POL00393915
POL00393915
SUP/CON/001
CONTRACT CONTROLLED AND REFERENCED DOCUMENT LIST
Version Reason for change Frozen/issue date
reference
1.4 Rebaselined and reformatted version that matches I 2 August, 2000
baseline 1.4 of the Codified Agreement
INTRODUCTION
This CCD List Version 1.4 was adopted through the Change Control Procedure and
incorporates amendments to the CCD List from all CCNs up to and including those
signed on 30 June 2000 (“ the Baseline Date”). This is without prejudice to the
application of these CCNs to matters other than the CCD List, for example changes
or amendments to the CCDs themselves.
When making use of this version of the list, it is necessary to take into account CCNs
approved after the Baseline Date which may include amendments to the list itself
(which will be incorporated at the next version), and, if using a document on the list,
to consider whether there are any CCNs affecting the document which have not been
incorporated into the document itself.
For the avoidance of doubt, the inclusion of a CCD in the list set out below shall not
alter or affect the interpretation or construction to be given to any words used to refer
to that CCD in the Codified Agreement, or the interpretation or construction of the
CCD List itself.
Documents in the table below are CCDs with the exception of those numbered 901
and above which are CRDs
No Pathway Programme Document Title Version Date
Reference Reference
1 SD/DES/005 pwy/sd/des/005 Horizon OPS Reports and Receipts - 7.0 06/12/99
Pathway Horizon Office Platform Service
2 CS/SIP/002 _pwy/cs/sip/002__ Business Continuity Framework 4.0 29/10/99
3. BP/DES/003 _ pwy/bp/des/003_ Counter Hardware Design Specification 7.0 12/07/99
4 CS/PRP/001 — pwy/cs/prp/001 Counter Transaction Performance 2.0 01/07/99
Measurement and Benchmarking
5 OB/IFS/001 —_ dss/obesint DSS Client Interface Specification \ OBCS 3a 30/3/99
6 BP/PRD/0002_ bap/bpr/obcs OBCS Business Process Rules 3.0 06/09/99
7 SU/DES/003 _ pwy/su/des/003_ OBCS Access Service High Level Design 4.0 10/11/97
8 BP/TRN/0O1 pwy/bp/trn/001_ Training and User Awareness Baseline 11.0 29/11/99
Document
9 — RS/POL/002__ pwy/rs/pol/002__ ICL Pathway Security Policy 4.0 30/04/99
CCD List Page I of 7 14
POL00393915
POL00393915
SUP/CON/001
10 BP/DOC/014 pel/ap/ion/001_ ~~ POCL Automated Payments Generic Rules 1.0 09/02/96
I (Reserved for future use)
12. BP/IFS/007 __ pel/rdp/ais/001 Application Interface Specification Reference 3.3¢ 02/02/98
Data to Pathway
13. TI/IFS/008 pel/rdp/tis/001 Pathway to Post Office Technical Interface 2.0 17/12/99
Specification
14 PA/STR/003 _ pwy/pa/str/003__ Pathway Release Policy 5.0 16/07/99
15 RS/FSP/001 _ pwy/rs/fsp/001 Security Functional Specification 4.0 12/05/99
16 CR/FSP/0004 pwy/cr/fsp/0004 Service Architecture Design Document 4.0 30/09/97
17 TI/IFS/001 pel/pestipis Pathway to TIP Application Interface 5.7 05/07/99
