POL00032633 - Acceptance Report for HNG-X Acceptance Gateway 3 (v.0.2) - DRAFT

Evidence on official site

POL00032633

POL00032633
oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 7
FUJITSU COMMERCIAL IN CONFIDENCE
Document Title: ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3
Document Reference: REQ/GEN/ACS/0002
Release: Release specific
Abstract: This document comprises the Acceptance Report for HNG-X

Acceptance Gateway 3. It provides details of the Acceptance status
of all POL requirements associated with this Acceptance Gateway
and is for submission to the HNG-X Acceptance Board.

Document Status: DRAFT
Author & Dept: Dave Cooke

HNG-X Acceptance Manager
External Distribution: Neil Williams, Phil Norton, Mark Burley, David Smith,

Liz Tuddenham, lan Trundell

Security Risk No
Assessment Confirmed

Approval Authorities:

lame Role Signature Date

Phil Norton POL Requirements and See Dimensions for record
Acceptance Manager

Dave Cooke FS HNG-X Acceptance Manager See Dimensions for record
See HNG-X Reviewers/Approvers Matrix (PGM/DCM/ON/0001) for guidance on who should approve.

© Copyright Post Office Limited GCNIANEOT. bi Seema Ref REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 1 of 33
POL00032633
POL00032633

oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

0 Document Control

0.1 Table of Contents

DOCUMENT CONTROL

Table of Contents
Document History
Review Detail:
Associated Documents (Internal & External)
Abbre'
Glossary
Changes Expe: .
Accuracy ....
Security Risk Assessment ..

INTRODUCTION...

ic Io

IBIS In BE I= ISISISISISISISISIE
roles pol [e0 Loo Na fom lends feo lo I

Acceptance Board assessment checklist for AG3

REVIEW OF STATUS OF ACCEPTANCE CRITERIA

Functional Requirements — Use Case:

Non-Functional Requirements and Criteria
.2.1 Deferred Test status

Assessment of Status
No Run status
Not Complete Status
Not Covered / Zero defects statu:
Deferred Failed statu:

Failed Status .

be
joo

3 REVIEW OF STATUS OF ACCEPTANCE INCIDENTS...........cseceeee
3.

3.1 Acceptance Incident Aggregation...

3.2 Acceptance Incidents arising from Agreed Deferrals
3.2.1 Acceptance Incident details for type AI-AD ......

3.2.2 Aggregated Acceptance Incident details for type Al-AD

3.3 Acceptance Incident arising from non-testable criteria 27
3.3.1 Acceptance Incident details for type AI-NT... 27
3.3.2 Aggregated Acceptance Incident details for tyoe Al-NT 27

3.4 Acceptance Incident arising from Testable criteria 28

3.4.1 Acceptance Incident details for type AI-TS...
3.5 Acceptance Incident total...

A APPLICABLE POL REQUIREMENTS AND ACCEPTANCE CRITERIA............ 30
© Copyright Post Office Limited GCNIANEOT. bi Seema Ref REQ/GEN/ACS/0002
2009 Version: 0.2

UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 20f 33
POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 af
COMMERCIAL IN CONFIDENCE

(ee)
FUJITSU

B DEFINITION OF ACCEPTANCE METHODS...
C DEFINITION OF ACCEPTANCE INCIDENT SEVERITY...

D ACCEPTANCE BOARD RECOMMENDATION OPTIONS

0.2 Document History

Version No. Date Summary of Changes and Reason for Issue Associated Change -
CP/PEAK/PPRR
Reference

0.1 28-OCT-2009 Initial version

02 02-NOV-2009 Updated following joint FS / POL review

0.3 Review Details

See HNG-X Reviewers/Approvers Matrix (PGM/DCM/ION/0001) for guidance on completing the lists below. You
may include additional reviewers if necessary, but you should generally not exclude any of the mandatory reviewers
shown in the matrix for the document type you are authoring.

Review Comments by (date by which comments should be returned)

Review Comments to

Mandatory Review

Role

Name

HNG-X Programme Manager Alan D'Alvarez

HNG-x Solution Architect Jim Sweeting
POL HNG-X Programme Manager Mark Burley
POL HNG-X Requirements Manager Phil Norton
POL HNG-X Acceptance Manager Neil Williams
POL HNG-X Design Authority lan Trundell

HNG-X Testing Manager

Debbie Richardson

POL HNG-X Testing Manager

Lee Farman

Optional Review

Role Name
Head of Programmes — Private Sector Business Mike Wood
Unit

Head of Change and IS. Dave Smith
RMGA Commercial Director Guy Wilkerson

© Copyright Post Office Limited GCNIANEOT. bi Seema Ref REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009
STORED Page No: 3 0f 33
POL00032633

POL00032633
oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 "4
FUJITSU COMMERCIAL IN CONFIDENCE
POL HNG-X Senior Contracts and Service Manager Liz Tuddenham
Issued for Information — Please res' this
distribution list to a minimum
Position/Role Name
(*) = Reviewers that retumed comments
0.4 Associated Documents (Internal & External)
Reference Version Date Title Source
PGM/DCM/TEM/0001 I 5.0 03 June 2009 RMGA HNG-X Generic Document Dimensions
(DO NOT REMOVE) Template
Schedule B6.3- HNG-X Acceptance I Dimensions
Process

Unless a specific version is referred to above, reference should be made to the current approved
versions of the documents.

0.5 Abbreviations

Abbreviation Definition

0.6 Glossary

Term Definition

0.7 Changes Expected

© Copyright Post Office Limited GCNIANEOT. bi Seema Ref REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 4 0f 33
POL00032633
POL00032633

oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

0.8 Accuracy
Fujitsu Services endeavours to ensure that the information contained in this document is correct but, whilst every

effort is made to ensure the accuracy of such information, it accepts no liability for any loss (however caused)
sustained as a result of any error or omission in the same.

0.9 Security Risk Assessment

Security risks have been assessed and it is considered that there are no security risks relating specifically to this
document.

