/SIP/002 Business Continuity Framework PVCS
TD/STR/007 FTMS Resilience and Recovery Strategy Pvcs
©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref. TSTISOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 7 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Unless a specific version is referred to above, reference should be made to the current approved
versions of the documents.

Abbreviation Definiti

IR1] A request for authorisation

ACE Application Control Engine

ACL ‘Access Control List

ADSL ‘Asynchronous Digital Subscriber Line

APOP Automated Payments — Out Pay

ASDM ‘Advanced Security Device Manager

ASM ‘Oracle Automatic Storage Manager

BAL Branch Access Layer - The interface between Counters and the Data Centre — a set

of Web Service end points

B-B credit FC packets are stored in buffers within FC targets, switches & host in order to
accommodate physical media delays. A buffer to buffer credit (B-B credit) indicates
the packet is in a staging point but not committed to store. In distance solutions, B-B
credits are used as a means to daisy-chain unrelated FC frames onto the same
media, ensuring maximum performance in the use of the transmission media.

BCV Business Continuance Volume (a clone or snapshot based local copy) - storage
devices to which copies of working volumes are made in order to carry out business
activities

BGP Boundary Gateway Protocol

BIN Binary Input (also used to describe the EMC Symmetrix configuration file)

CSM Content Switch Module. A network device that allows incoming requests for service to
be load balanced across a number of platforms.

DA EMC Symmetrix Disc Adaptor

DCS Debit Card System; Horizon service that supports payment by Debit Card

DMX EMC Symmetrix storage device with a non-blocking Direct Matrix architecture for

connection of any host to any storage volume (can be thought of as a distributed
modular cross-bar architecture)

DR Disaster Recovery

DRV volume Special volume in EMC Symmetrix that allows the movement of data between
physical disks by means of Symmetrix Optimizer

DWDM Dense Wave Division Multiplex

EMC CC / ECC EMC Control Center ... storage Management Application

ETS Electronic [Phone card] Top-up Service

FA EMC Symmetrix Disco Adaptor / port — used for host connectivity

FC Fibre Channel (a storage communications standard which uses 8:10 bit encoding — at

1Gb/sec speeds, bandwidth is 100Mbytes/sec as 10 bits are used to represent 1 Byte)

FE Fast Ethernet

©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref. TST/SOT/HTP/0006
Version: 02
Date: 19-Oct-07

Page No: 8 of 108
2
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

POL00029327

POL00029327

PLAN
COMMERCIAL IN CONFIDENCE

FRU Field Replaceable Unit — the paris which get replaced when a component fails (Le. if
a whole controller board is a FRU, the whole board gets replaced if a single
component fails on it)

FSBN Fujitsu Services Business network

FWSM Firewall Services Module

Gb Giga bit

GE Gigabit Ethernet

GK gatekeeper volume

‘Special volume in EMC Symmetrix used as a conduit for system communications for
use by SymAPI — uses SCSI protocol

GPRS General Packet Radio Service

GRE Generic Routing Encapsulation (Specified In RFC 2784)

FLD High Level Design

HNG-X Horizon Next Generation

HSCSD High Speed Circuit Switched Data

ICMP Internet Control Message Protocol

IDS Intrusion Detection System

IP Internet Protocol

IPSEC IP Security

ISDN Integrated Services Digital Network

ISL SAN Inter Switch Links used to connect fabrics together and for switch to storage port
connections

JRE Java Runtime Environment

L21P Layer 2 Tunnelling Protocol

LAN Local Area Network

Koy Lucent connector — a type of hardware connector used for Fibre cabling

LCP Link Control Protocol

LINK the organisation responsible for branded and shared network of cash machines and
self-service terminals of certain member banks and building societies in the UK,
which enables services from one member bank or building society to be available at
cash machines of all member banks and building societies.

LNS L2TP Network Server

LUN Logical Unit Number

MAC Media Access Control

Mb Mega bit; Mega bits per second

MPLS Multiprotocol Label Switching

MSS Maximum Segment Size

N+1 N instances are sufficient to handle the load.

NAT Network Address Translation

NBS. Network Banking Service

NMS Network Management System

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07
Page No: 9 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

NNM Network Node Manager
NPS Network Banking Persistence Service

NTP Network Time Protocol

OBC Outlet Business Change

OOB ‘Out of Band

OS ‘Operating System

P2P Peer-to-peer

PAS HING-X Private Internet Address space (PAS)

PE Router Provider Edge Router

PHUt Portable Hardware Unit 7

PO Post Office

POL Post Office Lid

PPP Point to Point protocol

PSK Pre Shared Keys

PSTN public switched telephone network

QoS Quality of Service

RA EMC Symmetrix Disc Adaptor 7 port — dedicated to remote replication

RAC ‘Oracle Real Application Cluster

RAC Model Request, Authorisation, Confirmation, basic model for Transactions where initial

Online Request [R] from Counter elicits Online Authorisation [A] from the Service
Provider. Confirmation [C] of outcome of Transaction is sent in near real time from
Counter to the Data Centre.

RADIUS Remote Authentication Dial In User Service

RAID Redundant Array of Inexpensive Disks, a.k.a. Redundant Array of Independent Disks
RDMS Reference data management system

RDP Remote Desktop Protocol

RFC Request For comments

RIP. Routing Information Protocol

RMAN Oracle

RMGA Royal Mail Group Account

RPO Recovery Point Objective — after a disaster occurs, the point in time to which a DR

system needs to recover to (i.e.: RPO=0 means that data needs to be recovered to
the point immediately before the disaster occurred = last transaction before the
disaster = no data lost)

RTO Recovery Time Objective — after a disaster occurs, the time a DR system can take to
recover full functionality (i.e.: RPO=0, RTO=1 hour, means that the application needs
to be recovered in one hour, to the last transaction immediately before the disaster

occurred.)
SAN ‘Storage Area Network
SCSI Small Computer System Interface
SFS Volume Special volume in EMC Symmetrix holding the Symmetrix File System (configuration)
©Copyright Fujitsu Services Ltd 2007 Commercial In Confidence Ref: TST/SOT/HTP/0006
Version: 02
Date: 19-Oct-07,

Page No: 10 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

SID Session identity

SNTP_ Simple Network Time Protocol

SP Service Provider

SRDF7S Symmetrix Remote Data Facility (remote copy) 7S = synchronous

SRDF/S ‘Symmetrix Replication Data Facility 7 5 = Synchronous

SRRC Service Resilience and Recovery Catalogue. A document describing the failure
modes, business impact, events raised, and recovery mechanism for each service

SSC ‘Systems Support Centre

SSH Secure Shell

SSL Secure Sockets Layer

Abbreviation Definition

ST ‘System Test

Symmetrix EMC Range of storage devices

TACACS+ Terminal Access Controller Access-Control System plus

TCP Transmission Control Protocol

TLS Transport Layer Security Protocol

TNS Transaction Network Services

UDP. User Datagram Protocol

UMTS Universal Mobile Telecommunications System

USN Uniqueness Sequence Number

Vast Volume Special volume in EMC Symmetrix (from Enginuity 71 code) that will hold the

contents of DMX cache as it is de-staged to disk in case of a power outage in excess
of 60 seconds — stored in the first drives of a DMX system (number of drives
dependant on system cache configuration)

Also used for

Special Volumes in EMC CLARIION to hold system configuration, for de-staging of
cache contents in case of power failure, to hold copies of microcode for upgrade, for
reserved use by CLARiiON layered software = the first 5 drives in a CLARiiON array

vIP Virtual IP

VSAN Virtual Storage Area Network

VSAT Very Small Aperture Terminal

WAN Wide Area Network

WD Work Description

WWN Manufacturers World Wide Name assigned the HBA (host) and storage devices (FA)

or switch ports — akin to MAC address in Ethernet

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 11 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 12 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 13 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 14 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

0.7 Glossary

Test Level or Testing I The specific phase (level) within the Software Development Life Cycle. For instance
Level Component Test, Component Integration test, System Test, Solution Validation and
Integration or Release Validation

Business Continuity The following is from TST/GEN/HTP/0002.

Business Continuity Plans protect against the impact of unexpected interruptions in
business as usual arising from any fortuitous event affecting the continuity of
business critical processes, functions, premises, people, computer systems and
supply chain (Royal Mail Group Business Continuity Planning Framework v7.0 May
2005)

At a working level, Post Office Limited and Fujitsu Services (Post Office Account)
generally recognise the term Business Continuity as having three closely related
components:

Resilience may be defined as the steps taken to avert a loss of service or disaster
or reduce the likelihood of a disaster or loss of service.

Contingency may be defined as the interim processes and procedures adopted
during the loss of service.

Recovery may be defined as the business and technical arrangements to restore a
lost system or service and manage the process of reversion to normal processing
and full resumption of service.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/O006
Version: 0.2
Date: 19-Oct-07

Page No: 15 of 108
2
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

POL00029327

POL00029327

PLAN
COMMERCIAL IN CONFIDENCE

(Fujitsu Business Continuity Framework, CS/SIP/002 v12 18/8/06)

Disaster Recovery

The HNG-X configuration includes two sites in order to provide business continuity
in the event of a catastrophic failure. However, the configuration is much simpler
than Horizon only one of the sites (the primary site) operates as the Production
site, whilst the other site remains in reserve as a Disaster Recovery (DR) site, only
to be activated in the event of a catastrophic failure of the Production site. Again,
each site is sized to accommodate full projected peak workloads

The HNG-X System Qualities Architecture (ARC/PER/ARC/0001) defines the
following possible triggers for DR
e Critical failure to a documented system SPOF (primary storage,
blade frame cabinet)

e Failure of all components critical to providing service where no
immediate replacement can be provided- this could either be for
the entire service (switches, servers (e.g. active &standby)), or
where it would not then be possible to provide full service (e.g. ata
level of N-3 for an N+1 configuration)

e Long term power failure to entire data centre

e Disaster affecting part or the entire data centre (accident, fire, and
flood).

Use of the DR Data Centre to run live systems may also be required in the event of
a PCI forensic investigation requiring the Live Data centre to be quarantined

Hydra The deployed solution from the start of migration to the completion of migration. i.e.
While Horizon and HNG-X co-exist.

Integrity Within this document integrity is a framework term applied to not only the
combination of resilience and recovery but also error monitoring.

IRE11 The site of the Production HNG-X Service

IRE19 The site of the Standby system for IRE11 which also doubles as a Test system

FA, F2, F3, F4 These are the names of the 4 one week long DR test slots planned for mid-2008

Platform A type of server hosting a business application or infrastructure service that

is part of the HNG-X solution and hosted in the HNG-X data centres, a
platform can have multiple instances and is built from a Platform
Foundation

(ARC/PPS/ARC/0001)

Platform Foundation

The combination of HNG-X approved hardware and a HNG-X approved
operating system for the purpose of hosting an HNG-X application, service
or function in the HNG-X data centre; the platform foundation is provisioned
through an automated process, the operating system has been modified to
comply with HNG-X policies, e.g. Security Policy (ARC/PPS/ARC/0001)

Changes

0.8 Changes Expected

This document is the High Level Test Plan that represents the testing that will be required to meet our
objective to ensure FJS hand over to PO Ltd, tested processes and facilities too incidents which could
threaten normal business operations. The production of the HLTP is expected to be a two stage

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/O006
Version: 0.2
Date: 19-Oct-07

Page No: 16 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

oO
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

process. The first stage will include the Scope and Objectives of the testing (all sections up to the,
Appendix). The second part to be listings / reports of the Planned testing that is to take place and WI
include extracts from Quality Center (where appropriate) in the appendix of this HLTP.

0.9 Accuracy
Fujitsu Services endeavours to ensure that the information contained in this document is correct but, whilst every

effort is made to ensure the accuracy of such information, it accepts no liability for any loss (however caused)
sustained as a result of any error or omission in the same.

0.10 Copyright

© Copyright Fujitsu Services Limited (xxx). All rights reserved. No part of this document may be reproduced,
stored or transmitted in any form without the prior written permission of Fujitsu Services.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 17 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

1 Introduction

1.1 Principles

e FJS will define an overall High Level Test Plan for Business Continuity and DR and be primarily
responsible for carrying out testing (except where agreed with the Post Office and Joint Test
Team)

e The testing is to ensure that the stated Requirements for Resilience and DR can be met.
DOORS requirements are in Appendix A

e Tests, test designs and test results will be mapped against the DOORS requirements held in
Joint Quality Center as the basis for Acceptance within the HNG-X program.

e As resilience is a quality of the system, all architecture and design documents need to state how
they will meet the appropriate requirements

« where resilience is a feature of the manufacturers specification of a hardware or software
component, and that component has been accepted by FJS as meeting the manufacturers spec
on delivery, testing of resilience features will not be carried out unless FJS have tailored or
amended the configuration etc for the purposes of HNG-X

e Resilience testing will include both the failover and the fallback scenarios

e Testing will be planned, designed and executed on an incremental basis, with each subsequent
cycle of testing building on, but not duplicating, testing of previous cycles.

e Testing will focus on the vectors or variances between environment, infrastructure or
applications. i.e. where a component has not changed in its configuration, coding or design since
the previous layer of testing it will not be re-tested

e Resilience testing will be carried out throughout the HNG-X program focussed on components
which have changed through configuration management. i.e. it is assumed that Resilience
endures unless physical changes made to the infrastructure or component

e Resilience testing will not just be the ability to cope with a failure but includes that the failure
results in an appropriate alert being raised

e Recovery testing will ensure that practised processes are in place to backup and restore all
appropriate systems as dictated by the design.

e Resilience testing will be carried out separately to DR testing but may contribute to the
subsequent DR tests through ironing out or proving any issues etc

e DR tests will be carried out through planned DR test cycles and the final DR test F4 (4° DR
cycle) will be run against the entire infrastructure immediately prior to Live

e Results of tests will be reviewed by the Joint Test Team and successful completion, failure or
variances reported to FJS and to POL's Business Continuity Manager to either a) confirm that
resolution/rectifications is required or b) accept the risk that testing has either not been carried
out or that specific tests have failed and are not to be rectified prior to acceptance

e JS will be responsible for maintaining details of test results within Quality Center

« The depth of review of test results will be based on the combined Risk Impact + Likelihood
prioritisation held in Joint Quality Centre (as per the HNG-X Testing Strategy). Requirements
with a Priority of 1 (Highest) will be subject to in depth review, whereas those with Priority 5
(Lowest) will be subject to a ‘light touch’ check.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 18 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

1.2 Definitions

The organisation The Business Continuity Institute (http://www.thebci.org/) has a glossary giving a
common definition of the various Business Continuity Management terms. However, these definitions
post date Business Continuity activities within Horizon and do not always match up with our internal use.

Business Continuity Plans protect against the impact of unexpected interruptions in business as usual arising
from any unforeseen event affecting the continuity of business critical processes, functions, premises, people,
computer systems and supply chain (Royal Mail Group Business Continuity Planning Framework v7.0 May 2005)
At a working level, Post Office Limited and Fujitsu Services (Post Office Account) generally recognise the term
Business Continuity as having three closely related components:

Resilience may be defined as the steps taken to avert a loss of service or disaster or reduce the likelihood of a
disaster or loss of service.

Contingency may be defined as the interim processes and procedures adopted during the loss of service.

Recovery may be defined as the business and technical arrangements to restore a lost system or service and
manage the process of reversion to normal processing and full resumption of service

For V&l testing stream Business Continuity is strictly limited to the resilience and recovery of the HNG-X
and the changed Horizon components. For Disaster Recover (DR) we will work with the Business
Continuity manager testing specific areas of concern, as well as the main Business Continuity test plan.
(SVM/SDM/PLA/0003)

Disaster Recovery relates to the elements of the hosting solution which provide hosting of the solution
from a secondary data centre in event of a catastrophic failure at the primary data centre, with very little
or no loss of data (DES/PER/HLD/0001)

Resilience (Testing) relates to elements of the hosting solution which provide tolerance to faults within
the primary data centre; one of the main design goal being that any single failure will not prevent the
application from continuing to work within the primary data centre, Doors ID ARC-492
(DES/PER/HLD/0001)

Recovery (Testing) may be defined as the business and technical arrangements to restore a lost system or
service and manage the process of reversion to normal processing and full resumption of service. (CS/SIP/002)

Estate Monitoring relates to events and alerts that are raised on the estate. If a problem is not detected,
then all the plans are not going to be put into effect. The timelines of detection and the response to any
alarms raised are part of the overall impact to the customer of the service outage (DES/PER/HLD/0001)

1.3. General

This document is the High Level Test Plan (HLTP) that represents the testing that will take place for the
Business Continuity and Integrity testing stage, in accordance with the HNG-X Testing Strategy.

It seeks to fulfil the objectives as set out in both the document, HNG-X Work Package for Non-Functional
Testing (TST/GEN/WPD/0005) and HNG-X Work Package for Disaster Recovery Scenario Testing
(TSTGENWPD0003).

The objectives are stated as HNG-X Work Package for Non-Functional Testing:

Integrity Testing (Resilience and Recovery)

» Devise a set of tests that need to be defined by taking inputs from the analysis of the
potential points of failure, test objectives (based on risk prioritisation) and identifying system,
configuration and infrastructure changes.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 19 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

>» To carry out the tests throughout the project and not just at the end of the testing lifecycle.

> Needs to take Disaster Recovery requirements, plans and testing into consideration.

The Disaster Resilience model for HNG-X is based on one production (IRE11) and one standby (IRE19)
Data Centre. Resilience within the Data Centre is achieved by duplication of servers, either load-
balanced through CSM'’s or in active/standby configurations. Services that are load-balanced are
deployed on N+1 server, temporary loss of one server does not affect business capacity. Services that
are deployed in an active/standby pair support either the whole estate or a defined partition of the estate
within the single active instance; these services are designed to support rapid fail-over.

Standardised platforms and Blade Frame technology for virtualisation will allow for rapid replacement of
a failed server processing unit - another Blade picks up the task and restarts the server. The overall
solution design minimises disruption to Post Office trading.

This is further expanded in the HNG-X Testing Strategy (TST/GEN/STG/0001).

The objectives are stated as HNG-X Work Package for Disaster Recovery Scenario Testing:

» Evaluate and discuss with the Infrastructure Team how the DR system will be constructed. It
is the role of the Infrastructure Team to plan and build both the Data Centre Environments
but as one of the main users of the Disaster Rigs we need to define the requirements the test
teams will have on this environment.

>» To liaise with CS to define a process on how to backup the Test Rigs on a daily basis. The
present process for the Horizon project is that the SPTS routinely backup the Test Rigs on a
daily basis. As the Test Rig will be reconfigured into running the live system within 3 hours in
the event of a disaster, backing up the test environment will be very important as will to
restoring it back to the test role when the problems have been resolved.

» To plan how to test the DR scenario along with all the other teams that need to be involved.
In the event of a disaster to restore the environment will need involvement from more than
one party. Therefore we need to plan with other teams how the DR plan will be put into
action and how we test that plan. There maybe key areas that Test can check independently
of the main plan to try and resolves issues before a ‘Big Bang’ approach with other teams

» To plan how DR testing will be executed producing HLTP’s. Some areas to consider are:-
o Testing of specific components and procedures that are part of the DR Scenarios
o Testing of DR scenarios within the Fujitsu domain
o Testing of the DR scenarios with connections to third parties

>» To plan how to restore the DR environment to its testing role once the live site has been
restored, in particular defining the requirements on this operation, e.g. time frame (unless
this is already defined in the contract). Procedures and guidelines will need to be drawn up
on how to action this. This will require the test unit to make sure all processes and
procedures are in place and function according to the requirements.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 20 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

1.4 Resilience and Recovery Testing

Most of the Resilience and recovery testing will not be part of a separate testing stream, but performed
as part of the testing of the individual component. For those components where no evidence of
Resilience and recovery testing can be found then tests will be need to be devised and run resulting from
the raised defect. Adopting this approach it can be seen that an extensive test/document inspection
phase is required relying on Quality Center being up to date.

There is a risk that using this approach will result in there not being adequate time to both test
components and resolve any issues if it is discovered that Resilience testing has been missed, then this
would either a) delay the program or b) mean going live with areas of untested resilience which could
cause business loss subsequently.

It is essential that Quality Center be up to date. If it is not up to date then it will not be possible to
determine what tests have been performed. There should be very few tests that do not result in Quality
Center being up to date within a few minutes of the test completing. Volume testing would be one
example where for instance significant analysis may be required to ensure that the test has been passed.

ARC/SYM/ARG/0001 and ARC/SYM/ARC/0003 describe the overall approach to Estate Management,
and specifically to monitoring the estate. If a problem is not detected, then plans will not be put into
effect. The timelines of detection and the response to any alarms raised are part of the overall
impact to the customer of the service outage, although specific service level agreements may break
the response down into smaller units that are more easily measured.

1.4.1. Data Backup and recovery
Backup and Recovery Design is covered in DES/SYM/HLD/0015 and DES/INF/LLD/0016.
Always remembering that it is critical to test Recovery.

Data backup and recovery strategy is detailed in the POA HNG-X Backup and Recovery High Level
Design paper (DES/SYM/HLD/0015)

Various other solutions are identified within DES/SYM/HLD/0015 to cover migrated Horizon systems and
the Hydra state of Horizon/HNG-X co-existence

In order to allow continued validation of fixes or extensions to functionality the Test System must be able
to perform all backups and restores by all methods under control of the scheduling system and monitored
by an analogue of the SYSMAN system.

Recovery testing is two phase. For systems that recover from a local dump (RMAN and SQL-Server) it is
possible to test this recovery independent of the backup infrastructure. Similarly the method of BCV
image or image set recovery is effectively being tested every time a test rig is being reset.

Many applications such as DRS have not changed since Horizon, and share a recovery mechanism. It is
considered adequate to show a sample recovery to prove the generic processes still hold.

In general testing should separate testing of the backup infrastructure and generic processes, which is
what is provided by this design, from specific application recovery which is covered by the design for that
application, and which may include schedule recovery following the corruption.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 21 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

1.5 DR Testing

The HNG-X System Qualities Architecture (ARC/PER/ARC/0001) defines the following
scenarios in which DR would be used:

e Critical failure to a documented system SPOF (primary storage, blade frame cabinet)

e Failure of all components critical to providing service where no immediate replacement can be
provided- this could either be for the entire service (switches, servers (e.g. active &standby)), or
where it would not then be possible to provide full service (e.g. at a level of N-3 for an N+1
configuration)

e Long term power failure to entire data centre
e Disaster affecting part or the entire data centre (accident, fire, and flood).
The HNG-X Resilience and Disaster Recovery HLD (DES/PER/HLD/0001) section 2 states:

In the event of a catastrophic failure, that is, a failure which renders the primary data centre unable to
host the solution in a commercially viable manner, the hosting of the entire solution will move to the
secondary site (a “site failover’).

To support this, all servers, network switches, routers, firewalls, storage and supporting infrastructure at
the primary site will be duplicated at the secondary site, and will operate in manner where they are
permanently ready to fail over. This places limitations on the use of such components for testing, and it
may be necessary to deploy dedicated test equipment at the secondary site where use of DR equipment
is prohibited by such requirements.

Following a site failover it is assumed that any issue or failure at the primary site will be resolved, and
that the hosting of the solution will move back to the primary site (a “site failback”). A failback is
disruptive to the branch service, and failback will always be a planned event that aims to minimise the
service outage of failback. Such service outages do not normally count towards SLA targets. With the
increasing likelihood of 24 x 7 counter operations it may be much more difficult than in Horizon to agree
the timing for failback.

There are currently planned to be 4 (four) DR slots named F1, F2, F3 and F4. These slots will be used to
incrementally test the DR capability and resolve any issues. The end result needs to be confidence that
the planned full DR trial scheduled for Q4 2008 will succeed.