Specification
18 (Reserved for future use)
19 (Reserved for future use)
20 (Reserved for future use)
21 (Reserved for future use)
22 (Reserved for future use)
23 (Reserved for future use)
24 (Reserved for future use)
25 SD/STD/001 _ pwy/style Horizon OPS Style Guide 2.0 23/06/99
26 CR/FSP/006 — pwy/cr/fsp/006 Audit Trail Functional Specification 3.0 01/07/99
27 PA/STD/003 _ pwy/pa/std/0003 Business Requirements Definition 1.2 12/11/97
28 PA/PRO/007 _ pwy/pa/pro/0007 New Service Introduction 13° IMV/I11/97
29 SU/IFS/028 — gecmeter/p1269/sGEC Meters Ltd - “Watercard” Budget 2.0
pecs/r349_02 Prepayment System Transaction Terminal
Outline Requirements
30 SU/IFS/029 —_p1269/r281 GEC Meters “Watercard” Payment System 2.0
2K Card Data Specification (I2C)
31 SU/IFS/027 1269/1280 Kent Meters/GEC Meters “Watercard” Issue I
Payment System Card Data Encryption
Specification
32 SU/IFS/003 hl 1290 6974a L&G Agency UTP File Interface 0.2 13/02/97
Specifications
33 SU/IFS/024_ hl 12907018 ~— A Point of Sale Supporting the Quantum 1.0 11/02/98
Application Utilising the POCL Secure DLL
34 SU/IFS/026 _ ifdoc.doc CQO/Service Providers Interfaces 3.0 25/05/98
35 BP/DOC/008 _ pcl/prd/aps/001 Automated Payments System Client List 1.07 12/01/00
36 AP/IFS/0001 — pwy/ap/ifs/0001 Pathway to HAPS Interface Specification 5.0 22/09/99
37 CR/PRP/003 — pwy/cr/prp/003_ HAPS Disaster Recovery 1.0 30/07/98
38 CR/ACS/006 — pwy/cr/acs/0006 APS Acceptance Test Acceptance 3.0 16/07/98
Specification
CCD List Page 2 of 7 14
POL00393915
POL00393915
SUP/CON/001
39 IM/ACS/001 pwy/im/acs/001_DSS/POCL Implementation Part A - User 3.0 20/08/98
Training / Procedures — Acceptance
Specification
40 IM/ACS/003 pwy/im/acs/003 DSS/POCL Implementation Part C - 2.0 23/06/98
Services Acceptance Test Specification
41 CR/ACS/022_ pwy/cr/acs/022_ MIS Services Acceptance Test Specification 1.0 20/10/98
42 CR/ACS/005_ pwy/cr/acs/005 OBCS Acceptance Test Acceptance 4.0 06/11/98
Specification
43 RS/ACS/002 pwy/rs/acs/002 Security Acceptance Test Acceptance 2.0 16/10/98
Specification
44 CR/ACS/019 pwy/cr/acs/019 Service Levels Acceptance Test Acceptance 1.0 21/10/98
Test Specification
45 CR/ACS/011 pwy/cr/acs/011 Audit Acceptance Specification 2.0 13/11/98
46 CR/ACS/009 pwy/cr/acs/009 ICL Pathway to TIP Interface Acceptance 3.0 27/11/98
Specification
47 BP/IFS/012 _ rdp/ais/009 Application Interface Specification Reference 1.0b 23/04/99
Data to Pathway Type B Data
48 CR/ACS/008 pwy/cr/acs/008_ EPOSS Acceptance Test Acceptance 4.0 18/12/98
Specification
49 CR/ACS/018 pwy/cr/acs/018 Help Desk Acceptance Test Acceptance 2.0 11/12/98
Specification
50 CR/ACS/012_ pwy/er/acs/012 Reconciliation Acceptance Test Acceptance 2.0 22/12/98
Specification
51 RS/ACS/001 pwy/rs/acs/001 End-to-End Service Acceptance Test 1.0 24/12/98
Acceptance Specification
52 CR/ACS/020_ pwy/er/acs/020 Acceptance Criteria within Schedule C3 1.0 24/12/98