© Copyright Post Office Limited CEAMANEOT, th RememaSEEE Ref REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 5 of 33
POL00032633
POL00032633

o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3
FUJITSU COMMERCIAL IN CONFIDENCE

1. Introduction

This document comprises the HNG-X Acceptance Report to the HNG-X Acceptance Board for the
assessment of the progression through Acceptance Gateway 3 (AG3) — Readiness for Pilot.

The basis for HNG-X Acceptance is defined in Schedule B6.3 and some sections are reproduced within
this report.

The POL Requirements and Criteria, contained in the HNG-X Requirements Catalogue - POL DOORS
archive v1.42, and associated with AG3 are contained in Appendix A.

The definition of the HNG-X Acceptance Methods is contained in Appendix B.

The definition of the Acceptance Incident Severity is contained in Appendix C.

1.1. Scope
The purpose of this Acceptance Board is: -

‘To agree the Acceptance status of the relevant Release (HNG-X Release 1 for AG3) and provide a
recommendation to the ‘Joint Release Authorisation Board’.’ The proposed options that this Board can
select from are described in Appendix D.

This recommendation is based on an assessment of the status of the applicable POL Requirements and
Acceptance Criteria and of the stage progression criteria for AG3 are described in Schedule B6.3.

The primary assessment concerns the status of any Acceptance Incidents as follows:-

Progression through HNG-X Acceptance Gateway 3 shall occur once all of the following have
been satisfied for the HNG-X Acceptance Criteria allocated to achieving progression through the
respective HNG-X Acceptance Gateway:

(a) subject to paragraph 4.6 (of Schedule B6.3 which refers to dispute handling, defect
aggregation and deferred tests), all such HNG-X Acceptance Criteria have been achieved;

(b) activities leading to HNG-X Acceptance Gateway 1 (named “Readiness for Router Roll—
Out (Z1)” and HNG-X Acceptance Gateway 2 (named “Readiness for Data Centre Migration”)
must be completed and these two HNG-X Acceptance Gateways passed through in accordance
with paragraph 4.5.4.2 as pre-requisites to achieve HNG-X Acceptance Gateway 3.

(b) there are no outstanding HNG-X High Severity Acceptance Incidents;

(c) the number of outstanding HNG-X Medium Severity Acceptance Incidents is five or fewer
and an agreed workaround exists for each of them; and

(d) there is an agreed workaround for all outstanding HNG-X Low Severity Acceptance
Incidents except for those which the Parties agree do not require a workaround.

(e) details of all Non Incidents are recorded, although they shall have no impact upon
Acceptance Gateway progression

These together with other supporting factors are summarised in the following checklists for AG3.

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 6 of 33
oO
FUJITSU

POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
COMMERCIAL IN CONFIDENCE

1.2 Acceptance Board assessment checklist for AG3
References in this table refer to the HNG-X Acceptance Schedule B6.3.

Acceptance Gateways.

Schedule 6.3 paragraph 4.3 identifies three key HNG-X Acceptance Gateways controlling
progression through the HNG-X

Acceptance Process Stages plus two additional Acceptance Gateways.

Acceptance Gateway 3

First of three key HNG-X
Acceptance Gateways.

Check list.

Achievement of Requirements.
(With the exception of those Requirements covered by Acceptance Incidents or agreed to
be covered by Deferred Tests):

All AG3 Requirements
have been achieved
(4.5.1.1(a)).

The sequence of HNG-X Acceptance Process stages and the order of precedence for

Passage through both AG

Acceptance Gateways is defined in schedule 6.3 section 2.2 1&AG2
x Results in a defect that would render a key element I =
os of one or more of the Business Capabilities and g None allowed
=8 ‘Support Facilities or a key element of the & (4.5.1.1 (c)).
A 5 Infrastructure unfit for operational use. S
F Fr
é x Five or fewer allowed and
2
Bs Results in a defect that would cause problems in the 3 beads eure ive
g is 2 operational use of one or more Transaction types. € workaround and -
2
A Ezy 3 an agreed Rectification
Soy Plan.
. 355
3 3 £ 3 Contract does not specify
= 33 é a limit on the number but
8 g 2 Results in a defect that does not cause any adverse
g ul operational impact in the use of the Business A all have an agreed
eo Capabilities and Support Facilities or an element of g workaround (unless.
Be the Infrastructure, or can be addressed 3 agreed otherwise).
38 by a Fujitsu Services workaround without any Fa
go adverse operational impact for Post Office. s Contract does not
83 mention target timescale
$3 for rectification.
ge
2 Is found: 5
3 not to be a defect; not to have resulted from the 3
as introduction of HNG-X or not to fall within the high, I = Need not be counted.
Bs medium or low categories. iS
2
Deferred Tests.

If, other than as a result of a Default of Fujitsu Services, it is impossible for a test to be
carried out when scheduled in the HNG-X Acceptance Plan then that test becomes known,
as a "Deferred Test".

The total number of
Requirements with
Deferred Tests (but not
recorded as an
Acceptance Incident)

equals:
Roce tence) Disputes) . There are no unresolved
In accordance with Schedule 6.3 paragraph 4.6 the parties agree that:. eeetance DienTiess
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY Date: 02-Nov-2009
STORED PageNo: 7 of 33
POL00032633
POL00032633

o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

2 Review of status of Acceptance Criteria

The POL requirements for Acceptance Gateway 3 comprise all of the functional requirements
represented by the POL Use Cases and a set of the Non-Functional requirements.

2.1 Functional Requirements — Use Cases

There are 144 Use Cases which constitute the POL functional requirements. Their summary status is as
follows: -

Count of Status Status
Service Barrel Not Zero Deferred I Failed Passed I Grand
Covered I defects Failed Total
Banking 8 10 18
Branch Accounting 1 17 18
Branch Admin 1 1 8 10
Branch Support & 17 17
Control
Bureau de Change 7 7
ETU 1 3 1 5
loP 8 11 19
Postal Services 1 8 9
Retail & Stock Sales 1 1
Shared 1 1 5 12 19
Cash & = Stock 3 18 21
Management
Grand Total 1 1 27 6 109 144

ee

The status of Deferred Failed indicates that a Use Case has one or more defects associated with it, but
that the resolution of these defects have been agreed to be deferred to beyond start of Pilot.

