FUJ00234932 - Schedule D6 - Market Testing (V15.0) (V1.0 dated 31/08/2006, V12.0 dated 03/07/2017)

Evidence on official site

FUJ00234932
FUJ00234932

CONFIDENTIAL

SCHEDULE D6

MARKET TESTING

Version History

1.0 31/08/06 Agreed version as at date of signature of CCN
1200

14 26/09/06 Minor corrections

2.0 25/01/07 Baseline copy of 1.1

6.0 16/06/09 Moving all schedules to V6.0 as agreed with
Fujitsu

6.1 04/01/10 Amendments as per CCN 1268

7.0 10/05/10 Moving all schedules to V7.0 as agreed with
Fujitsu

8.0 21/02/12 Moving all schedules to V7.0 in accordance
with CCN1294d

9.0 13/01/14 Applying changes as per CCN1349 and
CCN1400

10.0 10/09/15 Moving all Schedules to v10.0 in accordance
with CCN1506

11.0 31/03/16 Moving all schedules to V11.0 in accordance
with CCN1604

12.0 03/07/2017 Moving all schedules to V12.0

13.0 Moving all Schedules to V13.0

14.0 20/12/2021 Moving all Schedules to V14.0

15.0 11/04/2024 Moving all Schedules to V15.0

Schedule D6 Version 15.0
Page 1 of 13
CONFIDENTIAL
SCHEDULE D6
MARKET TESTING
1. OVERVIEW
1.4 This Schedule D6 defines the processes available to the Parties for Market Testing the

2.4

2.2

2.3

3.1

3.2

3.3

3.4

Testable Services.
MARKET TESTING METHODS

Subject to paragraphs 5.1 and 6.1, the Market Testing method for all Testable Services
shall be Benchmarking.

Fujitsu Services may not increase any Charges, decrease any Services Levels or
(unless required by Post Office pursuant to paragraph 4.3) cease providing any
Services in connection with or as a consequence of Market Testing save where Fujitsu
Services participates in Competitive Tendering and is appointed by Post Office as the
winning tenderer, in which case the Agreement shall be amended under the Change
Control Procedure to reflect Fujitsu Services’ tender as described in paragraph 4.3.3(a).

Governance in respect of Market Testing in terms of monitoring, review and reporting of
events and progress and issue resolution shall be managed by the Commercial
Relationship and overseen by the Systems Integration Partnership and Executive
Relationship, as described in Schedule A2.

BENCHMARKING

The purpose of Benchmarking (the "Benchmark Purpose") is to compare the value for
money of the Benchmark Services with Equivalent Services. The focus shall be on
comparing the price of the Benchmark Services with market prices, but taking account
of current technologies at the time of Benchmarking, and not restricted to the same
technical solution as is used in the HNG-X Services.

The target price range for each Benchmark Service shall be as described in paragraph
3.8.

The Charges for the Benchmark Service to be used in Benchmarking comparisons are
the Charges then set out in paragraph 2 of Schedule D1 (as adjusted in accordance
with paragraph 4 of Schedule D1) for that Service for the remaining term of the
Agreement, applying the volumes (in relation to any variable Charges) then forecast in
the CCD entitled "Horizon Capacity Management and Business Volumes”
(PA/PER/033), excluding (i) the Service Management Element, and (ii) any Gain Share
payments that may be payable to Fujitsu Services in relation to cost savings in respect
of that Service.

Fujitsu Services shall, unless paragraph 5.1.2 applies, initiate Benchmarking and unless
any of paragraphs 5.1.1, 5.1.3, 6.1.1 or 6.1.3 apply procure that Benchmarking is
completed in respect of each Testable Service referred to in the Benchmarking timetable
in Annex 2 (as such timetable is varied in accordance with paragraph 3.5) in each

Schedule D6 Version 15.0
Page 2 of 13

FUJ00234932

FUJ00234932
CONFIDENTIAL

3.5

3.6

3.7

Financial Year in which that Service is due to be Benchmarked as set out in that
timetable up to and including 318 March 2015. After 31% March 2015, the Parties
acknowledge and agree that there shall be no Benchmarking of Testable Services.

The Benchmarking timetable in Annex 2 may be revised and any Testable Services set
out in Annex 1 may be added to that timetable by written agreement between the
Parties, subject to the following provisions:

3.5.1 no more than two Testable Services shall be timetabled for Benchmarking in any
Financial Year;

3.5.2 no Testable Service shall be timetabled for Benchmarking more than once every
three Financial Years; and

3.5.3 no Testable Service shall be Benchmarked before the Service first becomes
eligible for Benchmarking as set out in Annex 1.