Acceptance Test Acceptance Specification
53 IM/REQ/005__ pwy/im/req/005 Horizon Counter Infrastructure Rollout - 4.0 03/12/98
Survey Requirements Specification
54 CR/ACS/021 pwy/cr/acs/021 Policies & Standards Acceptance Test 1.0 11/01/99
Acceptance Specification
55 AP/SER/001 — pwy/ap/ser/001 Automated Payments Service Overview 1.0 14/08/98
56 AP/PRD/001 pwy/ap/prd/001 AP Client Take on Process 1.0 06/02/98
57 IM/ACS/005__ pwy/im/acs/005_ DSS/POCL Implementation part D - Rollout 2.0 21/12/98
Acceptance Specification
58 CR/ACS/010 pwy/cr/acs/010 POCL Reference Data Interface Acceptance 3.0 21/01/99
Test Acceptance Specification
59 IM/STR/025__ pwy/im/str/0025 High Level Counter Infrastructure Rollout 5.0 22/10/99
Strategy
60 OB/DES/001 pwy/ob/des/001 OBCS Access Service (VME) Release 0100 1.0 10/12/96
System Interface Definitions
61 SU/TRN/006 pwy/su/trn/006 Remedial Training 1.0 26/11/97
62 SU/TRN/001 pwy/su/trn/0001 Training Needs Analysis for the POCL 2.0 07/07/99
Counter Automation Project
CCD List Page 3 of 7 14
POL00393915
POL00393915
SUP/CON/001
63 SU/TRN/005 pwy/su/trn/005__ Training Evaluation Paper 2.0 08/07/99
64 SU/TRN/O16 pwy/path/pubs/0 ICL Pathway Training and User Awareness 4.0 09/06/98
Ol Style Guide ( doc no. PATH/PUBS/001)
65 IM/REQ/014 _ pwy/im/req/014 Training Scheduling and Minimum Training 1.0 27/05/98
Compliance
66 SU/PRO/029 _ pwy/path/proc/00 Training Venue Administration 2.0 03/06/98
04 (doc no. PATH/PROC/0004)
67 BP/PRD/007 pwy/bp/prd/007 POCL Policy for Releasing Individuals to 1.0 13/08/98
Attend Training
68 BP/PRD/006 — pwy/bp/prd/006 POCL Policy on Competency Testing 1.0 13/08/98
69 IM/STR/026 _ pwy/im/str/026 _ Installation Strategy 1.0 02/12/98
70 IM/STR/040 _ pwy/im/str/040_ Scheduling Strategy 1.0 02/11/98
71 BA/ACC/O11 pwy/ba/acc/011 Acceptance Specifications Consolidated 1.0 01/02/99
Caveats
72 RS/FSP/003__ pwy/rs/fsp/003 Statements on Security Objectives and 4.0 29/03/99
Methods for the Protection of Siemens
Metering Code and Data
73 BP/PRD/O15 _ bps/back/001 Removal of Existing Customers from the 1.0 03/06/99
Card Scheme
74 CR/ACS/007_ pwy/cr/acs/007_ POCL Infrastructure Acceptance Test 2.0 31/03/99
Acceptance Specification
75 CS/PRO/025_ pwy/cs/pro/025 NR2 Access Control and User 2.0 30/06/99
Administration Processes and Procedures
Description
76 CS/PRO/0045_ pwy/cs/pro/0045 NR2 Automated Payment Service Processes 1.0 15/06/99
and Procedures Description
77 CS/PRO/0021 pwy/cs/pro/0021 NR2 Electronic Point of Sale Service 4.0 11/01/00
Processes and Procedures Description
78 CS/PRO/0048 pwy/cs/pro0/048 NR2 Horizon System Helpdesk Processes 1.0 15/06/99
and Procedures Description
79 CS/PRO/022__ pwy/cs/pro/022_ NR2 Order Book Control Service Processes 2.0 30/06/99
and Procedures Description
80 CS/PRO/024__ pwy/cs/pro/024_ NR2 Operating Environment PPD 2.0 24/08/99
81 CS/PRO/0027_ pwy/cs/pro/0027 NR2 Introduction Processes and Procedures 1.0 15/06/99