Each of these defects is represented as an Acceptance Incident in section 3.

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 8 of 33
POL00032633

POL00032633
o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 7
FUJITSU COMMERCIAL IN CONFIDENCE
2.2 Non-Functional Requirements and Criteria
There are 752 non functional Acceptance Criteria associated with Acceptance Gateway 3. Their
summary status is as follows: -
Status
Verification Method I NoRun I NotCompleted I Not Covered I Failed I Passed Grand
Total
Document Review 3 19 7 221 250
(19 with
concession)
Design Walkthrough 1 138 139
(11 with
concession)
Monitoring 2 2
Statement of Fact 42 42
(2 with
concession)
Statement of 90 90
Obligation
(4. with
concession)
Solution Test 10 12 29 115 166
(22 with
concession)
Release Validation 4 5 7 47 63
Test
(96 with
concession)
Grand Total 17 36 3 43 653 752

Key to Status

Failed - Each Failed Criteria is represented by an Acceptance Incident in section 3

No Run - This identifies the number of criteria whose designated tests have not been run at the time of
this Acceptance Board. A number of these are due to the status of the testing of the criteria being agreed
to deferred, with the associated criteria having the status of ‘Deferred Test’ — see section 2.2.1.

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 9 of 33
POL00032633
POL00032633

o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

Not Completed — This identifies the number of criterion where either: -

a) Acceptance Evidence has been submitted by FS but not yet assessed by POL,
or

b) Test execution had started but not completed at the time of this Acceptance
Board. These will also have the status of ‘Deferred Test’.

2.2.1 Deferred Test status

The Schedule B6.3 acknowledges that there may be circumstances when previously scheduled testing
that was targeted for completion by this Acceptance Gateway cannot now take place. Providing that this
is not due to a contractual default by Fujitsu, and the parties agree, then the tests associated with a POL
requirement may be ‘Deferred’. Fujitsu are still obliged to carry out these ‘Deferred Tests’.

For this Acceptance Gateway, Fujitsu have requested that tests associated with the following
requirements are given ‘Deferred Test’ status. These are: -

SEC-3115, SEC-3135, SEC-3210, SEC-3212, SEC-3193, SEC-3161, SEC-3230, SEC-3154, SEC-3158,
SEC-3113, SEC-3177, SEC-3257, SEC-3354, SEC-3164, SEC-3210, SEC-3204, SEC-3348

These are all associated with the Security Penetration testing that is due to complete on 18/11/09.

The Joint Test Team has advised that ARC-462, ARC-463, TR471 are now scheduled to be tested in
LST and so should also be given ‘Deferred Test’ status.

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 10 of 33
oO
FUJITSU

POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i

COMMERCIAL IN CONFIDENCE

2.3 Assessment of Status

The following sections provide details of the use cases / criteria that fall into each of the ‘status’ entries in
sections 2.1 and 2.2 together with an impact statement.

2.3.1

No Run status

A status of No Run identifies those criteria whose designated tests have not been run at the time of this
Acceptance Board. There are no Use Cases with a status of No Run.

The number of non-functional criteria with a status of No Run is shown in the table 2.2 and comprises
both ‘non-testable’ and ‘testable’ criteria as follows.

2.3.1.1 No Run/non-testable criteria
The criteria and impact of the ‘No Run’ status in this category are as follows: -
Original Original Object text Acceptance Criteria I Verification Impact
Object Id Method
SEC-3138 I Risks identified in the I Evidence that all I DR This criterion cannot conclude
area of SQL injection I risks raised under until the two criteria associated
attacks (see SEC-3347) I Requirement SEC- with SEC-3347 have been
will be managed under I 3347 have been assessed.
Change Control. addressed under the
Change Control They are: -
process. SEC-3137 - see AI-NT-1001
&
SEC-3348 — see Al-TS-??
SEC-3061 I By provision of an I Review of I DR This criterion cannot conclude
appropriate architecture I documentation and until all other Security criteria

for HNG-X and
associated service
operation, Fujitsu
Services shall protect

Post Office from liability
for information security
threats to a_ similar
extent that Post Office is
protected by Baseline
Horizon unless

agreed waivers prior
to going live shows
that all other security
requirements have
either been accepted
or, where not,
waivers have been
agreed by Post Office
Information Security.

have been assessed.

© Copyright Post Office Limited

2009

COMMERCIAL IN CONFIDENCE.

UNCONTROLLED IF PRINTED OR LOCALLY

STORED

Ref: REQ/GEN/ACS/0002
Version: 0.2

Date: 02-Nov-2009

Page No: 11 of 33

POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i

COMMERCIAL IN CONFIDENCE

Fe)
FUJITSU

Original Original Object text Acceptance Criteria I Verification Impact
Object Id Method
SEC-3060 I By provision of an I Review of I DR This criterion cannot conclude
appropriate architecture I documentation and until all other Security criteria
for HNG-X and I agreed waivers on have been assessed.
associated service I completion of ST
operation, Fujitsu I tests shows that all
Services shall protect I other security
Post Office from liability I requirements have
for information security I either been accepted
threats to a_ similar I or, where not,
extent that Post Office is I waivers have been
protected by Baseline I agreed by Post Office
Horizon unless Information Security.
ARC-423 Fujitsu Services shall I Post Office and the I DW
adopt a quality process I Independent
and shall follow a I Assessor
recognised methodology I acknowledge that the
in the production of the I process and
Solution Baseline I methodology utilised
Documentation Set. by Fujitsu Services
are suitable —_ for
documenting the
Solution Baseline.
2.3.1.2. No Run/ testable criteria
The criteria and impact of the ‘No Run’ status in this category are as follows: -
Original Original Object text Acceptance Criteria Verification Impact
Object Id Method
ARC-463 Fujitsu Services shall I Tests to demonstrate I ST Deferred Test
demonstrate that network I network connectivity for
connections for portable I portable office
office configurations shall I configurations are defined
be automatically selected I and contained within a
from those physically I detailed test plan, the
available without the I successful completion of
intervention of the sub- I which shall determine the
postmaster. acceptance of this
requirement. To clarify
‘successful completion’,
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE ve beeen
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY Date: 02-Nov-2009
STORED PageNo: 12 of 33
oO
FUJITSU