The planned content of the slots are as follows:

FA Network Failover

F2 Network Failover and Issues Resolved, Rig Integrity
F3 Failover, Rig Integrity and Issue Resolved, Failback
F4 Failover, Rig Integrity, Failback and Issues Resolved

The low level details of these slots will be determined after discussions with Tony Wicks, POA CS
Business Continuity Manager, IS Operations in IRE11 and other interested parties. For Horizon the
Business Continuity Test Plan has a series of subtests. The intention is that we use the equivalent tests
as developed as part of the HNG-X Business Continuity Test Plan SVM/SDM/PLA/0003 rather than
develop a separate set of tests.

For this activity the process, procedures and scripts for DR should be in place supplied by IS Operations
in IRE11. However, previous experience has shown that there will be considerable effort needed to both
correct and in some case write these. Where possible assistance will be given but ownership of this is
with IS Operations in IRE11.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 22 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2 Scope

This document is concerned solely with Business Continuity (Disaster Recovery) and Integrity (Resilience
& Recovery) testing related aspects of the solution and does not cover other non-functional
requirements. Specifically Performance (Volume) testing, will be a separate discrete testing stage and
subject to its own HLTP (TST/SOT/HTP/0003). However, it is likely that there will be some cross-over
between testing stages as the work is to be carried out on the V&I test rig. This will need to be co-
ordinated during test execution planning. For example, it may be necessary for some Business
Continuity tests to be performed under full load and therefore appropriate for these to be conducted
during the Performance Testing stage.

There is an issue regarding the scoping of the activity. Originally it was considered that the scope of the
testing was:

1 Check all of the components for resilience and an absence of single point failure
2 Test and document the new active/standby DR configuration

However, for the DR it is clear that there is an existing agreed Business Continuity activity that includes
documented procedures for Horizon. This is already being updated for HNG-X and it is difficult to see
how this can be improved on. The Business Continuity activity is managed by the POA CS Business
Continuity Manager and the intention is to liaise with the POA CS Business Continuity Manager. This
document contains the tests as highlighted in TST/GEN/HTP/0002 and in HNG-X Systems Qualities
Architecture (ARC/PER/ARC/0001). These will need amending in the light of the discussions with the
POA CS Business Continuity Manager.

The other area is the resilience/integrity of the components — the intention is that this will be made up of
the components in the branches and all components in the Data Centre. This is again a problem area as
the resilience of the branch components and some of the Data Centre should be tested as part of Unit
and System (SV&l) testing. Therefore, the activity will be in two parts:

a. Investigate the testing of the components and see whether or not resilience is or has been tested

b. For those components not tested then scripts will be developed and the components tested
The components are broken down as per the architecture documents:

i. Counter Architecture ARC/APP/ARC/0003

ii. Branch Access Layer ARC/APP/ARC/0004

iii. Online Services ARC/APP/ARC/0005

iv. Batch Applications ARC/APP/ARC/0007

v. Branch Database ARC/APP/ARC/0008

vi. Counter Business Applications ARC/APP/ARC/0009

vii. Technical Network ARC/APP/NET/0001

viii. Platforms and Storage Architecture ARC/PPS/ARC/0001

The testing of these areas will be based on the Recovery and Resilience design of these components as
stated in the Architecture and Design documents associated with each area.

Some sections will appear to duplicate material that has been presented earlier. This is intentional, and is
designed to make the description of each component easy to read, there will also be a natural overlap.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 23 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1 Features to Be Tested
Ensuring that data centre components are resilient to a single component failure, Door ID ARC-492

Resilience and Recovery features of HNG-X will be tested or proved. This could be by an actual test or
possibly by another appropriate approved method of acceptance (further details of acceptance methods
in section 5.1). If the test is by another test stream then it will be made clear where the details of the
testing can be found within Quality Center.

Given the move to the 2 Data Centre model some features of Horizon will need to be tested. Only those
features that have changed will be tested. For instance if virtualisation is chosen then the resilience of
the virtualised system will be tested. However, if it is, say, just a server move, rather than an upgrade,
then the Resilience will not be tested. Until the design of the migrated system is clearer it is not possible
to give details of the testing required but it is likely to be substantial.

Testing of the process of transferring connections between the respective HNG-X and the EDG data
centres will need to be covered in HNG-X testing. DR testing will need to include testing of links from the
HNG-X DR environment to the Live EDG with two-way data transfer, as well as all remaining non-EDG
data transfers

2.1.1 Counter

The following text is taken from the Recovery and Resilience section of HNG-X Counter Architecture
(ARC/APP/ARC/0003). The tests are outlined in Appendix B.1 and text in green is used to clarify what
may be taken as ambiguous statements.

Counter failures tend to have a more limited impact of service availability than failures in the central
Data Centres. Nonetheless, it is important to consider counter failure scenarios, and make adequate
provision for remedying or working-around them. This section considers a number of possible failure
conditions affecting counters, high level test cases are then created ready for migration into Quality
Center.

For more information, readers are referred to HNG-X System Qualities Architecture
(ARC/PER/ARC/0001).

2.1.1.1. Counter Hardware Failure

If permanent or intermittent failures occur in counter input or output devices such as printers, monitors,
keyboards and scanners, they will be noticed quickly by Post Office staff attempting to use them, who will
be trained to log helpdesk calls. Engineers will attend the branch to repair or replace the.

This should be no change from Horizon in that the process users use to report hardware problems will
continue to be used.

Intermittent failures affecting internal subcomponents such as hard disk drives may not be visible to
users, but should result in events being written to the Windows event logs, where they can be picked up
by SYSMAN and subjected to event correlation, to see if a pattern of failure is developing. It will
therefore be necessary to ensure that events at the counter can propagate up through SYSMAN3 and be
detected.

HNG-X Counters connect independently to the Data Centre, so the failure of a single counter usually only
affects one user and only until a repair or replacement can be affected.

This should be no change from Horizon in that the process users use to report hardware problems will
continue to be used

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 24 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.1.2 Counter Software Failure

If any software component experiences a pattern of software failure in testing, then root cause analysis
will be undertaken and a fix applied. This should be no change from Horizon in that the process users
already use to report software problems will continue to be used.

Unfortunately, large-scale systems integration projects occasionally uncover patterns of software failure
in Commercial Off-The-Shelf products, which cannot be reproduced or fixed by their vendors. If such
problems are found, then alternative software will be considered, or additional SYSMAN or ClearDesk
tasks will be incorporated to reduce their impact.

Fatal software failures experienced in the field will be recognised by SYSMAN’s monitoring agents, and
events will be created, which will trigger alerts to operators who can intervene to diagnose the problem.

Non-fatal software failures experienced in the field are also likely to be reported in Windows event logs
or in proprietary log files. Whilst these may not immediately have any effect on the service, they present
a risk of more significant associated problems occurring later on. To reduce this risk, a wider set of
event types will be configured to alert operators during pilot deployments of the HNG-X application on
both the NT and XP operating systems, so that non-fatal errors can be analysed during these periods,
and a decision can be made about whether to alert on these non-fatal events during full live operations
too.

2.1.1.3. Counter Data Failure

No transaction data is held locally on the Counter’s hard disk drive, so there is no requirement for a data
recovery process from failed Counter PCs.

All data stored locally on counters is used by at least one software component, so if software
components discover data integrity or corruption problems in their data they will write error or warning
events to their logs, which will then be forwarded to operators as for “Software Failure” (see earlier).

2.1.1.4 Failure of other Counters

In multi-counter branches there are some circumstances where the failure of one counter could cause an
outage to the auxiliary functions on other counters at the same branch:

« Where the failed counter was acting as a local software distribution staging post.
« Where the failed counter was running CNIM2 in active mode to monitor the branch router.
« Where the failed counter was sharing a report printer.

The Counter High Level Design consider how best to minimise the effect of the failure of one counter on
other counters at the same branch.

2.1.1.5 Network Failure

All HNG-X branches will have their own locally-installed Branch Router, which will detect WAN
connection failures, and switch to an alternative connection type without the need for users to restart
their application sessions. Depending on their duration, WAN failures are classed as “transient”, “longer”
or “permanent”, and the impact of each type of failure on the user depends on the type of transaction

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 25 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

they are trying to undertake. For more details readers should refer to HNG-X Branch Exception Handling
Strategy- Agreed Assumptions and Constraints.

A network failure on the LAN is much less likely because of the relative simplicity of the network
infrastructure, but could occur in a single counter, in the Branch Router, or in the Ethernet hub or cabling.
If the LAN fails, all business transactions for all affected users will be prevented, so users will report the
problem to the helpdesk who will deploy an engineer to repair or replace the faulty hardware. For the
branch there should be no change from Horizon. The current process for reporting hardware problems
will continue to be used.

2.1.1.6 Branch Router
DES/NET/HLD/0010 Branch Router HLD

The branch router is an ‘of the shelf router. Its primary purpose is to connect counters to the FSBN
network.

It has no high-availability features built-in. If the router were to fail, an engineer will visit the site and
install a new one.

There are multiple ways for the router to connect to the FSBN: ADSL, IDSN, PSTN, GPRS (3G). If the
primary connection method were to fail, then the router will automatically connect via an alternative
method.

2.1.1.6.1 ADSL
The router connects to one of six LNSs
The LNS peer with the FSBN and the C&W MPLS network

2.1.1.6.2 ISDN/PSTN
ISDN/PSTN connections dial in to C&W routers at diverse sites round the country.

2.1.1.6.3 GPRS/3G

Two GGSNs (Gateway GPRS support node) in different locations each connected to different FSBN
POPs

2.1.1.7 Server Failure

Counters connect via the Branch Router to a number of sever platforms. All such platforms are
deployed in redundant configurations, such that a single server failure has no significant impact on
counter operations. This will be covered later as part of server failure.

2.1.1.8 Data Centre Failure
If the live Data Centre fails, Counter connections to Data Centre-resident servers will be broken.

No reconfiguration of the counter will be required in order for reconnect to the secondary Data Centre,
though users will need to restart their sessions and re-authenticate.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 26 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.2. Counter Business Applications
The following is from HNG-X Architecture - Counter Business Applications (ARC/APP/ARC/0009).
Each counter operates independently of other counters in the same branch.

The counter business application relies on a resilient network connection provided by the branch router.
A counter cannot continue to trade if there is no network connection to the data centre. The resilience of
the network connection is covered within other architecture documents.

2.1.2.1. Counter Business Applications Software
The counter business applications need to be robust and reliable.

All component design and implementation must consider the error conditions that can arise and the way
that the business application can handle the error. The scale of the system is such that errors that are
“only 1 in a million” will occur several times per week.

The software must be resilient to hardware errors in attached peripherals.

Any exceptions in lower level components need to be trapped and handled within the calling software.
Errors need to be logged so that support staff can analyse the problems encountered, however error
reporting must consider the potential load on support systems if all counters report errors at the same
rate. Some filtering logic will be applied to avoid excessive error logging.

The overall development guideline is that the business application does not break and if it does it does it
gracefully! This should be covered by functional testing and will be checked by an inspection of Quality
Center rather having separate tests.

2.1.2.2 Branch Peripheral failures

The business application provides alternative means of data entry for input of data where the counter
peripheral has failed: Bar code reader, magnetic card reader, scales.

Note that for some transaction types, the availability of an alternative means of data entry (e.g. fallback
to PKE) is controlled by reference data.

The counter business application provides a print preview mechanism to display the intended print layout
on screen. The Clerk must manually transcribe the data to produce a manual receipt / report.

There is no fallback mechanism for the counter printer when printing vouchers (such as Postal orders).

There is only one back office printer per site. It is connected to a single (fixed) PC, except in larger
offices where it will be network connected. The business application provides a print preview facility to
enable user to complete essential business processes in the event that the back office printer is not
available.

In the case of touch screen and keyboard failures, the general design target is that everything that can be
done via the touch screen can also be performed via the keyboard and vice versa. There are however,
occasional exceptions to this rule, for example not all characters can be input via the keyboard.

In the case of the Rates board, the fallback mechanism is to print a copy of the current rates via the back
office printer.

For PIN pad failures, there is a potential to fallback to swiped transactions from chip and PIN. However,
this only applies to card payment (and then only as long as permitted by EMV). Failure of the PIN pad,
effectively removes the capability to perform Banking transactions at the counter. If no other counter is
available with a working PIN pad (e.g. Single Counter Office) then Banking transactions will not be
available at that branch.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 27 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

This should be covered by functional testing and will be checked by an inspection of Quality Center
rather having separate tests

Other cases of peripheral failure are effectively the same as failure of the counter base unit, e.g. VDU.
For the branch there should be no change from Horizon. The current process for reporting hardware
problems will continue to be used.

2.1.2.3. Branch Exception Handling

This section relates to exceptions that can occur within the branch due to failures in hardware or other
software components outside the business applications layer.

The main scenarios described are around the failure to communicate successfully between the counter
and the data centre systems — in particular, failure to write transaction data to the Branch Database.

The connections to the Branch Access Layer do not use sticky sessions. There is significant resilience
within that layer and there is a high expectation that a retry of a message will succeed. This should be
covered by functional testing and will be checked by an inspection of Quality Center rather having
separate tests

The HNG-X Branch Exception Handling Strategy- Agreed Assumptions and Constraints

(REQ/CUS/STG/0002) provides additional detail. The business process surrounding such exceptions is
summarised below

2.1.2.4 Online transactions
The counter will connect to the data centre for online transactions during customer sessions.

Where the transaction is recoverable, a recovery record will be written to the branch database prior to the
connection to the authorisation service. Not all online transactions are recoverable — e.g. DVLA (which is
a read only interface and conveys no state), is not a recoverable transaction.

There are further forms of online transactions which simply lodge a recovery record and / or an audit
event, but require no further processing within the Data Centre: for example, prior to label printing within
Postal Services transactions.

The counter will manage the connections to the data centre, timing out the communications based on
configured timeout values, and following business processes agreed for the individual transactions.

2.1.2.5 Settlement
A counter needs to be able to connect to the Data Centre systems at the end of each customer session.

Recovery records will be updated at settlement time to indicate that they are now complete and do not
require further recovery.

The counter will manage the connections to the data centre, timing out the communications based on
configured timeout values.

In the case of settlement transactions, the counter will automatically retry to write the transaction data
automatically a configurable number of times. It will also prompt the Clerk to decide if further retries are
needed. Failure to write the transaction data will result in a forced log out.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 28 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.2.6 Reporting and Other Data Access

Several counter business applications use the Branch Database to store persistent business data in
addition to the Transaction data written in the Settlement transaction. Examples are administration
functions such as User, Stock units, pouch details and bar codes allocated to pouches, and Track &
Trace. The reporting applications retrieve the reports data from the branch database, and also write “cut
off’ markers to delineate parts of the reporting data that have already been processed.

The business application will query the Branch Database via the Branch Access Layer for data. Where
data is to be written back to the branch database, the applications will do this in a similar way to
Settlement transactions. The business application will use recovery records as appropriate where the
resilience characteristics dictate that the results of a specific counter operation must not be lost.

2.1.2.7. Recovery and Recovery records

The format of the data written in the recovery records is transaction specific, but there will be some
required fields such as User Session identifier, Branch / terminal identifier and Transaction Identifier.

The application must construct the recovery records according to the business rules, for example
Banking and DCS recovery records need to be PCI compliant.

Recovery records will be updated at settlement time to indicate that they are now complete and do not
require further recovery.

e It is anticipated that there will be some form of local session level checking to ensure that all
recoverable transactions started within the customer session have been completed — and the
recovery process started if there is any not completed. [This will check against errors at
application level].

The recovery process will be performed on the original counter after a failed session.

The Recovery process will be driven by the counter application. The business application will obtain from
the Data Centre the list of recovery records outstanding, together with the associated recovery record
details.

For some online services (Banking, Credit / debit cards and E-top Ups), the counter will enquire from the
authorisation agent the outcome of the original authorisation request.

2.1.2.8 Log on after failed sessions
The recovery process will be performed after the first logon at the original counter that failed.

The system will detect a user logging on after a failed session, either any user on the original terminal or
the original user on a different terminal — however, the current assumption is that recovery will be
outstanding until a user logs on to the original terminal.

« Amore general recovery process could be examined again during the design stage.
Consideration would need to given to constraints in the Branch Database, the ability to detect
race conditions to prevent parallel recovery sessions, and the impact on the audit trail.

The Branch Exception Handling Assumptions and Constraints CCD provide additional detail —
particularly on the new concept of a “Recovery Receipt”.

2.1.2.9 Log on when no network connection

The system should detect when there is no network connection and make the user aware prior to
presenting the log on screen. The precise form of the user dialogue will be agreed during the design
stage.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 29 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.2.10 Audit records

One of the major audit requirements is that there are no gaps in the audit trail. The solution adopted is
that when the write of the audit record has not been confirmed, the application will re-attempt to write an
audit records a number of time (under user control). The record contents must not change between each
attempt to write the data.

However, if the user confirms that the attempt must be abandoned, then the user session will be
terminated by a forced log off. This behaviour must be considered within the design of individual
business transactions, and appropriate use of recovery records used if the application could reasonably
carry on in certain failure scenarios, or where the counter application needs to record specific state
changes that must not be lost.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 30 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.3 Branch Access Layer
The following is from HNG-X Architecture —- Branch Access Layer (ARC/APP/ARC/0004)

For resilience purposes, the system will need to be able to run services in relative isolation from each
other. The degradation or even loss of one service should not adversely impact any other services.

Resilience is addressed in the general architecture by virtue of the split into online service routing and
the local data access services architectures. The online service routing architecture more closely
addresses resilience.

Recovery does not need to be addressed in much detail, as the architecture is stateless, and any state
stored is held in a database. Any recovery after failures such as corrupted files etc is best addressed
through a full redeployment of the HNG-X applications. This should be covered by functional testing and
will be checked by an inspection of Quality Center rather having separate tests

The physical resilience architecture is based on an n+7 server's architecture. This means that a the loss
of a single server is not disastrous; however it does mean that the maximum concurrency of the system
will be impacted in proportion to the loss of hardware to total hardware. For instance, if we have 10
servers, and one fails, it will mean a loss of 10% of the capacity in terms of maximum concurrency and
load. A test is required to ensure that the loss of one server does not degrade the service to the extent
that it fails the SLAs.

2.1.3.1 Start-up
On start-up, the BAL will need to automatically be able to start individual Services automatically.

2.1.3.2 Branch database connection fail-over

The branch database connectivity, as detailed in section 2.4.7 of ARC/APP/ARC/0004 , will need to have
intelligent routing, testing and fail-over capabilities for the BRDB connectivity. This means that the
database connectivity will need to do the following things:

* Test the connection.
e If aconnection fails to connect to a BRDB node altogether, change BRDB node.

e Handle total failure in a managed fashion.

2.1.3.3 Online Service Routing fail-over

The Online Service Routing architecture will need to be able to handle failure of backend systems in a
managed way. This means that it will need the following characteristics:

e Handle time-outs.
¢ Handle retries.
¢ Handle alternative network routes.

e Handle complete failure.

2.1.3.4 Other considerations

As the servers are stateless, the fail-over and disaster recovery characteristics of the Blade Frames will
be sufficient. These considerations are outside of the scope of the BAL.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 31 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.3.5 Branch Access — Hydra
The following is drawn from HNG-X Resilience and Disaster Recovery HLD (DES/PER/HLD/0001).

2.1.3.5.1 Correspondence Server

Correspondence Servers host the Riposte Message Store distributed database, of which each counter is
also a member.

The total message store has been manually split into four clusters, each of which contain approximately
one quarter of the branch estate (both in terms of size and performance).

Each message store is supported by four servers, known as neighbours, two at each site. In Horizon one
server at each site uses EMC storage to allow BCV backups, and the other is on Compaq RAID array in
case of EMC failure. In HNG-x one server will use DMX-A and the other will use DMX-B.

This is analogous to Branch Database resilience, except that Riposte has all four members active,
whereas Branch Database is active/standby at the primary site with a failover delay to the secondary
site. This reflects the higher Horizon availability requirement for PAS/CMS which is now defunct.

Active/active. No failover.

If a rebuild is required there is a procedure for recovering the message store either from a backup or by
replication from a surviving neighbour.

2.1.3.5.2 Generic Agent

The agents run services (confusingly also known as agents) which allow messages to be passed between
Riposte and the back-end databases. There are three different classes, online, bulk load, and bulk
harvest.

There are also streams running in the daytime maestro batch schedule, such as pouch delivery, which
use the bulk load agents to turn LFS into a sort of online system with high latency, so it is not simple at
Horizon to look at a stream and say whether it is batch or on-line.

EACRR is used to track the agents in the pool, and make sure that one (and only one) of each type is
running. In practice most back end systems are able to cope with multiple agents, as the agent recovery
is typically a reharvest which generates duplicate input anyway.

Stateless. No complex failover just restart.

Recovery by reprovisioning.

2.1.3.5.3 KMS

Key Management Service. A SQL-Server database running on Windows NT4 in a special security
domain. The database and any required file store are on the Key Management Server S: drive which is
on EMC SRDF replicated storage. BCVs are not used, SQL-Server does a dump to disk and areas of the
S: drive are backed up.

One of the most important uses for these keys is to encrypt the counter message store. The complexity
of doing this and the need to recover transactions from "dead" counters that may not have replicated to
the correspondence servers has been one of the big drivers for HNG-x.

The KMS has a hardware random number generator, which mandates that it be outside the BladeFrame
unless a software equivalent is approved (the company that makes the hardware RNG has stopped
because it believes the software one is better, but the approval process is complex).

Resilience: fail over to secondary.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 32 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.3.1.4 VPN

The VPN servers are really part of the network infrastructure, but rather than being hosted on appliances
they are physically separate NT4 servers that run active/active.

Active/active. No failover.

Recovery by reprovisioning.

2.1.3.1.5 RADIUS servers
This controls login to the VPN service by the counters.

There are several types of RADIUS server for the various types of connection e.g. ADSL, ISDN.
FRIACO, Branch Router, and there is peer resilience amongst each type of server, but at Horizon not
N+1 resilience following loss of a site.

The performance balance is weighted to ISDN at the moment, but this is expected to have moved
considerably towards Branch Router by the time of data centre migration.

2.1.4 Online Services
The following is from HNG-X Architecture —- Online Services (ARC/APP/ARC/0005)

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 33 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

The term “online services” is misleading — all Counter access to the HNG-X Data Centre will now involve
an online service of some form. Online service in this instance means required during a Counter
transaction and not provided directly by the Branch Access Layer.

Online services are invoked from the Counter via the Branch Access Layer, which may contribute to the
functionality of the service e.g. by writing recovery data to the Branch Database.

2.1.4.1. Session recovery Overview

HNG-X must cope with [perceived] failure to deliver a session's settlement data to the Data Centre and
subsequent cancellation of the session. Session recovery has to take account of the difference in
behaviour of transactions with and without an on-line component, so a summary is included here. See
REQ/CUS/STG/0002 for further details.

Transactions written to the session basket are either cancellable or recoverable. Some transactions are
cancellable up to a point before becoming recoverable. One class of recoverable transaction is where
communication with a third-party is used for authorisation, causing a change of state and implicit transfer
of funds between accounts based on that transaction. Another class is where the transaction creates an
item of value (e.g. prints a parcel label) and/or acquires a resource (e.g. allocates a bar code that is not
reusable). To allow recovery following a cancelled session, a recovery record must have been written to
the Branch Database for each recoverable transaction in that session.

Where network problems prevent a Clerk from completing a session, he or she can cancel the session.
Depending on the point in the session at which the cancellation occurs, settlement data for the session
may have already been committed. The Clerk follows a defined process for cancelling cancellable
transactions and settling recoverable transactions, printing a Recovery Receipt and any Customer
Receipts required (which may include void receipts for cancelled transactions). The Clerk is forcibly
logged off at the end of this process.

The Data Centre tracks logon and logoff for each counter. During logon at a Counter, the Data Centre
can detect if that Counter was previously logged on but that a normal logoff did not occur. In that
situation the Data Centre can invoke the recovery process at the Data Centre and Counter. The
recovery process attempts to bring the Data Centre/External Client view of the session state in line with
the Counter’s view. For example, if the settlement data had been committed, that data might contain
transactions that the Counter regards as cancelled, and the system would then need to reverse out those
transactions.

