Description of Fujitsu’s System
of IT Infrastructure Services
supporting Post Office Limited’s
HNG-X application
Throughout the Period 1 April 2022 to 31 December 2022
With the independent service auditor's assurance report including tests performed and
results thereof
POL00337569
POL00337569
FUJITSU
Table of Contents
1. FUJITSU SERVICES LIMITED’S MANAGEMENT STATEMENT .....
2. INDEPENDENT SERVICE AUDITOR’S ASSURANCE REPORT ON THE DESCRIPTION OF
CONTROLS, THEIR DESIGN AND OPERATING EFFECTIVENESS...
3. DESCRIPTION OF FUJITSU’S SYSTEM OF IT INFRASTRUCTURE SERVICES SUPPORTING
POST OFFICE LIMITED’S HNG-X APPLICATION THROUGHOUT THE PERIOD 1 APRIL 2022 TO
31 DECEMBER 2022
3.1 Overview of Fujitsu
3.1.1 History of Fujitsu
3.1.2 Major Markets and Human Capital
3.1.3. Organisational Structure, including Business Units .
3.1.4. Geographical Spread...
3.2 Overall Control Components ..
3.2.1 Control Environment ....
3.2.2 Integrity and Ethical Values
3.2.3 Business Lines and Function:
3.3 Control Activities...
3.3.1. Governance and Oversight of Control Activities
3.3.2 Information and Communication
3.3.3 Monitoring .....
3.3.4 Risk Assessmen
3.3.5 COVID-19 Global Pandemic .
3.3.6 Description of Services provided .
3.4 Third Party Considerations
3.5 Complementary User Entity Controls
4. DESCRIPTION OF CONTROL OBJECTIVES, CONTROLS, TESTS AND RESULTS OF TESTS
4.1 Testing Performed and Results of Tests of Entity-Level Control...
4.2 Control Objectives, Control Activities, Testing Procedures and Results of Testing.
4.2.1 Control Objective 1
4.2.2 Control Objective 2.
4.2.3 Control Objective 3.
4.2.4 Control Objective 4.
4.2.5 Control Objective 5.
4.2.6 Control Objective 6.
4.2.7 Control Objective 7.
4.2.8 Control Objective 8.
4.2.9 Control Objective 9.
4.2.10 Control Objective 10
4.2.11 Control Objective 11
4.2.12 Control Objective 12
Table of Contents i
POL00337569
POL00337569
FUJITSU
1. Fujitsu Services Limited’s Management Statement
19 May 2023
The accompanying description has been prepared for Post Office Limited (POL), who have used Fujitsu
Services Limited (“Fujitsu”)'s IT Infrastructure services system, and their auditors who have a sufficient
understanding to consider the Description, along with other information, including information about
controls operated by POL themselves, when assessing the risks of material misstatements of POL's
financial statements.
The Description indicates that certain control objectives specified in the Description can be achieved only
if complementary user entity controls assumed in the design of Fujitsu's controls are suitably designed
and operating effectively, along with related controls at the service organisation. The Description does not
extend to controls of the user entity, POL.
Fujitsu confirms that:
a. The accompanying Description at pages 5-56 fairly presents the IT Infrastructure services system
(System) supporting POL’s HNG-X application throughout the period 1 April 2022 to 31
December 2022. The criteria used in making this statement were that the accompanying
description:
(1) Presents how the System was designed and implemented, including, if applicable:
e The types of services provided.
e The procedures, within both information technology and manual systems, by which
those services are provided for POL.
e The information used in the performance of the procedures and supporting
information; this includes the correction of incorrect information and how information
was transferred to the reports prepared for POL.
e How the System dealt with significant events and conditions.
« The process used to prepare reports for POL.
e Services performed by a subservice organisation, if any, including whether the carve-
out method or the inclusive method has been used in relation to them.
e Relevant control objectives and controls designed to achieve those objectives.
e Controls that we assumed in the design of the system, would be implemented by
POL, and which, if necessary to achieve controls objectives stated in the
accompanying description, are identified in the description along with the specific
control objectives that cannot be achieved by ourselves alone.
« Other aspects of our control environment, risk assessment process, information
systems (including the related business processes) and communication, control
activities, and monitoring activities that were relevant to the services provided.
(2) Includes relevant details of changes to the service organisation's System during the period 1
April 2022 to 31 December 2022.
Fujitsu’s Management Statement 1
POL00337569
POL00337569
FUjITSU
(3) Does not omit or distort information relevant to the scope of the System being described.
b. The controls related to the control objectives stated in the accompanying description were
suitably designed and operated effectively throughout the period 1 April 2022 to 31 December
2022, if POL applied the complementary user entity controls assumed in the design of Fujitsu's
controls throughout the period 1 April 2022 to 31 December 2022. The criteria used in making
this statement were that:
(1) The risks that threatened the achievement of the control objectives stated in the description
were identified.
(2) The identified controls would, if operating as described, provide reasonable assurance that
those risks did not prevent the stated control objectives from being achieved; and
(3) The controls were consistently applied as designed, including that manual controls were
applied by individuals who have the appropriate competence and authority throughout the
period 1 April 2022 to 31 December 2022.
Dan Walton
Delivery Executive
Fujitsu's Management Statement 2
POL00337569
POL00337569
=
EY
Building a better
working world
2. Independent Service Auditor’s Assurance Report on
the Description of Controls, their Design and
Operating Effectiveness
To: Management of Fujitsu Services Limited.
Scope
We have been engaged to report on Fujitsu Services Limited (“Fujitsu”)’s description at pages 5-56 of its
IT Infrastructure services system supporting Post Office Limited (“POL”)'s HNG-X application throughout
the period 1 April 2022 to 31 December 2022 (the Description), and on the design and operation of
controls related to the control objectives stated in the Description.
The Description indicates that certain Control Objectives can be achieved only if complementary user
entity controls assumed in the design of Fujitsu's controls are suitably designed and operating effectively,
along with related controls at the service organisation. Our engagement did not extend to such
complementary user entity controls, and we have not evaluated the suitability of the design or operating
effectiveness of such complementary user entity controls.
Fujitsu’s responsibilities
Fujitsu is responsible for preparing the Description and accompanying statement at pages 1-2, including
the completeness, accuracy, and method of presentation of the Description and statement; providing the
services covered by the Description; stating the control objectives; identifying the risks that threaten the
achievement of the Control Objectives; selecting the criteria presented in the statement; and designing,
implementing, and effectively operating controls to achieve the stated control objectives.
Our independence and quality control
We have complied with the independence and other ethical requirements of the International Ethics
Standards Board for Accountants’ International Code of Ethics for Professional Accountants (including
International Independence Standards), which is founded on fundamental principles of integrity,
objectivity, professional competence and due care, confidentiality and professional behaviour.
We apply International Standard on Quality Control I and accordingly maintain a comprehensive system
of quality control including documented policies and procedures regarding compliance with ethical
requirements, professional standards, and applicable legal and regulatory requirements.
Our responsibilities
Our responsibility is to express an opinion on Fujitsu's Description and on the design and operation of
controls related to the Control Objectives stated in the Description, based on our procedures. We
conducted our engagement in accordance with International Standard on Assurance Engagements 3402,
Assurance Reports on Controls at a Service Organization, issued by the International Auditing and
Assurance Standards Board. That standard requires that we plan and perform our procedures to obtain
reasonable assurance about whether, in all material respects, the Description is fairly presented, and the
controls are suitably designed and operating effectively.
An assurance engagement to report on the description, design and operating effectiveness of controls at
a service organisation involves performing procedures to obtain evidence about the disclosures in the
service organisation's description of its system, and the design and operating effectiveness of controls.
The procedures selected depend on the service auditor's judgement, including the assessment of the
risks that the description is not fairly presented and that controls are not suitably designed or operating
effectively. Our procedures included testing the operating effectiveness of those controls that we consider
necessary to provide reasonable assurance that the Control Objectives stated in the description were
Independent Service Auditor's Assurance Report 3
POL00337569
POL00337569
=
EY
Building a better
working world
achieved. An assurance engagement of this type also includes evaluating the overall presentation of the
description, the suitability of the objectives stated therein, and the suitability of the criteria specified by the
service organisation and described on pages 1-2.
We believe that the evidence we have obtained is sufficient and appropriate to provide a basis for our
opinion.
Limitations of controls at a service organisation
Because of their nature, controls at a service organisation may not prevent or detect all errors or
omissions related to the provision of IT infrastructure services. Also, the projection of any evaluation of
effectiveness to future periods is subject to the risk that controls at a service organisation may become
inadequate or fail.
Opinion
Our opinion has been formed on the basis of the matters outlined in this report. The criteria we used in
forming our opinion are those described at pages 1-2. In our opinion, in all material respects:
a. The Description fairly presents the IT infrastructure services system as designed and
implemented throughout the period from 1 April 2022 to 31 December 2022.
b. The controls related to the control objectives stated in the Description were suitably designed
throughout the period from 1 April 2022 to 31 December 2022 to provide reasonable assurance
that the control objectives would be achieved if the controls operated effectively throughout the
period 1 April 2022 to 31 December 2022 and if POL applied the complementary controls
assumed in the design of Fujitsu's controls throughout the period 1 April 2022 to 31 December
2022.
c. The controls tested, which were those necessary to provide reasonable assurance that the
Control Objectives stated in the Description were achieved, operated effectively throughout the
period 1 April 2022 to 31 December 2022 if complementary user entity controls assumed in the
design of Fujitsu's controls operated effectively throughout the period 1 April 2022 to 31
December 2022.