If no revisions are agreed to the timetable in Annex 2 then, subject to paragraph 3.5.3,
that shall be the timetable for Benchmarking. The date in the Benchmarking timetable
by which a Benchmarking is due to be completed shall be put back, day for day, to the
extent that Post Office unreasonably withholds or delays its agreement under paragraph
3.7.3 to the Benchmarker's proposed approach for that Benchmarking.

Fujitsu Services shall procure Benchmarking from the Benchmarking consultancy who
ordinarily provides benchmarking services to Fujitsu Services, provided that that person
is an independent and generally recognised, within the IT industry, benchmarking
consultancy in the United Kingdom (the “Benchmarker”). The Parties acknowledge that
at the date of this Agreement Fujitsu Services uses Gartner Consulting or Compass
Management Consulting as its benchmarking consultant, either of which may be used
by Fujitsu Services as the Benchmarker so long as it remains an independent and
generally recognised, within the IT industry, benchmarking consultancy in the United
Kingdom. Any alternative benchmarking consultancy used to undertake Benchmarking
that meets the requirements of the first sentence of this paragraph shall be notified by
Fujitsu Services to Post Office.

Fujitsu Services shall procure that:

3.7.1. the Benchmarker shall select services for the Benchmark Group of an
appropriate standard, quality and relevance to the Benchmark Services in order
to achieve the Benchmark Purpose having due regard to all relevant factors,
including the nature and type of service concerned and the requirement of the
service recipient in relation thereto. The Benchmark Group shall (where such
services are available in the market) include examples of services which meet
the same business requirements as a Benchmark Service, but which utilise
more recent technology than that used to deliver the relevant Benchmark
Service;

3.7.2 no later than 30 Working Days before the date notified by Fujitsu Services to
Post Office when each Benchmarking is due to commence, Post Office shall be
provided with the Benchmarker's proposed approach to Benchmarking,

Schedule D6 Version 15.0
Page 3 of 13

FUJ00234932
FUJ00234932
CONFIDENTIAL

3.8

3.9

including the Benchmark Group that is proposed and the metrics to be used in
adjusting benchmark data so that comparisons can be made on a like-for-like
basis;

3.7.3 without prejudice to Post Office's right under paragraph 6.1.3, the Benchmarker
shall make such changes to the approach as the Parties and the Benchmarker
consider and agree to be reasonable, such changes to the approach to be
agreed no later than 20 Working Days before the Benchmarking is due to
commence. Either Party may include within such changes as are requested a
request that the Benchmark Group includes a service that meets the same
business requirements as the Benchmark Service, irrespective of the
technology used to deliver that service;

3.7.4 within 30 Working Days following the date on which a particular Benchmarking
is due to be completed in accordance with the timetable referred to in paragraph
3.4, the Benchmarker shall deliver a benchmarking report to each Party (a
“Benchmarking Report"). The Benchmarking Report shall contain the
documented findings and recommendations of the Benchmarker, including any
key financial and technical information supporting such recommendations; and

3.7.5 Post Office is given such direct access to the Benchmarker and the data and
information underlying the Benchmarking Report as Post Office may reasonably
require in order to discuss and understand the Benchmarking Report and its
assumptions.

If the Charges for the Benchmark Services (as described in paragraph 3.3) are greater
than the amount "A" calculated using the following formula those Charges shall be
deemed to be above the target price range, that range, for the purposes of this
Schedule D6, being the range between the lowest price service in the Benchmark
Group and the amount "A".

A= ((0.375N - Z) x (P2—P1)) +P1

where

N is the total number of services in the Benchmark Group;

Z is the integer part of 37.5% of N;

P1, having put the services in the Benchmark Group in ascending order by price (such
prices having been adjusted pursuant to any agreed weighting mechanism applied by
the Benchmarker) and numbered those services consecutively starting at one for the

service with the lowest price, is the price for the service numbered Z; and

P2 is the price for the service numbered Z + 1, such price having been adjusted
pursuant to any agreed weighting mechanism applied by the Benchmarker.