Any recovery records for an interrupted session can be retrieved by the Counter. A recovery record may
simply identify the transaction, requiring a further request to the Data Centre to retrieve the transaction
status, or it may contain all the transaction details necessary for recovery, such as the transaction
amount. No sensitive data is stored in a recovery record.

Recovery records are written to the Branch Database by the Branch Access Layer. Writing of the record
is triggered by the presence of an item in the XML of the service request with a well-known tag. The
recovery item contains at least a Transaction Recovery identifier but will also include any data that the
application needs for recovery. Recovery records are marked as completed when the transactions to
which they refer are committed to the Branch Database.

This should be covered by functional testing and will be checked by an inspection of Quality Center
rather having separate tests

2.1.4.2 Identifying transactions

Each Branch is assigned a unique numeric identifier, and each Counter within the branch is identified by
a unique numeric logical position - if a Counter is physically replaced its logical position does not
change. These two numbers are sufficient to identify the source of any message sent to the Data

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 34 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Centre. A globally unique identifier to be used in a message can be generated by combining the branch
and counter identifiers with a unique value from a Counter specific sequence.

The Branch Database holds a sequence number, known as the Uniqueness Sequence Number, or USN,
for each Counter in the estate. The USN to use at a Counter is supplied at logon, and the Counter tells
the Data Centre what the [updated] USN is as part of settlement.

When a recovery record is written, it contains at least the Branch and Counter identifiers and the current
USN, and the USN is incremented. These three fields together make up a unique Transaction Recovery
Identifier.

If a session is terminated abnormally, the Data Centre will not have the latest USN used by the Counter,
but at the next logon it can determine the highest USN that has been used in a Transaction Recovery
Identifier, and can therefore provide the Counter with the next USN for it to use. Note that the Counter
may have allocated a higher USN than this during the abandoned session, for some purpose other than
recovery, but only USN’s that have actually been written to the database need to be unique at the start of
the next session.

The Authorisation Agents require a correlation identifier to tie together the Request, Authorisation and
Confirmation messages that make up an online transaction. The Transaction Recovery Identifier could
have been used for this purpose but the Transaction Processing System expects the correlation identifier
to be expressed as a string with a particular syntax, thus:

pp-bbbbbb-cc-nnnnnnnnnn-uu

This form of identifier is known as an HTxnNum. The format is common between Horizon and HNG-X,
but the derivation of the fields is different between the two systems:

Pp is a fixed prefix; 00 for HNG-X, 44 for Horizon

bbbbbb is the Branch Identifier

Cc is the Counter Identifier

Annnnnannnn is the USN in HNG-X, and a Riposte Message Number in Horizon

Uu is a fixed suffix for HNG-X, with the value 1; for Horizon, it is a value in

the range 1-99 that must be combined with the Message Number to give
a unique value.

Leading zeroes in the variable fields are suppressed, giving identifiers such as 00-49934-2-787239-1.

This should be covered by functional testing and will be checked by an inspection of Quality Center
rather having separate tests

2.1.4.3 Retrieving RAC Transaction Statuses

When performing recovery for a transaction in the DCS, ETS or NBS domain the Counter may need to
retrieve the status of the transaction from the NPS to answer such questions as “did the [R1] reach the
external client?”, “was the transaction authorised?”, and so on. The data stored in a recovery record for
one of these domains must provide sufficient information about the transaction to allow the status

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 35 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

request to be generated. In particular, the recovery data must include the Routing Gateway and Agent
Hash values that identify the Authorisation Agent to which the [R1] was sent. Because of the need to
partition the NPS for efficient access, the Agents may require additional transaction identification over
and above the Transaction Recovery Identifier. Such additional data will be identified in the High Level
Designs for the Authorisation Agents.

This should be covered by functional testing and will be checked by an inspection of Quality Center
rather having separate tests

2.1.4.4 Failure of an Authorisation Agent

A logical Authorisation Agent is implemented as an active/standby pair of agents running on separate
platforms within the active Data Centre. Both agents in the active Data Centre start in standby.
Heartbeats exchanged through the NPS are used to decide which agent becomes active and when and if
the standby agent should take over.

When an Agent instance fails all outstanding transactions being processed by that instance are
abandoned and the agent terminates. No attempt is made by the replacement instance to recover work
(e.g. from the NPS). Failure is detected at the Counter by timeout. Where the Counter generates a
transaction reversal following a timeout the transaction status held in the NPS determines whether an
explicit reversal needs to be sent to the external client.

The Authorisation Agents depend on other system components to monitor their state and restart Agents
that fail. As for normal service start, heartbeats exchanged through the NPS are used to decide which
instance within the logical agent becomes active.

The Authorisation Agent for LINK acts as a server for the external service and is accessed via a CSM.
Only the active Authorisation Agent for LINK advertises itself to the CSM as available. On fail-over,
LINK reconnects and the CSM routes connections to the newly active instance. The other Authorisation
Agents act as clients of their external services. On fail-over the newly active agent establishes new
connections to the client.

An active agent, will not failover on loss of its connections with the external client. The resilience built in
to the network is such that the standby agent is unlikely to fare better, particularly as both active and
standby agents are in the same Data Centre.

Change of state from active to standby and vice-versa is notified to all BAL components connected to
the agent.

2.1.4.5 Network Configuration Errors

The protocol between the Authorisation Agents and the BAL, described in DES/APP/HLD/0006, allows
each component to check that it is connected as expected. The messages that flow through the
Authorisation Services identify their expected target, allowing rejection of misrouted messages.

2.1.4.6 NPS failure

The NPS is implemented as two Oracle instances, with the Agents maintaining permanent connections to
both instances’. If the Agent's preferred instance fails the Agent continues operating using the other
instance, while trying to re-establish the failed database connection. Failure of both instances leads to
termination of the Agent. Other system components should detect this and perform a controlled restart.

' More correctly, the critical threads maintain connections to both instances, while less critical threads switch between Oracle instances
as necessary.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 36 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Where an Agent has failed over to its non-preferred NPS instance it will, if possible, switch back to using
its preferred instance overnight.

2.1.4.7 Guaranteed Reversals
The business rules for an Authorisation Agent may require guaranteed delivery of reversals.

If an agent sends an explicit reversal to its client and fails to get an acknowledgement it will repeat the
request up to a configured retry limit.

To ensure that reversals sent from the Counter are not lost, two routes are used for their delivery. A
Counter requests a reversal explicitly through the BAL, and it includes the reversal in the session's
settlement data. When the session is settled the reversal is committed to the Branch Database. A near
real-time process transfers reversals from the Branch Database to the NPS from where they are polled
by the agent. The transaction status in the NPS is used to discard duplicate reversals.

Note that no recovery record is written for the reversal request. A recovery record will have been written
for the original authorisation and will remain in the Branch Database until the settlement data is
committed. If the session is cancelled the recovery record for the original authorisation request is
sufficient to allow the recovery process to determine the transaction status and generate any
necessary reversal. The number of cases where a Counter can get through to the BAL with a reversal
request but the request fails to reach the Authorisation Agent does not warrant an additional recovery
record update.

This should be covered by functional testing and will be checked by an inspection of Quality Center
rather having separate tests

2.1.4.8 I Web Service Failure

The internal and training Web Service applications run within Interstage Application Servers. Interstage
monitors the processes and restarts them in the event of failure. For resilience there are N+1 instances
of each Web Service, running on separate platforms, where N instances are capable of handling the load
from the whole estate. This architecture assumes that N=1; performance measurements are required to
confirm the number of instances actually required. The CSM between the BAL and these Web Services
monitors their availability and routes traffic accordingly.

In addition to the Interstage monitoring, health checks allow Systems Management components to
monitor service availability and hence trigger remedial action such as restarting the service.

This functional part of this failure should be covered by functional testing and will be checked by an
inspection of Quality Center rather having separate tests.

A separate test will be required to ensure that the performance can still be met with the failure of a single
instance.

2.1.4.9 Disaster Recovery

The Disaster Resilience model for HNG-X is based on one live and one standby Data Centre. During
normal operation the standby Data Centre is used for testing.

The stand-by Data Centre is a copy of the live one. The systems at the DR site are capable of providing
the same functionality (capacity, performance, resilience and backup) as the primary site. Note that the
use of Blade Frame technology means that there is only one set of logical servers i.e. when failing-over
Blade-based servers to the DR site the same logical server images execute on the DR Blade as were
executed on the live Blade. See ARC/PPS/ARC/0001 for further details of Blade technology.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 37 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Systems crucial to POL operation should have no data loss; storage for these systems will be
synchronously replicated from the active to the DR Data Centre so that any transaction committed will be
persisted on the storage at both Data Centres.

Both live and standby Data Centres contain the necessary Networked Security Processors. The NSPs
are accessed via virtualised addresses to enable local access at each site. (Note that additional
separate NSPs need to be available at the standby site for use in testing).

2.1.5 Batch Applications
The following is from HNG-X Batch Applications Architecture (ARC/APP/ARC/0007)

The Batch Applications are host database applications which run under Solaris in the Horizon system.
These systems provide the delivery links to POL, POL clients, and POL service providers as well as the
deliveries from these back to branch.

These systems provide and receive branch data through the branch database via The Branch Access
Layer. Specialist batch transfer processes running on the database servers transfer the data via
database links to / from these systems.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 38 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Data for all the host database systems will be replicated via a synchronous link to the second Data
Centre. This guarantees that no transactions will be lost. Failover will be manually controlled on servers.
There will be a standby Solaris server at each site that can take over in the event of a failure of the
Solaris host. Failover to the DR failover site is an all or nothing operation. All the requisite software will
be in place at the failover site and in the event of failover, Oracle instances for each of the host servers
will be brought up at the failover site.

Data that does not require such a high level of protection and availability will be hosted on more cost
effective secondary storage. Where required this data will be replicated to the second Data Centre via an
asynchronous link or a scheduled replication mechanism.

Historical and audit data will be placed on dedicated Centera storage arrays and the contents are
replicated to the second Data Centre.

Both Data Centres will contain all the appropriate management systems to allow for the management of
all storage platforms from either Data Centre.

The NPS Host is run on an Oracle RAC server with load balancing between two nodes. Failure of one
node is not necessarily fatal. Applications would only be re-homed outside core hours following recovery
after a failure.

APOP is also run under Oracle RAC, but is only run on one node, hence would be required to failover to
a standby node or wait for recovery of its node on Blade failure.

NPS and APOP are run on Bladeframe servers which have the ability to quickly switch to an alternative
Blade.

Resilience has been built into the schedule of the applications where possible e.g. to cope with possible
late or non arrival of data files (e.g. Link Rec files).

Remote access for POL is to be via two application servers which will be under Windows 2003 running
on Blades giving extra resilience.

For NPS and APOP the DR site does not have separate code images but shares the image on the SAN.
See section 6 of HNG-X Solution Architecture (ARC/SOL/ARC/0001) for further detail.

2.1.6 Branch Database

The following is from HNG-X Branch Database (ARC/APP/ARC/0008)

HNG-X stores branch data in a new centralised Branch Database in the Data Centre.
The Branch Database replaces the Riposte Message Store used by Horizon.

The database uses Oracle version 10gR2 and it uses an Oracle Real Application Cluster (RAC), which
runs the database over multiple nodes (servers).

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 39 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.6.1 Hardware and software failure

Oracle RAC provides a high degree of resilience. If the hardware or software on one node fails, the
surviving nodes carry on running. BAL redistributes the workload of the failed node on to the surviving
nodes. The workload distribution is through re-routing of messages based on metadata stored in the
Branch Database. The workload distribution is even to ensure that the surviving nodes remain well
balanced.

The node configurations chosen ensure that the system can run at its design limits if a single node fails.

2.1.6.2 Data corruption

It is possible, but extremely unlikely, that the data written to disk is corrupted. However, Oracle will
identify this type of data corruption and raise an alert. In most cases, data corruptions can be resolved
without affecting services. In rare cases, the recovery of the entire Oracle database may be necessary.
This can take many hours, as data recovery is from backups and then archive logs have to be re-played.

To avoid this situation, and ensure uninterrupted service to Post Office the system keeps an additional
local copy of the data. The local copy is maintained using Oracle Data Guard. This acts as a standby
database. By using a standby database, restoration of trading is achieved within minutes. For
performance reasons Standby Database and the Branch Database must be in the same Bladeframe
cabinet. The standby database uses the same nodes as live database while recovery of the live database
takes place. This delivers similar performance to live. After the live database has been restored, switch
over to live from standby only happens outside core Post Office hours.

Standby Database and the Branch Database use separate storage arrays within in SAN.

DN: The high-level design should provide a list of recovery scenarios including the steps the DBA needs
to follow to recover from the situation.

2.1.6.3 Disaster recovery

The DR Data Centre has an Oracle RAC configuration that is identical to the live data centre. Both live
and DR Data Centres have identical copies of business data. Synchronous replication between the two
Data Centres helps in maintaining identical copies. No business data is lost if the primary Data Centre
suffers a catastrophic failure.

2.1.6.3.1 Steams
This section is taken from DES/PER/HLD/0001

Oracle Streams is used to propagate data from a source database, often a reporting or data warehouse
type system. This allows large queries to be run in near real-time on the target database without
impacting the performance of the source database.

In HNG-x the Branch Database will use Streams to send data to the Branch Support database. The
consequence for resilience and DR is that a Data Guard failover to the Branch Standby must continue to
replicate via Streams to the Branch Support database.

This is described in detail in the Branch Database Recovery HLD

2.1.6.4 Branch Database Unavailability

The following details are taken from the Host BRDB Capture of Unavailability Low Level Design
DES/APP/LLD/0026.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 40 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

The Branch Database (BRDB) will reside on a four node Oracle Real Application Cluster (RAC).
Database access will generally be via a specified Node/Instance name (such as BRN1, BRN2 etc.),
rather than via a Service (where the particular Node/database instance used for the connection is
transparent to the user).

To balance the load across the nodes, a bespoke mapping process will be used to control which
database Instance each Post Office outlet will use. When an Instance becomes unavailable, a
mechanism is required that will allow subsequent processes that would have used the Instance that is
now unavailable, to be routed to one of the remaining, available Instances. This document provides the
Low Level Design (LLD) for this mechanism.

It should be noted that the availability of a database instance is affected by the availability of the
Automated Storage Manager (ASM) and the node itself.

2.1.7. Technical Network

2.1.8 Every discrete server that connects to the network will have at least two NICs. Each NIC will
connect to a different network switch. The NICs will be configured in an Active/Passive
configuration (not load balanced)

Discrete Windows and Linux servers will utilise Broadcom 57xx NICs, and run in Broadcom SLB [Smart
Load Balance] mode. This is a feature of the Primergy RX300 platform rather than Windows or Linux.

2.1.9

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 41 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

The following is from HNG-X Technical Network Architecture (ARC/NET/ARC/0001)

This section describes the capability and technique to handle a defined set of exception conditions within
the context of the business availability requirements.

2.1.9.1 Outline Approach

This is based on reuse from Horizon as far as possible, an exception being SSL offload, the following
table summarises the techniques;

Component Resilience mechanism
Branch Access I Network Paths
Network

The network is engineered to avoid single points of failure in the “high order part of
the network” by use of multiple components and links.

A Routing protocol is used between Network components in the HNGX domain and
those in the service provider domain to maintain optimum network paths.

Network Paths from Branch

Wireless WAN (GPRS/EDGE/3G) will be used as a backup to ADSL. The Branch
Router will determine when ADSL has failed and switch to the backup network. Once
the ADSL service is restored, the branch router will verify this using a traffic test and
switch back.

Single Points of failure

For those parts of the Branch network over which POA has design responsibility,
single points of failure in the high order part of Branch network are avoided. High
order is intended to mean any network component which concentrates traffic
(statistically or in absolute terms) from a significant number of post office branches.

Since there are components in the service provider cloud which represents single
points of failure. For example in the BT ADSL service, there are over 100 devices on
which the branch sessions terminate (the exact number is not provided by BT). The
failure of any such device will result in no service to about 1/100 of the branches
(assuming a reasonable spread). Such single points of failure represent a trade-off
between network service costs and availability. These trade-offs are made and
agreed prior to service introduction with the customer and service management.
Mitigations are agreed with the service provider to minimise both the downtime and
the likelihood of downtime.

Application endpoint

The Application at the branch targets a Virtual IP address which represents a service.
This Virtual IP address is created on the ACE and the ACE selects a working
application server to forward the TCP connection. This decision is based on regular
probing by the ACE of the Branch Access Layer Servers for Application availability.

Therefore the branch application does not need to locate a functioning application
server. Rather this is provided transparently by the network.

Access Tier I These are configured as an Active / Standby pair with TCP connection state
Firewall replication between the pair. When the Standby Firewall determines that the Active
Firewall has failed then it will (by design) take over with no loss of Application
connectivity due to loss of state.

ACE used as I At each HNGX Data Centre there are 2 Catalyst 6513 switches each with one ACE
layer 4 Load I blade. The ACE blades are configured in an active standby pair with state replication

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/O006
Version: 0.2
Date: 19-Oct-07

Page No: 42 of 108
Fe)
FUJITSU

POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

Balancer

between them. When the Standby ACE determines that the Active ACE has failed
then it will (by design) take over with no loss of Application connectivity due to loss of
state.

Note that the 6513 are on separate power phases.

Distribution Tier

At each HNGX Data Centre there are 2 Catalyst 6513 switches each with one FWSM

Firewall - I blade. The FWSM blades are configured in an active standby pair with state

FWSM teplication between them. When the Standby FWSM determines that the Active
FWSM has failed then it will (by design) take over with no loss of Application
connectivity due to loss of state.

LAN Application servers

Connectivity

These are configured with two physical network interface cards that are “teamed” to
create a single logical interface. Each such card is connected to a separate Catalyst
6513 switch port. This arrangement means that the failure of any one of {network
interface card, Catalyst port, Catalyst switch} does not result in loss of LAN
connectivity. Failover takes less than 2 seconds.

Next hop for application server

Application servers do not participate in Routing protocols. The next hop gateway is
determined by the having two possible Gateways running VRRP (Virtual Router
redundancy protocol). In the event that the Active Gateway fails, the standby will
take over this role with no loss of Application connectivity.

SAN Extension

There are at two DWDM provided Fibre Channel services using separate
components and over two fibre circuits. There is at least 5m between the fibres at all
times. The storage array determines which path to use.

Inter Campus IP
traffic

There are two DWDM provided 1 Gigabit Ethernet services using separate
components and over two fibre circuits. There is at least 5m between the fibres at all
times. A Routing protocol is used to determine a working path.

SSL offload This is performed within the ACE blade.
When a standby module takes over the functionality of the active module, the
existing SSL sessions are lost. New SSL sessions are established on the standby
(now active) module using the same configuration available on the active module.
Catalyst 6500 At each HNGX Data Centre there are 2 Catalyst 6513 switches in an Active / Active

arrangement within the Distribution Tier. The partial or full failure of one of these
results in the other Catalyst being used as described elsewhere in this table — for
example LAN Connectivity.

Each Catalyst functions as an independent layer 3 switch and other layer 3 devices
will select the functioning Catalyst based on interior Routing protocols.

Note there are also 2 Catalyst 6500 switches in the Access Tier. The same
considerations as stated above apply.

2.1.9.2 Component Targets

The following list summarises the availability targets for different classes / types of network components.
The term repaired is defined to mean service restoration as far as all other components are concerned.

An example of service restoration would be finding an alternative path around the failed device via

Routing protocols.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 43 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

e Single Layer 3 component failure in Core of Network repaired within 30 seconds.
e Single Layer 2 component failure in Core of Network repaired within 30 seconds.

e Failure of Active ACE or FWSM repaired within 20 seconds with no TCP/IP connection loss. SSL
sessions will need to be re-established as these would be lost.

e Complete failure of Catalyst 6500 repaired within 60 seconds.
e Loss of LAN connectivity (cable / port / interface card) repaired within 10 seconds.
e Failure of Active Outer Firewall repaired within 25 seconds with no TCP/IP connection loss.

e Failure in Branch “High order Network “ repaired within 210 seconds (based on standard use of
BGP timers)

« Detecting that an ADSL service in a Branch is unusable will take no more than 60 seconds for
clean failures and those where the PPP interface comes down based on LCP probes - interval
10 seconds). Switching to a backup service will take place within 5 seconds. Therefore the
maximum period for which there is no network path is about 65 seconds. The application will
need to explicitly control TCP timeouts to avoid long blocking periods due to exponential back
off.

Note that the current application design assumes a timeout in the region of 30 seconds, with one
automatic retry.

2.1.9.3 DR

As far as the network is concerned, there is a single Active network and single address space at both the
Primary site and Secondary site. It is the case that whilst the Secondary site is supporting testing then;

e The Primary site traffic is mainly Production traffic with some Test traffic
« The Secondary site traffic is mainly test traffic with some Production traffic.

e Separation of the Production and Test traffic classes is maintained through a variety of
mechanisms.

« The resources in shared platforms such as Catalyst 6513 available to Test traffic classes will be
limited to avoid the very low risk of Test impacting Production.

e Branches use Virtual IP addresses (VIP) to target services. Since the network is Active / Active,
each branch will simply select the Data Centre proving the service and detect this based on IP
Routing since the VIP is advertised into the Access network. This is how Horizon supports web
services today.

Consequences of this approach are that:

e There will be minimal change in the network when DR is invoked. The changes will be limited to
closing down Test traffic streams between the Secondary Data Centre and external sources and
also ensuring that external traffic sources are directed to the Secondary Data centre. platform
and storage

2.1.9.4 HNG-X Wide Area Network

The following BCP/DR testing considerations are drawn from the HNG-X Wide Area Network High
Level Design DESNETHLDO009

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 44 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

The WAN, both target and interim is designed to have no single point of failure. Network connectivity to
IRE11 and IRE19 will operate in an active/active state)

Although each of the new data centres has a single FSBN CE router, resilience through triangulation is
provided by the intercampus VLANs over DWDM fibre. Handoff routers for third party connections will be
similarly provided as single routers triangulated between sites. The intercampus WAN links and provision
of VLANs is documented within the LAN HLD

Network devices are deployed in pairs for resilience (with the exceptions previously mentioned) and will
be mounted within separate racks and have separate power feeds from UPS

Devices interfacing with equipment that cannot operate dynamic routing protocols such as firewalls
will use VRRP to provide a resilient gateway.

2.1.9.5 Data centre LAN

The following considerations are drawn from the HNG-x Resilience and Disaster Recovery High Level
Design (DES/PER/HLD/0001)

The intercampus link is a high speed fibre link between the primary and secondary data centre hosting
sites, comprising two redundant, diversely routed fibre links which are DWDM multiplexed to form a
number of usable logical links. The DWDM end points are separated by at least 5m at each site. There is
a detailed description in DESNETHLDOO07.

Over each of the diverse links there will be two 4GB Fibre Channel and two 1GB Ethernet links
The link may be used in a number of ways during normal steady state operation:

e Real-time replication of storage traffic from the primary site SAN to the secondary site SAN

e Network traffic between the two sites, for example, copying of backups to the secondary site for
restoring onto test systems

The intercampus link also may be used in a number of failure scenarios:

e In the case where the FSBN link into the primary site fails, it will be possible to route network
traffic via the secondary site and then over the intercampus link

. In the event of site failover but where storage is still available at the primary site, the link will be
used for replicating SAN traffic in the opposite direction (i.e. from secondary to primary site).

The following BCP/DR testing considerations are drawn from the Data Centre LAN High Level Design
DES/NET/HLD/0008

Section Design Text
2.1.1 Fibre I 2.3.5.6(d) Between both HNG-X data centres there are a pair of fibre optic cables.
Services The radial distance of each of these is < 100 km and the two fibres are kept separate

along their runs with no common interconnection points.

3.1.5 Data I Under normal operating conditions, IRE11 primarily offers the Production HNG-X
Centres service and IRE19 primarily offers the Test service.