Description
82 PA/STR/O12 pwy/pa/str/012_ ICL Pathway Core Systems Release 2.0 16/07/99
Contents Description
83 CS/PRP/O11 — pwy/cs/prp/011 OBCS Benchmark Counter Transaction 3.0 07/10/99
Times for CSR
84 CS/PRP/013 — pwy/cs/prp/013_ APS Benchmark Counter Transaction Times 3.0 07/10/99
for CSR
85 CS/PRP/O14 — pwy/cs/prp/014. EPOSS Benchmark Counter Transaction 3.0 07/10/99
Times for CSR
86 PA/STR/013_ pwy/pa/str/013_ ICL Pathway Core Systems Release Plus 1.0 02/07/99
Contents Description
CCD List Page 4 of 7 14
POL00393915
POL00393915
SUP/CON/001
87 IM/TRN/O16 pwy/im/trn/016 Counter Assistants Training Course 1.0 13/07/99
Specification
88 IM/TRN/O17 pwy/im/trn/017 Counter Managers Course Specification 1.0 13/07/99
89 CS/PER/041 pwy/cs/per/041_ Definition of Remote and Intermediate 1.0 22/06/99
Locations
90 AP/IFS/031 — pwy/aps/ifs/031 Pathway to HAPS Application Interface 5.0 10/04/00
Specification (Horizon Release 2+)
91 AP/IFS/0029 pwy/ap/ifs/0029 Pathway to HAPS Technical Interface 2.0 28/09/98
Specification
92 AP/IFS/030 — pwy/ap/ifs/030 Pathway to AP Client Generic Technical 1.0 12/05/99
Interface Specification
93 AP/IFS/042 — pwy/ap/ifs/042_ Pathway to CQO Application Interface 4.0 04/05/00
Specification
94 AP/IFS/046 — pwy/ap/ifs/046 Pathway to CQO Technical Interface 2.0 15/02/99
Specification
95 IM/STR/O18 — pwy/im/str/018 AP Client Migration Strategy 5.0 16/07/99
96 VI/POL/0001 pwy/vi/pol/0001 General Testing Policy 2.0 30/09/96
97 VI/STR/0001 pwy/vi/str/0001 Testing and Integration Strategy 2.0 30/09/96
98 VI/STR/006 — pwy/vi/str/006 Revisions to the Testing and Integration 2.0 24/10/97
Approach for Pathway Release 2
99 CS/REQ/006_ pwy/cs/req/006 OBC Change Catalogue 3.0 19/07/99
100 CS/IFS/003 _ pwy/cs/ifs/003_ ICL Pathway/POCL Interface Agreement for 3.0 19/07/99
Operational Business Change - Outlet
101 CS/PDN/O15 pwy/cs/pdn/015_ Service Descriptions for Outlet Change 3.0 19/07/99
102 AP/IFS/049 — pwy/ap/ifs/049 Pathway to SPM Application Interface 1.0 25/06/99
Specification
103 IM/TRN/023 pwy/im/trn/023_ Counter Assistants Course Specification 1.0 13/07/99
(with balancing)
104 IM/REQ/051 _ pwy/im/req/051 Provision of In-office Migration Services 1.0 13/07/99
105 IM/TRN/O18 — pwy/im/trn/018 HFSO Course Specification 1.0 13/07/99
106 IM/TRN/024_ pwy/im/trn/024_ HFSO Counter Managers Specification 1.0 13/07/99
107 IM/TRN/022__ pwy/im/trn/022_ HFSO Refresher Course Specification 1.0 13/07/99
108 BP/DES/022 _ jed/lfs/005 LFS Bar Codes 1.2 11/08/99
109 BP/DES/024 _ jed/Ifs/008 LFS Data Retention 1.1 16/07/99
110 BP/DES/019 _ jed/Ifs/001 Inventory Item Specification 1.3 11/08/99
111 BP/DES/020 _ jed/Ifs/002 LFS User Roles and Access Permissions 1.2 16/08/99
112 BP/DES/023 _ jed/Ifs/007 LFS to SAPADS and SAPADS to LFS 1.3 11/08/99
Application Interface Specification
113 BP/DES/021 _ jed/Ifs/003 LFS Reports and Receipts 1.2 10/09/99
114 BP/DES/025 _ jed/Ifs/012 LFS Business Contingencies l.la 07/09/99
115 BP/DOC/015 pel/tst/pid/003_ Millennium Weekend Horizon Operational 1.0 20/07/99
Health Check - Overview
CCD List Page 5 of 7 14
POL00393915
POL00393915
SUP/CON/001
116 BP/IFS/O11
117 PA/TEM/007
118 CR/FSP/014
119 AP/IFS/048
120 CS/PRD/058
121 BP/PRD/023
122 IM/PRO/134
123 SU/REP/021
124 IM/PRD/056
125
126 AP/IFS/052
127 AP/IFS/0S6
128 CR/SPE/022
129 AP/IFS/053
130 CR/SPE/015
13
BP/PRD/024
132 CR/SPE/014
133 CR/SPE/019
134 CR/SPE/009
135
136 BP/SPE/026
901 RS/CSD/001
902 BP/ION/002
903 BP/POL/001
rdp/ais/011
pwy/pa/tem/007
pwy/cr/fsp/014
pwy/ap/ifs/048
pwy/es/prd/058
pel/pm/pre/001
pwy/im/pro/134
pwy/su/rep/021
pwy/im/prd/056
pwy/ap/ifs/052
pwy/ap/ifs/056
pwy/cr/spe/022
pwy/ap/ifs/053
pwy/cr/spe/015
hor/imp/rol/005
pwy/cr/spe/014
pwy/cr/spe/019
pwy/cr/spe/009
sup/con/001
dss/itstds
pel/sec/code
pel/req/env
Application Interface Specification Reference
Data to Pathway Type B Data for CSR+
Change Control Note [form]
APS Client Connection Service Description
APS Host Operational Reconciliation
Reports for CSR+
ICL Pathway /POCL Interface Agreement
for Operational Business Change - Product
LFS Business Process Diagrams
Training Development and — Sign-Off
Document
Standard Reports and Formats
ICL Pathway User _ Implementation
Escalation and Management
(Reserved for future use)
Pathway to Client Standard
Mageard/Barcode Application —_ Interface
Specification
Pathway to Client Type ‘CG
Mageard/Barcode Application Interface
Specification
Automated Payments Client Specification -
Mid Kent Water
Pathway to Client Standard Watercard
Application Interface Specification
Automated Payments Client Specification -
Hampshire County Council
User Satisfaction I Measurement in
Implementation - ICL Pathway Measures
Automated Payments Client Specification -
Knowsley Borough Council
Automated Payments Client Specification -
Yorkshire Electricity
Automated Payments Client Specification -
Girobank
(Reserved for future use)
43a
3.0
2.0
4.0
3.0
nN
1.0
3.0
1.0
2.0
Contract Controlled and Referenced1.4
Document List
Departmental IT Security Standards
A Code of Practice for Post Office
Information Systems Security
6.3.1
1S
01/10/99
12/07/99
10/04/00
20/01/00
10/01/00
27/10/97
03/12/99
15/05/99
09/03/00
03/04/00
04/04/00
12/04/00
03/04/00
04/04/00
05/06/00
22/06/00
16/06/00
1/8/2000
March
1997
28/10/94
Guide to Environmental Best Practice in Post Leaflet None
Office Counters Limited — [POCL's
Environmental Policy Summary]
CCD List
Page 6 of 7
POL00393915
904 BP/PRO/005__ pel/pocl/vis
90 BP/POL/002__ pel/sec/for
By
906
90
7
908 BP/IFS/006 __ pcl/iface/007
Design Standards Volume 1: Identity System
[POCL Visual Identity Design Applications
Guideline]
Post Office Counters Information System
Security Policy
(spare)
(Removed)
POCL Interface Requirements for BA/POCL
System
POL00393915
SUP/CON/001
Jan 1997
6 March
1995
1.6 16/04/96
CCD List