ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
Document Title: MIS Services Acceptance Test Specification
Document Type: Acceptance Test Specification
Abstract: This document describes the Acceptance Test
for MIS Services
Status: APPROVED
Author: Peter Robinson
Comments To: Author
Pathway Customer Requirements
Approval By: 26" October 1998
Distribution: Pathway: Management Team
Test & Integration Manager
Pathway Library
POCL/DSS: Horizon Library
Horizon: Mary Reade
Recommended for ICL Pathway Test Manager Authority(ies) Test Manager
Approval:
Signature:
Name:
Date:
Approved: For and on behalf of ICL For and on behalf of the
Pathway Authority(ies)
Signature:
Name:
Date:
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: I of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
0. DOCUMENT CONTROL
0.1. DOCUMENT HISTORY
Version Date
Reason
0.1 15/04/98 First draft issue of NR2 document
0.2 29/05/98 Second draft issue for internal QR validation
1.0 20/10/98 Versions 0.1 and 0.2 previously known as CS/ACS/008.
Document reference changed to CR/ACS/022 at the
request of Customer Requirements as the initial
reference incorrect. Issued for approval.
0.2 ASSOCIATED DOCUMENTS
Reference Version Date Title Source
(1) Acceptance 11/02/97 Acceptance Criteria Pathway
Criteria
(2) Acceptance 0.1 13/09/96 Standard for Raising and Pathway
Standard Progressing Acceptance
Incidents.
(3) Acceptance 0.1 17/09/96 Standard for Pathway
Standard documenting
Acceptance
Specification
(4) Authorities’ 8.0 14/11/97 Acceptance Procedures DSS/POCL
Agreement Schedule (A)AO7
(5) POCL 8.0 13/11/97 Acceptance Procedures POCL
Agreement Schedule (P)A11
(6) DSS 8.0 14/11/97 Acceptance Procedures DSS
Agreement Schedule (D)A11
(7) Authorities’ 8.1 8/3/98 Requirements Schedule DSS/POCL
Agreement (A)B04
(8) Authorities’ 8.1 8/3/98 Solutions Schedule Pathway
Agreement (A)BOS
(9) DSS 8.1 8/3/98 Requirements Schedule DSS
Agreement (D)A15
(10) DSS 8.1 8/3/98 Solutions Schedule Pathway
Agreement (D)A16
© 1998 ICL Pathway Ltd = COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED
Page: 2 of 23
ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
(11) POCL 8.0 13/11/97 Requirements Schedule POCL
Agreement (P)A15
(12) POCL 8.1 8/3/98 Solutions Schedule Pathway
Agreement (P)A16
(13) CR/FSP/004 4.0 30/9/97 Service Architecture Pathway
Design Document
(14) CR/FSP/004 5.0 9/1/98 Service Architecture Pathway
Design Document
(15) CS/PER/034 0.1 31/03/98 — Service level Reports Pathway
Production
(16) DSS 72 30/03/98 (1)BES Service Levels (3)POCL
Agreement (2)Schedule Do8
(17) DSS 7.2 30/03/98 PAS Service Levels BA/POCL
Agreement Schedule D08
(18) Authorities 7.2 30/03/98 APS Service Levels BA/POCL
Agreement Schedule E08
(19) Authorities 7.2 30/03/98 CMS Service Levels POCL
Agreement Schedule E08
(20) Authorities 7.2 30/03/98 I OBCS Service Levels POCL
Agreement Schedule HO8
(21) Authorities 7.2 30/03/98 EPOSS Service Levels POCL
Agreement Schedule FO8
(22) Authorities OJ 30/03/98 POCL Infrastructure POCL
Agreement Service Levels Schedule
(7.2)
G10
(23) CS/PER/0013 1.0 14/04/98 Horizon Service Review - ICL
Performance Statistics Pathway
(24) ICL Pathway 0.1 19/03/98 Processes for Managing ICL
Reference Data Pathway
Changes
(25) ICL CFM 2.0 01/07/97 I SMC Operations Manual ICL CFM
(26) ICL Pathway 5.1D 27/03/98 Pathway - TIP ICL
Application Interface Pathway
Specification
(27) SD/DES/005 2.3 07/05/98 Functional Specification ICL
Pathway
© 1998 ICL Pathway Ltd = COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 3 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Ref.: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
0.3. ABBREVIATIONS
BA Benefits Agency
BES Benefits Encashment Service
CAPS Customer Accounting and Payment Strategy
CMS Card Management Service
cs Customer Service
DSS Department of Social Security
EIS Executive Information System
ID Identification
PAS Payment Authorisation Service
PDA Programme Delivery Authority
PCHL Payment Card Help Line
POCL Post Office Counters Ltd
PPD Processes and Procedures Description
SLA Service Level Agreement
SLAM Service Level Agreement Monitor
0.4 CHANGES IN THIS VERSION
None. First Issue
© 1998 ICL Pathway Ltd = COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED
Page: 4 of 23
FUJ00001470
FUJ00001470
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Ref.: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
0.5 TABLE OF CONTENT
0. DOCUMENT CONTROL...
0.1 DOCUMENT HISTORY........
0.2 ASSOCIATED DOCUMENTS.
0.3 ABBREVIATIONS.
0.4 CHANGES IN THIS
0.5 TABLE OF CONTENT...
1, PURPOSE & SCOPE...
2. ACCEPTANCE INCIDENTS...
3. ACCEPTANCE PERIOD...
4, DELIVERABLES & SERVICE...
5. ACCEPTANCE CRITERIA......
5.1 ACCEPTANCE CRITERIA AND TEST CONDITIONS...
5.1.1 Description of tests conducted by Acceptance Trial.
5.1.2 Description of tests conducted by Acceptance Review.
6. ACCEPTANCE INCIDENT SEVERITY...
6.1 HIGH SEVERITY INCIDENTS...
6.2 MEDIUM SEVERITY INCIDENTS.
6.3 LOW SEVERITY INCIDENTS.
7. TEST DATA...
8. AUTHORITY RESPONSIBILITIE!
8.1 APPOINT TEST MANAGER.
8.2 ACCEPTANCE INCIDENT REPORT:
8.3 ACCEPTANCE INCIDENT ANALYSIS REPORT!
8.4 ATTENDANCE AT TRIALS AND REVIEWS...
8.5 MANAGEMENT AND CO-ORDINATION
8.6 PROGRESS REVIEWS.
9. CONTRACTOR RESPONSIBILITIES...
10. ACCEPTANCE TRIAL TEST CONDITIONS.
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 5 of 23
ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
PURPOSE & SCOPE
This document describes the Acceptance Test for MIS Services in
accordance with the Acceptance Procedures that are set out in the Schedules
referred to section 0.2, and also the Pathway document “Standard for
documenting Acceptance Specifications”. This Test will determine that MIS
Services meets all the Acceptance Criteria that are agreed in the Acceptance
Test Specification and that are within the scope of the “Pathway Release
Contents Specification” document for New Release 2 if applicable.
2. ACCEPTANCE INCIDENTS
The standard and method for originating, progressing and resolving
Acceptance Incidents shall be as described in the associated Document
“Standard for Raising and Progressing Acceptance Incidents”.
3. ACCEPTANCE PERIOD
The Acceptance Period for the Acceptance Tests which comprise the
Operational Trial is as determined by schedule B07 of the AUTHORITIES’
Agreement.
The Pathway programme plan details the schedule for the MIS Services
Acceptance Test.
4. DELIVERABLES & SERVICE
This section details the Deliverables and Services that are the subject of this
Acceptance Test and as defined by the related Agreements.
FUJ00001470
FUJ00001470
Deliverable or Contract Method
Service. Reference
Services MIS Joint Agreement Schedule Acceptance Review
Criteria - Bo1 Comprises of:
894/1 Review and
894/5 - Services Requirements walkthrough of each
894/6 Criterion with
associated
Documentation
Demonstration of SLAM
and Business Objects
application as required
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 6 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
[ I [ Site visit as appropriate I
Table of Deliverables and Services.
5. ACCEPTANCE CRITERIA
This section lists the identifier of each Acceptance Criterion that will be
demonstrated by the Acceptance Test. It also lists the Acceptance Test
Conditions that are used to determine whether (or not) the Acceptance
Criterion has been met together with the applicable test Phase.
5.1 ACCEPTANCE CRITERIA AND TEST CONDITIONS
Conformance of the MIS Services Acceptance Criteria will be demonstrated
through Acceptance Reviews.
Tests conducted by Acceptance Trials comprise practical tests using
prepared test scripts. If applicable the Test Condition(s) appropriate to a
criterion are specified in section 5.1.1 together with a description of the test.
Detailed composition of the test in terms of sequences of Test Conditions is
contained in Section 10. In the tables in section 5.1.1 the rows labelled
Function Run entry will be populated immediately prior to the running of the
Acceptance Trials in a working version of the Acceptance Test Specification.
These will provide invigilators with references to the checklists used to
monitor the progress of the testing. The order of running of Test Conditions
will not necessarily correspond to the order presented in HLTPs because of
the “physicalisation” of the testing. The Function Run entry will allow the
invigilator to read across from the criterion to the checklist.
Tests conducted by Acceptance Review comprise typically document
reviews, site visits or presentations. The Test Condition(s) are described in
section 5.1.2.
5.1.1 Description of tests conducted by Acceptance Trial
This requirement is against ad-hoc and supplementary MIS requirements.
Those that are generic will be tested, where applicable, in the acceptance
trial via the functional areas for which they belong (i.e.: TIP, Helpdesks etc.)
The non-generic will be tested in Acceptance Review (i.e. Service Review
Reports etc.) as defined below in section 5.1.2.
5.1.2 Description of tests conducted by Acceptance Review
The table below shows which acceptance criteria are to be met by
Acceptance Review. Each Acceptance Test will use the latest baselined
version of any document referred to in section 0.2 or below.
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 7 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Refi: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
Requirement Id 894
Criterion 0.1.2 (a)
Derivation Schedule
Criterion Description I The CONTRACTOR shall make available POCL data in
support of MIS requirements that identifies office, user and
stock unit registration/deletion with mutual association.
Test Condition Visibility, by demonstration, of an event log showing user and
stock unit registration/deletion with the option to obtain screen
print out of the results obtained.
Office details will not be accessible via the above route. This
data to be obtained from TIP.
Method Demonstration
References -
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 8 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Refi: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
Requirement Id 804
Criterion 0.1.2 (b)
Derivation Schedule
Criterion Description I The CONTRACTOR shall make available POCL data in
support of MIS requirements that will identify log-on and log-
off.
Test Condition Log-on and Log-off status is passed across the TIP interface
where the test condition can be validated
Method Document Inspection
References (26)
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 9 of 23
ICL Pathway
Acceptance Test Specification Version:
CR/ACS/022
1.0
Date: 20/10/98
MIS Services Ref.:
FUJ00001470
FUJ00001470
Requirement Id 894
Criterion 0.1.2 ©
Derivation Schedule
Criterion The CONTRACTOR shall provide POCL data that shall
Description include completion of summaries and returns/reports, roll over
to new Balances and/or POCL outlet accounting periods.
Test Condition
Information will be provided via report production that will
identify:
Receipts (Returns) relating to:
* APS Copy / APS Mag Card
¢ EPOSS session / EPOSS session (duplicate)
* Event Log
© Other Banks Cheques
* Rem In Slip / Rem out Slip
¢ Revaluation
* Transaction Log
¢ Transfer In Slip / Transfer Out Slip
Stock Units Level (Daily) relating to:
¢ APS Transaction List
« BES
¢ British Telecom Bills
© Cheques Listing
¢ Daily Cash on Hand
« DNS Deposits / DNS Withdrawals
¢ Giro Deposits / Giro Withdrawals
© Other Banks Cheques CRU
e UKPA
Stock Units Level (Weekly) relating to:
¢ Balance Report / Balance Snapshot
« BES
¢ Declaration of Cash / Stamps / Stock
¢ DVLA V10 Summary / DVLA V11 Summary
¢ Green Giros & Milk Tokens
¢ Pensions & Allowances
¢ Postal Orders Paid
* Rems In / Rems Out / Rems Summary
* Stock on Hand
¢ Transfer In / Transfer Out / Transfer Summary
Office Units Level (Daily) relating to:
¢ BES Card / BES PUN Summary
¢ British Telecom Bil
¢ DNS Deposits / Withdrawals
¢ Giro Deposits / Withdrawals
¢ Rem In Daily / Rem Out Daily Summary
« UKPA
Office Units Level (Weekly) relating to:
¢ Balance Report / Balance Snapshot
¢ Cashflow
© 1998 ICL Pathway Ltd
4/25/2022
COMMERCIAL IN CONFIDENCE Printed on:
DOCUMENT CONTROLLED Page: 10 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Refi: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
¢ Counters Revenue
¢ Green Giros & Milk Tokens
P&A P2311MA / P&A P2311(B)
Postal Orders Paid
¢ Redeemed Savings Stamps
* Rems in Summary by Product 33 & 34
* Sales Report
¢ Transfer Reconciliation
* Unclaimed Payments & Uncharged Receipts
Method Document Inspection
References QT.
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 11 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Refi: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
Requirement Id 894
Criterion 0.1.2 (d)
Derivation Schedule
Criterion The CONTRACTOR shall provide POCL data that ensures.
Description polling events information is provided.
Test Condition To be shown that offices for which no data has been collected
for the current day, due to failure to detect an end of day
marker, this will be reported on the Pathway to ‘TIP interface.
Method Document Inspection
References (26)
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 12 of 23
ICL Pathway
Acceptance Test Specification Version:
CR/ACS/022
1.0
Date: 20/10/98
MIS Services Ref.:
FUJ00001470
FUJ00001470
Requirement Id 894
Criterion. 0.1.2
Derivation Schedule
Criterion The CONTRACTOR shall provide management information to
Description POCL in the areas of receipt/ implementation of new issues of
Software, Reference Data and Local Reference Data updates.
Test Condition
This will be demonstrated by:
¢ walk-through of the documented operational process
relating to software and reference data upgrades.
¢ walk-through of a full audit trail that is in place for
software and reference data upgrade issues.
¢ walk-through of the process that shows all changes
made relating to software and reference data over any
given period.
Method Document Inspection
References (24) & (25)
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 13 of 23
ICL Pathway
Acceptance Test Specification
MIS Services Refi: CR/ACS/022
Version: 1.0
Date: 20/10/98
FUJ00001470
FUJ00001470
Requirement Id
894
Criterion Number
0.1.2
Description
The CONTRACTOR shall provide MIS where impact on
POCL business occurs in the areas of service infrastructure
failures/repairs/replacement, down-time, recovery time, file
corruption etc.
Test Condition
Information will be provided via SLAM and Business Objects.
Reports interfacing to SLAM to be validated and tested in
support of this requirement will be via:
- Performance Measure Exception Report
- Performance Analysis Report
- Detailed Analysis Report
Information delivered will relate to:
* systems performance /availability
¢ call to resolution where timing commencement shall
be effective from call logged-time and termination
shall be on return to customer.
* unique call identification and progress according to
priority and status.
«service delivery analysis qualified by product,
function, outlet and priority.
Method ¢ Site Visit Horizon Helpdesk
¢ Demonstration of SLAM EIS
¢ Demonstration of Business Objects
References (15) through to (23)
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 14 of 23
ICL Pathway
MIS Services Refi: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
FUJ00001470
FUJ00001470
Requirement Id 894
Criterion 0.1.2 (g)
Derivation Schedule
Criterion Information is to be provided that enables POCL to
Description monitor/manage service levels.
Test Condition
Information relating to SLA requirements will be provided to
the agreed Horizon Service Review agenda against the review
timetable.
In addition 5 days prior to the time-frame agreed the review
information will be passed to AUTHORITIES in both
electronic (CD-ROM) and hard copy (Horizon Service Review
Book) format.
Service level monitoring information will be provided via SLAM
and Business Objects. To enable this reports interfacing to
SLAM to be validated and tested in support of this requirement
will be:
- Performance Measure Exception Report
- Performance Analysis Report
- Detailed Analysis Report
The following criteria will apply:
1, A Review Book will be constructed to follow the
defined content and format of the Service Review.
2. Following requirements will be fulfilled:
* monitoring of service levels via the SLAM and
Business Objects applications.
the agreed processed data to be made available in a
format that will facilitate analysis by business objects.
3. Data to be provided that will enable ad-hoc derived
service levels monitoring to be available.
4. SLAM will facilitate demonstration of key SLA areas
and will embrace;
¢ POCL services
¢ Helpdesk Services
¢ Card Management
¢ System Performance and Availability
as qualified by service requirements.
Method Demonstration of SLAM EIS
Demonstration of Business Objects
References (15) through to (23)
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 15 of 23
ICL Pathway
MIS Services Refi: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
FUJ00001470
FUJ00001470
Requirement Id 894
Criterion 0.1.2 (h)
Derivation Schedule
Criterion The CONTRACTOR will ensure that exception reporting shall
Description be provided.
Test Condition
The above criteria will be met at the service manager level
within Path Customer Service and subsequently, where
required, via escalation routes to POCL.
Access will be required during Release 2 phase data that will
fulfil manual exception reporting needs, data being provided via
a business objects application.
Exception reporting arising out of call alerts and escalation on
the PCHL Helpdesk and Horizon Helpdesk will be reviewed by
site visit and demonstration of Helpdesk processes.
Method Site Visit PCHL Helpdesk
Site Visit Horizon Helpdesk
References -
Phase Operational
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 16 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Refi: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
Requirement Id 894
Criterion O11
Derivation Schedule
Criterion The above criterion is qualified by provision of the sub-set
Description criterion defined under 0.1.2 items (a) to (h) inclusive.
Test Condition -
Method =
References -
Phase -
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 17 of 23
ICL Pathway
MIS Services Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
FUJ00001470
FUJ00001470
Requirement Id 894
Criterion 0.1.3
Derivation Schedule
Criterion The CONTRACTOR will ensure the provision of POCL data
Description in support of MIS requirements at the Outlet, Outlet type and
Region level.
Test Condition
Information relating to outlet, outlet type and region will be
provided via SLAM in respect of formal Horizon Service
Reviews and Business Objects application as required.
Reports interfacing to SLAM that will be validated and tested in
support of this requirement will be:
- Performance Meas ception Report
- Performance Analysis Report
- Detailed Analysis Report
as they apply to POCL at the Outlet and Regional level.
‘The following criteria will apply:
1. Release 2 will facilitate monitoring of information at
the outlet and regional level via SLAM and Business
Objects.
2. the agreed processed data to be made available
during Release 2 phase in a format that will facilitate
analysis by business objects.
3. baseline data to be provided that will enable ad-hoc
derived service levels monitoring to be available.
4. SLAM will facilitate demonstration of key areas
relating to Outlet and Region and will embrace;
¢ POCL services
¢ Service Delivery
¢ Helpdesk services
as qualified by service requirements.
This requirement excludes outlet and regional analysis being
fulfilled via the TIP route.
Method Demonstration of SLAM EIS
Demonstration of Business Objects
Site Visit (as required)
References (15) through to (22)
Phase Operational
6. ACCEPTANCE INCIDENT SEVERITY
This section identifies the guidelines to be applied during the analysis of
Acceptance Incidents, in order to establish the severity of such Acceptance
Incidents.
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 18 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
6.1 HIGH SEVERITY INCIDENTS
Failure to meet an Acceptance Criterion which would have a substantive
impact on the service received by the Customer.
e.g. Failure to pay benefits to the right person, at the right place, at the right
time.
Failure to meet an Acceptance Criterion which would have a major impact on
the ability of the AUTHORITIES to perform their business, or where there was
a major impact on the resources of the AUTHORITIES necessary to
overcome that impact on their business.
e.g. Failure to support accurate POCL accounting.
Failure to meet an Acceptance Criterion which would impact the security of
the service where there is no procedural workaround.
Consistent failure to meet Minimum Acceptable Thresholds for Service
Levels.
e.g. Where particular transactions do not meet the minimum Acceptable
Threshold under normal loading.
6.2 MEDIUM SEVERITY INCIDENTS
Failure to meet an Acceptance Criterion which is visible to the Customer and
is likely to give rise to an adverse public perception of the service, but does
not substantively impact the service received by the Customer.
e.g. Incorrect spelling on a receipt.
Failure to meet an Acceptance Criterion which would have a medium impact
on the ability of the AUTHORITIES to perform their business, or where there
was a medium impact on the resources of the AUTHORITIES necessary to
overcome that impact on their business.
e.g. Non production of a weekly report, resulting in it's manual transcription,
which causes additional resource or effort at every outlet of the average
duration of 1 hour per week per outlet.
Occasional failure to meet Minimum Acceptable Thresholds for Service
Levels.
e.g. At peak loading, some transactions fail to meet Minimum Acceptable
Thresholds, but on average all transactions within the service do achieve
Minimum Acceptable Thresholds.
6.3 LOW SEVERITY INCIDENTS
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 19 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
Failure to meet an Acceptance Criterion that is neither visible to nor has
substantive impact on the service received by the Customer.
e.g. Presentational, style and other cosmetic faults that are only visible to the
user.
Failure to meet an Acceptance Criterion which would have a minor impact on
the ability of the AUTHORITIES to perform their business, or where there was
a minor impact on the resources of the AUTHORITIES necessary to
overcome that impact on their business.
e.g. Non production of a weekly report, resulting in it's manual transcription,
which causes additional resource or effort at 10 or fewer outlets of the
average duration of 1 hour per week per outlet.
Failure to meet an Acceptance Criterion which would impact the security of
the service but where the workaround is as secure as the original solution
(i.e. the only impact on risk is in ensuring that the workaround is performed,
but where procedures have been agreed and are in place).
7. TEST DATA
Test data including any operator entered scripts that are required to run the
Acceptance Test are defined below.
Business Test Thread: None
High Level Test Plan(s): None
Organisation: None
8.
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 20 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
AUTHORITY RESPONSIBILITIES
This section describes the AUTHORITY’s or AUTHORITIES’ Responsibilities
in relation to this Acceptance Test. Particular Acceptance Tests may also
require additional participation and responsibility by the AUTHORITY or
AUTHORITIES.
8.1 APPOINT TEST MANAGER
The AUTHORITY or AUTHORITIES shall nominate a Test Manager and other
representatives to review the tests prior to commencement of the test.
8.2 ACCEPTANCE INCIDENT REPORTS
The nominated representatives and Test Manager shall be diligent in raising
complete, accurate and timely Acceptance Incident Reports as set out within
this Acceptance Test specification.
8.3. ACCEPTANCE INCIDENT ANALYSIS REPORTS
The Test Manager shall be diligent in returning signed Acceptance Incident
Analysis Reports with their decision (e.g. Accept, Reject, Discuss) normally
within five working days, or when urgency is requested by Pathway, within
two working days of receipt from Pathway. A copy of all correspondence will
be faxed to reduce delay.
8.4 ATTENDANCE AT TRIALS AND REVIEWS
The nominated representatives shall attend Acceptance Test Trials and
Reviews including repeat Tests at times and locations specified and with
reasonable advance notice by Pathway.
8.5 MANAGEMENT AND CO-ORDINATION
The Test Manager shall be the single point of communication and co-
ordination with Pathway’s nominated Test Manager for all matters concerning
this Acceptance Test from its initial planning through to Acceptance.
8.6 PROGRESS REVIEWS
Unless otherwise waived by both parties, Pathway’s Test Manager and the
AUTHORITY or AUTHORITIES Test Manager shall meet each week to
review the progress and actions of both parties until Acceptance of the
Acceptance Test is achieved. The time and location of review meetings will
be scheduled with at least one week advance notice by Pathway.
9.
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 21 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services _ Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
CONTRACTOR RESPONSIBILITIES
Upon receipt of a signed Acceptance Incident Analysis Report from the
Authority, where correction is required to be re-tested within the same phase
of Acceptance Test, the Contractor will return the amended component(s), on
average, within 4 days. This will include re-testing necessary as per the
agreed test strategies.
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed on:
4/25/2022
DOCUMENT CONTROLLED Page: 22 of 23
FUJ00001470
FUJ00001470
ICL Pathway MIS Services Ref: CR/ACS/022
Acceptance Test Specification Version: 1.0
Date: 20/10/98
10. ACCEPTANCE TRIAL TEST CONDITIONS
Not required.
© 1998 ICL Pathway Ltd COMMERCIAL IN CONFIDENCE Printed:
4/25/2022
Page 23 of 23