FUJ00078067 - Notes of CNT Meeting held on 12th September 1996.

Evidence on official site

FUJ00078067

FUJ00078067
+18-SEP-1996 41:15 FROM BIRD & BIRD TO P.81788
va
we
FAX TRANSMISSION
BIRD & BIRD
. 90 Ferter Lane
To: ICL London FCA 11P
: _ Telephone

Atten\Ref: Jim Morley

Client: BA/POCL - _

Matter: BA/POCL

Account.No; BPOCL-1

Date: 18 September 1996 : . Dilan:

ct canpe
PR Parker
DM Caythwate
Fat cook
Number of pages (including this page) : a en
P Seats
DW Byan-Cook
iM Siith
CP Helse
IRC Walkey
Die
M Macdonald
BMeCSone

Time:

Note; This fox is intended for the named addressee only. It contains information which may be confidential and
also be privileged. Unless you are the named sddresuee (or authorised (uy reveive far the addressee)
not copy or usc it, or disclose.if fo anyone elso. If you hive received il in error plouse neti My
1 We cain arrange for ils return. To do so, or if you have any qucrics, pleasc telephone,

Cw Rees
RSWoamy
51 abner
Dear Jim PD Quinan
ie Saeicn
Please find attached notes of the CNT meeting held-on 12th September. [should — eywcr
be grateful if you would circulate these to Tony Oppenheim and Warren RRGahan
Spencer. CM Crotinvaite
NT Jenkins
AM Bekereat
SK fopping
106 Heer

Core AE ‘vom
wS ene
YecD mo

KT.CAmokd

TA swt
q te B 1Dann

FE

Hong Kong Ofc ute 1306 13, 1 Mon Queen's Hand evr, Hang Keng Telephone
FUJ00078067
FUJ00078067

28-SEP-1996 11:15 FROM BIRD & BIRD TO P. 82/88

NOTES OF CNT MEETING ON 12TH: SEPTEMBER 1996
Present:
Pat Kelsey =}.

Keith Baines } BA/POCL Programme
Stuart Riley }

Tony Oppenheim}
Warren Spencer }
Jim Morley 3} Pathway
Hamish Sandison } .
Hazel Grant } Bird & Bird
NOTES/AGREED POINTS
1. Change Control Note 2 (Live Trial Increase from 60-200)
It was agreed that this could be dealt with separately from the other change requested at the same
time (relating to a change-in the start date of national go live.) This change tequest will be
progressed, whereas the change to the start date will be discussed further.
2. Agreements to Agree
It was agreed that it was necessary to agree a process to document the conclusion of Agreements
to Agree. Given time pressures it may not be possible to agree the process at this stage, although (
the process would have to be agreed by the 15th of November. «
3. Schedule A06

It was noted that the paper listing changes to this Schedule would be brought to the CNT in the
week.commencing 7 October: .

4. PDA Test manager

It was noted that the PDA had named its Test Manager.

Ss. Clarification of Note 2.3 (f) in the CNT’s Notes 22/08/96

It was confirmed that this related to incorporation of generic acceptance criteria.

6. Change to Requirements.

PK confirmed that the Programme agreed changes suggested by Pathway to the following

1
18-SEP-1996 11°16 FROM BIRD & BIRD . TO

FU.

requirements: 489, 512, 531, 915 and 958.
7. Change Control Notes

The ten CCNs listed in point-2.3 of the CNT notes dated 22.08.96 were then discussed. Pathway
added two further CCNS numbered 11 and 12 below. The CCNs'were as follows:

71 Increase in live trial from 60 to'200

7.2 Move in start date from 1 July to 1 June for national go live.

7.3 Change in the Roll Out sequence

7.4 One Operational Trial not three

7.5 Amendments to Requirements

7.6 Incorporation of the acceptance criteria

7.7 Changes to key personnel

78 Amendments to Solutions

7.9 I Nonimpact wording changes

7.10 Elimination of agreements to agree in the Authority’s Responsibilities and
Requirements.

7.11 OBCS

7.12 Measurement of transaction times may change B3

8. CARS

Pathway tabled a note containing the ten most urgent CARS, These issues are being dealt with
outside the meeting although CNT may need to consider them. It was agreed that CARS should
be'a regular agenda item of CNT meetings until all outstanding ones are dealt with.

