Executive summary 3
Control points identified 5
Fee quotation for Controls testing 12

Disclaimer
This Report is provided solely for the use of Fujitsu in connection with its engagement of KPMG LLP to carry out an independent data Integrity assessment, and for no other purpose. It is based
‘on the information represented and supplied to us by Fujitsu, which has not been independently verified by us.

This Report should not be disclosed to any person or referred to, in whole or in part, other than for Fujitsu internal purposes.

FUJ00172083
FUJ00172083

Executive
Summary

Executive summary

FUJ00172083
FUJ00172083

Phase 0 —- Documentation Readiness Review

Introduction

In accordance with our Letter of engagement signed 26 March 2012, we have
completed the Phase 0 work - the documentation readiness review.

Our approach

We have based this report on the information contained in the Fujitsu
document “Horizon Online Data Integrity” ref ARC/GEN/REP/1229 dated 25
November 2011together with a sample of additional High and Low Level
Design Documents, a site visit to witness a demonstration of the system and
subsequent clarification dialogue between KPMG and your system architects.

Our findings

Based on the initial review of documents supplied to us, we believe the
documentation to be at a suitable level in terms of scope and detail to enable
the processing to be understood and to enable controls to be identified for
inclusion in the formal review and assessment Stage.

We have set out in the following section the control points that we have
identified against each of the six assertions that you have asked us to
consider as part of this review

Scope and exclusions

Excluded from scope are the integrity of the Oracle Real Application Clusters
and any issues relating to service reliability and stress testing of all or part of
the Horizon Online system. Also excluded from scope are the testing of IT
infrastructure controls such as general controls reviews and security
assessments. Fujitsu assert that these have been covered in separate
reviews and audits, and that we may review and refer to the work of those
reviews where necessary for the purpose of our testing and reporting.

Scope and exclusions (cont'd

The deliverable reports from this engagement are not, and will not be treated as,
expert witness reports or opinions. As agreed with Fujitsu's legal counsel, third
parties should not rely on the deliverable reports as constituting a formal audit or as
having reviewed or proved anything not expressly set out in the reports. Fujitsu have
drafted commercial terms governing the potential requirement to distribute the
reports externally. This will be agreed with KPMG and included in the final
deliverable reports as a condition of its release to Fujitsu's third parties.

Budget for testing and reporting

We have considered the resource required to test the controls identified in the
following section as underpinning the six assertions supporting the completeness,
accuracy and integrity of the audit trail and quote a fee of£131k (in addition to the
Phase 0 work already undertaken). This represents a reduction from our earlier fee
quote of £205k in total for 20 controls.

Conclusion

We have completed Phase 0 and identified the necessary control points which will
require testing to support each of the six assertions.

We hope that you find this satisfactory and look forward to working with you on the
next phase of this important project.

tor KPMG Technology Risk Consulting

FUJ00172083
FUJ00172083

Control points
identified for
assertions
FUJ00172083
FUJ00172083

Assertion 1 — Baskets net to nil

That all of the transactions in a basket (a basket is defined as any number of items for one customer) received from the Post Office branch counter
balance to zero against the customer payment.

identified control points

hen the contents of a Basket are written to the BRDB a check is made that the net value of all the accounting lines is
deed zero and should it not be, then an alert is raised and the basket is discarded and an error response returned to
ithe counter.

I

2 The transaction cannot be completed until a successful response has been received from the BAL indicating that the I
“message has been stored.

‘Any failures in committing Auditable activities at the Data Centre will result in an error response being returned to the I
unter. In all cases the User is informed of what is happening. Such failures will not be visible in the transaction audit, I
!

‘but may be visible in the system Event Log.

is CONFIDENTIA
AG net

a

FUJ00172083
FUJ00172083

Assertion 2 - Basket received is same as that seen by counter

That the basket received at the data centre corresponds to what the counter staff sees on the HNGX screen.

1 zy ensure that the message is not tampered I with after being sent from the counter, each message has an associated I
Digital Signature. The mechanism for creating this Digital Signature is as follows:

1. At Log On, the Counter creates an RSA Public / Private key pair.

i
T
__2. The Public key is sent to the BAL as part of the audited Log On message
3. The Log On message is “concatenated with the Digital Signature and the BAL's signing certificate for its Public ‘Key a
4 I and signed by a BAL Private key (held in the data Centre Key Store) and added to the audit trail with a BAL generated
jsn

4. All subsequent messages are digitally signed by the counter using the private key established at Log On.

I
6 I pas Signing a message involves taking a SHA-1 I Hash of the message and digitally signing the Hash value using I

6. The Digital signature is stored : alongside the message in the Journal table and is extracted with it into the Audit file
as described below

The first thing BAL does is to record the message

Assertion 3 — Full basket enters audit trail

The full basket goes into the audit trail.

When the contents of a Basket are written to BRDB a check is made that the net value of all the accounting lines is

2 indeed zero and should it not be, then an alert is raised and the basket is discarded and an error response returned to
‘the counter. _

Each night \t after midnight, the contents of this table for the p previous ‘day are re copied from the BRDB to a number of serial

files.