If, pursuant to paragraph 3.8, the Charges for the Benchmark Service are deemed to be
above the target price range, within 30 days of the issue of the Benchmarking Report
Fujitsu Services shall:

Schedule D6 Version 15.0
Page 4 of 13

FUJ00234932
FUJ00234932
CONFIDENTIAL

3.9.1

3.9.2

3.9.3

either adjust its price for the Benchmark Service so that it falls within the target
price range and continue to provide the Benchmark Service as previously; or

initiate Competitive Tendering in accordance with paragraph 5 to appoint a new
sub-contractor to Fujitsu Services in respect of the Benchmark Service so that
the Benchmark Service may be provided more cost-effectively; or

notify Post Office that (i) it does not consider it possible to provide the
Benchmark Service at a price that is within the target price range and achieve
an adequate gross margin on that Benchmark Service and (ii) its reasons for
this conclusion.

4, COMPETITIVE TENDERING

44 The purpose of Competitive Tendering is to identify potential alternative suppliers of
Competitive Tendering Services (either as potential sub-contractors to Fujitsu Services
or as direct suppliers of the service to Post Office) who can offer improved value for
money in providing the Competitive Tendering Services.

4.2 Competitive Tendering may be carried out either:

4.2.1

4.2.2

by Fujitsu Services (for the purpose of finding a new sub-contractor), in the
circumstances described in paragraph 5.1; or

by Post Office (for the purpose of finding a new direct supplier) pursuant to
paragraph 6.1.

43 Following Competitive Tendering, Post Office may decide at its sole option:

4.3.1

4.3.2

4.3.3

to continue with the current Service from Fujitsu Services at the current prices;

in the case of Competitive Tendering undertaken by Fujitsu Services where the
outcome of the tender process is such that, if Fujitsu Services was to sub-
contract all or part of the Competitive Tendering Service in question to an
alternative service provider identified in the tender process a downward revision
to the Charges would be, in the mutual opinion of the Post Office and Fujitsu
Services, deliverable, to require Fujitsu Services to sub-contract such
Competitive Tendering Service to such alternative service provider and revise its
Charges accordingly so that the Charge for that Competitive Tendering Service
shall be equivalent to the sum of: (i) the costs to Fujitsu Services of that sub-
contract (which may include Interface Establishment Costs allocated to such
alternative service provider), (ii) the Relevant Margin thereon, and (iii) the
Service Management Element; or

in the case of Competitive Tendering undertaken by Post Office:
(a) where Fujitsu Services is the winning tenderer, to continue with the

Competitive Tendering Service from Fujitsu Services on a revised basis
to be agreed under the Change Control Procedure, to reflect the

Schedule D6 Version 15.0

Page 5 of 13

FUJ00234932
FUJ00234932
CONFIDENTIAL

4.4

5.1

specification and charges for that service tendered by Fujitsu Services,
as amended and agreed with Post Office; or

(b) where the outcome of the tender process is that an Equivalent Service
to the Competitive Tendering Service is available at a price which is less
than the Charges for that Competitive Tendering Service (excluding (i)
the Service Management Element, and (ii) any Gain Share payments
that may be payable to Fujitsu Services in relation to cost savings in
respect of that Service) either:

(i) to invite Fujitsu Services to appoint the winning tenderer as a
new subcontractor within 60 Working Days (or such other period
as the Parties may agree) of such invitation and to revise its
Charges for the Competitive Tendering Service on the same
basis as such Charges may be revised under paragraph 4.3.2;
or

(ii) to appoint the winning tenderer as a direct supplier to Post
Office and terminate that Competitive Tendering Service (as a
Terminable Service) in accordance with Clause 47.10.1 of the
Agreement.

In the event that Post Office exercises its option pursuant to paragraph 4.3.3(b)(i) and
either:

4.4.1 Fujitsu declines to appoint such winning tenderer; or

4.4.2 the time limit specified in paragraph 4.3.3(b)(i) expires prior to Fujitsu Services
appointing the winning tenderer,

Post Office may, at its sole option, exercise its rights under paragraph 4.3.3(b)(ii), failing
which paragraph 4.3.1 shall apply.