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3
COMMERCIAL IN CONFIDENCE

POL00032633
POL00032633

Original
Object Id

Original Object text

Acceptance Criteria

Verification
Method

Impact

MIG-2981

Fujitsu Services shall
ensure that the closing
position on Horizon can be
fully reconcilable to the
opening position on HNG-X
via means of reports and
the format will be agreed
during development

Migration reports
produced during ST
conform to the agreed
report specification and
contain appropriate data

ST

MIG-3069

The branch migration
process shall demonstrate:

(a) the closing trading
position for each Branch of
Baseline Horizon,

(b) proof (as defined in MIG
2980) of the successful
migration from Baseline
Horizon to HNG-X,

and

(c) any
regarding

discrepancies

Demonstration as per the
Requirement

ST

MIG-3096

The Fujitsu Services
Configuration Management
service shall make it
possible to identify which
phase (Horizon or HNG-X)
of migration a branch is in

Evidence that the status
of each counter is
correctly identifyable as
being Horizon or HNG-x
during the simulated
migration period.

RV

MIG-3162

HNG shall be capable of
regression back to Horizon,
including regression of the
full branch estate, up to the
point of Contractual
Acceptance as agreed by
the Migration Strategy

Tests to demonstrate
regression back to
Horizon are defined and
contained within a
detailed test plan, the
successful completion of
which shall determine the
acceptance of this
requirement. To clarify
‘successful completion’,
success criteria will be
iden

RV

© Copyright Post Office Limited

2009

UNCONTROLLED IF PRINTED OR LOCALLY _ Date:

COMMERCIAL IN CONFIDENCE.

STORED

Ref:

Version: 0.2

Page No:

02-Nov-2009
13 of 33

REQ/GEN/ACS/0002
POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
COMMERCIAL IN CONFIDENCE

oO
FUJITSU

Original
Object Id

Original Object text

Acceptance Criteria

Verification
Method

Impact

SEC-3113

Fujitsu Services shall
provide a list of measures
that will be taken to mitigate
the risk of unauthorised
devices being connected to
any component of the HNG-
x system, with the
exception of passive
devices within the Branch. A
"passive device" is one whic

that all
achieve the

Evidence
measures
requirement

ST

Deferred Test

SEC-3115

Branch Terminals shall be
bootable only from their
primary mass _ storage
device on the terminal.

Evidence that attempts to
boot from other than the
primary mass storage
device fail.

ST

Deferred Test

SEC-3154

{CISP 8.5.1b} Unauthorised
logical access from non-
HNG-X systems and
networks shall be
prevented. This shall
include but shall not be
limited to, _ unauthorised
access from any of the
following: Any public
networks used. Networks
connecting to Third Partie

Demonstration of
protection (either by
simulation of attempts of
unauthorised access or by
other means). The exact
timing and environment
for the tests shall be
agreed in the test plan but
shall in any case be prior
to live.

RV

Deferred Test

SEC-3158

{CISP 8.5.1c} Controls shall
protect against denial-of-
service attacks originating
from non-HNG-X systems
including those listed in
Requirement SEC-3152

Demonstration of
protection (either by
simulation of attack or by
other means)

RV

Deferred Test

SEC-3177

All RADIUS servers that
authenticate network
access shall be secured
and segregated into logical
network segments by carrier
access method and be
externally visible to
authorised domain users
only.

As per the Requirement

ST

Deferred Test

SEC-3193

Any mobile backup or
secondary network
produced within the {CISP.
8.5.1k} specification of the
requirement shall be
secured to the same level
as the primary network.

As per the Requirement

ST

Deferred Test

© Copyright
2009

Post Office Limited

UNCONTROLLED IF PRINTED OR LOCALLY _ Date:

COMMERCIAL IN CONFIDENCE

STORED

Ref:
Version:

Page No:

REQ/GEN/ACS/0002
0.2

02-Nov-2009

14 of 33

Fe)
FUJITSU

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3
COMMERCIAL IN CONFIDENCE

POL00032633

POL00032633

Original
Object Id

Original Object text

Acceptance Criteria

Verification
Method

Impact

SEC-3212

It shall not be possible to
install any application or
operating system extension
except under the control of
properly authorised and
authenticated systems
administrators carrying out
authorised and audited
changes.

As per the Requirement

ST

Deferred Test

SEC-3257

The logical security
perimeter of the HNG-X
system shall be defined and
agreed with Post Office
Information Security.

Tests to demonstrate the
security perimeter are
defined and contained
within a detailed test plan,
the successful completion
of which shall determine
the acceptance of this
requirement. To clarify
‘successful completion’,
success criteria will be
identifi

ST

Deferred Test

SEC-3354

All cryptographic key
lengths shall be at least 128
bits for symmetric keys and
at least 1024 bits for
asymmetric keys where the
associated cryptographic
control protects the integrity
or confidentiality of HNG-X
Business Data, Reference
Data or Applicati

Tests to demonstrate
compliance are defined
and contained within a
detailed test plan, the
successful completion of
which shall determine the
acceptance of this
requirement. To clarify
‘successful completion’,
success criteria will be
identified in advanc

ST

Deferred Test

© Copyright Post Office Limited

2009

UNCONTROLLED IF PRINTED OR LOCALLY

COMMERCIAL IN CONFIDENCE

STORED

Ref.
Version:
Date:
Page No:

0.2
02-1

REQ/GEN/ACS/0002

Nov-2009

15 of 33
POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
COMMERCIAL IN CONFIDENCE

Fe)
FUJITSU

2.3.2. Not Complete Status

The following POL requirements have had Acceptance evidence submitted but their assessment has not
yet completed.

The number of non-functional criteria with a status of Not Complete is shown in the table 2.2 and
comprises both ‘non-testable’ and ‘testable’ criteria as follows.

2.3.2.1

Not Complete / ‘non-testable’ criteria

These criteria all have the verification method of document review. They comprise criteria where
documentary acceptance evidence has been submitted by Fujitsu but where the POL assessment has
not completed.