After copying the previous days files a check is made that indeed there are no missing or duplicate j jsns : for 2 any count
and should any be found an alert is raised. a
‘Should there be no response from the Data Centre following an attempted ‘commit of an auditable activity within a

‘timeout period (currently set to 30 seconds), an automatic retry is invoked. This sends identical business data to the

5 Data Centre where a check is made to see if the Audit data has already been committed to BRDB. Should the retry also I

imeout, then the User is prompted and asked whether they wish to Retry or Cancel the Activity. Such time-outs and

any ret retries will not be visible in the transaction audit, but may be visible in the system Event Log. _

Continual failures to Update the Database at the Data Centre mean that it is not clear at the counter whether or not the
database accurately reflects the situation in the Branch. Therefore the safest thing is to force a Log Off at the counter
‘and ensure that when communications are re-established, that the Recovery process is invoked to reconcile the counter}

6 view with that on BRDB. I
‘If there is a basket currently being processed, then a special Disconnected Session Receipt will be produced showing I
which transactions have been discarded and which are to be recovered making it clear what money needs to be I

exchanged with the Customer.

~I
I
I
I
I
I
———
I
j

I
I
I
I
I
I
4
I

FUJ00172083
FUJ00172083

Assertion 4 - All baskets enter audit trail

All baskets get into the audit trail.

identified control points

‘Access controls restrictions ensure counter staff cannot access the audit trail to change data other than through the
defined process for inputting data via the countersystem

I
cess to the counter system which enables the entry of f transactions via the BAL is controlled through a secure key I
I

2
‘exchange mechanism.
3 The jsn is stored within the message body which is securely encrypted _using cryptographic keys
t
4 A check is made that there are no gaps or duplicates in the jsn sequence for any counter.
I
‘Every auditable request made by the counter will be logged in the message journal before the request is actioned by thel
5 ‘BAL, The message journal performs two functions, firstly it provides auditing facility and secondly it provides a duplicate,

\checking facility to prevent counter messages that may have been resent from being reprocessed.
I

FUJ00172083
FUJ00172083

ydom,
FUJ00172083

FUJ00172083
Assertion 5 — No extra baskets enter audit trail
No extra baskets get into the audit trail (i.e. nothing is added that the counter staff has not seen on the HNGX screen).
‘Every auditable request made by the counter will be logged in the message journal before the request is actioned by the)
2 BAL, The message journal performs two functions, firstly it provides auditing facility and secondly it provides a duplicate,
I
I
3 .
change mechanism. }
4 ‘The jsn is stored within the message body which is securely encrypted _using cryptographic keys I
5 check is made that there are no gaps or duplicates in the jsn sequence for any counter.
is ( ripen 9

AG net
FUJ00172083
FUJ00172083

Assertion 6 - Audit trail has integrity

That the integrity of the audit trail has been maintained.

Nr Vigenuned contol ponte I

1 Each message within the audit trail has its message body encrypted using the cryptographic keys used by the counter submitting the basket.

Helen is stored within the message body which is securely encrypted using cryptographic keys

3

4 These files ‘are then copied to the Audit s system where they @ are sealed with digital seals. They are held there for a period ‘of7 years during,
roduce the relevant audit data fora particular Branch.

The Digital Seal is calculated using an MD5 hash of the entire content of the file being sealed. This value is stored in a separate “Seals
Database” held on the Audit Server. I
I
6 Whenever data is retrieved for audit enquiries a number of checks are carried out: I
7 a) The audit files have not been tampered with (i.e. the Seals on the audit files are correct) I
8 _b) The individual Baskets (and other records) have their digital signatures checked to ensure that they have not been corrupted. —_ I
9 a) ‘A check is made that no records are missing or duplicated. I.e. a check is made that there are no gaps or duplicates i in the jsn sequence for,
__any counter. _ _ _ I
I
I

Ld There is adequate synchronisation of server_and counter clocks throughout the process for time and datestamping purposes

LP anda 1
nited Kingdom, 10

This doc

NFIDENTIAL and ts
1G i,
FUJ00172083

FUJ00172083

5)
c
‘-
®
4
{°)
=
head
c
je)
O
FUJ00172083
FUJ00172083

Phase 2 - Controls testing fee quotation

Our fee quotation to test the controls identified in the preceding section and provide a report on the effectiveness of their design, implementation and
operation is as follows.

[ Tasks T Number of
I _ Days
+

‘Controls testing of 21 discrete controls (as listed in previous section)
‘Mobilisation
Review and Reporting

Total

I 76 131

This quotation is subject to all the terms, conditions and caveats of our Letter of Engagement dated 22 February 2012 and signed by Fujitsu on 26"
March 2012 and the above table is to be regarded as an updated and more specific version of the tables on page 5 of that Letter.

Note - based on our review of design documentation and logic of the controls we believe that there will not be a requirement to undertake a separate
data analysis stage. Should the identified controls not be operating effectively then we would need to reconsider the need for data analysis.

This doc
member firm of

is CONFIDENTIAL and its cir
1G network of ind

RICTED. © 2011 KPMG LLP, a
ed with KPMG Internati

rope LLP and a 1
2 United Kingdom, 2
This document is CONFIDENTIAL and its circulation and use are
RESTRICTED. © 2011 KPMG LLP, a UK limited liability partnership, is a
subsidiary of KPMG Europe LLP and a member firm of the KPMG
network of independent member firms affiliated with KPMG
International Cooperative, a Swiss entity. All rights reserved. Printed in
the United Kingdom.

The KPMG name, logo and ‘cutting through complexity’ are registered
trademarks or trademarks of KPMG International Cooperative (KPMG
International).

FUJ00172083
FUJ00172083