Production components of the solution are active at both IRE11 and IRE19
simultaneously. The network is therefore considered active at both data centres,

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/O006
Version: 0.2
Date: 19-Oct-07

Page No: 45 of 108
2
FUJITSU

POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

even though IRE19 is primarily offering a test service. This stance is further
enhanced by the need for rapid failover from IRE11 to IRE19 in a disaster recovery
situation.

The direct distance between IRE11 and IRE19 is 6.303 kilometres (3.917 miles). Via
the main roads, the distance is 15.8 kilometres (9.82 miles). The radial distance of
the fibre services between the two sites is unknown at this time. The separacy of the
fibre services is still to be established. The requirement is for a minimum separacy of
10 metres.

3.1.8.5 LAN

Topology
Bladeframe

There is one production and two multimode BladeFrame in each IRE11 and IRE19
data centre. (see diagram 11)

3.1.8.5.1
Bladeframe
Resilience

See details below

3.1.9.5 (Core

MSFC)

The Core MSFCs are deployed as a resilient pair. Both MSFCs participate in the
OSPF routing protocol and are with other Core MSFC at the other data centre and
with ASA firewalls at the local data centre. The core MSFCs at both data centres are
attached to OSPF Area 0 and multiple subordinate transit areas for different access
layer connectivity. Note that all inter area traffic must pass through the MSFCs to the
other access layer areas or the other data centre

3.1.9.6 (ASA

Firewalls)

ASA Firewalls are deployed in an Active / Standby configuration. The firewalls share
common IP addressing and in the event of failover the interface IP address migrates
from the failed server to the standby server. Servers connected to an ASA DMZ will
use the ASA DIZ interface address as their default gateway.

3.1.11 Virtual

Services

The ACE use Route Health Injection to insert a static VIP address into the MSFC
routing table when a back-end service is available. The VIP is redistributed into the
IGP by the MSFC. The same or a different VIP may be used at both data centres
depending on the requirement. Because of the production / DR status of the data
centres, the VIP is only advertised from the Production data centre. In a DR
situation, the VIP advertisement is disabled at IRE11 and enabled at IRE19.

3.1.14 Inter

DIC
Connectivity

There are two fibre paths, between the IRE11 and IRE19 data centres, nominally
named North and South. The North and South fibres are diverse as defined in
section Error! Reference source not found.. Data services are divided across
North and South to provide resilience to a failure of either fibre. The collapsed core
and distribution layer switches are connected to North and South as are the Access
layer switches. If North or South fails, both the Core and Access layers will continue
to operate via the remaining fibre path.

North carries 2 * 1Gb Ethernet between Core switches A and Access Switches A.
South carries 2 * 1Gb Ethernet between Core switches B and Access Switches B.
There are therefore a total of 2 * 1Gb connections carried on the North fibre and 2 *
1Gb connections on the South fibre

3.2.1 The following key principles apply to network resilience:
Availability & . A . ares
Resilience e No Single Points of failure exist within the data centre network
e The inter data centre WAN service is resilient with no single points of failure
©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 02
Date: 19-Oct-07

Page No: 46 of 108
Fe)
FUJITSU

POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

e There is a single WAN CE router at each data centre.

o Resilience for high speed WAN connections (>8Mb/s) is achieved by
triangulation through both data centres and across the inter data
centre WAN.

Resilience for low speed WAN connections (<8Mb/s) is achieved by providing
resilient services into each data centre. This is to avoid a single failure of such a
service preventing a successful DR transition

3.2.1.1 Power All network devices that support multiple power supplies shall be connected to
separate uninterruptible power supply (UPS) power distribution units (PDUs).
The DWDM devices will be separate in the data centres (minimum separation 10m)
and use separate power supply phases.
3.2.1.2 Network devices are provisioned in a resilient pair. The resilient pair may be within a
Physical single data centre or spread across both IRE11 and IRE19 data centres in the case of
Proximity access layer triangulation.
Resilient pairs within a data centre are mounted in separate racks
3.2.1.3 Servers have at least two physical interfaces that constitute a single logical interface.
Physical The server is connected to either the access layer switches or the core switches.
Interfaces Servers may not be connected to both access layer and core switches as this may
bypass network security. One physical interface is connected to one 6513 switch and
the other interface to the other 6513 switch. A logical interface is typically associated
with a single IP address. A VLAN containing the two physical interfaces is trunked
between the switches to provide a single layer two domain. This domain may be
served with other servers and network equipment
3.2.1.4 External network cabling, providing a resilient service, entering the data centre shall
Network have a minimum separation of ten metres (10m). Within the data centre the resilient
Cabling cables must terminate on separate patch panels and / or devices in separate racks.
Network cabling shall conform to the following standards:
Copper
o UTP Category 5e? ANSI/EIA/TIA 568B (s 100m)
° Fibre
© multimode 850 nm / 62.5 micron (s 220m)
3.2.1.5 Next I Routers run the VRRP protocol to provide next-hop redundancy. VRRP is the
Hop preferred protocol. Where VRRP is not available, HSRP may be used.
Redundancy ASA firewalls, wherever possible, use a serial failover cable between the two
firewalls. Where it is impractical to use a cable (due to distance limitations) a failover
VLAN may be used.
FWSM firewalls use dedicated VLAN interfaces over which the failover protocol runs
3.2.2 Data I IRE19 is normally in Test mode; that is, it primarily hosts the test environments. In

centre Failover

the event that DR is declared, all live services must failover from IRE11 to IRE19.

2 Note, Category 5e and 6 cables can store high levels of static electricity because of the dielectric
properties of the materials used in their construction. The cables must be grounded, to discharge any
static electricity present, prior to connection to interface cards.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 47 of 108
Fe)
FUJITSU

POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

To facilitate the instantiation of the production service in IRE19, the test
environments are isolated from the production network to prevent any interference
with production activity. The network reconfiguration required to implement the
isolation are a mixture of procedural and automated activities. The procedural
activities require the Networks operational support team to follow a script to ensure all
steps are followed. The automated activities are scripts on the Network Management
Systems that are invoked to perform discrete tasks; i.e., shutdown interfaces, disable
VLANs, alter routing configuration etc.

The intention is to ensure that no services are advertised out of IRE11 and all live
services are advertised out of IRE19. Services are never advertised from both data
centres concurrently

4 Acceptance
and Testing

The network is highly resilient due to the multiple provision of redundant hardware.
Every component of redundancy must be considered as part of the acceptance and
testing strategy. In principle, double failure is not accounted for. In the case of
double failure, reliance is placed upon the maintenance / renewal schedule of the
equipment.

The following should be considered in component network designs as part of
acceptance and testing:

1. Physical infrastructure
a. What components will be lost due to:
i. Power failure
ii. Cable failure
ili. Module failure
iv. Unit failure
b. What component offers redundancy for the failed component?
2. Physical server
a. Interface redundancy

i. Does the server failover to use the alternative layer 2 switch
when the primary switch fails?

ii. Is the layer 3 next hop preserved / available after failover?

b. Server redundancy

i. Does the service hosted on the server failover to the
alternative server within the same data centre or to a server
at another data centre?

3. Timing

a. Is failover timely? i.e., does the server / service / network failover
within the prescribed limits for the solution component?

b. Does spanning tree converge within acceptable limits?

c. Does routing converge within an acceptable time?

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/O006

Version: 0.2
Date: 19-Oct-07
Page No: 48 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

4. Routing
a. Are the OSPF DR and BDR router configured properly?

i. e., the DR and BDR routers are pre-determined by use of
the OSPF priority setting.

b. Is there any load balancing?

i. Routing is deterministic; load balancing is to be avoided. I.e.
the path is pre-determined by use of the OSPF interface cost
setting.

c. Does the routing converge as expected?
d. Is the convergence optimal?
., is dog-legging between data centres avoided?

e. Is the routing deterministic?

i. ie., is a well defined routing path followed under all failure
conditions?

ii.ls it possible to pre-determine the routing path to be used
under all failure conditions?

f. Is there any route leakage?
i. i.e., routes being incorrectly redistributed

ii.route visibility outside of the routing domain — i.e., route
leakage from one VPN to another, between 3” parties etc.

5. IP addressing
a. Is the correct IP address advertised from the correct data centre?
i. Le., VIPs, LANs etc.
b. Is the IP addressing summarised as expected?

The BladeFrame network connectivity consists of:

Type Use
Management port (ethO) 100Mb dedicated interface for access to the PAN Manager software on the
cBlades.
pBlade BladeFrame Processor Blade. Physical component used to provide
pServers
pServer BladeFrame Processing Server. A virtual processing server composed of
physical and virtual hardware resources (CPU, memory, disk etc). l.e.,
consists of a number of pBlades.
©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 02
Date: 19-Oct-07

Page No: 49 of 108
Fe)
FUJITSU

HNG-X:

POL00029327

POL00029327

ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

cBlade

BladeFrame Control Blade. Physical component used to interface 1O
between the BladeFrame internal network and the external network. The
PAN Manager software (used to configure the BladeFrame) runs on the
cBlade. Load balancing and fail-over policies are configured on the cBlade.
Each cBlade has a 100Mb management interface and eight 1000Mb
external network interfaces. Redundant cBlades provide resilience.

vEth

BladeFrame virtual Ethernet interfaces connected to pServers. The PAN
Manager software is used to connect vEths to vSwitches.

rEth

BladeFrame redundant Ethernets. Two or more physical NICs from different
cBlades providing resilience to failure. A vSwitch rEth is similar to a
traditional switch uplink port. Note the uplinks may carry default VLAN or
802.1q encapsulated traffic.

vSwitch

BladeFrame virtual instance of a layer 2 Ethernet switch that spans pBlades
and cBlades. Used to connect pServers together in an LPAN, LPANs
together and pServers and LPANs to external network equipment.
vSwitches may not be connected to other vSwitches. Routing between
vSwitches is performed at layer 3 by a dedicated internal pServer or an
external router.

Note that vSwitches cannot communicate directly and therefore there is no possibility of layer 2 loops
and no requirement for the Spanning Tree Protocol to be enabled on the BladeFrame interfaces of the

external switches.

Communication between vSwitches is via an external router.

The default cBlade network interface configuration is “PAIRED”. PAIRED specifies that one cBlade NIC
in the rEth pair is active and the other cBlade rEth NIC is idle. The idle NIC is only activated if failover is
required, for example if the active external switch or cBlade fails.

Figure 1 BladeFrame resilient network architecture

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 50 of 108
POL00029327
POL00029327

(oe) HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST q
FUJITSU rian &>

COMMERCIAL IN CONFIDENCE

ye BladeFrame : >

pServer-A
vEth-A~~
vSwitch-A ae ee vSwitch-B
Eth-
cBlade-1 ( cBlade-2
Eth-B

Active Active Idle Idle
1Gb 1Gb 1Gb 1Gb
i rt

SV. External
eel) Switch 2

External

Switch 1

External External
Router 1 Router 2 v0.2

2.1.9.6 Branch Access Network

The following BCP/DR testing considerations are drawn from the Branch Access Network High Level
Design DES/NET/HLD/0014

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 51 of 108
2
FUJITSU

POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

Section

Design Text

4 Design

The network is designed to provide high availability for all areas of the network where
branches are aggregated. Single points of failure being restricted to individual branches
and their associated local access media (although most branches will benefit from
backup access methods leaving the Sarian router as the single point of failure).

4 Design

The two data centres will operate in an active/DR configuration with IRE11 as the
normally active site, and all branch traffic will be steered towards IRE11 under normal
operation using routing metrics. Although the data centres operate as active/DR, the
network will operate in an active/active configuration at all times. Under normal
operation, the DR site (IRE19) will be used for testing, and all test traffic will be steered
towards this site. Under invocation of DR, all test traffic will be ceased

46.2
Branch
Router
Mgmt

The branch routers are managed by a Sarian system known as ROSS. The ROSS
platforms are currently located within the Wigan and Bootle data centres and will be re-
provided in IRE11/19. The C&W VPN for ROSS management will be extended to include
IRE11 and IRE19. Operation is expected to remain unchanged for HNG-X. Further detail
can be found in the Branch Router HLD (DES/NET/HLD/0010).

4.8 Disaster
recovery

The Horizon data centres at Wigan and Bootle operate in an active/active configuration.
For HNG-X however, the two new data centres in Northern Ireland will operate in an
active/DR manner, with IRE11 as the normally active site. IRE19 will be used as a test
facility under non-DR conditions. Although applications and services from the data
centres will operate as active/DR, the network will operate active/active at all times.

Live traffic will be steered towards IRE11 under normal circumstances using BGP
attributes. The local CE router (and handoff router where applicable) will be preferred,
and the path will be deterministic. Traffic will not be load balanced across parallel paths.
Test traffic will be steered towards IRE19 in a similar manner. Support staff will have
connectivity to either site.

Failure of data centre WAN equipment on the preferred path (local CE and/or local
Handoff router) will result in traffic re-routing via the equivalent router in IRE19 and the
intercampus LAN. Failover will be dynamic with convergence dependent on the routing
protocol in use.

Invocation of DR is a manual process that is likely to take around two hours to conclude.
Network failover to DR does not need to be dynamic and will use scripting wherever
possible to manage the changeover.

6.3
Resilience

The WAN, both target and interim is designed to have no single points of failure. Network
connectivity to IRE11 and IRE19 will operate in an active/active state (although the
applications and services provided by the data centres may operate as active/DR).

Although each of the new data centres in Northern Ireland has a single C&W CE router,
resilience through triangulation is provided by intercampus VLANs over DWDM fibre.

Network devices are deployed in pairs for resilience (with the exceptions previously
mentioned), and will be mounted within separate racks and have separate power feeds
from an uninterruptible power supply. Service recovery expectations are:

« Failure of Layer 3 component where OSPF routing used: < 30 secs

©Copyright Fujitsu

Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/O006
Version: 0.2
Date: 19-Oct-07

Page No: 52 of 108
POL00029327
POL00029327

(oe) HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST ”
FUJITSU rian &>

COMMERCIAL IN CONFIDENCE

e Failure of Layer 3 component where BGP routing used: < 210 secs
e Failure of Layer 2 component: < 30secs

Failover performance to alternate media within Sarian router is covered by Branch
Router HLD

2.1.10 Platform and storage
There are different classes of server. These are described in the Platforms & Storage Architecture.
« BladeFrame, which is SAN-attached

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 53 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

« Discrete Windows 2003 R2 servers Fujitsu-Siemens Primergy platforms (principally RX300)
e Discrete Linux RHEL 4.0 servers on Fujitsu-Siemens Primergy platforms (principally RX300)

e Discrete Solaris 9 Servers on various Fujitsu-Siemens PrimePower platforms (principally
Pw450)

Discrete Solaris 10 Servers on various Fujitsu-Siemens PrimePower platforms (principally PW250,
PW650 or T1000)

A platform is only permitted to be outside BladeFrame if:

e It has some hardware that is not provided by standard BladeFrame e.g. serial cards in Aurora
server

e It is not based on Intel architecture e.g. SPARC Solaris
e It requires direct SAN attachment e.g. systems with SYMCLI
e Some other business justification exists

These services will be run with one instance in a discrete server in each data centre. This is undesirable,
as these servers are difficult to move from a Test domain to a Production domain, and they tend to
multiply rapidly which has a detrimental impact on running costs and system complexity.

These systems are inherently more prone to outage due to component failure, and the "server explosion"
may be further exacerbated by the need for a local N+1 resilience model. Even for active/active systems
due consideration must be taken of the need for continued resilience and service availability AFTER the
loss of a site.

The following is from HNG-X Architecture - Platforms and Storage ARC/PPS/ARC/0001

Due to the inconsistent use of the term ‘Platform’ throughout the Post Office Account a new term is
introduced to describe the combination of operating system and hardware. The combination of an
operating system and hardware will be referred to as ‘Platform Foundation’. The moment this generic
Platform Foundation is being modified by changing operating system parameters or configurations for
the purpose of deploying an application or service to be hosted on the Platform Foundation, it becomes a
platform.

2.1.10.1 Platform Strategy for HNG-X

e Publication of a Definitive Hardware List (DHL)
o New platforms can only be deployed on approved hardware that is listed

o DHL contains sufficient hardware choices to accommodate all platform requirements
present and future

o DHLwill be maintained and refreshed on an ongoing basis
« Publication of a list of approved and supported operating systems for HNG-X
o Solaris 10
o Red Hat Enterprise Linux 4 AS
o Windows 2003 R2

e Abstraction of hardware and OS from platform definition to enable update/refresh of platform
foundations independent of application changes

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 54 of 108
oO
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

PLAN

COMMERCIAL IN CONFIDENCE

POL00029327
POL00029327

The HNG-X platform strategy changes the way a platform is designed. Instead of the Horizon model
where the application drives the selection of hardware and operating system, in HNG-X the application
owner will have to choose from one of the pre-approved Platform Foundations. This may result in
hardware exceeding the minimum requirements for an individual application, but will reduce the overall
support costs over time. In the same way the supporting software packages are selected from standard
components published in the Definitive Software Library (DSL) wherever possible.

The following diagram illustrates the HNG-X approach.

: Application(s)/ Business Service
_ (Branch Database, NPS etc.)
COTS (Oracle, Interstage etc.)

Application

Systems Management Agents
(monitoring, alerting, software

distribution)

Security and other agents
(Antivirus, logging, auditing)
ea

Operating System incl. hardware
‘specific drivers & patches —

ny

fandard Components
from DSL

Standard Platform Foundation

~

Platform

> Definition
for

HNG-X

J

Figure 2 Platform Definitions in HNG-X

2.1.10.2 Hardware Selection for HNG-X
In the context of the platform strategy the hardware has to fulfil the following requirements:

e Provide a reliable and sustainable foundation for all HNG-X business applications, business,
infrastructure and systems management services

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence Ref, TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07
Page No: 55 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

e Enable and support the HNG-X resilience and disaster recovery requirements

e Provide sufficient maintenance and hardware support cover from supplier to fulfil contractual
obligations for HNG-X

« Supportable by Fujitsu Services Core Services
e Must fit into the Fujitsu Services supplier strategy

A detailed analysis of the HNG-X disaster recovery service level targets (SLT) in relation to the HNG-X
application and data centre architecture has resulted in the following findings which subsequently
influenced the hardware choices for HNG-X:

e The Network Banking service will have to be available to the Post Offices Branches within two
hours of a disaster being declared.

e The Network Banking service relies on a number of other services and applications to perform its
business function, most importantly the Branch Database and the Branch Access Layer (BAL).
This provides the ability to settle banking transactions and any other transactions that only
require these components.

« To enable Post Office Branches to trade the branches will have to be able to communicate with
the data centre which requires that, apart from the physical network, support systems such as
Radius servers are available

« The minimum number of servers and support systems required to enable Network Banking to be
available to the Post Office Branches within two hours of the declaration of disaster situation is
in the region of 35 to 45 servers

e In order to recover the Network Banking service within the required timelines a number of
complex and sophisticated applications and systems need to be recovered at the same time,
each with its own recovery mechanism

Added to the Network Banking Service Level Targets are the following constraints:
« The data centres are operated in an Active/Disaster Recovery (DR) mode
« While the DR data centre is not used for disaster recovery purposes it will be used for testing

e The data centres are operated remotely and no personnel is available locally in the data centre
to aid the disaster recovery process

Based on the aforementioned requirement that the hardware has to enable and support the resilience
and disaster recovery requirements for HNG-X, the Bladeframe system was chosen as the platform for
the majority of business critical applications and support systems.

2.1.10.3 Active / DR data centres strategy and server placement

The strategy for the HNG-X data centres is to provide a single fully resilient data centre that exclusively
handles all business applications and services that form HNG-X. Only in the case of a major disaster will
the second, identically configured data centre be used for business application and services. In order to
enable the fail over in a disaster situation a number of infrastructure and security services have to be
already active in the second data centre prior to invoking the disaster recovery procedures. Examples for
such servers are remote access systems, security and authentication systems and infrastructure relevant
functions such as storage management. These servers and services are implemented as discrete

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 56 of 108
POL00029327
POL00029327

(oe) HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST q
FUJITSU rian &>

COMMERCIAL IN CONFIDENCE

servers outside the Bladeframe environment and run in an active configuration in both data centres at all
times. The following diagram depicts this configuration. The individual platform designs determine
whether a server is exclusive to one data centre or part of the active/active configuration.

HNG-X Test Environment

Figure 3 Server Placements for Active/Active Services

2.1.10.4. HNG-X Storage Architecture

HNG-X storage comprises multiple physical tiers of storage arrays with different qualities. The data
hosted on these storage arrays are grouped into four storage service classes and the classes are
commissioned on the appropriate hardware tier. The storage service classes are described in detail in
the following sections.

A minimum of two storage arrays for live data is deployed in each data centre alongside the existing
Horizon Archiving arrays on EMC Centera. The enterprise class storage array is used to provision data in
a highly protected and available way, including synchronous replication to a remote data centre inline
with storage services class 1. It is also used to provision other service classes as long as the capacity is
sufficient and the midrange system cannot provide a more cost-effective solution. The midrange system
hosts service classes 2 - 4 (defined in the next section) where it provides a cost-effective alternative to
using the enterprise class storage system. Each array has an identical equivalent in the second date
centre and replicates data to the second system either synchronously or asynchronously depending on
the application needs.

Although the storage arrays do not contain a single point of failure in themselves, the storage solution as
a whole is a single point of failure. Due to the extremely high cost of duplicating the storage arrays in
each data centre, this has been accepted as a risk and is in line with the systems qualities architecture
for HNG-X. The data is protected against a catastrophic data centre failure by replicating the contents of
the storage arrays, either synchronously and/or asynchronously across to identical storage arrays in the
second data centre.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref, TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 57 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.1.10.4.1Data Classification

The data classification for HNG-X focuses on the Recovery Time and Recovery Point Objectives (RTO &
RPO) for the individual application data. All data hosted on Horizon was analysed and the owners of the
data were interviewed to determine which data need to be hosted by the HNG-X storage solution during
the migration from Horizon to HNG-X. An attempt was made to classify all data to be stored as part of
the HNG-X solution and the findings are as follows:

« The negotiated service level targets for HNG-X are very detailed for some business services and
not very exact for others

« Two main systems and a number of smaller systems have an RPO of zero, translating into a
requirement to ensure that no data will ever be lost

« Most data has an RPO greater than zero but it is very difficult to determine the exact value
e RTO requirements vary widely between the application data, from minutes to days

Four main groups of data with similar characteristics have emerged and were combined into the
following classes of storage service:

1. Storage Service Class 1

Storage Service Class 1 supports critical applications and databases that need high performance
and replication (RPO = 0, RTO = 0).

This service class will replace the existing Horizon Symmetrix storage arrays. Some of the
business functionality will move to service levels 2 and 3.

On this storage service level class will reside the most business critical data for the Post Office.
This data is captured in the new “Branch DB” database. This tier will also host storage for a few
additional Oracle databases supporting “Online Systems” as well as the Oracle data guard
standby databases for the Branch Database,

2. Storage Service Class 2

Storage Service Class 2 supports critical applications and databases that need high performance
and/or replication, but have extended recovery objectives (RPO=0, RTO>24hr).

This service class will replace the existing Horizon Symmetrix storage arrays insofar as some of
the business functionality that has extended recovery time objectives will move to Service Class
2.

On this service class will reside data which is critical data for the Post Office but which can be
recovered with less demanding requirements and/or is performance sensitive. This class
supports the production SAP system for the Post Office (POL-FS), and Data from the Horizon
Riposte platform (correspondence servers) during the migration phase into HNG-X. Both SAP
and Riposte data are performance sensitive. This class does need to host OS boot volumes.

3. Storage Service Class 3

Storage Service Class 3 supports other production databases, Quality Assurance (QA), test —
asynchronous replication or no replication (RPO > 0, RTO > 24hr).

This service class will support the remaining HNG-X production databases and other data from
the Horizon platform during the migration phase into HNG-X. This service class will provide
capacity for recovery databases, i.e.: capacity for QA and test systems for the Post Office.

