POL00448072 - Escalation Process V2.0

Evidence on official site

POL00448072
POL00448072

(Document Information

Process Name Escalation process

Process Ref INV-ESCO1

Process Owner: Tracy Bannister

Document Status: Approved

Document Classification: Internal

(Process Summary (describe in a paragraph the context and reason for process):

If a discrepancy has been investigated, this process shows how it can be escalated if the PM does not agree with the decision or if the loss

cannot be established

Process Owner Role: Network Resolution Operations Manager

Version History

\Version Number Date Issued Author Updates since last version
0.1 10/08/21 Fleur Langley-Knight Initial version
0.2 12/08/21 Fleur Langley-Knight Added in business feedback
0.3 15/09/21 Fleur Langley-Knight Controls added
1.0 04/10/21 Fleur Langley-Knight Summary & version updated
4a 19/04/2022 Duncan Hughes Review of process and controls
2.0 20/07/2022 Duncan Hughes Reviewed and approved by process owner
Review History
Reviewer Role Last Date Reviewed Version(s) Reviewed
[Tim Humphries T2 12/08/21 0.1
[Tracy Bannister Network Resolution

Operations Manager 20/07/2022 1.2

POL00448072

POL00448072
Process Notes
{Detail any notes to supplement specific process stages)
Number A tional pr. ne
a. The Weekly Case Review will asses the case and based on the success rate value will make the decision to escalate the case to Tier 3 or clear the account.
2. If the account is being cleared, the analyst will make sure Authorisation is completed prior to Dynamics case assigned to PAST (this is embedded in Activity pane and copied into the resolution section before

assigning) & notes updated.

4. The dispute resolution committee will either make a decision on how to proceed with the case or will recommend one of the following actions:

© Gather more information from loss recovery. Contact the Network Monitoring Team to see what reports are available.
© Refer to legal for review and recommendation
© Refer to Audit for investigation
* Ask for more information from contracts to understand the options available
‘* Write out to Area Manager as PM needs more support (if it is identified the loss was caused due to a lack of training or support from Post Office, therefore outside of the PM’s control, the account will be
cleared).
s. Advisors work in two week sprints. If they are unable to resolve a case within the 10 day sprint, they will discuss the case with the Team Manager t agree next steps (whci could include

escalation to the WRC),

T3 conduct a deep dive of the case and review the systems and contact the PM for more information where required.

It may not be possible to make a decision in the meeting and more thought may be required to the best course of action. Where this happens the decision will be parked.

POL00448072
POL00448072

(Glossary
(Include abbriviations / terms / acronyms used in process flow, along with a description to aid understanding)

‘Terms Definition
CIRT Case Investigation Review Team ~ This is the former name of the Tier 3 investigation team.
PM Postmaster - Person under contract to Post Office to operate a branch. This could be an individual or a Strategic Partner and the use of this term could also cover the postmaster's

branch team members.

{insert Reference of Process}: { Insert Name of Process and

(Version Number in brackets)} Process Template Symbols

POL00448072
POL00448072

Customer Outcomes

{Insert Description of Process in italics}

eo I Emthrole participating in the process must havea ‘The reference numberof the
SF I separate swiniane. process must be used
SE I teecesrmamattctonne tonne wh youd otinow theres mime

2S e I SSE Stine rset chin

2eES you nece fonda temthen pete see “roc hang iosegetyounove seer es

5 ne Sone stn pace mos eh

= BE SB I kooreonmanecn bowed trou yten ft pcos ‘ane ROCESS othr new nome
Bz, B I tevcsans orton tt ertseutsemteseg CONT fan eossied Se" rcs Choge™

en I trenareoooeintenr cura) Spore aad lathe to she)
Process star

Desa tener evertht hares proesta stat
amps Castor res arch ore sro “Coe

O

esage tener:

seth sl here a proces stared some so faced eer
‘Mhamgntbe eer stem bse venta ede a analy ead
Thou foroumgl sn rement oh poe oe snd antes
foram ager Serbs the shes hw sents woseenesnd hen
Scheie Datal ‘thin rad ces nen eth td meting for
‘have sched ump chisel proces eae ery
‘ornng a 30m wang)

©

Time lag or delay:

se sta shower thee iasme sora ey between sees

©

Trigger mid process
‘lev cnet nc on hom te cee!

Name and type of
communication or wgger

{An intermediate event:

ie
a
L
ae
aE
He
HF
Hi
i
H
i
i

interme tvent Sotatopterroiston otesonsto aati a

(Acustomer cancels,
[An error occurs,
A response i received)

Notes against a process or any other element on a map,

‘An activity ina process.

sey sn scivty wth an ote proce

a ‘espe mor ve moe el nd tebe nts ne
(PROCEDURE REF) ‘Saitenume narctenceetepearcue nn ne

Referred Process
Taster io ts cea mn
eemply ote ewer te oe

Str cantare mag ord
Process Ref serve seins vel pros wat topo toor eta 3
Process Name prcosthen eth moa

Generic Customer Outcome
‘Sting solestan’ or ‘atomer aces nem proat

—_— > eu
‘Activity Flow: This line and arrow i used to show the flow Fi hows Txor CoS on aaa waht cane tostow i ss
<——___ mhartivityand the order in whic the activities ocur feadorabdoutome forte cater
<> _Piformation of Data Flow: Dotted line with arcow end
shows the direction of low on INFORMATION either into or
oxo from an activity and ito o from a system.
Goat ‘nacre eluate avy ak et ho mak an
Gomme od {tlwesstar ine toes tobe tren nthe sty somes Row the Customer Experience Score,
‘si ines tthe no cantnon toma sce hoppers a _Diibcsa tor tm cseer ema xa anh fo ero
> our serve dene / ose prey ots beter
Dotted line with arow end shows ink between an activity elena nett et sab ents etae epat .
« and an outcome. re rexon Rs deertisto sepuat tam teow ‘eaten ath ego a erat pa he rt

Customer nights:
& Hapelahaneehareoei a Ceasar yreplipenen ened

Uretitaston tan ow wong gown ONE fh obi the ‘customer Communication:
hae gion map mths oe ehh oo don en A an ay Communication of any kind i sent to the
‘enact act flog we ES" "NO cnt SURO caennnauedeone
\Wherno"i estoun heron eisve eros bitter tout, Name orreference for athe ansortheefrncct he conmunaton wet
ame oF reference (Or, setiecn bebo ragerenen tracy nein

©

Inclusive Gateway.

9

Feral: “termne what to buy con. Posb comes me espe eae oF Dna. Fee
‘meta ependogan ow arora chow ae ocr oh

Adocument or data set:
Information tat this used a input to an activity or created or updated
asan output ofan activity

For example a report might be generated bya system and sent by email
to1acontact centre agent to review. So you can show the name ofthe
document reviewed by using tis shape and a dotted arrow nto the
activity where the contact agent reviews the item.

System being “read from” or being updated as
result ofthe associated activity

I Name otsystem I } ict aranssicusdahgthesytensnwhese teenie

\ ‘mg rna om i dt sb wes onan sty oben
pastes" whee he spmisbang pasted ara et tan

Business Rul

‘Tiskonsuseto stow tare abuses asics wth hot Wee
“revert pons afro fre Doser le mt be es a he reader
iene aban ein a tae Channels
these as desman sss hs proses ‘Show channel cons on the activity bx where the channel
‘used or the activity flow that join it to the next activity.

‘Operational Risk —Inadequate, none or unknown control “They can also be used to link to customer outcomes or
Team dw tea gate rome nr ‘communication to show the method by which the
‘Sceqae“orhere sas aqedts detain ez ny colt ‘communication was seat.

caret nino

‘When documenting process imprnt dent prs he oes,

CG o

tat orn
cn

End of alternate path ofa process End of Process fate ra poe
POL00448072