Description of tests of controls
The specific controls tested and the nature, timing, and results of those tests are listed on pages 57-81.
Intended users and purpose
This report and the Description of tests of controls on pages 57-81 are intended only for POL, as user of
Fujitsu's IT infrastructure services system, and POL's auditors, who have a sufficient understanding to
consider it, along with other information including information about controls operated by POL
themselves, when assessing the risks of material misstatements of POL's financial statements.
Brut + pager
19 May 2023
London
United Kingdom
Independent Service Auditor's Assurance Report 4
POL00337569
POL00337569
FUSITSU &
3.Description of Fujitsu’s system of IT infrastructure
services supporting Post Office Limited’s HNG-X
application throughout the period 1 April 2022 to 31
December 2022
3.1. Overview of Fujitsu
3.1.1 History of Fujitsu
Fujitsu has evolved, through a process of acquisition and organic development, to create a broad-based
technology and services organisation, with a strong record of innovation and lean service delivery. Fujitsu
has a long and successful history with Post Office which has links going back more than 25 years.
A quick overview of FUJITSU Global key facts:
Established CEO,CDXO Business Segments
June 1935 Takahito Technology Solutions
° Ubiquitous Soluti
Tokita Suara
Revenue" R&D Expenditure”
3,586.8 105.3
Employees
124,200
worldwide
(ac of end of March 2022)
billion yen billion yen
“Consolidated financial figures fr fiscal year ending March 31, 2022.
Figure 1. FUJITSU Global key facts
Description of Fujitsu's System 5
FUJITSU
POL00337569
POL00337569
The Company milestones are on Fujitsu's website at Company milestones: Fujitsu Global and are
summarised as follows:
1. First Steps: Telecommunications (1923-1949)
6A Shift to Solutions and Services (1992-2001)
7. Aim for a prosperous society that promotes the well-being of I
people (2002 - )
Figure 2. A long line of landmark achievements and product milestones for Fujitsu
3.1.2 Major Markets and Human Capital
Fujitsu is the leading Japanese information and communication technology (ICT) company, offering a full
range of technology products, solutions, and services. Approximately 124,000 Fujitsu people support
customers in more than 100 countries. Fujitsu use their experience and the power of ICT to shape the
future of society with their customers. Fujitsu (TSE: 6702) reported consolidated revenues of 3.6 trillion yen
(US $34 billion) for the fiscal year ended March 31, 2022.
3.1.3. Organisational Structure, including Business Units
Europe Region Operating Model FUJITSU
Countries
paar UK Finland France Netherlands Spain Germany (0) I Austia(A) I Switzerland (CH)
pate Ireland Sweden Belgium Luxembourg Portugal
relationship Denmark Western Europe pac
Gass) In-country delivery DACH business lines and delivery
i coaril Partner Business Solutions (PBS) I OX Services OX Unit (DXU) I Consulting Services
“Portfolio. ‘Applications & Multi Cloud Services (AMCS) I Service Integration Business Applications & Consulting Services (BACS)
competitiveness Werktorce and Workplace Services (WWS) I Cyber Security Managed Services
(with KEA unis) Enterprise Platform Services (EPS)
Ges Customer Service Management I Projects and Programs
and quality
“Secerce Pu North Western Europe (NWE) delivery DACH support functions
useeas Portfolio I Transfermation and Service Integration Customer Service Management I Portfolio I Taraformation
(DACH bus lines)
Global Detivery Centers
Functions “Finance HR Marketing Communications CISO DSPU Procurement Legal & Commercial Strategy CTO Shared Services I
ear) 2 or yjin2002
Figure 3. Fujitsu Europe Operating Model
Description of Fujitsu's System
POL00337569
POL00337569
FUSITSU
3.1.4 Geographical Spread
As a global company, Fujitsu has offices in countries all around the world. Visit Fujitsu locations across
the world: Fujitsu Global.
North /
South America
Figure 4. Fujitsu Global Locations
Description of Fujitsu's System 7
POL00337569
POL00337569
FUJITSU
3.2 Overall Control Components
This section provides information about the five interrelated components of internal control at Fujitsu:
« Control Environment - sets the tone of an organisation, influencing the control consciousness
of its people. It is the foundation for all other components of internal control, providing discipline
and structure.
¢ Control Activities — are the policies and procedures that help make sure that management's
directives are carried out.
« Information and Communication — are systems, both automated and manual, that support the
identification, capture and exchange of information in a form and time frame that enable people to
carry out their responsibilities.
e Monitoring — is a process that assesses the quality of internal control performance over time.
e Risk Assessment - is the entity's identification and analysis of relevant risks to the achievement
of its objectives, forming a basis for determining how the risks can be managed.
Fujitsu internal control components include controls that may have a pervasive effect on the organisation,
an effect on specific processes, account balances, disclosures, classes of transactions or applications or
both. Some of the components of internal control include controls that have more of an effect at the entity
level, while other components include controls that are primarily related to specific processes or
applications. When assessing internal control, we consider the interrelationships among the five
components.
3.2.1 Control Environment
Management has established and maintains an internal control structure that monitors compliance with
established standards, policies, and procedures. The remainder of this subsection discusses the tone at
the top as set by Leadership and Management, the integrity, ethical values and competence of Fujitsu
employees, the standards, policies and procedures, the risk management process and monitoring and the
roles of significant control groups. The internal control structure is established and refreshed based on
Fujitsu's assessment of risk facing the organisation.
3.2.2 Integrity and Ethical Values
Fujitsu recognises its responsibility to foster a strong ethical environment to determine that its business
affairs are conducted with integrity and in accordance with high standards of personal and corporate
conduct. This responsibility is characterised and reflected in the Fujitsu Way, which is understood by all
employees of the organisation. All employees are required to maintain ongoing compliance training.
Compliance checks are undertaken to help ensure that employees understand and comply with the Fujitsu
Way.
3.2.3. Business Lines and Functions
The Business Lines and Functions that provide services or support the delivery of service to POL are as
follows (as referenced on the Europe Region Operating Model):
e — In-country delivery
o Partner business Solutions (PBS) I DX Services
o Applications & Multi Cloud Services (AMCS) I Service Integration
o Workforce and Workplace Service (WWS) I Cyber Security
o Customer Service Management I Projects and Programs
e North Western Europe (NWE) delivery
Description of Fujitsu's System 8
POL00337569
POL00337569
FUSITSU
e Global Delivery Centres
« Functions
o Finance
o HR
o Marketing
o Communications
o CISO
o DSPU
o Procurement
o Legal & commercial
o Strategy
o CTO
* Shared Services
The purpose of these Business Lines and Functions is to enable, organise and facilitate the delivery
requirements placed on Fujitsu by the Post Office contract.
Each of the Business Lines or Functions is also controlled through its own service descriptions,
organisational controls, vision, mission and value statements, governance and control frameworks,
monitoring and review controls and performance measures.
The Business Lines and Functions establish their own frameworks for the continuous formal support of the
Fujitsu team managing the Post Office contract by their management and enforce this through their own
policies, procedures and standards and registers, including, where applicable, internal and external audits.
The controls in place at each of these areas have overall objectives, terms of reference, job descriptions
and Senior Management roles. Each of these functions has its own levels of management, staff, directors
and stakeholders, all of which impact the service that Fujitsu is able to provide to Post Office. Each of these
Business Lines and Functions is also responsible for helping to ensure that their staff are appropriately
trained and follow Fujitsu Corporate processes to achieve this.
3.3 Control Activities
3.3.1 Governance and Oversight of Control Activities
Fujitsu has established the Risk Management Committee (RMC) as the body responsible to the Fujitsu
Europe Board to promote risk management in accordance with the Fujitsu Way.
The directors are committed to maintaining a strong control environment throughout the organisation and
recognise that the control environment provides the foundation for all other components of internal control
providing discipline and structure.
The Board of Directors is responsible for monitoring performance of the Company on behalf of its
shareholders and helping to ensure that Fujitsu satisfies regulatory and statutory requirements related to
its operations. Authority for action and expenditure within Fujitsu Service flows from the Board and the
Board has established that the necessary control systems are in place to help ensure that business is
undertaken in a responsible manner. Fujitsu's policies, operations and strategy are controlled by the Board.
In addition, Fujitsu has a systematic approach to policy and process with a set of Master Policies approved
by the RMC and sub-policies and processes determined by the relevant regional functions underneath.
The framework, known as the Europe Business Management System (EBMS) is managed by Fujitsu's
Governance and Assurance teams and comprises a set of mandatory Master Policies and Business
Description of Fujitsu's System 9
FUJITSU
POL00337569
POL00337569
Processes. The Europe Master Policies cover the following under each of which is a set of specific business
processes owned by Senior Management:
.
Business Strategy Master Policy
Compliance Master Policy
Corporate Information Technology and Voice Master Policy
Data Protection Master Policy
Delegation of Authority Master Policy
Europe Environmental Master Policy
Europe Marketing Master Policy
Europe Responsible Business Master Policy
Finance Master Policy
Occupational Health and Safety Master Policy
Offerings Master Policy
Procurement Master Policy
Project and Program Management Master Policy
Quality Master Policy
Security Master Policy
Service Delivery Management Master Policy
Tax Master Policy
Treasury Master Policy
Within the Fujitsu teams supporting POL, each Business Line and Function follows the EBMS. Where
exceptions to the EBMS are necessary, local standards, procedures and work instructions are documented
with an ‘Exemption’ from the Exemption Advisory Board where the Exemption Advisory Board authorises
that local departure from the EBMS.
Human Resources
3.3.1.1 Policies and Practices
Human resource policies and practices relate to hiring, orienting, training, evaluating, counselling,
promoting and compensating personnel. The competence and integrity of Fujitsu’s personnel are essential
elements of its control environment.
3.3.1.2 Performance Management
Fujitsu has industry acknowledged good practice embedded in its approach to performance management.
Description of Fujitsu's System
10
POL00337569
POL00337569
FUSITSU
Fujitsu call their approach Zinzai Career and Performance Management and the key elements of this
inclusive approach include:
e Managers across the business disseminate and share Fujitsu business goals with all employees by
converting them into meaningful team and individual objectives.
e Monthly one-to-one discussions are held with direct reports, using coaching skills to ensure individuals
have the support they need to take ownership of, and deliver against their objectives.
e Every individual creates their own personal development plan, which forms part of the monthly review,
captures development needs and includes a suitable learning action for each need.
e Every employee has an interim quarterly review and an annual appraisal held to formally record
achievement against objectives, noting outcomes and future development needs.
e Following the appraisal, on an annual basis, a performance rating is allocated to every employee
based upon their achievements against objectives. These ratings are linked to salary review and
bonus eligibility.
Within Fujitsu, employee performance management is recognised as key to delivering excellent customer
service.
To support managers and employees through the process Fujitsu has a comprehensive “one stop shop”
intranet portal, Talent and Learning, that provides a wealth of collateral, guidance and training aids for
each stage. As well as traditional training we have videos of employees and managers talking about the
process and on-line demonstrations of the Zinzai Career and Performance Management IT recording
system. Fujitsu's regional CEO is personally involved in filming communications and training material for
all employees.
3.3.2 Information and Communication
Fujitsu UK and Ireland Business Lines and Functions have Europe Connect portals to enable sharing of
knowledge across the company and throughout their own business areas.
These portals provide information about each of the Business Lines and Functions and what products and
services they offer to the company.
Fujitsu has a robust and reliable communication framework that utilises push and pull strategies to help
ensure that employees have the information they need to perform their roles effectively, efficiently and
ethically.
Some of the mechanisms used to communicate directly with Fujitsu employees include:
e Virtual Road Shows.
e Virtual Staff Briefings.
e Virtual Team Meetings.
e Leadership and Management Cascades via Microsoft Teams.
Fujitsu also seeks the views of employees via representative groups and employee surveys in different
parts of the Company. Fujitsu management consults regularly with these bodies, providing updates and
seeking views on important issues. In addition, Fujitsu has agreements with trades unions that include
regular meetings with local and senior management to discuss issues affecting employees in the unions’
area of interest.
Description of Fujitsu's System 11
POL00337569
POL00337569
FUJITSU
3.3.3. Monitoring
Fujitsu utilises a variety of systems, processes and tools to help ensure that operations are efficient, effective
and ethical, including:
« Performance Dashboards.
e Standard Reporting Packs.
e Audits and Health Checks.
« Reviews and Lessons Learned.
* Customer Satisfaction Scores.
Data and information from these sources are used to identify weaknesses, inefficiencies or potential
performance issues. Performance issues are remediated and opportunities for improvement are identified,
evaluated, prioritised and managed through to appropriate implementation.
EBMS audits by various Fujitsu Subject Matter Expert (SME) Teams are used to support the design,
implementation and post implementation review of the controls in place and to help ensure that the relevant
governance, strategy and needs and requirements of both POL and Fujitsu are met.
3.3.4 Risk Assessment
Risk Policy and Implementation
Fujitsu manages risk and uncertainty in its business in order to improve performance and achieve
objectives. All operating companies have a risk management framework. Each company has a designated
Chief Risk Management Officer (‘CRMO”) whose responsibilities include bi-annual risk reporting and
prompt escalation of significant risks in addition to managing and monitoring the risk process on behalf of
the board. Fujitsu’s risk management framework centres on the risk management policy which is a key
management policy overseen by the Fujitsu Services Limited board.
Responsibility for implementation of the Manage Risk Policy is delegated throughout the business cycle.
Management oversight at critical points in the business cycle is provided through the Review Framework,
a structured set of formal management reviews. The management of risk is embedded throughout these
structures such that any potential problems can be planned for and managed appropriately
Fujitsu’s Risk Process
The Fujitsu Services Risk Process is used to support the evaluation, reporting and management of risks in
the business and is consistent with industry best practice, particularly the International and British
Standards and code of practice for risk management (ISO31000 and BS31100). Fujitsu Services uses the
international standard (ISO31000) for risk management as the template to improve its risk framework and
process.
Fujitsu's Enterprise Risk Management System (ERM) provides clear and effective monthly risk reporting to
the regional leadership teams and forms the basis of the GBG. This helps to ensure a high level of risk
management is maintained throughout the organisation.
3.3.5 COVID-19 Global Pandemic
Fujitsu personnel have the technical capabilities and resource capacity to continue their relevant operations
and services remotely. Service delivery includes the ability to perform processes, procedures, and controls
related to Fujitsu's IT Infrastructure Services.
Description of Fujitsu's System 12
POL00337569
POL00337569
FUJITSU
3.3.6 Description of Services provided
The Services that Fujitsu are contracted to provide are contractually referred to as HNG-X. HNG-X was a
project that replaced the Horizon message-based branch network with the Horizon on-line branch
service, also referred to by Post Office as Horizon Online and rolled out in 2010. The HNG-X Counter
Business Application was later adapted to run on Windows operating systems other than NT4, providing
all of the functionality of the HNG-X Counter Business Application. This adaptation is known as HNG-A.
In relation to the scope of Fujitsu services and assurance provided by this ISAE 3402 report for the
examination throughout the period 1 April 2022 to 31 December 2022, noted below are the Fujitsu IT
infrastructure services supporting POL'’s HNG-X application and the changes to the IT environment during
the review period.
e The weekly incident reporting had been cancelled by POL in November 2021 but reinstated since
October 2022. This has not impacted the fundamental end-to-end processes and controls in
scope.
e As notified to POL, as of January 2022, McAfee Intrusion Detection system sensors have
reached their end-of-life service. Signatures are still able to be downloaded but the vendor could
change this at their entire discretion. A project to implement a supported solution has been
commissioned by POL.
e As of July 2022, the test management tool changed from Quality Centre to Zephyr.
In addition, under POL's evolving service delivery model where reference is made below to ‘POL approvals,
this may be provided by POL or their nominated agents.
Physical and Environmental Controls
1. Control Objective 1: Controls provide reasonable assurance that access to the data centre and
facilities with computer equipment, storage media and program documentation is restricted to
properly authorised individuals.
# Control
1.1 Data centre access: Data centre specific physical access security policies and procedures to
control access to the data centre and other sensitive areas, including computer equipment and
storage media, are implemented and are made available to Fujitsu staff via the intranet.
1.2 Access within the data centre: Access beyond the security desk is protected by a key-card
system to restrict individual access to specific data processing areas based on the access level
granted. New users requiring access to the data centre must complete an access form, which
must be signed as approved by the line manager responsible for the zones requested.
1.3 CCTV: The data centre access is monitored through the use of CCTV video cameras placed
at strategic locations around the data centre. The CCTV video footage is monitored by security
guards.
1.4 Security guards: Security guards are present at the data centre 24 hours per day and seven
days per week. The data centre can only be accessed through the security desk manned by a
security guard at all times.
1.5 Data centre visitors: Visitors are required to sign in at the reception areas and temporary
badges are issued. Visitors must be pre-notified to data centre security by a Fujitsu employee.
1.6 Failed access monitoring: Attempts to enter restricted areas without using authentication
devices are denied and a security alert is triggered and logged. Data centre management
proactively follows up on security alerts that are triggered.
1.7 Review of user access within the data centre: Periodic reviews are performed by the data
centre Facilities Manager for users with access to the data centre on a quarterly basis.
Description of Fujitsu's System 13
POL00337569
POL00337569
FUJITSU
# Control
1.8 Deletion of user access: Delivery team managers notify the local site facilities team of
terminations or transfers of their direct reports. Upon notification user access is revoked from
the security access control system.
2. Control Objective 2: Controls provide reasonable assurance that computer equipment and
facilities are protected from damage by fire, flood and other environmental hazards and
maintenance agreements are in place.
Control
2.41 Fire Suppression: Fire detection and suppression devices, such as hand-held fire
extinguishers, are strategically placed throughout the entire data centre.
2.2 Maintenance Schedule: Periodic inspection and maintenance is performed on protection
devices, sensors and alarm systems.
2.3 Environmental monitoring: Smoke detectors and water, humidity and temperature monitoring
devices are installed throughout the data centre to detect abnormal environmental conditions.
2.4 UPS Supply: UPS systems are installed to protect the facilities and computer equipment from
electrical power fluctuations and outages.
The Trident House campus in the IRE11 data centre comprises of a two storey office block (Phase I) with
an adjoining computer room and data/output handling area. There is also a separate single storey building
(Phase II) containing offices and another computer room. There is one main entrance to the Trident House
Phase I building and an entrance for the loading bay, and one main entrance to the Trident House Phase
Il building.