Replication of the data is to be configurable (synchronous or asynchronous) allowing to cater for
both low RPO as in the case of Batch systems, and to cater simply for the purpose of ease of
recovery in case of site DR fail-over and fail back.

4. Storage Service Class 4

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 58 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Storage Service Class 4 supports Support databases, near line file system storage —
Asynchronous replication or no replication (RPO > 24hr, RTO > 48hr).

This service class hosts the remaining data supporting the HNG-X platforms.

Replication of the data is to be asynchronous allowing to cater for ease of recovery in case of
site DR fail-over and fail-back.

5. Storage Service Class 5

Storage Service Class 5 supports Data with long term, regulated retention. Regulatory reports,
SOX Records, email, etc. - may require replication.

6. Storage Service Class 6

Storage Service Class 6 supports Backup and Restores / Synthetic Full Backups - VTL with
replication capabilities

7. Storage Service Class 7

Storage Service Class 7 supports Tape for off-site storage

2.1.10.5 Recovery Time Objectives by Storage Service Class

The required recovery times in the four relevant storage service classes can be subdivided into local
recovery requirements in the event of an application failure and remote recovery in the event of a data
centre disaster. The local and remote recovery objectives for the different classes are listed below:

2.1.10.5.1Storage Service Class 1
Branch DB
1. Local Recovery in case of database corruption (and corruption replicated to remote DC)
a. Recovery Time Objective (RTO) = 1 hour from local split mirror backup

b. Recovery Point Objective (RPO) = time of last split mirror backup (maximum 24 hours)

(Upon declaration of Branch DB data corruption, the Branch DB functionality will be provided by an
Oracle standby database. RPO = up to 2x lag between production and standby database, RTO = 30
minutes. This acknowledges that recovering from database corruption can be a lengthy and complex
process which is not storage dependant)

2. Disaster Recovery in remote data centre from point of disaster declaration
a. RTO =1 hour
b. RPO = No data loss
Online System Databases
1. Local Recovery in case of database corruption (and corruption replicated to remote DC)
a. Recovery Time Objective (RTO) = 2 hours from local split mirror backup
b. Recovery Point Objective (RPO) = time of last split mirror backup (maximum 24 hours)
2. Disaster Recovery in remote data centre from point of disaster declaration
a. RTO =2 hours
b. RPO = No data lo:

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 59 of 108
POL00029327
POL00029327

(oe) HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST ”
FUJITSU rian &>

COMMERCIAL IN CONFIDENCE

Standby Branch Database and the Standby Online Systems Databases

1. Local Recovery in case of database corruption (and corruption replicated to remote DC)

a. Recovery Time Objective (RTO) = 1 hour from local split mirror backup

b. Recovery Point Objective (RPO) = time of last split mirror backup (maximum 24 hours)
2. Disaster Recovery in remote data centre from point of disaster declaration

a. RTO =1 hour

b. RPO = No data loss

2.1.10.5.2Storage Service Class 2
POL-FS
1. Local Recovery in case of database corruption (and corruption replicated to remote DC)
a. RTO = 24 hours from local split mirror backup
b. RPO = time of last split mirror backup (maximum 24 hours)
2. Disaster Recovery in remote data centre from point of disaster declaration
a. RTO = 24 hours
b. RPO = No data loss
Horizon Riposte
1. Local Recovery in case of database corruption (and corruption replicated to remote DC)
a. Recovery Time Objective (RTO) = 2 hours from local split mirror backup
b. Recovery Point Objective (RPO) = time of last split mirror backup (maximum 24 hours)
2. Disaster Recovery in remote data centre from point of disaster declaration
a. RTO =0 hours - Application cluster is active on both data centres
b. RPO =0- Application based host replication

2.1.10.5.3Storage Service Class 3
Batch Processing Solutions
1. Local Recovery in case of database corruption (and corruption replicated to remote DC)
a. Recovery Time Objective (RTO) = 2 hours from local split mirror backup
b. Recovery Point Objective (RPO) = time of last split mirror backup (maximum 24 hours)
2. Disaster Recovery in remote data centre from point of disaster declaration
a. RTO = Hours
b. RPO = No data loss for some
SAP POL FS Test and QA
1. Local Recovery in case of database corruption (and corruption replicated to remote DC)
a. RTO = 24 hours from local split mirror backup

b. RPO = time of last split mirror backup (maximum 24 hours)

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 60 of 108
Fe)
FUJITSU PLAN

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

COMMERCIAL IN CONFIDENCE

2.

Disaster Recovery in remote data centre from point of disaster declaration
a. RTO =none
b. RPO =none

2.1.10.5.4Storage Service Class 4
Recovery Objectives for this service class is as follows:

1.

2.

Local Recovery in case of database corruption (and corruption replicated to remote DC)
a. RTO => 48 hours
b. RPO = time of last split mirror backup (maximum 24 hours)
Disaster Recovery in remote data centre from point of disaster declaration
a. RTO > 48 hours
b. RPO=TBD

2.1.10.6 Storage Arrays

The previously described four storage service classes impose different requirements on the storage
hardware, and the resilience and availability features that the hardware has to provide. It can broadly be
broken down into two main sets of qualities

Enterprise Class Storage

Data from Service Classes 1, 2 and 3 will be hosted on enterprise class storage arrays, capable of
delivering both an extreme high level of data availability and performance. The storage array itself (at
each data centre) will contain no single point of failure. The array performance must be scalable with the
addition of hardware elements (controller boards, host connection ports, remote replication ports, cache,
etc.) should this prove to be necessary.

The following are characteristics of the storage systems:

Each discrete component of the storage array can be exchanged without taking the storage array
offline. This (replacement) operation will have no noticeable impact on performance.

Each sub-component / FRU is monitored for fault conditions
Major sub-components / FRUs are monitored for pre-fault conditions
Multiple fault monitoring sub-systems per FRU

Disk shelf implements electrical drive isolation / bypass at a hardware level to isolate electrical
faults in drives

Disk shelf implements FC port bypass at a hardware level to isolate faulty drives
Continuous integrity checking of data on drives / end-to-end data integrity checking

Ability to seamlessly move data within storage array to compensate for disk contention “hot
spots”

Consistency technology
Identical storage arrays to be deployed at both sites (Active — Passive configuration for HNG-x)

Synchronous remote replication

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 61 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

e Remote copy protected with same drive type and RAID level as production source

e Local copy clones protected with RAID protection (RAID 5 expected)

e Ability to take local split mirror backups or equivalent copies with no performance impact
Midrange Class Storage

Data that has less demanding requirements and does not make use of all the features offered by the
enterprise class storage systems will be hosted on midrange class storage arrays, capable of delivering
data in a secure and available manner. The storage solution will contain no single point of failure.

The following are mandatory characteristics of the storage systems:
e Major sub-components / FRUs are monitored for pre-fault conditions
e Disk shelf implements FC port bypass at a hardware level to isolate faulty drives
e Identical storage arrays to be deployed at both sites (Active —- Passive configuration)
e Asynchronous and synchronous remote replication
e Local copy clones or snapshot area protected with RAID protection (RAID 5 expected)

The service classes are provisioned out of either physical platform. Where only one platform type can
meet the requirements of the service class, this platform type is the only possible way to provide this
service class (e.g. storage class 1). The enterprise class storage array is used to provision service
classes 1, 2 and 3 to make use of the available capacity.

2.1.10.7. Recovery and resilience

The HNG-X solution mandates that no data centre shall contain a single point of failure. The only
exceptions to this rule in the platform and storage domain are the storage arrays, due to the exorbitant
costs of duplicating the storage environment locally. The storage arrays are fully resilient in themselves
and do not contain single points of failure.

Discrete servers outside the Bladeframe have either a stand-by server in case the hardware fails or are
clustered where high availability is required. The only exceptions are the Audit servers; the design for the
Audit servers does not require a data centre local resilience facility other than re-provisioning the Audit
server in case of a hardware failure. Where resilience is inherent in the application through the
deployment of multiple instances (e.g. Active Directory Domain Controllers or DNS servers) a pool of
stand-by servers is available to rebuild or recover the failed server. All servers, services or infrastructure
functions that are located in the outer ring in diagram and are necessary to access the data centre and to
invoke the disaster recovery procedures are run in an active/active configuration across the two data
centres with multiple instances of each server in both locations. In the event of a catastrophic loss of one
data centre at least two active instances of these servers remain in the second data centre.

Servers inside the Bladeframe environment are protected against hardware failure through a pool of
stand-by servers. Should an individual blade server fail it will automatically be restarted on a spare blade
either inside the same Bladeframe or in a different Bladeframe.

The storage arrays are configured to replicate their data according to the storage service classes and the
application requirements in regular intervals or constantly via a synchronous link. Should a storage array
irrecoverably fail, a site disaster will be declared and the entire data centre function will be moved to the
second data centre, and the servers and services will be restarted using the replicated data.

In the event that a disaster has been declared the active components housed in the outer ring as
described above will be used to access the second data centre and invoke the DR procedures. This will
be co-ordinated with the necessary changes to the network. After test access has been disabled by the
network the Bladeframe systems and the necessary discrete servers will be re-configured to use the boot
images and the application data that were replicated to the secondary data centre during normal

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 62 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

operation. The reconfiguration is largely automated using specially developed scripts that will prepare the
storage arrays and then attach the servers to the replicated data. The entire process is designed to take
no longer than 60 minutes to allow for application and service, testing and verification prior to enabling
branch trading.

2.2 Other Area’s

2.2.1 Storage Area Network (SAN)

To enable successful site failover to occur, both sites need to be reasonably consistent. That is to say,
the amount of data loss due to a site failover needs to be minimised. The major area where this may
occur is in the SAN replication.

Processes need to be in place to ensure that any change that happens on the primary site also occurs on
the secondary site. The “lag” must be carefully monitored, and alerts should be raised in case the lag
grows beyond an acceptable threshold. This is generally an alert which is raised by the storage system
itself.

2.2.1.1 Storage

A number of classes of storage are proposed in ARC/PPS/ARC/0001. Applications which require zero
data loss on failover must specify suitable storage, which in this case is EMC DMX with synchronous
SRDF enabled. Applications which can recover following a failover where some amount of data has been

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 63 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

lost, either because the loss of the data is not significant or because the recovery may be effected from
journals or upstream systems, may use a lower storage class. Add/ref t6’Storage’ HUD

Storage presentation is very important. LUNs that are replicated between sites need to have the same
SCSI IDs so that the BladeFrame at the failover site can recognise the storage without need for
reconfiguration.

In addition, to allow the workload of any pBlade to be run from any BladeFrame, each LUN that is
required by any pServer will be presented to the cBlades in every BladeFrame.

2.2.2 Network

Servers will appear on the secondary site with the same IP as they had on the primary site.

2.2.3 All VLANs that are required by any pServer will be trunked to all of the BladeFrames
The following details are taken from the HNG-X Storage Area Network (SAN) HLD DES/NET/HLD/0007:

Section 4.1 There will be two SAN Directors deployed at each HNG-X data centre. Both power
and FC cabling will be fully resilient

Section 4.1.2.4 I Power Supplies : If a power supply fails, a single power supply is sufficient to power
the entire system

Section 4.1.2 The supervisor module is a hot-swappable module. In a dual supervisor module
system this allows the module to be removed and replaced without causing
disruption to the rest of the system

Section 4.1.2.3 I MDS 9509 Crossbar Fabrics : The system will not experience any disruption or any
loss of performance with the removal or failure of one supervisor module

Section 4.1.2.6 I MDS 9500 Supervisor 2 Module: Provides fully redundant operation. Each chassis
has 2 supervisor modules for resilience. The control engine operates in
active/standby mode

Section 4.1.2.1 In the event of a crossbar failure, the standby channel on the remaining crossbar
becomes active, resulting in an identical amount of active crossbar switching
capacity

Section 4.1.2.2 I FSPF-based multipathing : In the event of a switch failure, dynamically reroutes
traffic

Section 4.1.2.4 I System Fans: The tray is designed with 1:1 redundancy. The system can sustain a
multi-fan failure with no negative effect. Up to 4 fans can fail before the systems are
affected. The entire fan tray is hot-swappable. The system can run for up to 30

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/O006
Version: 0.2
Date: 19-Oct-07

Page No: 64 of 108
Fe)
FUJITSU

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

minutes without a fan tray installed

Section 4.1.4

Virtual SANS : The second level of isolation (and resilience) will be achieved by
having a second set of connectivity devices and VSANs at each site

Section 4.1.4.1

The isolation of tape storage network from disk storage network eliminates an
application-level impact due to failures such as power rest of a tape library unit

Section 4.2.1 Wavestream (IRE11-IRE19) : All channels are protected using duel finre routes for
resilience
Section 12.2 Testing Connectivity - Test 1 (disable SAN ports), Test 2 (Pulling FC cables), Test 3

(Introduce transient FC errors using ANUE equipment), Test 4 (increasing latency
using ANUE equipment)

2.2.4 System Qualities

The HNG-X System Qualities Architecture (ARC/PER/ARC/0001) document defines availability and
recovery times. These should form the basis of testing in the HLTP.

The HNG-X system satisfies or provides solutions for the 3 main aspects of system qualities as follows:

e Capacity/Performance

e Availability. The system has been designed to be highly resilient, having Single Points Of
Failure avoided wherever possible for all components within the solution, using standard industry
practices. Where it is not cost effective to avoid Single Points of Failure, these will be itemised.
In order to protect against data corruption, persistent data will be backed up, in accordance with
the requirements for the system.

e Disaster Recovery. The systems at the secondary data centre will provide full functionality
(capacity, performance, resilience and backup) so that should DR be invoked and it is required to
move the entire service to the Secondary data centre, the same service provided by the Primary
data centre (in terms of capacity, performance and local resilience of the systems) would be
provided at the Secondary data centre. Additionally it is required that systems crucial to POL
operation should have no data loss; therefore for the DR solution, storage for these systems will
be synchronously replicated to the Secondary data centre so that any transaction committed will

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 65 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

also be persisted on the storage both at the Primary and Secondary data centres. Hence under
normal operation for these systems, the DR storage which will always hold an exact copy of the
storage at the Primary data centre.

2.2.4.1 Availability

The table below states the SLTs for overall availability. It shows both core hours, and this as a
percentage (e.g. the 9s notation). The SLT applies to a five year rolling average.

Service Level Max downtime Percentage
core hours per availability

year
Outages in Core Hours where the Core Solution (Central & 3 99.89568%

Branch Network, Core Infrastructure and Branch Database) is
unavailable at > 10% of Branches per SLT year

Outages in Core Hours where the Banking Solution (CAPO, 8 99.72181%
A&L, Link) is unavailable at > 10% of Branches per SLT year.
This includes time when the Banking Solution is unavailable
because the Core Solution is unavailable.

Outages in Core Hours where Other Services (ETU, DVLA, 14 99.51316%
PAF, APOP, DCS) are unavailable at > 10% of Branches per
SLT year. This includes time when the Other Services are
unavailable because the Core Solution is unavailable.

Table 1 SLTs for overall availability

In the case of a service outage where the SLT is currently failing (not for unavoidable disasters) and
Fujitsu Services recommends that the service is switched to DR operation whereby the entire service be
moved to the secondary data centre, the measurement of the above SLTs stops until Post Office Ltd
give official notification to move the service, after which the measurement continues in parallel with the
DR SLTs

Availability for individual branches and counters is stated in the table below, again both shown as core
hours and a percentage. Availability targets increase from March 2009.

Table 2 Branches and counter availability

Service Level Max downtime Percentage

core hours per availability
year

Branch availability during Core Hours until March 2009 per

SLT year 18.1 > 99.37%

Counter availability during Core Hours until March 2009 per

SLT year 25.8 > 99.10%

Branch availability during Core Hours from March 2009 per

SLT year 15.0 > 99.48%

Counter availability during Core Hours from March 2009 per

SLT year 23.3 > 99.19%

These values represent the maximum time per year that any counter or branch is unable to trade.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 66 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

2.2.4.2 Availability Principles

2.2.4.2.1 No data loss
Paragraph 5.1 of RM/CDE/0031 v 0.4 states that the current recovery models are assumed.

The recovery model for Horizon assumes that unrecoverable data loss is unacceptable for essential
services. HNG-X will assume the same.

2.2.4.2.2 Fail-over for resilience within the data centre

Requirements SCD-41 and ARC-445 state that automatic fail-over shall be used for defined services
within the Data Centre, and for the network connections within the Data Centre.

Components provided for resilience (fail-over) can be incorporated into the normal service, to provide
load balancing and improved performance. In this case, there should be sufficient spare capacity within
a single data centre to continue to provide the service if one component fails.

2.2.4.2.3 Single point of failure

Requirements SCD-40 and ARC-444 state that there shall be no single points of failure (SPOFs) that can
cause the loss of any Business Capabilities or Support Facilities.

Requirement SER-2155 states that SRRCs will be updated to reflect new Architecture. SCD-39 states
SRRCs will define the priority assigned to incident depending on the business impact and contingency for
all components in the infrastructure.

There are redundant components within most of the data centre infrastructure which prevent any SPOFs
in the services that support the main branch business. However Service Resilience and Recovery
Catalogues (SRRCs) will be created for main components within the system, indicating risks, repairs,
contingency and resolution in the event of potential documented failures to or within a component.

Data centre components that are not duplicated and represent single points of failure within the HNG-X
solution are itemised as indicated in the table below:

Single Point of Failure Reason Mitigation
Primary Storage Cost Highly resilient internally
POL-FS Main Host Cost Highly resilient internally
Blade Frame Cabinet Architecture Highly resilient internally
Broadband Access Servers No Alternative Backup Network
Triangulation between data centres provide
Wide Area Network to Data Centres Cost resilience
Solution Triangulation between data centres provide
Radius Servers Complexity resilience
Branch Cost Depends on number of counters (see below)

Table single points of failure within the HNG-X

Although the Primary Storage (for the Horizon solution an EMC Symmetric disk array) is a SPOF, it is
highly resilient internally and therefore assumed to meet the requirements. In the extremely unlikely
event that the entirety of one of these components fails, then the service will be recreated at the
secondary data centre. However as there are 2 Primary Storage Arrays at each data centre it would be

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 67 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

possible to provide a service using the Branch Standby Database which is located on different Primary
Storage to the Branch Database, therefore providing extra resilience. This may prove to be sufficient
until possible to repair the failure.

The main POL-FS host runs on a highly resilient server, which is not replicated due to cost reasons
(additionally the less important IXOS server is also a SPOF). In the unlikely event that this fails and it is
not possible to repair/replace within adequate timescales, then the entire POL-FS service will be
recreated at the secondary data centre if deemed necessary.

It is not possible to completely remove SPOFs at each counter and branch. However under HNG-X,
problems with an individual counter or branch are isolated and minimised as much as possible (e.g.
using the branch router and for larger offices hubs).

2.2.4.2.4 Recovery times

Requirement ARC-446 states that the impact on Branch Users shall be minimised if there is a failure and
subsequent recovery. Principles for this are described in the document Agreed Assumptions on HNG-X
Branch Exception Handling referenced from Schedule B6/1.

In most cases, HNG-X uses the same approach as the existing Horizon system. If any transaction times
out, the service should be available again by the time the transaction can be retried by staff at a counter.

To achieve this, all services running on central systems at the data centre that are critical to branch
operation should recover within two minutes wherever possible (this would not be possible for a serious
corruption requiring the restore of a backup).

Services that are not critical to branch operation, such as anti-virus services, should be available within a
reasonable period. These are described in section 3.2.3 within ARC/PER/ARC/0001.

2.2.4.3. Component availability

The table below states the maximum target time in which each data centre service should recover from
transient faults in order to meet SLTs

[Table in both the System Qualities Architecture paper and the HNG-X Resilience and Disaster Recovery
HLD DES/PER/HLD/0001

Maximum Target Recovery Time
Business Systems
Branch Database 2 minutes
Client File Transfer (DCS, ETU, Banking) 2 hours
DCS & ETU online 2 minutes
FTMS TIP Local & Track and Trace 2 hours
NBX Banking Agents 2 minutes
DVLA online, PAF & APOP Agents 2 minutes
Branch Access Layer 2 minutes
TES (application servers) 2 hours
NPS 2 minutes
APOP 2 hours
Main Host 2 hours
Storage Systems
Audit Centera Array Next day
Audit Server 2 hours
Backup Servers 2 hours
ECC Server (or equivalent) Next day
Main Backup System (Disk or Tape) 2 hours

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 02
Date: 19-Oct-07

Page No: 68 of 108
2
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

PLAN

POL00029327
POL00029327

COMMERCIAL IN CONFIDENCE

Support Systems

Secondary Authentication Service
Antivirus Server

Application Monitoring Server
Certification Server

DNS Server

Domain Controllers

NBX Network Observer Server
NBX Network Probe Server
Network Alarm Point Server
Network CISCO Works Server
Provisioning Server

Radius Servers

Accounting Radius Servers
SAS Server

Signing Server

SSC Branch Database

SYSMAN Enterprise Managing Server
SYSMAN Enterprise Monitoring Server
SYSMAN Enterprise Event Servers
SYSMAN Availability Server

SYSMAN Enterprise User Interface Server
SYSMAN Enterprise Database Server
SYSMAN Enterprise Provisioning Server
SYSMAN Enterprise Fanout Server
SYSMAN Enterprise Staging Servers
SYSMAN Enterprise Legacy manager
SYSMAN Enterprise Monitoring Display
-Network switches

-Network routers

Cable failures / mis-cabling

SQL Server (ACDB, OCMS, Athene, MTAS)

15 minutes
Next day
15 minutes
15 minutes
15 minutes
15 minutes
Next day
Next day
15 minutes
15 minutes
Next day
2 minutes
2 hours

15 minutes
2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

2 hours

Table 3 Maximum Target Recovery Time

2.2.4.4 Disaster recovery

In the event of a catastrophic failure within or at the entire primary data centre, that prevents full (or
possibly partial) operation; Fujitsu Services will recommend that Post Office Ltd make an official request
to switch over to DR operation at the Secondary data centre. When this official request has been made
by Post Office Ltd, the services should be restored within the following timescales (currently subject to

agreement with Post Office Ltd):

Service Description DR availability target from ot
notification
Core Solution and Network Banking, including: 2 hours
¢ Branch Database Servers
« Client File Transfer (DCS, ETU, Banking)
e DCS Servers
« FTMS TIP Local & Track and Trace
e NBX Banking Agents
« Branch Access Layer servers
e NPS Servers (Database)
All remaining Services excluding POL-FS: 5 hours
©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOTHTP/0006
Version: 02
Date: 19-Oct-07

Page No: 69 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

2
FUJITSU

ETU & DVLA online Servers

PAF & APOP Agent Servers

TES Application Servers

APOP Servers (Database)

Main Host (Batch Database Server)

(Priority would be given to any services crucial at time
of DR e.g. DVLA if at end/beginning of month. PAF if
at Christmas mailing peak period)

POL-FS 48 hours

Table 4 Service availability at DR

Whilst Business Continuity testing might result in times lower than those defined in the table above for
POL-FS and the Remaining Services group (as is sometimes the case on the existing Horizon solution),
a single BC test (e.g. POL-FS) does not take into account that the operations staff will already be busy
working on resuming other services. Also the times defined are the maximum acceptable times for DR
service resumption and the aim, where possible, will be to provide service at the DR data centre in as
short a time as possible.

The SLT times however reflect the reality of the situation, that unlike a scheduled business continuity
test, a genuine DR request will be unexpected and staff will not be fully prepared for it. However
processes will be in place to ensure that DR will occur as planned even if key individuals are on sick or
on leave. This process will be rehearsed during the business continuity tests.

2.2.4.5 Solution Overview - Availability
System availability within HNG-X falls into 2 categories.
e Systems crucial to the operation of the branch. These will require fast automatic failover.

« Systems not crucial to the operation of the branch. These will typically allow time for a service to
be restarted without affecting the ability of the branch to trade.

The table below shows the recovery mechanisms for essential Business Systems required to enable
branch trading (where recovery times of 2 minutes or less are required).