9. Acceptance Criteria

JM tabled a first draft of a standard for specifying acceptance criteria. This is being used
internally at Pathway to allow them to specify acceptance criteria from which the tests scripts
will be written. JM also tabled a timetable for preparation of the specific acceptance criteria.

10, Change Control

10.1 Change in.start date of national go live.

Tt was agreed that ten days of work would be associated with this change. Pathway will
meet the costs of this. work for which there will be no extra charge to the Programme.

10.2 General
Generally it was agreed that no “change” implied any amendment in the Related
Agreements: Therefore any changes to the Agreements would have to be written

Specifically.in a Change Control Note.

11, Further Meetings

FUJ00078067
IJ00078067

P.@3/88
FUJ00078067

FUJ00078067
18-SEP-1996, 11:16 FROM BIRD & BIRD TO P.04/288
lla It was agreed that walkthroughs would be held on 23, 24 and 25 September to

12.

13.

conclude the Schedules needed for operational trial.
The following CNT meetings were agreed:-

Thursday 19 September 9.30 a.m at Bird & Bird
Thursday 3 October 2.00 p.m at Feltham
Thursday 10 October 2.00 p.m at Bird & Bird
Thursday 17 October at 2.00 p.m-at Feltham
Thursday 24 October at 2.00 p.m at Bird & Bird
Thursday 31 October 2.00 p.m at Feltham
Thursday 7 November 2.00 p.m at Bird & Bird
Thursday 14 November 2.00 p.m at Feltham

Drop Down Process

12.1

12.2

A letter from JM to PK dated 11 September was discussed. It was agreed that
acceptance criteria schedules would all be based on standard wording. The
contingency schedules (D9 and E9 in the POCL Agreement and D9, E9, F9, G11
in the DSS Agreement) would be inserted but be empty.

An agenda was agreed for the walkthroughs on 23, 24, 25 September as follows:

Dayl - POCL Infrastructuré
Day2 - PAS, CMS. and BES
Day3 - POCL Services

It was agreed that Schedule B3 would have to be discussed during the 3 days. It
was agreed that Schedules B1 and B2 were not of a high: priority and could be
dealt with in walkthroughs in October.

It was agreed that infrastructure roll out Schedules would be dealt with in
October.

_ Notes of CNT Meetings

Tt was agreed that notes of CNT meetings would be issued as action points.and agreements/notes
ideally on the Monday following.a CNT meeting.

13.

Next Meeting

Thursday 19 September 9.30-a:m (not-10.30 a.m.as originally proposed) at Bird & Bird
FUJ00078067

FUJ00078067
18-SEP-1996 11:16 FROM BIRD & BIRD TO P.@5788
PROGRAMME ACTION POINTS
1. Change Control Note Live Trial increase from 60-200

This has been signed off by Pathway ad needs t to be elim through'the process at the Programme:

Hew Ce (Pepe @
Action - Pat Kelsey VI, “fe tha. Aden ame

2. Agreements to Agree and the Change Control Process

A process to document the existing. resolved Agreements to Agree (without having a formal
process) should be set up. This could be combined with consideration of the Change Control
Process generally. Bird & Bird to consider paper by David Groom at Pathway on Change
Control.

Action’- Bird & Bird

3. ICL Pathway’s letter to Pat Kelsey dated 30 August re clarification of different
types of acceptance.

The Programme to respond by 13 September,

Action - Pat Kelsey

4. Confirmation regarding test 1 acceptance being with prejudice
Programme to confirm telephone call, a

Action - Pat Kelsey

5 Change to roll out sequence

The Programme will try to send ICL Pathway material to:be considered at a PDA Board Meeting
on 17 September. This material i pip? to be: issued ona a without teres basis.

D> a ri,
Action.- Stuart Riley nak , rn ener = ne 3 cat SSE). 4 . .

6. Generic Acceptance Criteria i
Programme to consider how these will be incorporated into the Scheie,» Z et v

Action - Bird & Bird/Pat Kelsey 2~ ?

7. Changes to Requirements

Programme to consider whether changes to Requirements var, 906 are acceptable.
FUJ00078067

FUJ00078067
18-SEP-1996 11:16 FROM BIRD & BIRD To P.86/08
q ”
(eo .
; ety

Action - Pat Kelsey wy ys
8. Change Control Notes oo 7; x

8.1 Liquidated Damages ee u

iq ei ws yo!

A specific point raised by Tony Oppenheim related to the change in start date of national

go live. Pathway would wish only to be liable for liquidated damages from 1 July, even

though the start date'will be changed to 1 June. In-retum it has been suggested that the

payment guarantees made the Programme would not start unti] 1 July. The Programme

will consider and. if appropriate, confirm this,

Action - Pat Kelsey

8.2. Change from three to one Operational Trial /

Programme to process. Neu

vy”
Action - Pat Kelsey \
wry >
. /
9. CNT Meetings ANA
. X

Tony Oppenheim suggesting that CNT meetings should.be binding (compared to all other
meetings which are without:-prejudice.) The Programme.will consider this.

Action - Bird & Bird/Pat Kelsey
FUJ00078067
FUJ00078067

28-SEP-1996 11:16 FROM BIRD & BIRD TO P.87/88

ICL PATHWAY ACTION POINTS
lL Agreements to Agree

Pathway will list the Agreements:to agree which they have found and bring to the next ;

CNT meeting. Sek Ct Gee pet ee, s

Action - Tony Oppenheim
2. Walkthroughs on 23, 24 & 25 September .

Pathway suggested booking conference rooms in a hotel and staying in the hotel to
maximise the walkthrough time and minimise the travelling costs. Pathway will check
availability of their own venues, 0930 Bak Med

Action. - Tony Oppenheim

3. Implementation Requirements
Jim Morley has written to Pat Kelsey regarding ring-fenced requirements. Pathway to
table a paper at the next CNT meeting covering outstanding non-implementation
requirements.
Action - Jim Morley ~~ .

4, Requirements

4.) Pathway have reviewed the electronic baseline of requirements and found them
acceptable with five minor points:relating to process and not principle. Pathway

to confirm this to Alan FowJer of the Programme.
Action - Jim Morley .

4.2 Pathway to consider the following.requirements for the next CNT meeting: 481,
486, 50S ‘and 933 (of which S05 and 933 are to be deleted.) Pathway confinning
that they would be happy with deletion of 505 and 933 providing it-took place
with the other agreed changes to the requirements.

. — _ ek ‘
Action - Jim Morley Cc ( rhe
5. General Point Relating to Change Control

Pathway to confirm at the next CNT meeting point 8.1 of Programme Action Points
listed above,
FUJ00078067
FUJ00078067

P.@8/88

18-SEP-1996 11:17 FROM BIRD & BIRD TO

’ Action- Tony Oppenheim
6. Change Control Relating to Changes to Key Personnel
Pathway to.progress.
Action - Tony Oppenheim/Jim Morley
7, Amendments to Solutions
Pathway to progress.
Action - Tony Oppenheim/Jim Morley
8. CARS

Pathway to notify Pat Kelsey of the next ten most urgent CARS and specify implications
of failure to discharge the CARS by the relevant Authority.

Action - Jim Morley

TOTAL P. 88
Dew, TH

ray Pors
ox TOS
Gite

Ri :

QZ \ Kes.

ae)

Di-crts
Pl -c-ts

pPS-crts

FUJ00078067
FUJ00078067

we

Wes
ogcS