COMPETITIVE TENDERING BY FUJITSU SERVICES
Fujitsu Services shall undertake Competitive Tendering where:

5.1.1 subject to paragraph 6.1.3, the Benchmarker notifies the Parties that, in the
Benchmarker's reasonable opinion, due to the lack of availability of suitable
services for inclusion in the Benchmark Group or other reasons in connection
with the Benchmarking process or criteria, it will not be or has not been possible
to perform a satisfactory Benchmarking for that Service and the Parties agree
that Competitive Tendering by Fujitsu Services may result in a downward
revision to the Charges for the Testable Service in question; or

5.1.2 the Parties have agreed that the Testable Service is one which should be
provided by Fujitsu Services through sub-contractors, with the aim that each
such subcontract should be of no more than four years’ duration; or

Schedule D6 Version 15.0
Page 6 of 13

FUJ00234932
FUJ00234932
CONFIDENTIAL

5.2

5.3

5.4

5.5

5.1.3 Fujitsu Services fails to initiate Benchmarking of a Testable Service in
accordance with paragraph 3.4, and Post Office notifies Fujitsu Services that
Fujitsu Services shall initiate a competition in respect of that Testable Service in
accordance with this paragraph 5; or

5.1.4 paragraph 3.9.2 applies,

and in each case Fujitsu Services shall initiate Competitive Tendering within three
months.

When paragraph 5.1 applies Fujitsu Services shall carry out, or procure that an
Independent Adviser (such Independent Adviser to be agreed with Post Office and such
agreement not to be unreasonably withheld or delayed) conducts, Competitive
Tendering in each case with a view to appointing a new sub-contractor to Fujitsu
Services in respect of the Service in question so that the Service may be provided more
cost-effectively.

Fujitsu Services shall ensure that:

5.3.1 once initiated in accordance with paragraph 5.1, Competitive Tendering shall be
actively continued and in any event completed within six months or in
accordance with any timetable agreed in writing between the Parties;

5.3.2 all invitations to tender and other key tender documents are submitted to Post
Office for its approval (such approval not to be unreasonably withheld or
delayed) prior to being provided to potential tenderers; and

5.3.3 Post Office is provided with copies of all tenders received, subsequent related
correspondence and documentation and valuation assumptions or processes
adopted from time to time throughout the tendering process and, in the event an
Independent Adviser is used, is given the opportunity to discuss the tenders with
that Independent Adviser.

The three month period referred to in paragraph 5.1 and the six month period referred to
in paragraph 5.3.1 shall each be extended, day for day, to the extent that Post Office
unreasonably withholds or delays its approval of the tender documentation referred to in
paragraph 5.3.2 or otherwise delays the Competitive Tendering by Fujitsu Services in
accordance with paragraphs 5.2 and 5.3.

Fujitsu Services shall disclose to any bona fide potential sub-contractor of Competitive
Tendering Services (subject to the same executing an Agreed Form NDA or any other
form of non-disclosure agreement mutually agreed by Post Office, Fujitsu Services and
such potential sub-contractor) Confidential Information to the extent that such disclosure
is reasonably required to enable that potential sub-contractor to prepare a reasonably
detailed tender proposal, including an anonymised list providing details of the terms and
conditions of employment of all Fujitsu Services personnel (and those personnel of its
relevant sub-contractors) who are then wholly or mainly employed or engaged in the
performance of the Competitive Tendering Services, to the extent such personnel may
be subject to the Transfer of Undertakings (Protection of Employment) Regulations 2006
if such Services were transferred (including, as a minimum, information on (i) numbers

Schedule D6 Version 15.0
Page 7 of 13

FUJ00234932
FUJ00234932
CONFIDENTIAL

6.1

6.2

6.3

of personnel (employees, contractors and temporary staff), (ii) salaries and other
benefits, bonuses and pensions arrangements, (iii) where readily available to Fujitsu
Services, skills sets and employment grades, (iv) age and length of service profile, (v)
locations of personnel and (vi) such key employee policies as shall be generally known
to the relevant employees and relevant to their terms of employment or reasonable
expectations).

COMPETITIVE TENDERING BY POST OFFICE
Subject to paragraph 6.2, Post Office shall be entitled if:

6.1.1. Benchmarking by Fujitsu Services pursuant to paragraph 3.4 in respect of any
Testable Service is not initiated in accordance with the Benchmarking timetable
in Annex 2 (as adjusted in accordance with paragraph 3.5) or Fujitsu Services
fails to procure the outputs required by paragraph 3.7 to achieve such
Benchmarking or Fujitsu Services fails to comply with its obligations under
paragraph 3.9 and Fujitsu Services fails to comply with written notice delivered
by Post Office to Fujitsu Services within 60 days of such notice to initiate such
Benchmarking or procure such outputs or comply with such obligations, or

6.1.2 following Benchmarking, Fujitsu Services gives notice to Post Office in
accordance with paragraph 3.9.3; or

6.1.3 it does not agree on a reasonable ground to the Benchmarking approach to be
used by the Benchmarker; or

6.1.4 Competitive Tendering by Fujitsu Services is not initiated within the period
specified in paragraph 5.1 (as may be adjusted in accordance with paragraph
5.4); or

6.1.5 there is a Default by Fujitsu Services in relation to its Competitive Tendering
obligations in paragraph 5.3.1 (the six month period therein as may be adjusted
in accordance with paragraph 5.4),

to initiate a competition within six months respectively of (i) expiry of the 60 day notice
period referred to in paragraph 6.1.1, (ii) receipt of notice under paragraph 3.9.3, (iii) the
date the Benchmarking was due to commence or (iv) expiry of the period referred to in
paragraph 5.1 or (v) Fujitsu Services’ Default in relation to its obligations in paragraph
5.3.1 (as the case may be), to find an alternative supplier of Equivalent Services to the
Testable Service in question. The exercise, by Post Office, of any of its rights under
paragraphs 6.1.1, 6.1.4 and 6.1.5 shall be without prejudice to any other rights or
remedies available to Post Office in such circumstances.

Post Office may choose to appoint an Independent Adviser to run such a competition on
its behalf, such Independent Adviser to be agreed with Fujitsu Services (such
agreement not to be unreasonably withheld or delayed).

Fujitsu Services shall (subject to any applicable legislation or regulations) be entitled to
participate as a tenderer in any such competition. If it participates in such competition,
Fujitsu Services shall submit its tender in the same way and to the same timescale as

Schedule D6 Version 15.0
Page 8 of 13

FUJ00234932
FUJ00234932
CONFIDENTIAL

6.4

6.5

6.6

other tenderers and shall not have access to the financial information in respect of any
other tender.

Unless Fujitsu Services exercises or intends to exercise its right under paragraph 6.3 to
participate as a tenderer in the competition, Fujitsu Services shall provide Post Office or
the Independent Adviser (as the case may be) with such assistance as may reasonably
be required to facilitate such a competition, including managing all or any part of the
competition should Post Office or the Independent Adviser ask it to do so.

Fujitsu Services shall disclose to any bona fide potential replacement provider of
Competitive Tendering Services (subject to the same executing an Agreed Form NDA or
any other form of non-disclosure agreement mutually agreed by Post Office, Fujitsu
Services and such potential replacement provider) Confidential Information to the extent
that such disclosure is reasonably required to enable that potential replacement
provider to prepare a reasonably detailed tender proposal.

Where in accordance with this paragraph 6 Post Office seeks a tender or tenders for a
third party contractor to provide Equivalent Services to those of a Competitive Tendering
Service, Fujitsu Services shall:

6.6.1 to the extent it can reasonably do so in advance (not knowing which provider
will be the winning tenderer) provide to Post Office its best estimate of any
Interface Establishment Costs likely to be incurred by Post Office in connection
with such services on the basis that the specification of the Competitive
Tendering Service and its intended replacement service are the same;

6.6.2 to the extent that any proposed third party replacement service does not meet
the specification of the Competitive Tendering Service, Fujitsu Services shall, in
a timescale consistent with the tender process, advise Post Office of the
Interface Costs likely to be incurred by Post Office in relation to the proposed
replacement service; and

6.6.3 provide to Post Office an anonymised list with details of the terms and
conditions of employment of all Fujitsu Services personnel (and those personnel
of its relevant sub-contractors) who are then wholly or mainly employed or
engaged in the performance of the Competitive Tendering Services, to the
extent such personnel may be subject to the Transfer of Undertakings
(Protection of Employment) Regulations 2006 if such Services were transferred
(including, as a minimum, information on (i) numbers of personnel (employees,
contractors and temporary staff), (ii) salaries and other benefits, bonuses and
pensions arrangements, (iii) where readily available to Fujitsu Services, skills
sets and employment grades, (iv) age and length of service profile, (v) locations
of personnel and (vi) such key employee policies as shall be generally known to
the relevant employees and relevant to their terms of employment or reasonable
expectations).

Schedule D6 Version 15.0
Page 9 of 13

FUJ00234932
FUJ00234932
CONFIDENTIAL

7. COSTS OF MARKET TESTING

714 Unless expressly provided otherwise in paragraph 7.2 or 7.3 below, each Party shall
bear its own costs (including, in the case of Fujitsu Services, the costs of the
Benchmarker) in relation to Market Testing.