Local Recovery Mechanism Connecting Systems

Failover Mechanism

System

BAL is connected to all
Servers; on failure detection
an alternative connection is
used

Branch Database
servers

Primary - Oracle RAC (cluster)
Secondary — Oracle Data Guard
(replication) Branch Standby Database

DCS, ETU online
Servers

Platform (Active/Standby Configuration)
Software Heartbeat mechanism between
them written to NPS.

Active Server broadcasts
message on start up

NBX Banking Agents
servers

Platform (Active/Standby Configuration)
Software Heartbeat mechanism between
them written to NPS.

Active Server broadcasts
message on start-up

DVLA online, PAF,
APOP & Help Desk
Agent servers

Platform (N+1 Configuration)

Network device checks service
and no longer uses a failed
system

Branch Access Layer

Platform (N+1 Configuration)

Network device checks service

Sop yFight Fujitsu Services Ltd

:007 ‘Commercial in Confidence

Re STE TO THRE SAY ORES
Version: 0. system

NPS database server

Oracle RAC (Cluster)

Dat&gents até-Oorfected to all
PeeNers; dA thie detection

oO
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

PLAN
COMMERCIAL IN CONFIDENCE

POL00029327

POL00029327

an alternative connection is
used

APOP database
server

Oracle RAC

Agents are connected to all

Servers; on failure detection
an alternative connection is

used

Main Host database

Platform (Active/Standby Configuration)

For current active standby

server configuration, use identity of
Active by VIP
©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref: TST/SOTHTP/0006
Version: 0.2
Date: 19-Oct-07
Page No: 71 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Table 5 Recovery mechanisms for essential Business Systems

The System Qualities Architecture paper (ARC/PER/ARC/0001) provides more details about the
Resilience, Failover and Recovery for all the main elements of the HNG-X Architecture. Reference
should be made to this document in conjunction with the High level Designs when designing the High
level Test Plan and detailed tests.

2.1.5 Estate Management

The following details are taken from the HNG-X Estate Management Component Architecture
(ARCSYMARC0005)

The key roles for Estate Management include:
e Provide storage for permitted Branch Configuration Data values

« Maintain the target OBC state for the Branch. (Noting that this may differ from live in that other
systems and staff may be responsible for achieving the desired state).

e Provide relevant configuration data for EM endpoints within the Data Centre
« Manage Operational Business Change
e Provide a delivery capability to external suppliers

e Support the provisioning of Branch Router and Counters for new and replacement units (a.k.a.

AutoConfig)
©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOTHTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 72 of 108
HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

POL00029327
POL00029327

3 Recovery and resilience
The following EM platforms to be considered:
« EMDB Server
e Boot Platform
« BCMS [DN: Out of scope currently.]

The table below summarises the recovery and resilience requirements for each platform:

Platform I Application I Recovery I Recovery DIB Data to be
(non-DR) I (DR) Time I Clustering Backed Up
Time Objective I required?
Objective

Comments

EMDB SQL Server I See Note I See Note I No Yes Si

Server 2005 *al. *al (database + I SAN (no VIP
logs) necessary). Real
Time access by EM
configuration data
consumers

(RADIUS etc) — but
endpoint must
provide resilience
for EMDB being
unavailable. EMDB
must poll data
providers (and be
capable of handling
their unavailability).

ingle blade with

Boot Radiator, 24 hrs See I 24 hrs See I No Yes Re

Platform Note * a.2 I Note * a.2 (database, but for Counters
transaction and Routers that
Router logs, RCFs I are being
Bootserver, and BSFs) provisioned (small
number and could
cope with 2 hour
outage). 2 Blades

RCAP,

Counter
BootServer

wi

eal time access

ith SAN.

Notes:

1. Each endpoint will be able to function with EMDB unavailable. The EMDB R
minimum length of time determined by the minimum value of:

TO values will be the

a) the minimum time required by the set of all EMDB endpoints can operate without EMDB,
b) the minimum time required for final changes to be entered into EMDB by OBC Team is
currently 17:00 on day-2 (which would imply that for a change on day-0, gives approximately

36hrs).

c) the maximum time for Branch Router, HNG-X and XP OS Migration changes can be

delayed without affecting installation of replacement units. This is likely
critical.

to be the most

2. The Boot platform as a replicated system will have similar recovery time to that of the Horizon

BootLoader (i.e. 24hrs based on current Business Continuity plans).

©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref
Version:
Date:
Page No:

TST/SOT/HTP/0006
0.2

19-Oct-07

73 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

3.1 Hardware Resilience

The EM platforms: BCMAS, EMDB and the Boot Platform are provisioned as individual Blades within a
Blade Frame Server. The Blade Frame technology effectively gives each server platform a fully resilient
virtual LAN connection to their respective Network Security Domains in the Campus Network.

The Blade's storage is supplied via a common SAN that is configured with distinct areas for Operating
Systems and Paging, Binaries and Data.

In the event of a single platform Blade failure, there are four likely failover scenarios.
Re-provision the failing platform on a spare (v)Blade in the Blade Frame.
Re-provision the failing platform on a spare (v)Blade in another Blade Frame.
Restore Image on new (v)Blade in the Blade Frame
Restore Image on new (v)Blade in another Blade Frame

In both of the re-provision cases above, the entire platform’s storage is immediately accessible via the
SAN.
[DC: A roll back of the database and a replay of transaction logs may be necessary]

3.2 Database Backups

EMDB requires regular backups and the ability to recover back to a position 5 minutes prior to a failure.
The 5 minute value may yet prove to be too long due to potential loss of input from external systems.

3.3. EMDB Endpoint Resilience Requirement

Each EMDB endpoint is responsible for its own resilience to the loss of its interface with EMDB should it
ever fail or be unavailable.

3.3.1. Time Synchronisation

3.3.2 The following details is taken from the High Level Design for Time Synchronisation at HNG-
X (DES/NET/HLD/0013)

3.3.3. NTP Servers

In the event of individual failure the stratum 1 and Active Directory client devices will be configured to
use:

e Either lan port on the device.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 74 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

e Either NTP server at the production site
e Either NTP Server at the DR site.

In the event of a collective failure of the stratum 0 devices the stratum 0 devices will have their names
aliased to DNS entries for the Estate Time Servers on all stratum 1 clients, the Estate time server will
have its TTL entry in the primary DNS Server set to one hour to ensure that within around 2 hours or so
the change in address will have been propagated throughout the system.

3.3.1.1. Reliability

The NTP protocol explicitly addresses resilience and reliability issues and can generally ensure that time
rarely exceeds 0.0128 seconds from the stratum 0 source, this is regarded as an acceptable upper
margin; there is redundancy in the system such that if any time servers should fail it will be replaced
operationally by another. The Windows based time service is a proprietary solution with characteristics
similar to the NTP standard and it is believed to be equally reliable.

Broadly speaking all strata will follow the following guidelines during normal operation where A is the
observed time difference between the time source and local clock.

Deviation IAI>5 seconds 5>IAI>1 seconds IAI <1 second

Action Report exception I Step change to I Drift towards
source time, log I expected time
action

When platforms start up there will be an introductory period where Windows machines will be manually
synchronised to the required tolerance, a function that Unix Machines will automatically perform (N.B. It
will be the platform owner's responsibility to ensure that any significant negative time changes are
preceded by appropriate housekeeping measures).

3.3.1.1.1 Stratum 1&2

To make a step change if the time is out by more than 1 second and less than 5 seconds time.

3.3.1.1.2 Stratum 3+

Not to report any events but drift towards the provided time; the time discrepancy will be reported by the
BAL.

3.3.1.2 Recovery

Support documentation and Kels will be provided to describe the necessary recovery steps should any of
the above occur.

3.4 Resilience

The system will be an active-active configuration at stratum 0 with two time servers at each site.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 75 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Where a step change of more than 5 seconds occurs the Windows Service will stop synchronising and
the Unix daemons will terminate without synchronising, the consequential events will be recorded and
reported through Tivoli.

3.5 Business Application Dependences

Business applications should not be allowed to start unless the time service is running. The time service
will not run if it is more than 5 minutes away from UTC and it can see a time server.

3.5.1

3.5.2 Active Directory

Directory services are provided by Windows Active Directory. AD will be deployed in accordance with
best practices for security and resilience to provide a continuous service in the event of disaster. This is
described in DES/PPS/HLD/0003. Interface modules are provided to allow Solaris and Linux systems to
interact with AD.

3.5.3 Secondary authentication is integrated with AD and managed transparently for applications.
This is described in DES/SEC/HLD/0001

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 76 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

The following details is taken from the Active Directory HLD for HNG-X (DES/PPS/HLD/0003)

To provide resiliency there will be 2 domain controllers per data centre, at each site there will be one
domain controller hosted within the Fujitsu Siemens Bladeframe and one hosted on a discrete server.

The Active Directory will be hosted on a Bladeframe pBlade which provides the highest server
availability model, the Bladeframe infrastructure provides the following resiliency (see Table below)

Additional domain controllers will sit outside the Bladeframe to ensure service is maintained in case of
connectivity failure with the Bladeframe

High level disaster recovery and resiliency information is covered in the HNG-X Resilience and Disaster
Recovery High Level Design document DES/PER/HLD/0001 level information derived from the TRIOLE
Active Directory templates can be found in the Active Directory Low Level design.

Failure Effect Action
p-blade failure None Replace hardware
p-server components failure I None Resource components are not single points of failure,

additional resources can be allocated to maintain resiliency
upon single failure.

c-blade failure None Configuration failed over to spare c-blade and c-blade
replaced

SAN connection failure None SAN connections provide resiliency (see SAN design for
details)

Network failure None Network design provide resiliency (see Network design for
details)

Table 6 Bladeframe Failure Effect and Action

3.5.4 Domain Name Service

A primary and secondary DNS service is provided based on dedicated linux servers. DNS is designed for
resilience across sites, and therefore the resilience model is also the DR model. The Windows Active
Directory domain controller infrastructure is also a secondary DNS server, and provides DNS services to
the Windows platforms in the estate.

The following details is taken from the Domain Name Service High level Design (DES/NET/HLD/0006)
The DNS must be resilient to:

Server Failure

Software failure

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 77 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Network failure

Data fill errors

The internal DNS is authoritative for the HNGx domain “horizonng.com” and comprises:

e One logical server at each data centre to host Windows services and DNS information. This
information is hosted within the Active Directory domain on a Windows 2003 server.

«One logical server at each data centre to act as the primary name server and host non-Windows
information. This information is hosted on a UNIX server running the BIND DNS software.

One Virtual IP address (VIP) across both data centres to provide a resilient access method to the DNS
service.

The primary DNS for the information above is at the active data centre; this is termed the primary master
DNS server. A secondary server exists for each service at the DR data centre; this is termed the
secondary master or slave DNS server. The primary and secondary servers are master (authoritative)
for the information served. The secondary DNS servers at the DR data centre will transfer their zone
information from the primary servers in the active data centre by zone transfer. The secondary servers
are dependent on the primary servers and will cache the data transferred from the primary server in local
files®.

The following types of failover are provided for:
Network Interface Card (rEth/appliance NIC) failover
IP failover

DNS server failure

DNS service failover

DNS client failover

$ See the section on Resilience for why this is important.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 78 of 108
oO
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

PLAN

COMMERCIAL IN CONFIDENCE

POL00029327
POL00029327

IRE11

ONS Tertiary
(vServer)

DNS Primary DNS P
(appliance ) Server D

IRE19

DNS Secondary
(appliance )

DNS Service
LAN

Source & Destination

ACE-M alo
3lz
3]0
<fs
Virtual Bie Virtual
IP 5I° IP
ais
=la
ale
. aa I
Security layer. I I
Protection for DNS I {
server operating I I
system and software < \ I
through firewall and \ I
intrusion detection RHI RHI
systems \

To Virtual I

Stateful load
balance client
requests via single
Virtual IP address to
> multiple physical
servers. Prevent
client resolver
timeouts via server

/ availability checks.

vo2
Figure 4 DNS service resilience overview
©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref: TST/SOTHTP/0006
Version: 0.2
Date: 19-Oct-07
Page No: 79 of 108
2
FUJITSU PLAN

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

COMMERCIAL IN CONFIDENCE

3.5.5

Remote Support and Diagnostics

The following testing considerations are drawn from the Remote Support and Diagnostics Topic
Architecture (ARCSYMARC0004)

The software facilities that together provide Enterprise Management are known as SYSMAN. SYSMAN2
is the generic name for all such software in the Horizon environment; this is updated to SYSMAN3 for the
HNG-X solution

3.5.5.1

Remote Access Framework

The notional framework that will support remote access will require a number of discrete components.
These will include:

The Tivoli Management Framework.

The Secure Access Servers (SAS) that will offer the point of access for all workstations, via
Windows Terminal Server.

An OOH facility that will allow remote access to the Campus via secured dedicated laptops
connected to the SAS

Secure 3° party support access
Secure Support workstations

Secure Console access

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 80 of 108
POL00029327
POL00029327

(oe) HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST q
FUJITSU rian &>

COMMERCIAL IN CONFIDENCE

Figure 5 Remote Access Framework

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref, TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 81 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

3.5.5.2 Recovery and resilience

In common with the RMGA application the SAS and Tivoli framework will be active in one campus, with
failover to another server within the same campus. In the case of severe failure the complete
environment will be reinstated the other campus.

3.5.5.2.1 SAS

The use of three SAS at each Data Centre will allow for failover to the remaining site in the event of a
DR situation. In the event of a single server failure at one site one of the remaining SAS can be used for
remote support access.

3.5.5.2.2 Test SAS

One Test SAS will be situated in the main campus. In the event of a failure the main SAS can be used
until the Test SAS is brought back on line.

3.5.5.2.3 Aurora

There will be at least two Aurora servers located at each site providing a recovery mechanism in the
event of Data Centre loss.

3.5.5.2.4 TMR

The TMR will be the subject of hot backups at regular intervals which will allow for recovery onto an
alternative platform. Such backups must be available in both sites to allow consistent recovery

3.5.5.2.5 TPM

The TPM volatile data is held on the external database server so no special backup recovery is required;
the exception to this is the local user database which must be backed up at regular intervals to ensure
user/role changes are recoverable.

3.5.5.2.6 Tivoli Gateways

Since there will be multiple gateways and the Endpoints are agile in the case of gateway failure,
resilience is automatic. There is little volatile data on a Gateway so on failure it is simply the case of
loading the software onto a new server. This is similar in the case of Campus failure.

3.5.5.2.7 Workstations

There are many instances of workstations so there is no need for action in the case of single failure.
Single failures would be handled by the normal incident management process. In the case of Campus
failure the workstations will need to be reconfigured to point to the other Campus.

3.5.5.3 Migration

The main issue for remote support access is to maintain the access to newer systems and estate
management tools as they are brought into HNG-X, whilst providing access to existing Horizon systems
and tools.

The Volume and Integration testing environment will be accessed through the HNG-X SAS.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 82 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

The Tivoli migration from Horizon to HNG-X will cause particular problems within the area of Remote
Support and Diagnostics. The main reason for this is the current Tivoli TMR, Gateway and Endpoint
versions are only compatible with Microsoft up to and including NT4 SP6, currently found at the Branch
estate.

The target TMR, Gateway and Endpoint versions for HNG-X (SYSMAN3) are supported in Windows
version later than, and including, W2000 but not NT 4. Some Campus servers are built around Windows
NT and are not being rebuilt for HNG-X. Legacy Campus machines (NT SP6, Solaris 8); Horizon Branch
and HNGX Branch (pre XP) will be managed by the Legacy TMR and Gateways. Any New Campus
machines (i.e. RHEL, MS 2000+, Solaris 10) will be managed by SYSMAN3. During migration,
therefore, there will have to be the ability to easily identify under which structure a machine is managed.

The above facts cause the need for a controlled migration with some Legacy support servers required in
the short term.

3.5.5.4 Testing and Validation

To test the HNG-X Remote Support and Diagnostics architecture a test unit will need to access the
servers in Belfast. Listed below are the high level testing requirements:

e Access to the SAS, Tivoli Management Framework and identity management solution for all
phases of HNG-x testing.

« Access to provide the ability to connect to Databases in the Data Centre via the SAS. This will
be provided using a specific Test SAS.

« Access to allow the take over of the GUI on servers in the Data Centre via the Test SAS.

« The access has to be secure, and not infringe Fujitsu Services or RMGA security policies.

e Large amounts of data may be transferred between workstations and the HNG-X System. This
will require the selection of a tool to provide secure data transfer.

The following BCP/DR testing considerations are drawn from the Remote Support Secure Access Server
High Level Design (DES/SYM/HLD/0017)

Section Design Text

4.1.1 (Access) I OOH Support access will be provided using OOH laptops which will provide access
during disaster recovery periods

8.2 The platform will provide resilience and repair described in the Windows 2003
(Availability) platform design. For the blade hosted SAS in IRE11 and IRE19.

For HNG-x it is planned to have 3 SAS in each Data Centre.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 83 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

3.5.6 Branch Support Database

The following testing considerations are drawn from the Branch Support Database High Level Design
(DES/APP/HLD/0023)

The document describes the design of the Branch Support Database (BRSS), which will be built on a
new database server using Oracle 10gR2 Enterprise Edition software.

The Branch Support Database will be populated with transactional, reporting and control data replicated
from the Branch Database on a near real-time basis. Adequate security measures will be put in place to
ensure that sensitive end-user information will not be replicated across from BRDB to BRSS.

Third line support (SSC) access to the Branch Database is limited and controlled to safeguard the
performance of the Branch against the support actions of SSC. Hence a separate support database
(single instance) is being made available for third line support.

The data will be retained in the BRSS for longer time duration as compared to the data retention in
BRDB. The reason for this is to satisfy the requirement of support streams to be able to access such data
over an extended period of time.

The Branch Support Database will provide a centralised point of access to live transactional, reporting
and control data for the various business and technical support streams.

BRSS will also be used to generate intermediate reports in order to satisfy some of the SLA reporting
requirements.

3.5.6.1 Availability

The Branch Support Database is a support system whose primary objective to provide a dedicated point
of access to Live data for the support streams. If BRSS were unavailable, the data is accessible from
alternate sources such as the Branch Database for more recent data and the audit storage system for
historical data. Because of this, there are no hard availability targets set for BRSS.

However it is expected that in the event of a failure, the BRSS be available for use within 24 hours.

3.5.7 Restart/Recoverability

Process Control supports process restart and recoverability. For more details on the common process
control, refer to HADDIS - Host Applications Design and Development Standards (DES/GEN/STD/0001).

The Restart/Recoverability at database/instance level is discussed in Section Failure &
Restart/Recovery.

3.5.8 Fail-over

The Branch Support Database runs on the BladeFrame Linux environment. Fail-over is implemented
using a remotely mirrored EMC file store while resilience to hardware faults can be handled by the
BladeFrame technology's inherent fault management and resolution. This assumes that the BRSS
environment operates under a N + 1 server strategy.

For a detailed discussion of Failure scenarios and failover, refer to Section Failure & Restart/Recovery.

3.6 Failure & Restart/Recovery

This section lists the various Oracle failure scenarios in detail and discusses the action to be taken in
response to each different type of failure.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 84 of 108
oO
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

POL00029327
POL00029327

PLAN

COMMERCIAL IN CONFIDENCE

3.6.1

Problem Scenarios & Recovery Options —- Summary

Problem Type

Problem Detail

Recovery Action Details

Instance Failure

The Branch Support Database
instance crashes

The instance failure will be flagged by Grid Control and support will need to
manually restart the instance.

Data replication from Branch Database will pause without any data loss while
the instance is restarted as long as the restart occurs within 24 hours as the
storage area used to hold pending Streams packets is sized to hold 1 peak
day's transactions.

Branch Support Database
Node crashes

The failure notification will occur via ITM Tivoli agent and via Grid Control (from
Oracle perspective)

Bladeframe technology will attempt to automatically restart the failed ‘pserver' on
a different physical blade in the LPAN. Once RHEL4 initialises in the new
blade, BRSS database instance will automatically start via oratab,

The Branch Support Database
instance crashes but fails to
restart

This scenario is a continuation from problem #1

if a manual restart of the failed database instance does not resolve the issue,
the error must be diagnosed by support and the database instance restarted. As
mentioned earlier, the Streams storage buffer in Branch Database can hold one
day's transactions. If the fault resolution is in danger of exceeding that period, it
is recommended that the size of the storage buffer‘ be increased to avoid any
data loss in the Branch Database.

In the meantime the Branch Database can be used by support for running low-
impact queries.

The Branch Support Database
node crashes but fails to restart

This scenario is a continuation from problems #2 & #3.

if the Bladeframe PAN manager cannot automatically restart the blade, support
will be flagged and will need to resolve the issue manually. The same Streams
buffer storage constraints that were discussed in #3 apply here.

In the meantime the Branch Database can be used by support for running low-
impact queries.

Media Failure

Alert-logs, RMAN backup
(check logical), dbv, Grid
Control detects a corrupt block

if the block corruption results in a database instance failure, as may be
expected if the corruption affects the data dictionary in the system tablespace or
the online-redo logs, the resolution options discussed as a part of Instance
failure (above) should be followed.

If the block corruption does not result in a node / instance failure, block recovery
using RMAN “blockrecover” command should be attempted. Block-recovery will
make use of the backup sets to recover the last known image of the block and
any changes made using the archived and online redo logs.

There may be simpler ways to recover from corruption of certain objects by
utilising application knowledge. Refer to Section 2.2.8.5.5 for further details.

The monitoring / verification
tools detect a data file
corruption

As discussed for block corruption above, if the file corruption results in
database instance failure, the resolution options discussed as a part of Instance
failure (above) should be followed.

If the file corruption does not result in an instance failure, the corrupt file and its
contents can be recovered by standard RMAN recovery options.

The monitoring I verification
tools detect a data file
corruption along with corruption
of online / archived redo log
files

The Branch Support Database writes archived redo log files to two different
locations and each location resides in a separate EMC DMX. This makes the
possibility of redo-log corruptions due to hardware issues unlikely. There is
relatively a greater chance of redo logs being corrupt due to a logical corruption
in the Oracle / EMC buffers

If such a corruption results in database instance/s failure, a full RMAN-based
database point-in-time recovery should be performed. There is a potential for
data loss here, which cannot be avoided.

4 The size of the storage buffer can be increased by resizing the tablespace BRDB_STREAMS_DATA.

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07
Page No: 85 of 108

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

COMMERCIAL IN CONFIDENCE

Fe)
FUJITSU

The monitoring / verification
tools detect a corruption of the
database control file

This will most likely result in a database failure, as the corruption will be
replicated across all copies of the control file

Recovery is a straightforward process

Restore a previous backup of the control file and apply any file-level changes
made since then and manually add any temporary files ie. temporary
tablespaces. Perform full RMAN database recovery to bring the restored control
file in ine with the change numbers in the data files.

Network Problems I Network slows down which I The network problem must be resolved manually.
peut in te Branch Support The Streams storage buffer in Branch Database may need to be increased if
further b hi i th or bite the Branch Support Database is in a danger of falling behind the Branch
further Behini 'e Branch I Database by more than 24 hours as a worst-case scenario.
Database
User Errors User inadvertently drops a table I The dropped table can be recovered using standard RMAN backup recovery
procedures. RMAN will need access to the most recent Level-1 backup and all
subsequent Level-2 backups along with copies of archived redo log files since
the Level-0/1 backup,
Refer to section Error! Reference source not found. for details on the
location and retention period of the various backup components.
3.6.2 Failure Types

3.6.2.1

An Instance failure occurs when software or hardware problems disable an instance. A common cause of
instance failure is a Network / OS level glitch, which tends to disappear after a short period of time hence
the automatic restart should be set up.

Instance Failure

Grid Control will be used to monitor instances and alert in the event of a failure. There is an option of
scripting in a restart of the failed instance into OEM Grid Control but it will not be used.

3.6.2.2

A media failure is a physical problem that arises when Oracle tries to write or read a file that is required
to operate the database. An example is disk head crash causing loss of all data on a disk.