Object Id

Original Object text

Acceptance Criteria

Impact

ARC-422

Fujitsu Services shall make
available to POL an accurate
and technically complete set of
documentation describing the
Solution Baseline
Documentation Set, excluding
legacy components where
existing Horizon documentation
may be retained.

The Solution
documentation shall be
provided to POL in
accordance with the timetable
stated in B6.2 and_ shall
comprise the documents or
other artifacts that are agreed
between Post Office and
Fujitsu Services according to
Schedule B6.2.

Baseline

ARC-499

For the portable configuration,
Physical connection to
available fixed network end
points is manual and presumed
to be achieved by the
subpostmaster. Fujitsu
Services will define with Post
Office the process that the
postmaster needs to follow to
correctl

DR- Documents provided to
describe the agreed process
for connecting the device to
each type of fixed network
endpoint and for dealing with
all network faults arising from
the connection of the device

DEV-375

HNG-X shall support parallel
development streams and,
except where there are
unavoidable dependencies,
these streams shall be
implementable in any
sequence or combination.

Fujitsu will describe how
parallel development and
implementation will be
supported.

© Copyright Post Office Limited

2009

UNCONTROLLED IF PRINTED OR LOCALLY

Ref.
Version:
Date:
Page No:

COMMERCIAL IN CONFIDENCE

STORED

REQ/GEN/ACS/0002
0.2

02-Nov-2009

16 of 33

Fe)
FUJITSU

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3

COMMERCIAL IN CONFIDENCE

POL00032633
POL00032633

Ori

inal Object text

Acceptance Criteria

Impact

MIG-3017

Physical security of any
infrastructure components,
including Branch base units,
which contain any business or
security sensitive information,
shall not be compromised by
processes developed and
implemented for the migration
from Baseline Horizon to HNG-
x

Evidence of joint agreement to
the migration processes
affecting the security of
physical infrastructure and the
risks to business or security
sensitive information.

MIG-3020

Fujitsu. Services and Post
Office shall jointly produce a
Migration Plan, which shall
detail how Security
requirements at MIG-3015 &
MIG-3216 are to be met

As per the Requirement

MIG-3033

Fujitsu Services shall
implement a reporting process
informing Post Office Ltd of
branches successfully migrated
to HNG X

As per the Requirement

SEC-3170

All proposals for encrypted
data to pass through any HNG-
X firewall layer shall be subject
to risk assessment to
determine if the requirement for
confidentiality outweighs the
requirement for system
availability and integrity.

Approval of the Risk

assessment process

SEC-3172

Cases requiring encrypted data
to pass through any HNG-X
firewall layer shall only be
authorised by Post Office
where a risk assessment has
identified that the requirement
for confidentiality outweighs the
requirement for system
availability and integrity

Approval of the authorisations
process

SEC-3178

Any end-user messaging
components or services, and
their dependent systems or
services shall be usable by
authorised users from within
the HNG-X environment only.
“End-user messaging" shall be
interpreted as the Branch
Message Broadcast Service
and any ot

Evidence of the Requirement
in the Design.

© Copyright Post Office Limited

2009

UNCONTROLLED IF PRINTED OR LOCALLY

Ref.
Version:
Date:
Page No:

COMMERCIAL IN CONFIDENCE

STORED

REQ/GEN/ACS/0002
0.2

02-Nov-2009

17 of 33
POL00032633

POL00032633
oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 7
FUJITSU COMMERCIAL IN CONFIDENCE
Original Object text Acceptance Criteria Impact

SEC-3180 I In the event that e-mail I Evidence of review if e-mail is

facilities are added to HNG-X, I incorporated.

additional security features

shall be agreed with Post

Office Information Security

prior to implementation.
SEC-3185 IThe provision of messaging I Evidence of the Requirement

capability shall not permit I in the Design.

active or scripted code to be

carried within the message

body that may be executed

upon Branch Terminals or

intermediate systems.
SEC-3190 I {CISP 8.5.1k} The use of I Design Documents Comply

wireless technologies within or I with the Security Policy and

associated with HNG-X I state that the Counter

systems or services shall be I Terminals and the Branch

excluded with the sole I Routers cannot be configured

exception of mobile public I for Wi-Fi or for Bluetooth.

telecommunications services

provided by UK licensed public

telecommunications operators

or as oth
SEC-3223 It shall be possible to recover I Examination of Key

the system to a _ secure I Compromise and Key Change

operating state from the I Procedures: NB/PRO/O08

compromise of any key that

could directly or indirectly

expose plain text PIN values.

This represents no change to

the current Horizon system.
SER-2168 Fujitsu. shall develop and I An entry in an artefact within

publish a documented process I the Solution Baseline

for the updating of Known Error I Documentation Set will be

Logs, relating these to I supplied which cross

Configuration Items within a I references this requirement

given release and sharing them I with the appropriate document

with PO Ltd. The process will I and the relevant clause within

conform to Fujitsu corporate I the document will be supplied.

standards and will not b The document will describe

how this
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE ve beeen
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY Date: 02-Nov-2009
STORED PageNo: 18 of 33
Fe)
FUJITSU

POL00032633

POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i

COMMERCIAL IN CONFIDENCE

Ori

inal Object text

Acceptance Criteria

Impact

SVC-806

Transaction Time Benchmark
evaluation shall be conducted
in accordance with the process
described in the document
‘Counter Transaction Time
Performance - measurement
and results(CS/PER/046)'.