The IRE11 data centre component of the Trident House campus is composed of raised floor computer
rooms, office space and facility support (Un-interruptible Power Supply [UPS] systems, backup generators
and power distribution equipment). The IRE11 data centre is staffed with its own security guards, who are
on duty 24 hours a day, seven days a week (1.4). Physical access to the data centre can only be obtained
through the security officer's desk at the main entrance to the campus. The Trident House campus is also
equipped with Closed Circuit Television (CCTV) cameras, monitored by the campus security guards (for
all areas) and the Data Centre Operations team for all secure Data Centre computer rooms. These cameras
are located along the IRE11 campus perimeter, entry/exit locations, main entrances and additional strategic
locations within the secure computer rooms to help ensure complete coverage of the data centre (1.3).
The IRE11 data centre has developed and implemented data centre specific physical access security
policies and procedures to control access to the data centre and other sensitive areas, including computer
equipment and storage media (1.1).
The POL computing hardware and storage media is located in secure areas of the data centre facility with
access restricted to appropriate personnel through the use of an electronic card access system (SAFE);
the computer room employs keypad/PIN code technology as an additional level of access control (1.2). All
personnel are required to individually swipe in and where applicable, swipe out of an area using badge
card readers. "Piggy backing" off someone else swiping in, is prohibited. Attempts to enter restricted areas
without using authentication devices are denied and a security alert is triggered and logged. Data centre
management proactively follow up on security alerts that are triggered (1.6 and 1.7).
Access to the data centre is secured based on access provided to users based on their role via the
electronic card access systems (1.2).
This access system controls entry for all entrances/rooms as per the access provided to personnel, while
maintaining the security of the building.
Description of Fujitsu's System 14
POL00337569
POL00337569
FUSITSU
When an employee leaves the data centre, the access card is removed from the system database and it
would no longer provide access. Therefore, if cards are not retrieved, the security of a facility can be
maintained. Unique cards are issued for each employee, for individual control, accountability and tracking
of activity. Flexible control is accomplished by allowing each person the access to different areas, and
only at certain times.
An audit trail is provided for management tracking and reporting of who entered and/or left a particular area
at a particular time. Tracking of all access attempts is provided to allow management to determine if
employees are attempting to enter areas they are not permitted access to, or whether employees are
attempting to get into areas at times when they are not allowed access to those areas (1.6).
Visitor Access
Visitors (and initially new joiners who have not yet been issued their photo access card) are issued with a
visitor's access card. Visits to the IRE11 campus, and the issue of visitor access cards, must be recorded
in the local site visitors' log. The details must include: Date and time of entry, Name, Company (where
applicable), Person visiting, Unique number of the visitor access card and Time of exit.
Visitors should normally be escorted around Fujitsu sites, but they can be issued with an ‘unescorted’
access card, depending on the provisions in the Local Site Building Security Procedures.
The ‘escorted’ and ‘unescorted’ badges (and lanyards) clearly distinguish visually, which is which.
All access to the computer rooms is strictly controlled. To access the computer rooms, an individual must
first complete a request in the data centre on-line access request system to obtain approval from the data
centre facilities manager; if a valid reason has not been provided for multiple accesses, the access will
only allow the individual to access the data centre once. No access is granted unless a valid reason has
been provided and the on-line access ticket has been authorised (1.5).
All visitor access cards (common areas) are handed over to the issuer (normally reception or site security)
at the end of each day. All visitor access cards (computer rooms) must be handed over to the issuer (IRE11
DC Support team) at the end of each day.
Persons issuing visitor access cards (reception/site security/DC Support team) check the records to help
ensure that all visitor access cards are recovered at the end of each day. If cards are outstanding at the
end of the day, they will be electronically disabled and enquiries will be made to the person who has been
issued the access card, or the person they were visiting, for the return of the access card.
Monitoring of Individuals with Access to the Data Centre
The IRE11 Data Centre management and Fujitsu Group Security personnel periodically review reports of
user access levels to restricted areas of the data centre to determine whether user access rights are
appropriate (1.7). The managers of the various delivery teams are responsible for notifying the local site
facilities team of terminations or transfers of their direct reports. Upon notification of employment changes,
access through the security access control system is revoked and the card key and other physical access
devices are collected (1.8).
Environmental systems
The IRE11 data centre is equipped with environmental systems to safeguard POL's hardware and
information assets located within the facilities. The computer room is equipped with leak detection systems,
smoke detectors, fire suppression systems, handheld fire extinguishers and temperature monitoring
systems (2.1, 2.3). Condensing units, pumps, and chillers provide cooling for the data centre. This
equipment supports multiple computer room air conditioning units distributed throughout the raised floors.
The POL client servers and hardware equipment are mounted in locked racks or free standing cabinets on
the raised floors.
Description of Fujitsu's System 15
POL00337569
POL00337569
FUSITSU
Each computer room is supplied with separate commercial power feeds, each from a single power
generation substation. Separate diesel generators support each computer room and provide backup power
in the event that commercial power is temporarily unavailable. These generators are supplied with
additional fuel tanks that provide an operating window at full load. The power distribution equipment
consists of two uninterruptible power supply (UPS) systems providing conditioned power to a UPS Static
Switch. The UPS Static Switch provides power as the primary and alternate source of power to the
associated Static Switch Power Distribution Units (PDUs). The PDUs have dual feeds designed to provide
a seamless transfer in the event of a power loss (2.4).
The IRE11 data centre is monitored by a Building Management System (BMS) located in the Site facilities
office (monitored by the 3% party, ISS engineers) in the Phase I buildings within the data centre location,
with repeater heads located in the Security office and the data centre support team’s laptops. The BMS.
automatically alerts all three stations, if abnormal environmental conditions occur.
The ISS engineers and Security teams monitor the BMS system 24 hours a day, seven days a week; the
DC Support team monitor the BMS Mon — Fri (08:00 — 17:00), to provide rapid evaluation and response to
facility problems (2.3). Scheduled inspection and maintenance are performed on environmental protection
devices, sensors, and alarm systems (2.2). Maintenance checks are performed at varying intervals
dependent on the devices; however, devices are checked at least annually.
Backup
3. Control Objective 3: Controls provide reasonable assurance that programs, files and datasets
that have been identified as requiring periodic backup are backed up and retained.
Control
3.1 Backup Definition: The Backup High Level Design documents define the backup and recovery
requirements for each platform.
3.2 Backup Toolset: Backups are performed either using NetBackup or RMAN (automated tools)
for each platform.
3.3 Backups are written to a secondary location: Backups performed are written to a separate
disk array and are written to a disk array at the disaster recovery site.
3.4 Failed backups: Failed backups are logged as events in the Tivoli Works Scheduler tool for
SMC review and resolution.
The Solution Owner is responsible for ensuring that, in the event of accidental deletion or corruption of
data, the data can be recovered. The Platform Physical Design document will define whether a NetBackup
client is required and the Application High Level Design will define the backup and recovery policy and
method (3.1). The Solution Owner is also responsible for defining the archive and deletion policy as well
as the data that needs to be retained for audit purposes.
At the discretion of the Solution Owner, backups may be performed using Oracle RMAN or the NetBackup
based backup tools according to patterns defined in the Backup & Recovery High Level Design (3.2).
In the case of Oracle RMAN backups, the backup data is written to disk in a separate disk array. It is also
written to a disk array at the disaster recovery site (3.3). Those systems which have been identified as
requiring backups via the NetBackup solution will have their backups scheduled via the TWS scheduler.
TWS provides automatic monitoring of the status of the backups, and will have backups written to each
data centre to provide resilience in the event of a requirement to perform Disaster Recovery.
Depending on the size of the dataset to be backed up, either a direct client backup via the network may be
performed or a split mirror backup using standard features (clones and snapshots) of the storage arrays
which are presented to the backup media server. Data is written to a virtual tape library at both the primary
and the disaster recovery sites. No tapes are exported from the system unless specifically requested and
authorised.
Description of Fujitsu's System 16
POL00337569
POL00337569
FUJITSU
Note that in some circumstances, the recovery may by design be affected by replaying the data from an
upstream system rather than by performing a traditional "backup recovery" as many systems need to keep
a consistent view of each other and going backwards in time is not always appropriate.
The Backup Development team delivers appropriate NetBackup policies according to these definitions. The
Live System Test team reviews the delivered policies against the design requirement. If an RMAN backup
has been specified, the Live System Test application instance will perform those same RMAN backups.
The backup jobs are automated as defined by the Solution Owner in the Batch Scheduling High Level
Design and implemented by the Schedule Development team. If a backup does not complete or does not
backup all files it will exit with a failure status. Detection of failed backups is through job failure being
signalled to the Master Batch Scheduling system which raises events in a generic manner to the System
Management Centre (SMC). SMC uses the knowledge base) system to identify the appropriate team to
respond to the backup failure and pass a Triole for Service (TfsNOW) call to their call stack with a voice
prompt. Corrective action that is required beyond a simple rerun via the batch scheduler is planned TfsNOW
ticket is raised for approval. A mechanism exists to provide emergency approval by escalating to the Duty
Service Manager during out of office hours (3.4).
The backup and recovery methods are based on well-known industry standard solutions, and the general
operation was extensively tested during non-functional testing prior to HNG-X go-live. The responsibility of
the operational teams only extends to recovering data from virtual tape or clone images and performing
database recovery, such as archive log replay. There may subsequently be application support activity
required to return the service to an operational state. Recovery is tracked through the incident number of
the call raised for the original fault report, and is only performed when a TfsNOW has been approved by
Service Management. This same process is followed for all systems that may perform backup recoveries.
Recoveries for RMAN backups are performed by the DBA team that supports those databases. Recoveries
for NetBackup backups are performed by the Unix team. Recoveries from clones are performed by the
Unix or NT team depending upon the OS type of the target system.
Audit retrievals are happening on a fairly frequent basis driven by formal customer requests from POL.
Audit retrieval is tested as part of an upgrade or change to the audit infrastructure, such as firmware
upgrades of the ETERNUS CSHE.
Job Scheduling
4. Control Objective 4: Controls provide reasonable assurance that batch job processing is
appropriately authorised and scheduled and that deviations from scheduled processing are
identified and resolved.
Control
41 Maintenance of Job Schedules: Access to amend job schedules is restricted to appropriate
Fujitsu personnel.
42 Failed job schedules are monitored: Automated alerts are configured and sent to relevant
teams upon the occurrence of a batch job failure. These are investigated in line with the incident
management process.
HNG-X Job Scheduling
Jobs are scheduled within the data centre environment with the Tivoli Workflow Scheduler (TWS) which is
used to orchestrate the execution of jobs within the environment. Each vertical application has its own set
of tasks which are defined and TWS is used to schedule those and maintain the dependencies within that
application.
Description of Fujitsu's System 17
POL00337569
POL00337569
FUJITSU
The platform architect will outline the required jobs needed for that platform as part of the High-Level Design
(HLD) document. Changes to the required jobs would go to LST where the TWS schedule would be
checked against the HLD by the test team. The Unix team then implements the changes. SMC performs
day to day monitoring and management of the Tivoli toolsets.
If there are job errors/failures in the daily processing, alerts are sent to the Tivoli Business Service Manager
(TBSM) via TWS. These alerts are then identified as part of the SMC proactive monitoring of the TBSM
tool, further detailed in Control Objective 6 below. SMC will then raise a TfsNOW ticket to the Unix Team
based in IRE11 to investigate and resolve the job failure (4.2).
Access to maintain and amend schedules is restricted to the Systems Management Team (4.1). If changes
are required to the job schedule, it will follow the standard TfsNOW process described in Control Objective
8.
Availability and Capacity Management
5. Control Objective 5: Controls provide reasonable assurance that system availability,
performance and capacity are routinely monitored to help ensure that potential issues are
captured and investigated.
Control
5:1 HNG-X Performance Monitoring: The SYSMAN tools (Tivoli ITM and OEM) proactively
monitor CPU, Memory, Disk utilisation and capacity of internal services on the platforms,
raising alerts for investigation by the SMC as appropriate. Administrator access to the tools is
restricted to authorised users.
5.2 HNG-X Capacity and Availability Monitoring: The Tivoli ITM and OEM tools proactively
monitor the availability of Wintel, Oracle and Unix platforms, feeding platform availability data
to Tivoli Business Service Manager (via Netcool Omnibus) about the availability of platforms.
Tivoli Business Service Manager (TBSM) presents this data in a business context to the SMC,
highlighting service affecting issues. Administrator access to Netcool Omnibus is restricted to
authorised users.
5.3 HNG-X Monitoring of Service Delivery: A monthly Service Review analysis is provided to
POL to review details of capacity, availability and incident management performance against
the agreed service level targets (SLTs).
HNG-X Availability and Capacity Management
SYSMAN (Systems Management) is a generic name for the set of platforms and software that provide
System and Estate Management support to all HNG-X Platforms. This includes the capture of availability
information for the in scope platforms via the IBM Tivoli Monitoring (ITM) tool (5.1).
SYSMAN3 and SYSMAN4 (versions in use) comprises the following tools:
Tool Scope
IBM Tivoli Monitoring (ITM) Proactive monitoring of Data Centre Platforms.
Tivoli Netcool Omnibus Event collection from:
¢ Data Centre.
¢ Branch Estate.
* Networks (NNM).
e EMC Storage.
¢ Applications.
Tivoli Business Service Manager (TBSM) Presentation of alerts and events in a business
context.
Description of Fujitsu's System 18
POL00337569
POL00337569
FUSITSU
Tool Scope
Tivoli Provisioning Manager (TPM) « Data Centre software provisioning.
Tivoli Endpoint Manager (TEM) e Reference data delivery to Data Centre.
Tivoli Workload Scheduler (TWS) Monitors and controls workflow throughout the POL
infrastructure.
Tivoli Netcool Reporter Reporting Product for SYSMAN reports.
Oracle Enterprise Manager (Oracle Grid) (OEM) I Monitoring of Oracle Databases.
SYSMAN3 and SYSMAN4 collect events using Tivoli Omnibus and present this to the SMC team via the
Tivoli Business Service Manager (TBSM) tool, which provides views and alerts in a business context,
correlated to the application or system that is impacted (5.2).
Events collected by a SYSMAN version from the counter estate are sent to the Audit Server from the
SYSMAN platforms and includes details related to operating system and application.
Systems within the Data Centre are proactively monitored through the use of ITM agents which gather the
event data at regular intervals and measure the data against thresholds and raise alerts if the thresholds
are breached.
ITM includes operating system agents that alert on CPU and Disk space events. Databases are also
monitored using Oracle Enterprise Manager (OEM). Custom Agents are used within HNG-X to capture:
Radius Authentication Events.
Netcool Event Statistics.
BNS Statistics.
HNG-X Application Statistics.
SYSMAN feeds alerts into Tivoli Omnibus using event probes which include:
.
.
SNMP Traps.
Unix (Solaris and Redhat) Syslog probes.
Unix SyslogNG (Syslog Server).
Windows Event logs.
Text file (Application logs).
EIF Probe (Integration to Tivoli Monitoring ITM).
The SMC monitors the output from the Tivoli systems and raises appropriate alerts via the TfsNOW toolset
and where appropriate Knowledge Base (KB) fixes, incidents or major incidents are applied.
Access to administer the tools is restricted to authorised users.
The Fujitsu Problem and Incident Management team report the branch and central branch and central
network availability against the agreed SLTs including the ‘Branch and Counter’ availability as well as the
network availability on a monthly basis to the POL Service Management Team (5.3).
Description of Fujitsu's System 19
POL00337569
POL00337569
FUSITSU
Incident Management
6. Control Objective 6: Controls provide reasonable assurance that significant incidents are
adequately reported, tracked, monitored through resolution and resolved timely.
Control
5.3 HNG-X Monitoring of Service Delivery: A monthly Service Review analysis is provided to
POL to review details of capacity, availability and incident management performance against
the agreed service level targets (SLTs).
6.1 Incident policies and procedures: Fujitsu has documented policies and procedures for
managing incidents impacting the in scope applications which are available via SharePoint to
Fujitsu teams.
6.2 Incident prioritisation: Incidents are assigned a priority in accordance with the severity levels
agreed with POL.
6.3 Incident resolution: Incidents are resolved in a timely manner, as per the assigned priority.
6.4 Major & Security Incident review: Once a Major or Security Incident is resolved, a formal
closure and review is performed, including, if applicable, a Root Cause Analysis.
6.5 Incident reporting: On a weekly basis, the Fujitsu MAC Team reviews the number and severity
of outstanding incidents in TfsNOW.
6.6 Alert handling: The Tivoli ITM and Netcool Omnibus tools automate the collection of events
and feed them to the Tivoli Business Service Manager to highlight areas of concern to the
SMC.
Incident Management Process
Fujitsu Post Office Account (POA) applies its own implementation of Fujitsu's Corporate Incident
management process as agreed with POL (6.1). It has documented procedures for managing incidents
impacting the in scope applications which are available via the POA’s SharePoint site to Fujitsu teams.
These documents are also available on Dimensions and the key ones are Customer Service Problem
Management Procedure (SVM/SDM/PRO/0025), POA Incident Enquiry Matrix (SVM/SDM/PRO/0023),
POA Operations Major Incident Procedure (SVM/SDM/PRO/0001) and POA Operations Incident
Management Procedure (SVM/SDM/PRO/0018).
The process applies to all incidents raised by Fujitsu's POA Major Account Controllers (MAC) team or by
the System Management Centre (SMC) (out of hours or for systems monitoring tools), where they are
related to the Fujitsu outsourcing contract. Post Office Limited IT Digital Service Desk Team acts as the
primary service desk function of Post Office Limited (user entity).
Fujitsu has defined an incident as “any perceived abnormal or undesirable occurrence relating to the
Services” based on its contractual agreement with POL.
POL staff, e.g., Subpostmasters, either raise incidents with POL IT Digital Service Desk or POL's Network
Business Support Centre (NBSC) and, where relevant, they are passed via POL's IT Digital Service Desk
on to the Fujitsu POA MAC or SMC desks. Fujitsu raised incidents are logged and managed using the
TfsNOW ticketing tool for incident management. The POL IT Digital Service Desk raise incident tickets in
POL's ServiceNow tool which feed via an HDI link into Fujitsu's TfsNOW. Feedback and responses on the
POL IT Digital Service Desk raised incidents can be sent back to POL's ServiceNow over the HDI link.
Fujitsu POA incidents raised by the MAC/SMC teams are logged in Fujitsu's TfsNOW tool which are linked
to POL’s ServiceNow tool, as required. Fujitsu POA incidents raised that are for external third-party
suppliers to POL, are picked up by POL IT Digital Service Desk for them to manage the POL suppliers.
Description of Fujitsu's System 20
POL00337569
POL00337569
FUSITSU
On a weekly basis, the Fujitsu MAC team reviews the number and severity of outstanding incidents within
TfsNOW. The scope of the process is from the receipt of an incident by the MAC/SMC, through to the
successful workaround or resolution of the incident.