All Branch Support database components essential for the operation of the database will reside on SRDF
replicated Rail-1 / Raid-5 disks. SRDF will ensure that every byte saved to the disk on the local (primary)
site is synchronously replicated and saved to the secondary (DR) site before a positive response is
returned back to the OS or disk management software such as ASM.

Media Failure

RAID-5 technology ensures that every byte of data written is mirrored on an erstwhile location in the disk

array so even if a disk in the disk array were to fail, there will be no data loss.

The combination of SRDF and RAID-5 ensure that the possibility of media failure is greatly minimised.

The Oracle database will be running in archivelog mode and the archived redo logs are copied across to
multiple locations so even if a media failure were to occur, provided the archived redo logs are
accessible, a straightforward database point in time recovery will ensure that there is no data loss.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07
Page No: 86 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

3.6.2.3. Block Corruptions

A block corruption is said to occur when Oracle detects that the block wrapper (block header & footer) of
one or more blocks is corrupt/invalid.

Once Oracle detects a corrupt block, it writes the following error message to the alert log for the instance
that detects the corruption:

ORA-01578: ORACLE data block corrupted (file # %s, block # %s)

Where file# is the file 1D of the Oracle datafile and block# is the block number, in Oracle blocks,
within that file.

Any potential downtime is dependent on how quickly block corruptions are detected.

3.6.2.4 Detecting Block Corruptions

An Oracle error #1578 does not always mean that the block on disk is truly physically corrupt as the error
message might just be indicating that there is a corruption in the cache. A number of means are

traditionally available to verify that the block on disk is physically corrupted:

» Set DB_BLOCK_CHECKSUM parameter to TRUE (default).

DB_BLOCK_CHECKSUM determines whether DBWn and the direct loader will calculate a checksum (a
number calculated from all the bytes stored in the block) and store it in the cache header of every data block
when writing it to disk. This allows Oracle to detect block corruptions whenever the block is read. If the block is
corrupted, error messages are written to the alert log but processes may not necessary fail.

This parameter will be set to TRUE for the Branch Support Database.
» Check messages in alert log on regular basis.

Oracle records any block corruption errors that it detects in the alert log. Automatic monitoring of corruption-
type alerts in the alert log will be set up via Grid Control.

» Set DB_BLOCK_CHECKING parameter to TRUE (currently FALSE)
Setting this to TRUE causes Oracle to proactively check for corruptions and hence aid early detection
>» Detect logical corruptions using RMAN “CHECK LOGICAL...” command.

This check option will be used by the Branch Support Database as a part of the backup operation. Refer to
Section Error! Reference source not found. for details.

3.6.2.5 Recovering from Block Corruptions
Once block corruption has been detected, the key task is to recover lost data. There are three options

available for recovering data in the Branch Support Database:
> Use application-specific means of restoring data.

> Recover the corrupt blocks using RMAN

» Restore from Oracle export files

Oracle block corruption will be faithfully replicated by the mirroring system (SRDF) to the remote DR site
hence failing over to DR is not an appropriate recovery method.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 87 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Index block corruptions are best resolved by rebuilding the index. There may be a performance impact of
rebuilding and recommendations about time of rebuilding have been made in the later sections.

The appropriate recovery option to choose will depend on the type and criticality of the object being
recovered and also whether the corrupted information has been consumed by all consumer systems. The
Branch Support Database objects can be grouped together based on the recovery options available e.g.
one group would be indexes where the recovery option would be to rebuild the index segment.

The discussion of object groups and recovery options available will be covered in the Support Guide.

3.6.3. Aurora Console Access
The following is drawn from HNG-X Resilience and Disaster Recovery HLD (DES/PER/HLD/0001).

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 88 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Aurora is used to manage all (serial) consoles for equipment such as cBlades, Solaris servers and Cisco
switches in a controlled and logged manner without physical access.

There will be two Aurora systems at each site with interfaces on the management LAN, each managing
complementary equipment, e.g.

Aurora1 manages bf001/cb1
Aurora2 manages bf001/cb2

Aurora1 manages core2 network switch (from mgmt LAN on core1)
Aurora2 manages core1 network switch (from mgmt LAN on core2)

Aurora1 manages Aurora2 and vice versa

Aurora connectivity is typically only used during "dead server" type recoveries, and is not required to be
highly available, but is very useful for looking at the logs to see what went up the screen as the system
died.

In the event of major disruption preventing access site access will be requested by the local Unix
Support team who will gain emergency access via the Aurora physical console port until general
connectivity is restored. This has never been required in Horizon.

There is no DR requirement for Aurora itself, but it is a critical component in Solaris DR to allow properly
managed reboots

The following BCP/DR testing considerations are drawn from the Aurora Console Access High Level
Design (DES/SYM/HLD/0020)

Section Design Text
6.1 A console server will be installed at each data centre.
Overview
8.1.3 An additional Console (standby) server, Aries multiport card and modem should be
Server purchased, per installation, to provide resilience, protecting against Console servers

Reliability failing. In the event the Console server fails manual actions will be required to
disconnect the failed server from all remote devices replacing it with the standby server.

The standby server should be connected to the network and kept up to date with software
updates and configuration changes. In order to ensure configuration changes are
applicable to all three Console servers (specifically with regard to device configuration
files - see section 5.2.2.1 above), the same server at each site should be connected to
the same port on the Aries card on all Console servers.

3.6.4 Authorisation Services
The Authorisation Services are described in the Topic Architecture document ARC/APP/ARC/0005

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 89 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

The following is drawn from Generic Authorisation Services High Level Design DES/APP/HLD/0006,
additional client-specific design’s are captured in the individual High Level Design documents that are
children of this document. Specifically,

DES/APP/HLD/0007_ ~—DCS Authorisation Agent High Level Design
DES/APP/HLD/0008 —_— ETS Authorisation Agent High Level Design
DES/APP/HLD/0009 _—NBS Authorisation Agent High Level Design

3.7 General

Mechanisms are required to ensure that where an instance of an Authorisation Agent fails another will
take its place. Resilience is achieved by having two instances of the Agent running at the same time on
different platforms. Both agents start in standby mode. Heartbeats exchanged through the NPS are
used to decide which agent becomes active and when and if the standby agent should take over.

When an Agent instance fails, all outstanding transactions being processed by that Agent will be
abandoned. No attempt will be made by the replacement instance to recover such work (e.g. from the
NPS). If possible, the failing agent informs the Branch Access Layer of its change of state by sending an
ASTS message (see Error! Reference source not found.) to each Online Service Router connected to
it. The replacement agent informs the Branch Access Layer of its change of state in the same way. The
OSRs route subsequent messages to the active Agent. Requests that were waiting for responses from
the failed Agent may be failed immediately or left to time-out.

Successful failover relies on the NPS to provide the necessary reliable communication mechanism
between the active and standby instances. The NPS is implemented with two Oracle instances. If an
instance fails the Agent process continues operating using the other NPS Oracle Instance while trying to
re-establish the failed connection. Failure of both instances leads to termination of the Agent and a
Tivoli controlled restart.

Controlled failover from an active instance to a standby instance occurs when the active agent “resigns”
following loss of a critical resource and writes a heartbeat showing itself to be unavailable. (An active
agent won't resign if the standby is unavailable.) Unilateral failover occurs when the standby agent fails
to read a heartbeat from the supposedly active agent for some configurable period.

Note that an active agent will not fail over on loss of its connections to the external client. The resilience
built into the network is such that the standby agent (which is running in the same Data Centre as the
active agent) is unlikely to fare any better.

3.8 Heartbeats

Each Agent instance writes a Heartbeat to the NPS periodically (configurable in registry). Each of an
instance’s Heartbeats overwrites its previous Heartbeat, so only its most recent Heartbeat is available. A
separate Heartbeat History table makes Heartbeat information available for systems management
purposes. The History table is updated each time a heartbeat is written that differs from the previous
heartbeat in a field other than the timestamps.

The Heartbeat includes the following information for failover purposes:
e Agent Active - Whether the Agent instance is actively processing NBX transactions.

« Agent Available - Whether the Agent instance is operational, i.e. whether it would be able offer
an authorisation service at all. Note that a standby instance is normally operationally available.

e Client Available - The availability of the Agent instance’s connections to the external client. The
meaning of ‘available’ varies according to the client in question. This datum is only relevant for

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 90 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

an Active instance - a Standby instance does not establish any connections. The value can
indicate all, some or no connections available.

« Priority — A static priority value obtained from Agent's registry. This is used to determine which
Agent instance has priority at Agent service start-up. It is also used to determine which Agent
should ‘resign’ where some error situation has led to both being Active. The values 1 and 2
should be used, with 1 being the higher priority

As Heartbeats are also used for operational monitoring of the Authorisation Agent instances, an Agent
instance will write a Heartbeat even if it is operationally unavailable.

Each Agent instance connects to both NPS Oracle instances, so that it can read Heartbeats from both.
(Note that they are written to only one Oracle instance.) Failure of either connection will require the
Agent to enter a retry loop until connection can be re-established. Failure of both connections will result
in the Agent exiting, at which point it will be restarted by SYSMAN.

Each Agent instance will attempt to write a final Heartbeat when it closes down, in both normal and
exception scenarios, to inform its Partner what it is doing. Agent_Active will be set to ‘N’ and
Agent_Unavailable to ‘Y’.

3.9 Agent Failover
There are two distinct failover scenarios to be considered:
e Controlled failover — both agent instances are running and can control the decision
« Unilateral takeover — an expected Heartbeat refresh by the Active Agent has not happened

The algorithms for both controlled failover and unilateral takeover take account of the exceptional
running of three or more Agent instances.

3.9.1 Controlled Failover

Upon reading a Heartbeat, an Agent instance has to decide whether it is the one that should be the
Active instance.

Controlled failover from an active instance to a standby instance occurs only when re-homing (see
2.2.10.7) or when the active instance resigns following loss of a critical resource. The resigning agent's
final Heartbeat will set Agent_Unavailable to ‘Y’. The active instance will not resign if its Partner is
advertising itself as unavailable.

If more than one instance is claiming to be available, the decision-making between them is as follows:

e Agent_Active - an active instance takes precedence over a standby instance (i.e. a standby
instance will never negotiate to wrest control from an active instance)

e Priority - everything else being equal, the instance with the lower priority number will take
precedence® . This is relevant if both instances are in standby, as could happen if both are
started at near enough the same time, or both are active (which should never happen)

Not all resource losses cause a failover. The networks between the Authorisation Agents and their
clients are designed to be highly resilient. As such, an active Agent will not fail over to its standby in the
event of network problems — the standby Agent is very unlikely to find the network in better shape.
Failure of an external client connection is also not a reason for failover, since the external client is
outside the HNG-X operational domain. Failover may not improve the situation and would unfairly count
against HNG-X availability rather than the client in service level statistics.

5 A configuration error could leave both instances with the same priority. In that event the Agents will use the alphabetical order of their
host names as the final discriminator.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 91 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

3.9.2. Unilateral Takeover

A Standby instance will take over when it detects the non-refresh of the Active instance’s Heartbeat for
some period (configurable via registry).

3.10 NPS Failure

The NPS is accessible via two different Oracle instances. Each Authorisation Agent Server is physically
connected to both Oracle instances; the Agent is capable of connecting to one or other of them at all
times.

When a connection to one Oracle instance fails, any Agents connected to it need to automatically fail
over to use the other Oracle instance. Failover is expected to be achieved within a few seconds,
therefore minimising the period that the authorisation service is affected. If the Agent loses its
connection to both Oracle instances, it will fail.

During the connection phase when the Agent is first loaded, the Agent attempts to connect to both Oracle
instances. Until it has succeeded connecting to at least one of them, it adopts the standard Agent
approach of retries as appropriate; retries continue until the configured total_connection_timeout period
has elapsed, after which the Agent fails. Each Agent is configured to have a preferred Oracle instance,
for overall performance reasons. There is a delay between attempting to open the preferred instance
and the non-preferred instance.

Once it has connected to one Oracle instance, the Agent can enter its main processing phase. Attempts
to connect to the other Oracle instance continue indefinitely (and are not controlled by the
total_connection_timeout).

Similarly, following a failover from one Oracle instance to another, attempts to re-establish resilience are
made by trying indefinitely to reconnect to the original Oracle instance.

3.11 Re-homing

For efficiency, an Authorisation Agent should write its Transaction Journal records to the same Oracle
instance as any process that is harvesting those records. This is material during the core day, merely
desirable outside core hours. Such components are configured to prefer a particular Oracle instance, but
failures may cause one or more participants to fail over to the non-preferred instance. In other words
components accessing the NPS can get out of step with regards to their active Oracle instance, and it is
desirable to resynchronise at some point.

As an independent requirement, it is helpful to operations staff if they can predict where active instances
will be running, and resynchronisation following failover is also desirable.

These two (independent) re-homing tasks are configured via the registry to occur together at some time
overnight. The active agent stands down (terminates) in favour of the standby agent if its priority is lower
than that of the standby (see 2.2.10.4). Both active and standby agents revert to their preferred Oracle
instance.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 92 of 108
Fe)
FUJITSU

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
PLAN

POL00029327

POL00029327

COMMERCIAL IN CONFIDENCE

3.11.1

File Transfer Managed Service (FTMS)

The following details are taken from the File Transfer Managed Service High Level Design
(DES/APP/HLD/0051):

Section 4.6
Recoverable

Resilient and .

The solution must be able to recover and retransmit files from the
last successfully completed transfer after a system crash or
lockout (provided the system is NOT dead or corrupt)

e The solution must have a retry facility that overcomes any
temporary aberration on the network/systems

e = If recovery is not achieved automatically by the solution then
simple operating procedures must be developed.

e The solution must detect and report errors.

Section 5.2.4 Multiple e The failure of one channel must not stop other channels from
FTMS Channel working
Architecture
Section 5.6.1 Networking I There are currently three supported physical connections for an FTMS
Services link: ATM, Frame Relay and ISDN.
e Resilience and recovery may vary from one connection type to
another
Sec 5.6.3 I The loss of an individual platform should I The structure of domain design and
Domain not prevent FTMS from being able to placement of domain controllers directly
Design process files via an alternative route if affects the resilience and recovery of the NT
ae there is one. When the system is fixed it infrastructure.
Resilience
and should be easy to restore the system for There are also known issues with dual
use. Protection of data also needs to be
Recovery network cards.

considered and an appropriate backup
strategy defined.

Sec 8 System Qualities
8.1 Availability

FTMS application must be developed to be able to support 24-hour use
with minimal recovery time in the event of software or hardware failure.

The network link to the remote sites should be designed with built-in
protection against single points of failure.

The generic recovery procedures for an FTMS link are covered in [TD/STR/007]

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence

Ref. TST/SOT/HTP/0006
Version: 0.2

Date: 19-Oct-07

Page No: 93 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

3.12 Features Not to be Tested

The full Q4 2008 DR activity is outside the scope of this plan and is documented in HNG-X Business
Continuity Test Plan (SVM/SDM/PLA/0003).

Security testing should be covered via other test steams and where particular tests, perhaps by virtue of
the sensitivities surrounding secure materials (e.g. Live keys, encryption algorithms, etc.), require
specialised or highly secure test environments, then it will not be practicable to combine such tests with
the mainstream threads, and these will be dealt with in a separate stream of testing - Security Test. The
resilience aspects of Security such as loss of a Firewall should be tested by the Integrity test team but
under the guidance of the Security test team, utilising their expertise and knowledge to determine the
impact on Security.

The Test Environment at IRE19 will not be tested separately for resilience. There should be no
resilience issues as the HNG-X elements should be identical to IRE11. IRE19 is critical in the
maintenance of the HNG-X solution and there is a known issue regarding DR where the availability of
IRE19 for a POL project delivery may take precedence over its availability for DR.

The Help Desks though critical in support of the Post Office Business are outside the scope of this
document. Currently there is no documentation showing how the HNG-X/Hydra help desk solution differs
from that currently implemented.

Performance (Load, Volume and Stress) testing as defined in TST/GEN/STG/0001 is outside the scope
of this document and is covered specifically by the Volume test HLTP TST/SOT/HTP/0003. However,
there are elements to the solution, such as loss of 1 part of N+1, which will require that Performance
testing be undertaken. This is documented where appropriate and tests devised. It is envisaged that
these tests will be performed by the Integrity team with close cooperation of the Volume team.

NB Both teams are directly under the same manager.
Testing of the complete migration process is not in the scope of Integrity Test Team.

A backup EDG platform will be implemented at the PRISM data centre in Maidstone (Post Office CR
PSOCRO1178). This will be linked to the Live HNG-X Data Centre. The Live EDG at the Northern Data
Centre will link to both the Live and DR HNG-X Data Centres.

Testing of the EDG back-up/failover process is outside the scope of HNG-X testing.

3.12.1 (Hydra) ‘Migration States’ Integrity Testing

The target end state of the HNG-X project is that all POL Counters will run HNG-X (rather than Horizon)
software and those counters will be served by the data centre IRE11 with the data centre IRE19 as
standby. Supporting Horizon and HNG-X counters out of IRE11/19 will be achieved through transitioning
multiple stages. (i.e. Weekends A, B, C etc)

To assure the confidence in capability for each and every migration (Hydra) state one might consider the
following testing tasks appropriate:

1. Validate and Verify the processes required to effect the Migration step
2. Verify and Validate the processes required to assure a completion of migration step
3. Test for any regression on the Functional Requirements of the Solution
4. Test for any regression on the Non-Functional requirements including
o Performance (Volume, Load, Stress)
o Integrity (Resilience, Recovery, Error Reporting)

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 94 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

Tasks 1, 2 and 3 will be carried out by RV (Release Validation) test stream. These assertions however
beg the question of how assured will POL be regarding the various Hydra configurations’ capabilities to
satisfy the Non-functional requirements.

Without the availability of a fully specified test rig to undertake the Non-Functional testing for each
Migration (Hydra) State it will not be possible to give the highest level of assurance of System Capability
before is goes live.

This document is concerned with the Integrity aspects of Non-functional testing in the project so the
following comments should be read in that context.

Until Migration Weekends A, B, C and D are complete in the production/business domain, POL business
workflow requires both the Bootle/Wigan pair and the IRE11/IRE19 pair to be running; with full resilience
provisions. Whereas the current test plan provides for testing the new and replacement
hardware/software at the (IRE11/19) data centres using the IRE11/19 kit configured as test rigs, the plan
makes no provision for the use of test rigs (of similar specification to Bootle/Wigan) for non-functional
testing of the dual (i.e. England/Ireland) data centre migrations. The (IRE11) VI test rig will never be
taken through the planned migration steps. I.e. the VI test rig will only be available to the VI Team when
it is in the state where all Horizon and HNG-X Counter business is transacted through IRE11(19) Data
Centre Services {i.e. Shared Batch I Shared Online I HNG Branch I Horizon Branch}. The conclusion
therefore is that the VI test team will have no opportunity to test the IRE11/19 migration configurations.

In summary, the current plan is that no physical, E2E integrity or performance testing of the various,
migration states (other than the final state that will go into Pilot) will be possible on the VI test rig.

This document envisages Integrity Testing effort with respect to the Hydra States to comprise the
following:

e Participate in the process of Risk Assessments of the Multiple, Transitory Migration States

e Identify which of the planned Integrity Tests (i.e. those applicable to the “Final” Hydra State
[= post Weekends A+B+C+D] ) are applicable to the Transitory States

e Produce a Gap Analysis between the outputs of the two tasks immediately above

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 95 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

4 Risks

The general project risks are to be covered in the overall HNG-X Projects Risk Register.
Assumptions, Risks & Constraints specific to testing are detailed in TST/GEN/STG/0001

4.1 Hardware and Software Risk Issues

e As the Resilience Test is testing a number of new technologies there is risk that the architecture
will change. This may result in additional Test Cases being required or in the removal of or
changes to existing Test Cases.

e The complete test environment is available in IRE11 i.e. Will the software & platforms be built
and delivered on time to meet the start of testing. If there are significant delays it may be the
case that the tests are prioritised and successful coverage of tests deemed of high importance is
sufficient. NB The current intention is that the V&l environment in IRE11 will become the live
environment.

e If the personnel involved in the collaborative working areas are not appropriately empowered,
then the decision making processes will become protracted, significant levels of rework will
result, and so costs and schedules will be adversely impacted.

e — If the Acceptance Criteria are not produced at the outset, and couched in terms of the necessary
test scenarios, it may not be possible to accommodate them collaboratively when planning and
engineering the test materials as intended, and so may necessitate the re-separation of Post
Office Ltd testing stages, with all the duplication of effort and increased timescales that will
involve.

4.2 Planning Risks and Contingencies

«The documents on which this document is based are not all base lined. When they are re-issued
it will be necessary to review this document and it's associated Test Cases to ensure complete
coverage of design requirements. The resources required to achieve this review and implement
changes may put the planned Test dates at risk.

« The SRRC is not available — this would prevent the proper design of tests as the expected
outcome of a failure would not be apparent

e Integrity and Volume testing is taking place on the same rig. To attempt to achieve the
challenging timescales will necessitate 24/5 testing. Shift working and the appropriate payments
needs approval and agreement.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 96 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

5 Quality

Quality Centre is the chosen product for test documentation and administration for the HNG-X delivery.

There is a link between Quality Centre and the Doors product which allows the direct linking of test cases
to specific use cases within the Doors product.

The Test Cases and the design requirements from which they were derived will be recorded in Quality
Centre. Within Quality Centre the requirement will include a reference to the document (Reference
Number, Version and Section Number) from which it was derived. If a document, from which a design
requirement was derived is changed the requirement, Test Case and Test Case reference to the
requirement will need to be reviewed and possibly changed.

All test scripts will be generated from Quality centre.

During the Resilience Tests and DR Tests (if appropriate) the Test Cases in Quality Centre will be
updated with the result of every attempted execution.

All Quality Centre data will be secured on a daily basis through normal processes that backup the server
on which Quality Centre is hosted.

6 Approach

6.1 General

Everything except the Host and Agent layers are being entirely re-engineered, and with widespread
revision of the supporting infrastructure across the whole solution, it is important that the system itself be
used to confirm continuing integrity (DR test system). Resilience within the data centre is to allow the
solution to survive the failure of a single part of the infrastructure.

The structure and contents of a HLTP are defined in [TST/GEN/PRO/0003)
The approach to non-functional testing is defined in [TST/GEN/PRO/0012].
Defect management is defined in [TST/GEN/PRO/0010].

The extraction of Test Case definitions from Quality Centre for input to a HLTP is defined in
[TST/GEN/PRO/0006].

The testing involves two activities:
(1) Resilience testing of the HNG-X Components
(2) DR Testing of the HNG-X data centres

The testing execution will not be confined to the actual running of scripted tests against the components,
but can be one of the following acceptance methods:

cT Component Test

RV Release Validation Test
DR Document Review

DW Design Walkthrough
SOO Statement of Obligation
SOF — Statement of Fact

ST System Test run by a Test team (not necessarily System Test Stream)
As an example:
©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref. TST/SOT/HTP/0006
Version: 02
Date: 19-Oct-07

Page No: 97 of 108
POL00029327

POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

Fe)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

When resilience is provided by a backup/restore mechanism, then the testing would not be carried out by
the test team but a support team and this could then be confirmed by either or all:

1 Reviewing the design (DW)
2 Ensuring the Work Instructions give details of backup/restore procedures (DR)
3 Observe backup/restore being performed by support team(RV)

There is a danger that the Resilience testing just tests either a component or the systems ability to deal
with failure. However, equally important is how the system falls back. For instance if a server fails and
the backup server takes over the workload what happens when the original server is repaired No
assumptions will be made on the fall back strategy, these are design considerations and the tests will be
based on the design.

As important as the system having resilience is that the support team is made aware of any problems.
Therefore, the testing must not only ensure that the components have the resilience as set out in the
design but that the appropriate alerts are raised when an event, such as a component failure, occurs.