An entry in an artefact within
the Solution Baseline
Documentation Set will be
supplied which cross
references this requirement
with the appropriate document
and the relevant clause within
the document will be supplied.
The document will describe
how this

© Copyright Post Office Limited

2009

UNCONTROLLED IF PRINTED OR LOCALLY

COMMERCIAL IN CONFIDENCE

Ref:
Version:
Date:

STORED Page No:

REQ/GEN/ACS/0002
0.2

02-Nov-2009

19 of 33
POL00032633

POL00032633
oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 7
FUJITSU COMMERCIAL IN CONFIDENCE
2.3.2.2 Not Complete / ‘testable’ criteria (ST or RV)
The criteria with this status are shown below together with an impact statement.
Original Original Object text Acceptance Criteria Impact
Object Id
ARC-470 Any single failure within the I Tests to demonstrate
Data Centres shall notI business continuity are
cause loss of any of the I defined and contained within
Business Capabilities &Ia detailed test plan, the
Support Facilities successful completion of
which shall determine the
acceptance of this
requirement. To clarify
‘successful completion’,
success criteria’ will be
identified
ARC-474 Confirmation messages for I As per the requirement
online transactions will only
be harvested in batch mode
at end of day. This means
that the TES will not
receive C2 messages in
near real time, and
Streamline payment file(s)
will only be produced
overnight.
MIG-2987 The capability to provide I As per the Requirement
prosecution support relating
to incidents on Baseline
Horizon shall _—_ continue
unimpaired during and
following completion of
migration.. In Baseline
Horizon this refers to
ARQs. . This may be
interrupted during data
centre move for
MIG-3078 Fujitsu Services shall I Evidence that tools will
provide any tools I ensure achievement
necessary to ensure that all
requirements for migration
to HNG-X are achieved.
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE ve beeen
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY Date: 02-Nov-2009

STORED Page No: 20 of 33
Fe)
FUJITSU

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3

COMMERCIAL IN CONFIDENCE

POL00032633
POL00032633

Original
Object Id

Original Object text

Acceptance Criteria

Impact

MIG-3109

Fujitsu shall ensure that
during migration (when
client data comprises of
both Horizon and HNG
sourced data) if failures
occur, that the resulting
Client data feeds are
complete and accurate
subject to agreed service
levels (i.e. no omissions
and no dupli

ST displays that Interface
specifications for all
outbound data feeds are
adhered to, irrespective as to
the source system (e.g.
Horizon or HNG). ST also
conforms that no data is lost
or duplicated in the outbound
data files during the
migration period.

MIG-3119

Except where dual
interfaces have been
agreed reference data
changes will be applied
consistently to both
Baseline Horizon and HNG
via a single interface to the
counter estate. This
includes Product, Branch
and AP (including AP_LADC
reference data driven

ST confirms that a single
source of reference data
changes can be consistently
applied to both Horizon and
HNG, in effect simulating the
operational requirement
during migration

MIG-3154

Prior to and during
migration to HNG-X, Fujitsu
Services shall provide a
Live Reference Data
Proving environment
capable of validating
Horizon and HNG-X
reference data prior to its
release into the live
environment. This shall
include the ability to conf

Proof that Horizon or HNG-X
data will operate as expected
in the appropriate
environment

MIG-3155

FS and PO shall establish a
reference data verification
process using the LRDP
environment to determine
that reference data
distributed to the HNG-X
and Horizon environments
will have the same or
where agreed equivalent
functional or operational
effect

Evidence that either Horizon
or HNG produces equivalent
outcomes to the existing live
Horizon data (except where it
is agreed that outcomes will
not be equivalent).

© Copyright Post Office Limited

2009

UNCONTROLLED IF PRINTED OR LOCALLY

Ref.
Version:
Date:
Page No:

COMMERCIAL IN CONFIDENCE

STORED

REQ/GEN/ACS/0002
0.2
02-Nov-2009
21 of 33
oO
FUJITSU

POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i

COMMERCIAL IN CONFIDENCE

Original
Object Id

Original Object text

Acceptance Criteria

Impact

MIG-3161

It shall be possible to make
software changes to
Baseline Horizon during
the Migration period ,
although Post Office has no
current plans for this.

Tests to demonstrate
changes to horizon baseline
during migration are defined
and contained within a
detailed test plan, the
successful completion of
which shall determine the
acceptance of this
requirement. To clarify
‘successful completion’,
success crit

MIG-3164

Baseline Horizon branches
installed during the Branch
migration roll out period
shall be scheduled for
subsequent conversion to
HNG.

Evidence that Branches
installed as Baseline Horizon
can be converted to HNG-X.

Tests to demonstrate this are
defined and contained within
a detailed test plan, the
successful completion of
which shall determine the
acceptance of this
requirement. To c

MIG-3256

Following migration to
HNG-X, Fujitsu Services
shall provide a _ Live
Reference Data Proving
environment capable of
validating HNG-X reference
data prior to its release into
the live environment. This
shall include the ability to
confirm the expected busi

Proof that HNG-X data will
operate as expected in the
HNG-X environment All BAU
processes in place and
agreed with PO Ltd.

SEC-3144

The HNG-X system shall
not retrieve data from any
external web service unless
additional security features
are agreed with Post Office
Information Security. For
the avoidance of doubt, no
security change is required
to the connection to the
DVLA web servi

Demonstration of protection
(either by simulation of attack
or by other means). Tests
are only required if HNG-X
supports browsing of external
web servers.

Deferred Test

© Copyright Post Office Limited

2009

UNCONTROLLED IF PRINTED OR LOCALLY

COMMERCIAL IN CONFIDENCE

Ref:

Version:
Date:
Page No:

STORED

REQ/GEN/ACS/0002
0.2

02-Nov-2009

22 of 33

POL00032633

POL00032633
oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 7
FUJITSU COMMERCIAL IN CONFIDENCE
Original Original Object text Acceptance Criteria Impact
Object Id
SEC-3224 It shall be possible to I As per the Requirement
recover the system to a
secure operating state from
the compromise of any key
that could directly or
indirectly expose plain text
PIN values. This
represents no change to
the current Horizon system.
SEC-3234 Sensitive Cardholder Data I As per the Requirement
(see Definitions) shall be
rendered unreadable
anywhere it is stored
(including data on portable
media, backup media, and
in logs) by using any of the
following approaches:
One-way hashes (hashed
indexes), such as SHA-1
Truncat
SEC-3309 All Sensitive Authentication I Tests show that all specified I Deferred Test
Data (see Definitions) and I data is protected by
Sensitive Cardholder Data I encryption or other method
shall be encrypted using I that makes it impractical to
approved algorithms and I deduce
encryption protocols whilst
in transit over any public
network unless specifically
agreed in writing by the
client.
Approve
SER-2195 Fujitsu Services shall I Tests to demonstrate the
define a Software Delivery I migration to HNG-x are
Management processes I defined and contained within
such that distribution, I a detailed test plan, the
activation, Business I successful completion of
enablement and I which shall determine the
Regression activities are I acceptance of this
known and controlled by I requirement. To clarify
Post Office, by branch and I ‘successful completion’,
for the whole estate as I success criteria will be
described in Systems Ma identifi
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE ve beeen
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY Date: 02-Nov-2009
STORED PageNo: 23 of 33
POL00032633
POL00032633