The key objectives of the process are:
e Log, track and close all types of incident requests.
e Respond to all types of incident requests.
e Restore agreed service to the business as soon as possible.
e Resolve incidents within the target timescales set for each priority level within the Service Level
Agreement(s).
e Ensuring incident priorities are linked to business/user impact and business urgencies.
« Keeping the user informed of progress.
e Reduced unplanned downtime.
e Improved customer satisfaction.
All incidents reported by ‘contact’ with the MAC/SMC desks, the POL IT Digital Service Desk, can transfer
incidents from POL’s ServiceNow tool into TfsNOW. A Contact is defined as TfsNOW incident transfer
from POL IT Digital Service Desk, voice, e-mail or a Tivoli Alert generated by the Tivoli Event Monitoring
tool as the methods of communication with the MAC or SMC and fall into the following categories:
e Business process error.
e Hardware (Data-centres) or software error.
e Request for information e.g., progress of a previously reported Incident.
e User complaint.
e Network Error.
e Logging via HNG-X web interface.
e Severity and Service Level Target (SLT) information.
¢ Evidence of an Error.
e System Alerts received automatically from transaction monitoring tools. Due to the urgent nature
of some of these alerts, they may be dealt with directly by the Fujitsu Software Support Centre
(SSC), with an update of workaround or resolution supplied to MAC/SMC.
The initial detection stage is the responsibility of the MAC and SMC, who receive calls from Users:
¢ Fujitsu Service Lines or Functions.
e POAIT Service Management.
¢ Third Parties.
e Fujitsu Service Delivery Management.
e POLIT Digital Service Desk.
Description of Fujitsu's System 21
POL00337569
POL00337569
FUSITSU
The main roles required by the process are:
e Incident Manager - To drive the Incident Management process, monitor its effectiveness and make
recommendations for improvement. The key objective is to ensure that service is improved through
the efficient resolution of Incidents.
e Major Account Controller - To provide a single point of contact for users, dealing with the
management of routine and non- routine Incidents, Problems and requests.
e Incident Resolver - To accurately diagnose and resolve Incidents and Problems within SLA, and
to assess, plan, build/test and implement Changes in accordance with the Change Management
Process. This role will typically be fulfilled by the support teams and service delivery units.
Once the details of the incident are recorded in TfsNOW the MAC/SMC team assigns a priority level to the
incident (POL IT Digital Service Desk assign incident priority before transfer to TfsNOW). If the call is
classed as a Security Incident or Major Incident, it follows a different route detailed in pages 24-27.
Incidents in TfsNOW are allocated a priority which should be aligned to the potential impact of the event
and the urgency. The impact of an incident is derived from a combination of its criticality (also known as
severity) and the number of users affected, whereas the urgency is calculated from the required speed of
resolution for the agreed Service Level Agreement for the service(s).
Alternatively, the priority maybe assigned using the information contained within the Knowledge Base (KB).
The Incident Management process contains four stages as detailed in the diagram below and ownership
passes between the various service lines and towers delivering the service.
>I Incident identification, classification and
5 prioritisation
8
E
gE ¥
28
ge 12 =
pats Investigation and diagnosis “5
22 Se
BS 85
os 52
gf Bs
se + g=
ge 3
z 8
Be 18 5:
SE «<—> > 82
ee Resolution and recovery Bo
ag a6
a Ls
2
=
e M
3
14
w >I Incident closure
Figure 5. Incident Management Process
Description of Fujitsu's System 22
POL00337569
POL00337569
FUSITSU
When a new TfsNOW incident is raised or received, the Knowledge Base is checked for KB information
about the issue which provides avoidance actions. Where applicable, a resolution or work around is applied
and details are linked to the parent Incident / error log for this known problem and the incident is closed. If
the incident is not resolved by either the MAC or SMC teams, the TfsNOW call is passed to the appropriate
Service Delivery Unit (SDU).
Incidents are first assigned a criticality value and then an urgency value based on the criteria listed further
below. Once these are determined, the incidents are assigned a priority value (1 - 5) (6.2).
Criticality Value (1-5)
Critical 1
High 2
Medium 3
Minor 4
(Cosmetic — Incident only)/Change (Incident & Problem) 5
Urgency Definition
1 e Has a significant adverse impact on the delivery of service to a large number of end
users.
e Causes significant financial loss and/or disruption.
e Results in any material loss or corruption of customer data.
For example, incidents with this urgency may affect the COMPANY.
2 e Has a moderate adverse impact on the delivery of service to a large number of end
users.
e Causes a financial loss and/or disruption to the customer which is more than trivial but
less severe than the significant financial loss described in the definition of an Urgency
level of 1.
For example, incidents with this urgency may affect a VIP SITE.
3 « Has a moderate adverse impact upon the delivery of service to a small or moderate
number of end users.
For example, incidents with this urgency may affect ALL COUNTERS IN A MULTIPLE
COUNTER BRANCH or a SINGLE COUNTER BRANCH.
4 e Has a minor adverse impact upon the delivery of service to a small number of end
users.
For example, incidents with this urgency may affect a SINGLE COUNTER IN A MULTIPLE
COUNTER BRANCH.
5 e Has no impact upon the delivery of service.
For example, incidents with this urgency may affect a SINGLE PERIPHERAL IN A
MULTIPLE COUNTER BRANCH.
If the incident is a known current issue, then the POL IT Digital Service Desk is advised of the status of the
incident and the TfsNOW parent incident is updated with the new child incident and the SDU(s) managing
the parent incident's resolution are advised of another occurrence of the issue. The SDU investigates and
diagnoses the incident, based on the information in TfsNOW, together with new information. The SDU also
coordinates where Fujitsu sub-contract third parties are involved.
Description of Fujitsu's System 23
POL00337569
POL00337569
FUSITSU
The SDU will produce a workaround or resolution for the incident. The SDU then either applies the
workaround or resolution or passes it to the MAC/SMC to implement following appropriate testing. The
parent incident record is the first incident for an issue in TfsNOW and is used as a tracking call for incidents
with child incidents.
The incident is then passed to the MAC/SMC to manage and when the call is resolved and this is agreed
with the person, team or third party who raised it the TfsNOW incident record can be closed. The MAC/SMC
team may request incident closure from the POA Duty Manager, e.g., where neither POA nor an external
POL third party has identified the underlying cause of an event which triggered an incident.
Throughout the incident life, the MAC/SMC retains ownership for monitoring and keeping the incident
logger informed of its progress, unless the incident is specifically software related, in which case SSC holds
the responsibility for confirming details of resolution.
The MAC/SMC manage the complete end-to-end incident process within the Fujitsu POA domain. Their
activities include:
e Regularly monitoring the status and progress towards resolution of all open Incidents.
e Proactively keeping the POL IT Digital Service Desk informed of progress.
« Monitoring Service Level target (SLT) information and escalating accordingly if an incident looks likely
to breach SLA thresholds.
Fujitsu is required to work to POL Service Level agreements and availability targets and not incident
resolution times (6.3). So Major incidents would be resolved in as short a time as possible, dependent on
the nature of the incident. The high priority placed on a Major Incident by Fujitsu's POA management team
ensures that the full resources required to resolve it are available and committed.
Major Incidents Definition
As a general rule, a Major Incident will always be an incident rated as priority 1 in the POA BU Operations
Incident Management Procedure document (SVM/SDM/PRO/0018), or a series of connected lower severity
rated incidents, which combine to have a significant business impact. However, not all incidents rated at
priority 1 qualify as Major Incidents. This is because the severity levels do not necessarily translate to the
global business impact on POL’s business. For example, a single counter post office which is unable to
transact, regardless of its business volumes, is rated as a priority 1.
A Major Incident can be triggered by a range of causes including network triggers, application/service
outages, hardware/infrastructure failures or security issues.
In the event of a Security Major Incident (which may also include PCI and GDPR Incidents), the POA
Security Operations Team (SecOps) must be alerted, see details below. The POA incident procedure
(SVM/SDM/PRO/0018) Appendix A and Horizon Security Business Continuity Plan (SVM/SDM/PLA/0031)
provides guidelines on potential security incidents.
Major Incident Process
An initial impact assessment of an incident is undertaken by members of the MAC team to determine if it
should be classified as a priority 1 incident, as described above. The POA Duty Manager ultimately decides
if the incident should be handled as a major incident. As a general rule the POA Duty Manager will
undertake the role of the Major Incident Manager and generally calls a Technical Bridge.
The POA Duty Manager will consult with the POA Business Continuity Plans to identify if the potential Major
Business Continuity Incident (MBCI) or MBCI triggers have been met and inform the POA Business
Continuity Manager if appropriate.
Description of Fujitsu's System 24
POL00337569
POL00337569
FUSITSU
With agreement from POA Senior Service Delivery Manager/s, or Duty Manager out of hours, a Short
Message (Phone text) will be sent to POA Management, and Fujitsu Service Delivery/Service Support team
managers as applicable, alerting to the potential existence of a Major Incident.
Generally, POL IT Digital Service Desk Team will be informed by POA Service Management of the Major
Incident, where impact is across domains.
Once a Major Incident is opened the relevant internal SDUs, Fujitsu teams and Fujitsu third party suppliers
are contacted to initiate investigation and diagnosis. A Technical Bridge (technical conference for Technical
experts and SDU's to discuss and analyse the incident and to formulate an action plan to restore the service
to POL without delay), which is managed as an internal conference call, is scheduled. This generally has
a standard agenda and all the relevant Service Delivery Units, support teams and Service Delivery
Managers (SDM) are invited. The Technical Bridge is technically focused and the Major Incident Manager
should document the activities and actions of the Technical Bridge so that a Major Incident Report can be
produced.