The testing is to ensure that the stated Requirements for Resilience and DR can be met. As Resilience
is a system quality then all Architecture and High Level Design documents will need to state how they
meet the appropriate Resilience requirements. Past experience would dictate that failure to do so will
have a dramatic impact on the amount of time and resource needed to carry out the testing. This
increase more in line with orders rather than a few percentage point increases.

Figure 6 Services Spear

Service

3° Parties e.g. Network Banking

Network

Custom Applications
Off the Shelf Software e.g. Oracle/SQL Server

Operating System

Hardware

Skis es Ue

There is a potential mismatch between the Business Continuity requirements of the Post Office and the
testing carried out. The major concern of the Post Offte is to carry out its business through the delivery
of its services, spearing down each layer effectively looking end to end. However, the method by which
testing will be performed is to concentrate on the resilience of the hardware and software components
which support/supply the services, layer by layer. Attempts will be made to align the services with the
underlying components to give confidence in the resilience of the service. This is similar to the approach
taken with DR.

The main emphasis of the testing is the data centre as very little resilience actually exists in the Branch.
The following is from HNG-X Systems Qualities Architecture (ARC/PER/ARC/0001):

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 98 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

6.2 DR Test Cycles

There are 4 DR failover test cycles planned with an initial walkthrough, these tests will be controlled by
ITU and operated by the actual support staff. The number of test cycles allows all staff to be made
familiar with the solution, and for F3 and F4 (as the final two tests are known) to be run in cooperation
with the Business Continuity Manager and their counterpart from the Customer and could serve as
acceptance tests.

V&I Integrity team will run a separate programme of Integrity testing designed to test the N+1 resilience
features and recovery from backup. This will start at the earliest opportunity and run right through to the
start of the migration weekends.

6.3. Test Case Analysis

The HNG-X testing strategy states that a full set of Business Requirements are to be formally stated for
HNG-X, covering both functional and non-functional aspects. These will employ Use Case Modelling
techniques, and will be elaborated to System Use Case level, and developed using UML, Sequence
Diagrams, and non Activity Diagrams, etc. as and where appropriate and held in a central repository
under formal change control these will in turn produce our low level test scripts.

6.4 Test Case Execution

V&l test team will complete the targeted Integrity testing within its own stream, collating the results where
necessary from other test streams.

As a general rule tests are executed by a single test team within a test stream, in this instance for the DR
testing it is likely that test execution/ completion will require the involvement of support personnel and
other business-as-usual teams as well as the V&l and members of the joint test team.

6.5 Approach to Resilience
There are HNG-X Architecture documents covering:

* Counter

e Branch Access Layer

¢ Online Services

e Batch Applications

¢ Branch DB

e Counter Business Applications

© Network

e Platforms and Storage

Each of these areas will be examined to assess how resilience is catered for. This will be done by a
document inspection of the Architecture, the High Level Design and the appropriate Low Level Designs.
The owning Architects and Designers will also be contacted to discover what tests have been performed
or are planned to ensure the resilience of that part of the solution. Resilience is not just how a piece of
hardware copes with a failure but how the application deals with the failure. It is anticipated that a
number of the tests will be performed by other test teams as part of the normal testing. However, it is
likely that further testing will be needed particularly in the boundaries between applications and systems.
Services have to be resilient to failure however if a service does fail then there is a target time by which

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 99 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

it needs to be available again. Testing is unlikely to proof conclusively that the time will be met just
whether or not it is likely to be met. However, testing is likely to show if target recovery time will not be
met.

6.6 Approach for DR

This is as document in HNG-X Business Continuity Test Plan (SVIM/SDM/PLA/0003)

7 Environmental Needs

V&l test rig will consist of the IRE11 HNG-X environment for Resilience testing and both IRE11 and
IRE19 HNG-X environments for DR testing. This in turn will allow the resilience and recovery testing to
be completed on what is essentially the live environment.

Both streams of the V&l team will work on the V&I test rig simultaneously, as well as the other outside
demands or request that are expected as we draw closer.

8 Responsibilities
Resilience testing will be under the direct control of ITU Fujitsu Services staff.

DR _ testing responsibilities are outlined in detail in HNG-X Business Continuity Test Plan
(SVM/SDM/PLA/0003) the 4 DR test slots will be as planned by the ITU with the inclusion of the POA
BCP manager and IS Support.

IS Operation in IRE11 will be responsible for all Data centre DR and Resilience Process and Procedures.

All test cases and results will be reviewed by the Joint Test Team with exceptions, issues, etc referred to
both the POL and FJS Business Continuity Managers.

9 Dependencies

v Post Office Ltd Business Requirements and Fujitsu Services Operational Requirements will be
produced at the outset of the programme, to formally identify both the functional and non-
functional requirements for Business Equivalence and the reduction in Total Cost of Ownership.

v_ Any Acceptance Criteria specified as to be satisfied by means of testing, will be couched in
terms of the test scenarios necessary to demonstrate that they are met.

v The HNG-X development area will adopt exhaustive, generic, component level verification
methods, in accordance with this strategic approach - Component Test (CT) and Component
Integration Test (CIT) — and retain comprehensive Regression Test packs at this level.

v_ Recovery and Resilience testing requirements documented in Quality Center

¥ Quality Center kept up to date
v Guidance on Business Continuity areas of concern

Dependencies specific to testing are further detailed in TST/GEN/STG/0001

10 Schedule

TBA

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 100 of 108
HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

POL00029327
POL00029327

11

Resources

The Resilience testing has been broken down into the Architectural areas. The intention is then to carry
out the Resilience testing as far as possible when these areas are being tested. Therefore, assistance
will be required from the appropriate teams to run the tests.

The Recovery testing will largely need the co-operation of the IS staff based in IRE11.

The DR testing will need the Data Centres in Ireland set up completely with links to 3 parties and the
standby system available as a Test Environment for Bracknell.

12

Entry Criteria

Due to the number of tests and the differing forms of the tests the Entry Criteria will be test dependent.
As such each test within Quality Center must have the Entry Criteria specified. For the Resilience aspect
of the testing examples of Entry Criteria are:

v

SKK KK

v

Architecture and design documents approved
Appropriate hardware available

IS Resource available to demonstrate process

Functional area Test Team available

Low level test Plan for Functional Area testing

Functional area testing results available in Quality Center
V&I Rig available

Injector Available from V&l Volume team

This will then lead to:

v

Test Plan in Quality Center complete

For the DR testing the Entry Criteria will be documented in
HNG-X Business Continuity Test Plan SVM/SDM/PLA/0003

13

Exit Criteria

The following Exit Criteria are copied from a check list that is document in HNG-X Testing Process —
Entry and Exit Criteria (TST/GEN/PRO/0001) and are applicable to this activity:

Y Has all the testing been completed and recorded in Quality Center?

v Quality Center test reports produced?

y Have all critical defects been closed?

v_ Tested Component Code and Data

v Test Plan

v Test Outputs

v Test Report

y Product Breakdown Structure

v_ Agreed Deliverables

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOTHTP/0006

Version: 02
Date: 19-Oct-07
Page No: 101 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

v Have all other (non critical) defects been cleared? If not, have outstanding defect(s) been
ratified for passing into next phase and a report produced?

v Have all the Objectives (Objective Driven Testing) designated for this stream, been covered
within the testing cycles?

v_ Have all the System Acceptance Criteria been met in full or non conformances been agreed and
signed off (and filed)?

y Are details of versions of all deliverables available for the handover to the next test stream?
Particular attention to be paid to components and modules that have been amended due to fixes
being applied.

Test Results Package

PMS Work Requests

Test Report Review Output

Is there a full set of testing reports available and filed?

SNR K

Is there any possibility that the system is unstable?

14 Test Pass / Fail criteria

Each Test Case defined in the Appendixes will have an “Expected Result” associated with it. The
“Expected Result” will be recorded in Quality Centre which will provide an audit trail if it becomes
necessary to change the “Expected Result”. Changes may arise for example if the functionality is revised
during the Testing, if the functionality defined in a HLD is revised or if the “Expected Result” is incorrectly
set.

If the execution of a Test Case results in the “Expected Result’ it will be “Passed”.

If the execution of a Test Case does not result in the “Expected Result” it will be “Failed”. The V&l Test
Manager will be responsible for the progressing of all failed Test Cases to a status acceptable to HNG-X
programme.

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 102 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST PLAN q

Pee)
FUJITSU COMMERCIAL IN CONFIDENCE

A Appendix — Manual Testing
A.1 Explicit Requirements

The following listings constitute the planned deliveries into this < enter Test Level Name here >. Each delivery has a listing of expected tests to be carried out using
manual testing methods

(Delete any of the ‘Delivery’ paragraphs (below) that are not required for this report. Rename the remaining paragraphs as required / appropriate)
The following is from TST/GEN/HTP/0002, then amended

ARC-484 ‘ARC-437 The system shall switch automatically from a primary DR Interrupt. I Documents provided with requirement cross reference, compliance with
Branch telecoms network connection to a secondary requirement in document.
connection where available in the event of connection
failure, and back again at an appropriate point on restoration (TDN : N. Williams comment : A DR will demonstrate how the design meets
of the primary circuit and User may be informed, this requirement)

Add : CT Add : Test to demonstrate failover of each component
(demo

failovers per

component)

ARC-484 ARC-466 The system shall switch automatically from a primary ST interrupt I Tests to demonstrate network connectivity are defined and contained within a
Branch telecoms network connection to a secondary detailed test plan, the successful completion of which shall determine the
connection where available in the event of connection acceptance of this requirement. To clarify ‘successful completion’ success
failure, and back again at an appropriate point on restoration criteria will be identified in advance to test execution
of the primary circuit and User may be informed,

(TON: N. Williams comment: The functions should be testable. Clear success
criteria for the tests (identified in advance to test execution) to be agreed and
passed into PO DOORS)

‘©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 103 of 108
Fe)
FUJITSU

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST PLAN q

COMMERCIAL IN CONFIDENCE

ARC-443 ARC-490 The resilience capabilities for the Data Centre and the Data_] SOO Minor Contractual Documents provided with requirement cross reference, compliance
Centre network will be as specified in Data Centre with requirement in document.
Operations Service Description. (amended as per review
2/2107)
ARC-443 ARC-488 The resilience capabilities for the Data Centre and the Data I DW Minor Walkthrough (or agenda item in walkthrough) will be arranged which will
Centre network will be as specified in Data Centre demonstrate this requirement has been met
Operations Service Description. (amended as per review
212107)
ARC-492 ARC-444 Any single failure within the Data Centres shall not cause I DW Interrupt I Walkthrough (or agenda item in walkthrough) will be arranged which will
loss of any of the Business Capabilities & Support demonstrate this requirement has been met.
Facilities
(TDN : N. Williams comment : A DW will demonstrate how the design meets
this requirement)
ARC-492 ARC-470 Any single failure within the Data Centres shall not cause I ST interrupt _ I Tests to demonstrate business continuity are defined and contained within a
loss of any of the Business Capabilities & Support detailed test plan, the successful completion of which shall determine the
Facilities acceptance of this requirement. To clarify ‘successful completion’ success
criteria will be identified in advance to test execution
(TON: N. Williams comment: Is it practical to simulate the potential single-
failure over modes, to demonstrate no-loss?
Clear success criteria for the tests (identified in advance to test execution) to be
agreed and passed into PO DOORS.
ARC-493 ARC-445 Switchover to backup systems within the Data Centres and_ I DW Interrupt I ? Walkthrough (or agenda item in walkthrough) will be arranged which will
for the network connections within the Data Centres shall demonstrate this requirement has been met.
be automatic where defined for that service,
(TON: N. Williams comment: A DW will demonstrate how the design meets this
requirement.)
Add : CT Add : Failover test

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence

Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 104 of 108

Fe)
FUJITSU

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST PLAN q

COMMERCIAL IN CONFIDENCE

ARC-493 ARC-471 Switchover to backup systems within the Data Centres and] ST interrupt] Tests to demonstrate business continuity are defined and contained within a
for the network connections within the Data Centres shall detailed test plan, the successful completion of which shall determine the
be automatic where defined for that service, acceptance of this requirement. To clarify ‘successful completion’ success
criteria will be identified in advance to test execution
(TDN: N. Williams comment: The functions should be testable. Clear success
criteria for the tests (identified in advance to test execution) to be agreed and
passed into PO DOORS)
ARC-446 ARC-446 The impact on Branch Users due to data centre failure and_ I DW Interrupt I Walkthrough (or agenda item in walkthrough) will be arranged which will
recovery shall be minimised. The principles of exception demonstrate this requirement has been met.
handling and recovery are as described in the document
‘Agreed Assumptions on HNG-X Branch Exception (TDN: N Williams comment: The DW should demonstrate that impact will be
Handling’ referenced from Schedule B6.1. minimised, with some indication of what the impact will be. Is achievement of
this ‘minimum’ testable)
Add : CT Add : Failover test
ARC-446 NEWO00 The impact on Branch Users due to data centre failure and CTinStor I interrupt I (TON: N. Williams comment: Is this ‘minimum’ testable?)
recovery shall be minimised. The principles of exception handling I RV
and recovery are as described in the document 'Agreed
Assumptions on HNG-X Branch Exception Handling’ referenced
from Schedule B6.1
SER-2145 SER-2145 Fujitsu shall establish and maintain a Configuration Management I DR Minor ‘An entry on the compliance matrix will be supplied which cross references this
Policy and processes with a single organisational accountability requirement with the appropriate document and the relevant clause within the
for the completeness, integrity and aceuracy of the Configuration document will be supplied. The document will describe how this requirement will
Management system be catered for in the design
SER-2146 SER-2146 Fujitsu shall develop and publish defined processes for the DR Minor An entry on the compliance matrix will be supplied which cross references this,
identification and registration of Configuration items into a requirement with the appropriate document and the relevant clause within the
Configuration Management system document will be supplied. The document will describe how this requirement will
be catered for in the design
SER-2147 SER-2147 Fujitsu shall define the operation of the Configuration Minor ‘An entry on the compliance matrix will be supplied which cross references this

Management processes and Post Office Ltd shall approve

requirement with the appropriate document and the relevant clause within the
document will be supplied. The document will describe how this requirement will
be catered for in the design

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence

Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 105 of 108

Fe)
FUJITSU

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST PLAN q

COMMERCIAL IN CONFIDENCE

SER-2155 SER-2155 Fujitsu Services and Post Office shall update the Service Review] DR Visible An entry on the compliance matrix will be supplied which cross references this,
and Resilience Catalogue (SRRC) to reflect the new System requirement with the appropriate document and the relevant clause within the
Architecture. document will be supplied. The document will describe how this requirement will

be catered for in the design

SER-2156 SER-2156 The Business Continuity Framework shall be modified to reflect I DR Minor An entry on the compliance matrix will be supplied which cross references this,
the System Architecture changes, and the move to shared Fujitsu requirement with the appropriate document and the relevant clause within the
Services data centres and Live configuration and Standby document will be supplied. The document will describe how this requirement will
configuration, be catered for in the design

SER-2157 SER-2157 The Business Continuity Plan shall be tested with the frequency _ I SOO Interrupt I There will be an appropriate section in a CCD or a document referred to by a
agreed within the Business Continuity Framework (BCF) CCD which contains a clause confirming this obligation. A compliance matrix

will be supplied which cross references this requirement with the appropriate
clause will be supplied.

SER-2158 SER-2158 Fujitsu shall support DR 7 Service continuity testing of other $00 Minor There will be an appropriate section in a CCD or a document referred to bya
suppliers to Post Office as a separately chargeable service as per CCD which contains a clause confirming this obligation. A compliance matrix
Horizon baseline and subject to receipt of Change Requests will be supplied which cross references this requirement with the appropriate

clause will be supplied.
Fujitsu Services will continue to co-operate with Post Office to
develop appropriate plans.

SER-2159 SER-2159 Failures in the System and service, leading to a Major Incident, I SOO Interrupt I There will be an appropriate section in a CCD or a document referred to by a
shall be managed and reported to Post Office using defined CCD which contains a clause confirming this obligation. A compliance matrix
communication channels and processes identified in Service will be supplied which cross references this requirement with the appropriate
Management Service document clause will be supplied.

SER-2178 SER: Fujitsu shall report major Business Continuity Incidents tothe I RV interrupt I Business Continuity Tests are defined and contained within a detailed test plan,
Post Office promptly in accordance with the timescales and the successful completion of which shall determine the acceptance of this,
through contact point described in “POA Customer Service requirement. To clarify ‘successful completion’, success criteria will be
Incident Management Process Details” identified in advance of test execution

SER-2178 SER-2200 Fujitsu shall report major Business Continuity Incidents to the I DR interrupt I Anentry on the compliance matrix will be supplied which cross references this

Post Office promptly in accordance with the timescales and
through contact point described in “POA Customer Service
Incident Management Process Details”

requirement with the appropriate document and the relevant clause within the
document will be supplied. The document will describe how this requirement will
be catered for in the design.

‘©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence

Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 106 of 108

Fe)
FUJITSU

POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST PLAN q

COMMERCIAL IN CONFIDENCE

SER-2179 SER-2202 ‘Management Information needed to support joint management I DR ‘An entry on the compliance matrix will be supplied which cross references this,
and resolution of incidents, which may include third parties, will requirement with the appropriate document and the relevant clause within the
bbe made available to Post OF document will be supplied. The document will describe how this requirement will
Management Process and provisions in Service Management be catered for in the design.

Service document.

SER-2179 SER-2203 ‘Management Information needed to support joint management I RV Incident management processes and procedures exercised satisfactorily during
and resolution of incidents, which may include third parties, will Release Validation testing
be made available to Post Office in accordance with the Incident
Management Process and provisions in Service Management (TDN: N. Williams comment: Unless the RV will simulate ‘an incident’ how will
Sevicedecument, . the process be exercised?

If MO is required, it should be passive with a criterion of 'no evidence of failure
of the process. )

BUS-3189 BUS3189 ‘Operations Control shall undertake a Business Continuity review I Email Visible Evidence of update activity in the BAU change plan
and assessment with Fujitsu and will update the Service Review I confirmation al terials updated
& Resilience Catalogue (SRRC) accordingly necessary materials updates

BUS-3190 BUS3190 ‘Operations Control shall help develop and agree with Fujitsu the I DR (The Minor Evidence of Operations Control inclusion in the Business Continuity Test Plan
testing for Business Continuity acess

‘Suing for Business Continuity Process) Evidence of Operations Control participation in test planning
MO
Confirmation
received

BUS-3197 BUS3197 ‘Operations Control shall help develop and agree the Problem & I Compliance to I Minor Process agreed
Incident Management process for HNG-X with the programme I process

SVC-392 Branch Outages shall be within the levels and frequency
described by the Service Level Targets in the Branch Network
Service document

SCD 4 There shall be automated fail-over for all Service

components e.g. using Active 1 and Active 2 components
performing optimisation of both load balancing and
performance, but each component ‘capacity rated’ to
‘support the total balanced work-load.

‘©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence

i
Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 107 of 108

POL00029327

POL00029327
co HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST PLAN
FUJITSU COMMERCIAL IN CONFIDENCE
B.1 Counter Architecture
V&l ID Description Quality Acceptance
Center ID Methed

CNTR-0001 A process exists by which Users can raise hardware faults. NB As there is no change from

Horizon it is assumed that this already exists and no test is required
CNTR-0002 Intermittent failures affecting internal subcomponents. Ensure written to event logs and then picked I NFUN- CNTR-0001

up by SYSMAN3.
CNTR-0003 A process exists by which users can raise software errors on the counter application.

C.1 Branch Access Layer

(Enter the Delivery title or ID as the title to this paragraph)

(Enter the Quality Center derived listings of the tests to be run below. )

(The listings that follow are purely for manual tests. No automated tests are included.)

©Copyright Fujitsu Services Ltd 2007 ‘Commercial in Confidence Ref.
Version:
Date:
Page No:

TST/SOT/HTP/0006
0.2

19-Oct-07

108 of 108
POL00029327
POL00029327

co HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST PLAN &
FUJITSU COMMERCIAL IN CONFIDENCE

D.1 Online Services

E.1 Batch Applications

F.1 Branch DB

G.1 Counter Business Applications
H.1 Technical Network

©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 109 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

2
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

B Appendix — Automated Testing

There is no Automated Testing

©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref. TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 110 of 108
POL00029327
POL00029327

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

fee)
FUJITSU PLAN

COMMERCIAL IN CONFIDENCE

C Appendix — Platforms/Components
1.1 Servers

Where it is deemed that there is no requirement for re-testing this will be indicated by N/A.

ID Platform Nam Tested in Sectior letwork Zone

A&L Banking Agents

Alarm Point

2

3 I Antivirus Server

4 I APOP Web Server

5 I Atalla HSM Appliance (HSM)
6 I Audit Server
7

8

9

1

Audit Workstation

BAL Server
Boot Platform (HNG-X)

0I Branch Change Management System
Server

11 I Branch Configuration Database Server

12 I Branch Database Server - Main

13 I Branch Database Server - Standby

14 I Branch Support Server
15 I CAPO Banking Agents
16 I Certificate Server (CAN)
17 I Cisco Works

18 I Connect Direct Simulator

19 I ConnectDirect Gateway

20 I DCS & ETS Authorisation Server

21 I Debit Card Management Server

22 I Dimensions Signing Server (DSS)
23 I DNS Server (Primary)
24 I DNS Server (Secondary)

25 I Domain Controllers - Active Directory
26 I DVLA Web Server

27 I EMC ECC Server
28 I EMC Remote Support Gateway

29 I Enterprise Boot Server

30 I Firewall Security Manager

31 I FTMS EDG Local

©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 111 of 108
POL00029327
POL00029327

oO HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST
FUJITSU ria &

COMMERCIAL IN CONFIDENCE

32 I FTMS EDG Remote

33 I FTMS TIP Local

34 I FTMS TIP Remote

35 I Generic Proxy
36 I Help Desk Web Server
37 I HNG-X NT4 Counter

38 I HNG-X XP Counter

39 I IN Pad Test Workstation (PPT)
40 I KMNG Server (KMN)

41 I KMNG Workstation (KSN)

42 I Link Authorisation Server

43 I Maestro Server
44 I MIS Client
45 I MIS Support Workstation

46 I Money gram Web Server

47 I Network Management Server

48 I Network Persistent Store
49 I NMS - Packet Capture
50 I Online Training Web Server

51 I PAF Web Server

52 I Performance Management Server (SPN)
53 I PIN Pad Key Generation Workstation (SKG)
54 I PIN Pad Proving Workstation (PPW)

55 I Radius Branch Router Management

56 I Radius Core Router Management

57 I RDMC Workstation
58 I RHEL Backup Server
59 I Router Operational Support Server

60 I Solaris Backup Server

61 I Solaris Host

62 I SSC Server

63 I SYSMAN’s Enterprise Database Server

64 I SYSMAN’s Enterprise Managing Server

65 I SYSMAN’s Enterprise User Interface Server
66 I TES Web Server

67 I Tivoli Workload Scheduler

68 I Training PIN Pad Loading Workstation

(TPP)
©Copyright Fujitsu Services Ltd 2007 ‘Commercial In Confidence Ref: TST/SOT/HTP/0006
Version: 0.2
Date: 19-Oct-07

Page No: 112 of 108
Fe)
FUJITSU

PLAN

HNG-X: ITU V&l BUSINESS CONTINUITY HIGH LEVEL TEST

COMMERCIAL IN CONFIDENCE

POL00029327
POL00029327

69 I Virtual Server Host

70 I Windows Backup Server

J.1 Storage
Primary Storage Elements:

Storage Element

EMC Symmetrix DMX3

Number per
data centre

Tested in Section

EMC Clariion CX3-80

EMC Celera NAS

EMC Centera CAS System

EMC EDL Virtual Tape Library

Cisco 9509 Directors

Fujitsu-Siemens Fibre Cat TX24 LTO3
autoloader

K.1 Network

Network Element

Location

Tested in Section

©Copyright Fujitsu Services Ltd 2007

‘Commercial In Confidence

Ref.
Version:
Date:
Page No: