POL00089259 - Planned Operation Risk Assessment Report for Winsford Post Office Branch

Evidence on official site

POL00089259
POL00089259

Post Office Ltd

Post Office Ltd - CONFIDENTIAL
Planned Operation - Risk Assessment

1 ICase Reference/Project Number POLTD I 1112 0228

Suspected Offence (s)

2 Suspect Details (A separate form is required for each suspect)

ce Grant Ian ALLEN Title: Sa 1
Age:

Home

address:

Employee I Srade: Sub postmaster I Job Title:

Oats Pay No.: Office: Winsford

Suspects I Make: N/K Model: N/K

Venice? I colour: N/K Reg. No.: N/K

3 Risk Related Intelligence Checks Undertaken (Indicate with an xX
check undertaken)

1 Local Management: x 2 PNC Person: 3 Local Police:

4 HRSC check: X I5 Equifax check: 6 PNC Vehicle:

7 Benefits Agency/

Local Authority: 8 SOCA: 9 Other:

4 I Risk Assessment on Suspect

What is known about the
suspect which has a bearing
on risk in this case?

(Name of person)

The level of risk Grant Ian ALLEN Is considered to
associated with be:

Comment on the rationale
for arriving at the
assessment score and any
controls put in place to
mitigate risk.

5 I Risk Assessment on Address(es) to be visited

What is known about the 1. The address were the interview is being
address(es) to be visited conducted are Royal Mail premises.
which have a bearing on
risk in this case?

The level of risk (Address (es))
associated with 1. Clippers Quay Salford

Copy
Ni

POL00089259

POL00089259
ROYAL MAIL GROUP - CONFIDENTIAL
Planned Operation - Risk Assessment
M50 3NW x

Comment on the rationale
for arriving at the
assessment score and any
controls put in place to
mitigate risk

1. Access to the premises is restricted.

6 I Risk Assessment on Geographic Area(s) to be visited

What is known about the
geographic area(s) which
has a bearing on risk in
this case?

1.

Clippers Quay is located within a number of

office blocks / hotels

aphic Area(s)

(
i a M L
The level of risk 1. Clippers Quay Is considered to
associated with Salford M50 3NW I be: x
Comment on the rationale 1. The area has CCTV coverage and Security Guards

for arriving at the
assessment score and any
controls put in place to
mitigate risk.

7 I Personal Protective

Equipment (PPE)

(e.g. vests,

Hi-Vis)

State whether PPE is to be
worn during any part of the
planned operation and
provide an explanation for
the decision.

8 I Police Liaison Point

Station:

Officer
Dealing:

Collar No:

Police Ref:

Contact Tel.
No:

g I Risk assessment on the Pl

anned Investigation Activities

planned indicate with and “x”)

te Foot: N/A I Static (Premises) N/A
surveillance

to be carried I Mobile: N/A I Static (Vehicle) N/A
Is an apprehension : Aas
aacieioetads No Do you plan to conduct an interview? Yes
Indicate I person: No I Vehicle: No
types of

searches I Home: No I Locker: No
ie Re a Other Premises

carrie ae Hae

DETAILS OF OPERATIONAL TEAM

Name of Persons Involved: I Contact Number: Call Sign: (if applicable)
Stephen Bradshaw Hl GRO N/A

Copy
No

POL00089259
POL00089259

ROYAL MAIL GROUP - CONFIDENTIAL

Andrew Wise i

N/A

OPERATIONAL RESPONSIBILITIES

1** Officer: 24 Officer:
Apprehens I 3: officer: 4% Officer:
ion

Other: Other:

1** Officer: I stephen Bradshaw 24 Officer: Michael Stanway
Interview

3™4 Officer: Other:

ae Searching

suena Officer:

searches I Search Searching

I Recorder: Officer:

Searching Othen:

Officer:
Mandatory Coded Warning (to s-gnal Lego

immediate withdrawal of al

accalated ns

at

1 investigators
tion)

What is known about the

N/A

investigation activities
specific to this
operation which has a
bearing on the risk

Comment on any controls IN/A

put in place to minimise

The level of risk pertaining to the investigation activities specific

to this operation is considered to be:

10 I Investigator In Charge Declaration

Copy
No

POL00089259
POL00089259

ROYAL MAIL GROUP - CONFIDENTIAL

Planned Operation - Risk Assessment

I confirm that in planning this operation I have given full consideration to the
Procedures & Standards 4.1 Criminal Investigation Duties Safe Systems of Work
(SSoW) relevant to this operation.

All persons involved in the operation have been briefed on;
The background and nature of the operation.

Their individual roles and responsibilities

What risks have been considered

. What measures have, or are to be taken to address/minimise risks.

aoe

Furthermore, I confirm that on 16 April 2012 Keith Gilchrist was informed of the
proposed course of action and the identified risks. Authority was given to
proceed.

* Before any investigation activities which bring Investigators in to contact with
the suspect are commenced a line manager must be informed. A Senior Manager
(level 9 or above) must be apprised where any risk is assessed as “High”. In
addition in High Risk cases Police assistance must be sought.

Signed: Job Title: Security Manager
Name: Stephen Bradshaw Time & Date: I 11:15 - 16 April 2012
Copy

No