De lo itte e STRICTLY PRIVATE AND CONFIDENTIAL
HNG-X: Review of Assurance Sources
Executive Summary Draft
Emerging findings at 29/04/14, subject to completion of Deloitte work
Deloitte Ref: Board Summary v5
SURIFCT TOL FGA! PRIVI FGF
WITN10370169
WITN10370169
Executive Summary
Context
Post Office Limited ("POL") is responding to allegations that the “Horizon” IT system used to record transactions in
Post Office branches is defective and that the processes associated with it are inadequate (e.g. that it may be the
source and/or cause of branch losses). POL is committed to ensuring and demonstrating that the current Horizon
system ("HNG-X’) is robust and operates with integrity, within an appropriate control framework.
Since its implementation in branches in 2010, POL has commissioned or has received an increasing number of
pieces of work relating to HNG-X to provide comfort over the design and operation of key controls. Deloitte has
been appointed to consider whether this assurance work appropriately covers key risks relating to the HNG-X
processing environment and raise suggestions for potential improvements in the assurance provision.
Our work was performed in the context of activities we see in other, similar organisations, as well as guidance
offered by recognised, best practise control frameworks (for example, the COSO framework, as published by The
Committee of Sponsoring Organisations of the Treadway Commission).
Our work is near completion and thus this summary outlines our emerging conclusions as at 29" April 2014. Our
report, containing final conclusions, additional detail and recommendations for next steps, will be issued in May.
Overall Comments
A significant amount of work has been performed relating to key risks across the HNG-X processing environment.
This work is comparable to that typically seen in other, similar organisations.
Specifically, the assurance provision relating to HNG-X's general control environment risks at Fujitsu adopts best
practises, where the risk assessment and control framework have been formalised and is independently assured
under a recognised assurance standard (ISAE 3402).
The significant work performed in the areas of implementation and specific risk is consistent with that typically
undertaken in organisations comparable to POL, where such risks are not required to be formally documented and
assured to comply with external governance requirements. POL could obtain greater assurance from this work if it
were aligned to a formalised, independently assured, risk assessment.
Governance and controls over change risks relating to the HNG-X implementation align to expected practices
(subject to the provision of documentary evidence by POL to support the verbal assertions of interviewees).
Relating to more specific risks (including responses to reported errors), extensive and detailed documentation has
been produced by technically competent professionals, familiar with the system, at Fujitsu. These documents
include descriptions of the key design and operating features of the HNG-X system in more specific areas and thus
contain significant information relating to controls within HNG-X. We note that the documents produced are of
system and operational nature, and, whilst consistent with organisations like POL that are not subject to external
compliance requirements in this area, would provide greater comfort over the complete coverage of key risks if
supplemented from a risk assessed lens.
Our main recommendation for improvement in the assurance provision therefore would be for POL to extend the
formai risk and contro! framework, already in place for general controls, to also embrace key risks and controls
holistically across the HNG-X processing environment. For example, to include controls in specific risk and thus
more operational areas of the business, such as the Finance Service Centre.
DRAFT FINDINGS
STRICTLY PRIVATE AND CONFIDENTIAL. SUBJECT TO LEGAL PRIVILEGE.
WITN10370169
WITN10370169
This exercise would provide a fully encompassing and coherent risk and control framework for the HNG-X
processing environment, and give a platform from which POL can deliver more comprehensive, efficient and
sustainable comfort that key processing environment risks are being managed on an ongoing basis.
Such an enhanced approach wouid also enable POL to formally optimise the design of the control framework
against POL’s emerging risk appetite definitions and take forward the more granular improvement suggestions
contained in our report. For example, the need for POL to formalise its response to the ISAE 3402 “User Entity
Contro! Considerations”, which POL has recently started to document.
Key Emerging Findings
We structured our work around 3 main areas of risk and have aligned our more detailed, emerging findings to
these:
IT Environment Risks:
IT Environment Risks relate to the policies and procedures which support the day to day running of the system,
such as security management, change control management and system operations management. Controls which
mitigate these risks are often referred to as “General Computer Controls”. Our work focussed on assurance
provided over Fujitsu's activities in these areas.
Formally structured and independent assurance work has been performed relating to these risks, in line with
benchmarks for an outsourced IT processing environment such as HNG-X.
POL's assurance over key risks in this area could be strengthened by POL completing its formal response to “user
entity control considerations” of the ISAE 3402 report and by suggesting some refinements to the narratives within
the ISAE 3402 to provide further clarity in certain, potentially ambiguous, areas (examples are in our final report))
HNG-X implementation Change Risks:
HNG-X Implementation Change Risks relate to the very significant IT changes that required formal project
governance structures when HNG-X was implemented. These risks are governed and controlled outside of day to
day system operating procedures. Controls which mitigate these risks are often referred to as “Project Controls”.
The design and operation of project governance and contro! procedures for the HNG-X implementation appears
comparable to what we see at other organisations (this is subject to the provision of evidence to support verbal
assertions made by POL in this area). No independent assurance has been provided in this area.
Assurance over these implementation risks could be further strengthened through both greater independent
scrutiny and through post-implementation assessment. We also note, for future reference, that such significant
projects are an opportunity to efficiently capture and create the control and assurance frameworks for Specific
Risks (see below), and to help clarify descriptions of controls and their optimal testing once changes are live.
Specific Risks:
Specific Risks relate to those more granular or unique matters, specific to and as applied to POL’s HNG-X
processing environment, for example inherent features within the application design, required end user activities
and application enforced behaviours. * Controls which mitigate these risks are often referred to as “Inherent System
Controls’, “End User Controls’, “Application Embedded Controls” and “Process Controls”. Our work focussed on
the interfaces with other systems (DVLA) and the preservation of HNG-X audit trail (Audit Store).
Substantial work has been performed over risks in this area, delivered largely by Fujitsu, in particular in areas
where reported issues have occurred in system processing. Based on the areas we have been provided, Fujitsu
have produced extensive and detailed documentation relating to the key design and operating features of the HNG-
X system, using technically competent professionals, familiar with the system
DRAFT FINDINGS
STRICTLY PRIVATE AND CONFIDENTIAL. SUBJECT TO LEGAL PRIVILEGE.
WITN10370169
WITN10370169
In order to provide greater comfort that this work addresses ail key risks, this area would benefit from being
managed, and documented, through a risk lens, potentially extending the formal! risk assessment and contro!
framework already in place for IT Environment risks (above).
Our work relating to both the DVLA interface and the Audit Store found that the level of understanding
demonstrated through system documentation appeared comprehensive, and that key controls were referenced
within that documentation (such as the use of ‘tamper proof’ IT infrastructure). The documentation has not however
been produced from a risk assessed perspective, that would then support more evidenced based, independent
verification of these key control features and attestations.
Such a formalisation exercise would not only give greater assurance over specific risks, but would also enable a
more automated and thus efficient control design to be considered (for example, more automated controls and
further proactive monitoring / alerting to key risk events).
Other matters:
We observed that the risk appetite of POL is yet to be defined, though we understand that an exercise is underway
with the ARC to achieve this. We consider this to be an important exercise for POL to perform, as it will help
underpin and better optimise the design of your control and assurance landscape (above) in the future.
We also note that POL’s use of Internal Audit could be extended to support the provision of further comfort over
specific risk areas. Internal Audit have covered some aspects of these risk in parallel with their work on IT
Environment risks, for example, the operation of interfaces to POL SAP, but there is opportunity for this to be
extended — for example, system interfaces to Credence and controls relating to adjustment postings.
Sources of Assurance Reviewed
‘Sources of assurance from the following organisations have been identified and considered in our work:
° Fujitsu, who designed, built and now operate HNG-X.
© Bureau Veritas, who perform ISO 27001 certification over Fujitsu's networks, including that of HNG-X.
© Information Risk Management (IRM) who accredit HNG-X to Payment Card Industry Data Security Standards.
* Ernst & Young, who produce an ISAE 3402 service auditor report over the HNG-X processing environment.
° — Internal audit, who perform risk based reviews within POL.
DRAFT FINDINGS
STRICTLY PRIVATE AND CONFIDENTIAL. SUBJECT TO LEGAL PRIVILEGE.
Other than as stated below, this document is confidential and prepared solely for your information and that of other
beneficiaries of our advice listed in our engagement letter. Therefore you should not, refer to or use our name or
this document for any other purpose, disclose them or refer to them in any prospectus or other document, or make
them available or communicate them to any other party. if this document contains details of an arrangement that
could result in a tax or National Insurance saving, no such conditions of confidentiality apply to the details of that
arrangement (for example, for the purpose of discussion with tax authorities). In any event, no other party is
entitled to rely on our document for any purpose whatsoever and thus we accept no liability to any other party who
is shown or gains access to this document.
Deloitte LLP is a limited liability partnership registered in England and Wales with registered number 0C303675
and its registered office at 2 New Street Square, London EC4A 382, United Kingdom.
Deloitte LLP is the United Kingdom member firm of Deloitte Touche Tohmatsu Limited (“DTTL”), 2 UK private
company jimited by guarantee, whose member firms are legally separate and independent entities. Please see
www. deloitte.co.uk/about for a detailed description of the legal structure of DTTL and its member firms.
STRICTLY PRIVATE AND CONFIDENTIAL. SUBJECT TO LEGAL PRIVILEGE.