o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 7
FUJITSU COMMERCIAL IN CONFIDENCE
Original Original Object text Acceptance Criteria Impact
Object Id
TR471 To support external training I As per the requirement
activities including

migration, the solution shall
be capable of running on a
pre-defined portable
platform.

2.3.3 Not Covered / Zero defects status

I

2.3.4 Deferred Failed status

This status identifies those Use Cases where one or more defects have been identified and agreed to be
deferred. An Acceptance incident has been raised for each defect and these are contained in section 3.

2.3.5 Failed Status

This status identifies those Use Cases or non-functional criteria where one or more defects have been
identified. An Acceptance incident has been raised for each defect and these are contained in section 3

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 24 of 33
POL00032633
POL00032633

oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

3 Review of status of Acceptance Incidents

The Acceptance Incidents listed below have been raised because the acceptance evidence has failed to
meet the acceptance criteria. They have been classified into three groups: -

e Those arising from defects whose resolution has been agreed to be deferred until after
the start of Pilot. These have an identifier of Al-AD-nnn

e Those arising from defects that have been raised during the assessment of the non-
testable criteria - in this case Document Review. These have an identifier of AI-NT-nnn.

e Those arising from defects that have been raised during testing and where no formal
deferral discussions have taken place. These have an identifier of Al-TS-nnn.

3.1 Acceptance Incident Aggregation

Schedule B6.3 (4.6.3) recognises that HNG-X Acceptance Incidents that are agreed to result from the
same failure or deficiency, or to affect the same operational process or business function, may be
aggregated into a single HNG-X Acceptance Incident for the purposes of the thresholds identified in
section 1.2. The following sections contain details of all of the individual Acceptance Incidents and then
identifies where aggregation has occurred.

3.2 Acceptance Incidents arising from Agreed Deferrals
There are 105 Als of this type of with the following severity: -

Acceptance Individual Als
Incident Severity

Low 117

Medium 0

High 0

Total 117

Of these, 30 of the Low Severity Als have been aggregated into 8 Low Severity Als giving a net figure as
follows: -

Acceptance Net Individual Als I Aggregated Als Net Total
Incident Severity
Low 87 8 95
Medium (e)
High 0
Total 87 8
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY Date 02-Nov-2009

STORED PageNo: 25 of 33
POL00032633
POL00032633

oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

3.2.1 Acceptance Incident details for type Al-AD

Details of these Acceptance Incidents are contained in the embedded WORD document here.

aE

D:\PROFILES\cooked’
My Documents\My Dc

3.2.2. Aggregated Acceptance Incident details for type Al-AD

Details of these Aggregated Acceptance Incidents are contained in the embedded WORD document
here.

D:\PROFILES\cooked’

My Documents\My Dc
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2

UNCONTROLLED IF PRINTED OR LOCALLY Date 02-Nov-2009
STORED PageNo: 26 of 33
POL00032633
POL00032633

oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

3.3. Acceptance Incident arising from non-testable criteria

There are 14 Als of this type of with the following severity: -

Acceptance Individual Als
Incident Severity

Low 14

Medium

High

Total 14

Of these, 10 of the Low Severity Als have been aggregated into 1 Medium Severity Al giving a net figure
as follows: -

Acceptance Net Individual Als I Aggregated Als Net Total
Incident Severity

Low 4 0 4
Medium 0 1

High 0 0 0

Total 4 1

3.3.1. Acceptance Incident details for type Al-NT

Details of these Acceptance Incidents are contained in the embedded WORD document here.

ea)

D:\PROFILES\cooked’
My Documents\My Dc

3.3.2 Aggregated Acceptance Incident details for type Al-NT

Details of these Aggregated Acceptance Incidents are contained in the embedded WORD document

here.

D:\PROFILES\cooked’
My Documents\My Dc

© Copyright Post Office Limited GCNIANEOT. bi Seema Ref REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 27 of 33
POL00032633
POL00032633

o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

3.4 Acceptance Incident arising from Testable criteria

There are (41) Als of this type of with the following severity: -

Acceptance Individual Als
Incident Severity

Low (41)

Medium

High

Total (41)

3.4.1. Acceptance Incident details for type Al-TS

Details of these Acceptance Incidents are contained in the embedded WORD document here.

ra

D:\PROFILES\cooked

My Documents\My Dc

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2

UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009
STORED PageNo: 28 of 33
POL00032633

POL00032633
o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 7
FUJITSU COMMERCIAL IN CONFIDENCE
3.5 Acceptance Incident total
The overall status of all Acceptance Incidents is as follows: -
Severity AI-AD - Agreed AI-NT - Non AI-TS - Test Total
Deferred Testable
Low 95 4 (41) (140)
Medium () 4 1
High ie) 0 te)
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009
STORED PageNo: 29 of 33
POL00032633
POL00032633

oO ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

A Applicable POL Requirements and Acceptance
Criteria

The POL Requirements and Criteria, contained in the HNG-X Requirements Catalogue - POL DOORS
archive v1.42, and associated with AG3 are contained in the embedded spreadsheet.

This contains references to any Concessions.

D:\PROFILES\cooked
My Documents\My Dc
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2

UNCONTROLLED IF PRINTED OR LOCALLY Date: 02-Nov-2009

STORED PageNo: 30 of 33
POL00032633
POL00032633

o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3
FUJITSU COMMERCIAL IN CONFIDENCE

B_ Definition of Acceptance Methods

The set of HNG-X Acceptance methods are defined in Appendix D of Schedule B6.3 HNG-X Acceptance
Process and reproduced below.