The Technical Bridge aims:
e Todiscuss and agree the recovery investigation & resolution of Major Incidents.
e To provide a forum for up-to-date progress reports.
« To aid communication and, if necessary, support the Technical Recovery Manager (TRM) in
producing a short term technical recovery plan and if appropriate longer term corrective actions.
These will be included in the Major Incident report. This ensures that Major Incident progress is
known by all, whilst also ensuring that all actions whether short term or long term is clearly stated.
¢ To collate information for inclusion on the Service Portal.
If the outcome of the Technical Bridge is that the Incident is determined Business As Usual (low) then an
SMS communication will be sent stating that the Incident is not a Major Incident, and the incident is then
resolved using the standard incident management process.
The Major Incident Manager will also distribute actions (provided by the Technical Recovery Manager
(TRM), following the Technical Bridge conference call. If during the Technical Bridge a clear recovery path
is identified, this is discussed and agreed on the call. Where co-operation or approval is required from POL,
and their third-party suppliers, the POA SDMs or Senior SDMs will contact them and request the approval
or assistance. Following agreement, the recovery is implemented.
After the Technical Bridge, the Technical Recovery Manager will liaise with the SDUs and/or Fujitsu third
parties to progress either the investigation or recovery. If no clear recovery path is identified, the decision
is then taken on whether to escalate for Service Bridge direction. Service Bridges conference calls are held
with Post Office Limited (and possibly their third suppliers).
The nature of the Major Incident determines which POA BU Service Team members and/or POL Managers
are involved in the Service Bridge.
The purpose of the Service Bridge is to:
e Provide appropriate direction on Incident resolution.
e Provide added impetus to restoration of service ASAP.
e Define communication intervals to Key Stakeholders.
e Provide focused Incident Management in line with the impact and severity of the Incident.
Once the Incident is deemed to be resolved, a final Technical Bridge is held to agree and confirm the
resolution of the Incident. The Major Incident Review date is set at the final Technical Bridge. SMS
communication is sent confirming resolution of the Incident.
Description of Fujitsu's System 25
POL00337569
POL00337569
FUSITSU
A Draft Major Incident Report is distributed within 24hrs of resolution of Major Incident (6.4). Once a Major
Incident is resolved there is a Formal Closure of the Major Incident and a review of the Incident including
consideration of:
¢ Lessons learnt.
¢ Incident definition.
¢ What went well?
e Timeline.
e Changes required to infrastructure.
e A review of the Major Incident Communication Procedure.
e Root Cause Analysis.
e Business impact.
¢ Action plan, including any changes requiring TfsNOWs.
e Service Improvement Plan update.
e Review service risk(s) and update Risk Register as appropriate.
Note: Where the underlying cause of a Major Incident is in a third party domain, e.g., a Fujitsu non-POA
team or POL third party supplier it is expected that they arrange the conference calls, hold the formal
closure review and produce the Major Incidents reports.
Security Incident Process
An information security incident is: "an adverse event or series of events that compromises the
confidentiality, integrity or availability of Fujitsu Services Post Office Account information or information
technology assets, having an adverse impact on Fujitsu Services and/or POL reputation, brand,
performance or ability to meet its regulatory or legal obligations." This also extends to include assets
entrusted to Fujitsu including data belonging to Post Office Ltd, its clients and its customers.
Fujitsu classifies Security incidents using one of two levels of severity:
e AMINOR incident will normally have limited and localised impact and be confined to one domain.
e A MAJOR incident will have a significant impact on the Network Banking Automation Community.
NB. For a Major Incident the POA Major Incident Process (SVM/SDM/PRO/0001) is followed.
Whenever a security incident is identified which presents a serious threat to conducting normal business it
is contained and isolated as quickly as possible.
A Security Incident can be notified to either the MAC or SMC Team then transferred to the SecOps call
stack, once it is initially assessed as a Security Incident by MAC/SMC.
Security Incidents may also be reported directly into the POA SecOps team via the reporting button on the
POA Portal. The initial report will be validated & clarified by SecOps, with calls made to the initiator if more
information is required. SecOps will follow team work instructions to progress their investigation.
All Security Incidents are reported to the SecOps team via a dedicated mailbox and escalated by phone if
necessary. Depending on the type of Incident and the severity of the incident, POA Security makes the
decision to escalate details to the POL Security and Fujitsu Central Security teams. In the case of Data
Centre incidents, POA Security also informs the Data Centre Manager if this has not already been done.
Description of Fujitsu's System 26
POL00337569
POL00337569
FUSITSU
Regardless of the severity of the incident, when a compromise in card data occurs, the incident is reported
to POL Security so that POL can comply with its contractual obligations with its card acquirer.
The investigation of a reported incident is carried out by a nominated investigator from the POA SecOps
team. POA SecOps team will work with POL Security Teams, as required.
When an investigation is closed, POA SecOps seek to ensure that details of the investigation have been
recorded and can be made available for Root Cause Analysis, trending & lessons learned (6.4).
Security Incident Trends and Checks
POA SecOps carry out a monthly check of investigations and create a summary report of security incidents
to the POL ISMF. This aims to inform POL of the security incidents raised for awareness and escalating
any major incidents identified.
These security incidents are also reviewed by POA Senior Management at the monthly POA internal
Information Security Management Reviews. Fujitsu Central Security team conducts trend analysis and
check for weaknesses which may need to be raised at future POL Information Security Management
Forums (ISMF).
Incident Reporting
The Fujitsu MAC/SMC Team reviews and reports the number and severity of all outstanding incidents in
TfsNOW. A weekly meeting is held between POL and Fujitsu for the review (6.5). On November 2021, the
weekly meeting has been cancelled by POL and reinstated since October 2022.
The Fujitsu MAC team reviews and reports the number and severity of all outstanding incidents in TfsNOW
in a weekly internal report. All POL related incidents are reviewed weekly and chased via the TfsNOW
incident management every 3 to 5 days. All outstanding incidents waiting for POL to progress have been
added to the monthly SMR pack for review (5.3). Any incidents which require additional progression are
chased via email into POL on an ad-hoc basis.
Alert Handling
As mentioned in the Control Objective 5 process narrative above, The ITM and Netcool Omnibus tools
monitor the platforms for availability and feed the alerts logged in TBSM for SMC review (6.6). Incidents
are only logged in TfsNOW for alerts that trigger a status change, which then follow the incident
management process described above.
Network Incident Management
Incidents relating to network problems are managed using the standard incident management processes
and controls described above.
Networks
7. Control Objective 7: Controls provide reasonable assurance that networks are managed to
contractual and site requirements, monitored for availability and response times and issues are
identified, tracked and resolved.
Control
5.3 HNG-X Monitoring of Service Delivery: A monthly Service Review analysis is provided to
POL to review details of capacity, availability and incident management performance against
the agreed service level targets (SLTs).
71 Network performance criteria: Network availability and performance requirements are clearly
defined between Fujitsu and POL in the Network Service policies and network service is
measured and monitored using these agreed service levels.
Description of Fujitsu's System 27
POL00337569
POL00337569
FUJITSU
Control
7.2 Network change management: Network changes are managed using the standard Fujitsu
TfsNOW process which includes authorisation, testing (where deemed appropriate) and
approval prior to deployment.
7.3 Network availability monitoring: Network availability is monitored using several tools, which
send automated alerts to the System Management Centre (SMC) if key components are
unavailable, or if traffic levels breach predefined thresholds.
74 Network incident management: Incidents relating to network availability are managed using
standard incident management procedures.
Network Service Description
POL defines the network services it requires from Fujitsu in the Central Network Service description
(SVM/SDM/SD/0012) which define the following (7.1):
¢ The Service definitions.
e Availability Requirements.
e Service levels targets.
¢ Assets and license.
e Dependencies and Interfaces with other Operational Services.
e Post Office Dependencies and responsibilities.
e Business Continuity.
« The Documents set supporting the Service.
Provision of the Network Service
Fujitsu provides network services to POL using its Network teams. These teams provide technical support
and implementation for the following products and platforms:
e The Post Office Account Network team based in UK (UK Networks Shared Services) and Pune
supports Cisco Routers, Switches, Load balancers and Firewalls.
e Aseparate team also based in Warrington supports the Intrusion Detection System (IDS) and proxy
servers (McAfee Web Gateway & Bluecoat Proxy SG).
e Acentralised Network Toolset Specialist Services (NTSS) overviews and administers the network
toolsets.
Wide Area Network Services are provided through a number of third parties depending on the circuit or
communications requirement.
Controls operated by these third parties are outside the scope of this report.
Network Change Management
Fujitsu follows the TfsNOW change management structure for all changes to network equipment as
described below in Control Objective 8 for the review period (7.2).
Network Availability Monitoring
Fujitsu has its own dedicated SMC team to monitor the availability of Network Services to POL using
TfsNOW to raise problems or incidents to the Network, Firewall or IDS teams for resolution which, where
applicable, follow the standard Incident management process described in Control Objective 6 above (7.4).
Description of Fujitsu's System 28
POL00337569
POL00337569
FUSITSU
Networks are monitored by POA SMC team for availability via the Spectrum and Netcool tools which send
automated alerts (7.3). For these alerts, a corresponding incident ticket is raised by the SMC team for
NTSS to resolve.
Network Service Monitoring
The Fujitsu Problem and Incident Management team report the central network availability against the
agreed SLTs on a monthly basis to the POL Service Management Team (5.3).