7.2 The costs of undertaking Competitive Tendering incurred by each Party shall be borne
solely by Fujitsu Services if:

7.24

7.2.2

the Competitive Tendering is undertaken pursuant to paragraph 6.1.2 and the
outcome of that Competitive Tendering is that an Equivalent Service to the
Competitive Tendering Service is available at a price which is less than the
Charges for that Competitive Tendering Service (excluding (i) the Service
Management Element, and (ii) any Gain Share payments that may be payable
to Fujitsu Services in relation to cost savings in respect of that Service); or

the Competitive Tendering is undertaken pursuant to paragraph 6.1.1, 6.1.4 or
6.1.5.

7.3 The costs of undertaking Competitive Tendering incurred by each Party shall be borne
solely by Post Office if:

7.3.1

7.3.2

the Competitive Tendering is undertaken pursuant to paragraph 6.1.2 and the
outcome of that Competitive Tendering is that an Equivalent Service to the
Competitive Tendering Service is not available at a price which is less than the
Charges for that Competitive Tendering Service (excluding (i) the Service
Management Element, and (ii) any Gain Share payments that may be payable
to Fujitsu Services in relation to cost savings in respect of that Service); or

the Competitive Tendering is undertaken pursuant to paragraph 6.1.3.

8. PARTIAL TERMINATION, INTERFACE COSTS AND CHARGES

In the event of termination by Post Office of one or more Terminable Service(s) pursuant to
paragraph 4.3.3(b)(ii), the provisions of Clause 48, Schedule E and paragraphs 9.1 and 9.2 of
Schedule D1 shall apply.

9. DISPUTES

Any dispute arising in relation to this Schedule D6 (including in relation to the suitability of the
Benchmarker or Independent Adviser) shall be dealt with in accordance with Schedule A2 to this

Agreement.

10. ASSOCIATED DOCUMENTS

10.1. The following CCDs are associated with this Schedule D6:

Document Reference Document Title

Schedule D6 Version 15.0

Page 10 of 13

FUJ00234932

FUJ00234932
CONFIDENTIAL

FUJ00234932
FUJ00234932

1 PA/PER/033

Horizon Capacity Management and
Business Volumes

10.2 The following CRDs are associated with this Schedule D6:

Document Reference

Document Title

No CRDs Applicable

Schedule D6 Version 15.0
Page 11 of 13
CONFIDENTIAL
ANNEX 1
TESTABLE SERVICES
TESTABLE SERVICE EARLIEST DATE FOR MARKET TESTING

Branch Network Service

1 April 2007

Service Desk Service

six months after Trigger Point T6 (Counter Application Rollout
Complete)

Engineering Service

Upon Trigger Point T6 (Counter Application Rollout Complete)

Reference Data Management
Service

twelve months after Trigger Point T6 (Counter Application
Rollout Complete)

Third Line Software Support Service

1 November 2010

Application Support Service (Fourth
Line)

1 November 2010

Data Centre Operations Service and
Central Network Service (both
services together constituting one
Testable Service)

six months after Trigger Point T6 (Counter Application Rollout
Complete)

Systems Management Service

six months after Trigger Point T6 (Counter Application Rollout
Complete)

Operational Business Change
(Branch Change) Service

twelve months after Trigger Point T6 (Counter Application
Rollout Complete)

Reconciliation Service

twelve months after Trigger Point T6 (Counter Application
Rollout Complete)

Management Information Service

twelve months after Trigger Point T6 (Counter Application
Rollout Complete)

Schedule D6 Annex 1 Version 14.0
Page 12 of 13

FUJ00234932
FUJ00234932

CONFIDENTIAL
ANNEX 2
BENCHMARKING TIMETABLE

Financial
Year Testable Services
ending 31
March: First Market Test in Year Second Market Test in Year
2007 None
2008 Branch Network Service None
2009 None
2010 Engineering Service Service Desk Service
2011 Data Centre Operations Service and Branch Network Service

Central Network Service (both services

together constituting one Testable

Service)
2012 Application Support Service (Fourth Third Line Software Support Service

Line)
2013 Systems Management Service Engineering Service
2014 Service Desk Service Branch Network Service
2015 None (unless contract extended beyond 31 March 2015 in which case

additions/alterations to be agreed)

Schedule D6 Annex 2 Version 14.0

Page 13 of 13

FUJ00234932

FUJ00234932