Type Description

HNG-X HNG-X Acceptance Criteria that cannot be objectively verified by a test of HNG-X
Document may be satisfied by Post Office undertaking a HNG-X Document Review. The
Review outcome of any such review will be documented by Post Office in the HNG-X

Acceptance Tracking Document. Fujitsu Services will supply a list of documents.
(and any specific references within such documents) for Post Office review,
which may satisfy the agreed HNG-X Acceptance Criteria.

HNG-X HNG-X Acceptance Criteria may be satisfied by Post Office participating in an
Design HNG-X Design Walkthrough led by Fujitsu Services of the Fujitsu Services’
Walkthrough I design. The outcome of any such HNG-X Design Walkthrough will be
documented by Post Office in the HNG-X Acceptance Tracking Document.

HNG-X Tests that are owned and managed by Fujitsu Services with significant
Solution Test I Collaborative support from Post Office, for the purpose of verifying that the Fujitsu
Services’ solution for the HNG-X System satisfies the relevant HNG-X
Acceptance Criteria. The collaborative team will produce a joint test report
presenting the results of the tests.

HNG-X Tests that are run and managed by Post Office with significant collaborative
Release support from Fujitsu Services, for the purpose of verifying that the HNG-X
Validation Release satisfies the relevant HNG-X Acceptance Criteria. The combined team

will produce a joint test report presenting the results of the tests and provide
evidence on any areas of non conformance.

Post Office shall specify any need beyond the level of support that Fujitsu
Services are required to provide under normal operational practice (such as a
report etc). Duration, nature and characteristics to be agreed in advance between
Post Office and Fujitsu Services and will take place during Live Pilot or
exceptionally during Live Monitoring. The total duration of HNG-X Monitoring and
the obligations on Fujitsu Services to produce data/reports to support Post Office
monitoring to be agreed between Post Office and Fujitsu Services (each acting
reasonably and in good faith) for a particular HNG-X Requirement.

HNG-X Where the solution to an HNG-X Acceptance Criterion is self-evident and does

Statement of I "0t lend itself to formal proving.

Fact

HNG-X Relates to HNG-X Acceptance Criterion that represents an ongoing contractual

Statement of I obligation for HNG-X.

Obligation

Other Used by exception, to be agreed between the Parties.
© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2

UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 31 of 33
POL00032633
POL00032633

o ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i
FUJITSU COMMERCIAL IN CONFIDENCE

C Definition of Acceptance Incident Severity

The definition of the severity of an HNG-X Acceptance Incident is defined in Appendix A of Schedule
B6.3 HNG-X Acceptance Process and reproduced below.

High The HNG-X Acceptance Incident was caused by the introduction of changes arising
from Project HNG-X and/or the Associated Change Activities that are subject to the
HNG-X Acceptance Process and results in a defect that would render a key element of
one or more of the Business Capabilities and Support Facilities or a key element of the
Infrastructure unfit for operational use, which could include:

a) not allowing Post Office to undertake one or more Transaction types;

b) not allowing Post Office to undertake one or more Transaction types using the
required business inputs or generating the required business outcome;

c) creating system performance issues which are in, or are likely to cause a, breach
of Service Level Targets.

Medium The HNG-X Acceptance Incident was caused by the introduction of changes arising
from Project HNG-X and/or the Associated Change Activities that are subject to the
HNG-X Acceptance Process and results in a defect that would not prevent operation of
one or more of the Business Capabilities and Support Facilities or elements of the
Infrastructure, but would cause problems in the operational use of one or more
Transaction types.

Low The HNG-X Acceptance Incident was caused by the introduction of changes arising
from Project HNG-X and/or the Associated Change Activities that are subject to the
HNG-X Acceptance Process and results in a defect that does not cause any adverse
operational impact in the use of the Business Capabilities and Support Facilities or an
element of the Infrastructure, or the HNG-X Acceptance Incident can be addressed by
a workaround without any adverse operational impact for Post Office.

Non An incident raised by either Party which, following investigation is found:

Incident

> not to be a defect;

> not to have resulted from the introduction of changes arising from Project HNG-X
and/or the Associated Change Activities that are subject to the HNG-X
Acceptance Process; or

» not to fall within the high, medium or low categories set out in this column.

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009

STORED PageNo: 32 of 33
POL00032633
POL00032633

ACCEPTANCE REPORT FOR HNG-X ACCEPTANCE GATEWAY 3 “i

FUJITSU COMMERCIAL IN CONFIDENCE

D Acceptance Board recommendation options

It is proposed that the decision of the HNG-X Acceptance Board should comprise one of the following
options: -

1. Proceed through Acceptance Gateway.
i. Acceptance Gateway criteria have all been met.
ii. There no Acceptance Incidents that would prevent progression through this Acceptance
Gateway

2. Proceed through Acceptance Gateway
i. Not all Acceptance Criteria have been met and consequently there are Acceptance Incidents.
ii. The severity of these Acceptance Incidents is within the limits for progression through this
Acceptance Gateway.
iii. Each Acceptance Incident has an agreed workaround.
iv. Where required by the contract, all Acceptance Incidents have an agreed rectification plan or a
target timescale for rectification

3. Proceed at risk through Acceptance Gateway
i. Not all Acceptance Criteria have met and consequently there are Acceptance Incidents.
ii. The severity of these Acceptance Incidents is within the limits for progression through this
Acceptance Gateway.
iii. One or more workaround, rectification plan or target timescale, is not yet agreed.

4. Do not proceed through Acceptance Gateway
i. Not all Acceptance Criteria have been met and consequently there are Acceptance Incidents.
ii. The severity of these Acceptance Incidents exceeds the limits for progression through this
Acceptance Gateway
iii. Remedial actions are required to address the Acceptance Incidents and / or workarounds.

© Copyright Post Office Limited COMMERCIAL IN CONFIDENCE Ref: REQ/GEN/ACS/0002
2009 Version: 0.2
UNCONTROLLED IF PRINTED OR LOCALLY _ Date: 02-Nov-2009