Overview of Network Technical Design
The Network that Fujitsu provides to support its services and applications to POL is divided into the
following at the top level:
e IP Network Space Data Centre Networks.
¢ Transit Networks.
e Wide Area Networks.
As shown in the diagram below. Note that branch networks is under Verizon's responsibility.
lent Systems Post Office Systems Fujitsu Support Sites Test Sites
COC oe
Client — PO Support Client PO Suppor FS
onz I ouz oN falercampus OME mz I OMz
ert rat rival
Normal data att
==+Backup data pathe==
v4 \
Primary ie) jSecondary
Data J Data
Branch OMZ Centre Branch DMZ Centre FJ Demarcation
Verizon Branch WAN
= 5
GPRSIEDGE Receiver
Router & Dish
BroadBand VSAT
Branch
Branch
Figure 6. Network Design
Testing is provided through the standby data centre for Live System Test and Solution Validation and
Integration during normal operations. This test support would cease, if the standby data centre was
required to act as the primary. Under normal business as usual conditions, the traffic is segregated between
the production and test environments by means of various physical devices and logical means of separation
as appropriate. Change Management is strictly controlled through a variety of internal change & release
processes and procedures — see Control Objective 8 below for more information on change management
for network components.
Description of Fujitsu's System 29
POL00337569
POL00337569
FUSITSU
The network is divided into 11 Security Domains. The term Security Domain is defined to mean a collection
of platforms and network components grouped together based on type, perceived vulnerability and risk
rating. Even so, it may be necessary to restrict traffic between platforms in a common Security Domain
(intra-domain traffic) through the implementation of logical separation, (using VLANs), or physical
separation, (using separate network segments in the same domain).
Any traffic which crosses network domain boundaries (inter-domain traffic) must pass through an
enforcement point that restricts data flow based on its source, destination, protocol, port, type or content /
format. This can be a firewall, router or other in-line control point. (i.e., the control is physically part of the
data path).
The diagram below illustrates how Network Domains fit within the Network tier model.
Figure 7. Network Tier
Network Domains are the basic building blocks for enforcing security in the Network.
The Domain structure places a logical ring around the logical Security Perimeter of the HNG-X Network in
the data centre, which extends beyond the data centre in some cases and is protected by means of IPSEC.
VPN technology using access lists to allow specific classes of traffic to enter HNG-X. The perimeter can
be best described as the collection of devices managed (or monitored) by Fujitsu Services. At the boundary
of these managed devices are firewalls (hardware or software-based), and the perimeter will be secured
according to firewall guidelines laid out in ARC/NET/ARC/0001.
Network Asset Management
Network Assets are managed through Cisco Prime Inventory along with an offline hardware inventory
register. Hardware and Software maintenance is on a business case basis and is based on business
availability targets.
Description of Fujitsu's System 30
POL00337569
POL00337569
FUSITSU
Change Management
8. Control Objective 8: Controls provide reasonable assurance that modifications to system
software and networks are authorised, tested, approved, properly implemented and
documented.
Control
8.1 Change management: The TfsNOW toolset is used to manage all changes with a joint
decision between Fujitsu and POL as to which parts of the tool are relevant for a change.
8.2 Change approval: All changes must be authorised by the Fujitsu Change Owner, with the
approval being documented in the TfsNOW toolset. Changes that cause major service
interruption or are a significant risk must also be authorised by the Change Advisory Board
(CAB), with approval being documented in the meeting minutes and within the TfsNOW change
record.
8.3 Emergency Changes: A change deemed necessary in order to resume live service will be
agreed, approved and documented on TfsNOW emergency change record. Updates are
communicated to POL at an agreed timeframe dependent on the severity of the incident.
Types of Changes
All operational changes are raised via TfsNOW toolset and subject to the TfsNOW change process (8.1).
Key change types that fall into scope for this process are listed below:
e Normal Change — Any change which is not classified as an emergency or standard change (e.g.
large-scale change to the service or service infrastructure, catalogue service or administrative
change of known low impact). This will include minor changes (minimum of 24 hrs prior to
implementation) & significant changes (minimum 5 working days prior to implementation & in line
with POL CAB).
e Standard Change — A standard change is a pre-defined and pre-approved change by POL Change
Management following the initial standard change approval process, where authorisation is
provided via CAB and changes added to the POL standard change catalogue. These are regular
& predictable changes that have been proven to be successfully implemented a number of times
with no history of unplanned impact.
e Emergency Change — Immediate action required in relation to a P1/P2 incident including
changes that are required to prevent a major incident (MI). Where time doesn't allow a change to
be raised & approval is granted on an MI Bridge, a retro emergency change would be logged
retrospectively within 24 hours of the change taking place.
These changes include POL authorised project work with Fujitsu. Changes made by POL 3” Party or POL
Network Partners are supplied by POL and are then recorded in TfsNOW for visibility of these changes.
The change management TfsNOW operational change process uses the Fujitsu TfsNOW toolset to
progress the change through control gates which are described below.
The TfsNOW toolsets are secure and auditable (at both system and user levels with time stamping being
employed). As changes are made to a change record and it progresses through the control gates listed
below with permissions and ownership of the change recorded at the various stages.
Both POL and Fujitsu change control teams participate in tailoring the questions in the TfsNOW toolset to
enable the relevant information to be obtained for POL’s internal change process. This helps their network
partners and third party suppliers assess a Fujitsu-controlled change for risks and impacts. These controls,
along with the KPls established by POL to monitor the TfsNOW toolset information standards for quality,
timings of the notice of the change, help to ensure the efficient and effective control and management of
operational change.
Description of Fujitsu's System 31
POL00337569
POL00337569
FUSITSU
Once a change is ready to be implemented, it becomes subject to the TisNOW change management
process. Change Advisory Board (CAB) approvals are obtained for major changes before deployment can
begin, with approvals documented both in CAB meeting minutes and within the TfsNOW.
Achange goes through following stage gates before being implemented to production:
e The request for the change from POL (projects).
e Costs and Impacts are sent to POL and approved or rejected (projects).
e If accepted, then a set of Requirements is jointly agreed with POL (projects).
e A project is initiated and project plans drawn up (projects).
e Architecture, High Level Designs and Low Level Designs and interface documents are written and
where appropriate discussed with POL.
e Development of Code is undertaken (projects).
e Code is tested by development (projects).
« TfsNOW is used to record and authorise BAU changes also (Operational changes).
e TfsNOW systems record the assessment by other potentially impacted teams to determine risks
associated with the change in their area (Operational Changes).
« TfsNOW systems contain a plan of the change (Operational Changes).
e¢ The POL CAB's review helps to ensure (Operational Changes):
o changes meet the governance requirements;
o changes do not overlap with other changes;
o that the change has considered any group or associated further risks and impacts by doing
the change; and
othe POL CAB follows the standard CAB process where it defines:
= Attendees.
= Sign off or rejection or associated actions.
= Recording and issuing of minutes from the CAB.
= Updating the TfsNOW toolsets with the CAB decision.
e The Change Manager is responsible for the following (Operational Changes):
o Reviewing and ensuring process conformance.
e If the above are in place, the designated change owner approves the change within the TfsNOW
system to proceed and implement the change (Operational Changes) (8.2). An approval note is
added automatically in the notes of the change once the change owner approves the change.
« Output of the change is confirmed via the Post Implementation Review (PIR) task before the
change is sent for closure.
In summary, TfsNOW is a Fujitsu toolset that allows a securely accessed, time stamped auditable system
to record change, provides Service Delivery Units and Service owners with audit trails and gives reasonable
assurance that modifications to software and infrastructure are assessed for risks & impacts. The changes
are approved by the Change owner, are assessed by appropriate methods and teams, and are approved
to be deployed to a live environment subject to testing results, they are implemented by the authorised and
approved teams and the changes are documented into new or existing documentation.
Emergency Changes
Emergency changes are progressed if there is a service incident. This will be documented in a TfsNOW
change record.
A service-affecting incident calls for a Technical Bridge which is convened (see the Incident Management
section in Control Objective 6) to analyse the cause and impacts of the incident. This team will include
service managers, an incident manager and technical staff. Any change deemed necessary in order to
Description of Fujitsu's System 32
POL00337569
POL00337569
FUJITSU
resume live service will be agreed and authorised and documented during the incident along with updates
to POL at an agreed timeframe dependent on the severity of the incident.
The TfsNOW change record will be sent to POL Change Management for approval as outlined above (8.3).
Project Changes
9. Control Objective 9: Controls provide reasonable assurance that new or modified application
software development efforts are authorised, tested, approved, properly implemented and
documented.
Control
9.1 System Development and Maintenance policies and procedures: Fujitsu has a formal
Systems Development Life cycle (SDLC) which incorporates phases including initiation,
Requirements, Definition, Design, Development, Deployment and Maintenance.
9.2 Change Governance: Depending on the nature, changes must either be approved by the
Change Control Board (CCB) before progressing into development, or by the Peak Targeting
Forum (PTF).
9.3 Design Proposal: Projects requirements are outlined in the Commercial Work Order (CWO)
and if justified, within a (CSP) Customer Solution Proposal, (PSD) Project Solution Design
documents or (FSR) Feasibility Study Reports, as applicable, that is stored in Dimensions and
is reviewed and approved by POL and Fujitsu management.
9.4 Change Testing: Changes are tested in line with the defined procedure.
9.5 Ability to implement changes: Only appropriate individuals have access to move code builds
between environments or promote transports to live. Segregation of duties is enforced between
users able to develop and implement changes respectively.
9.6 Approval to implement changes: POL approval is required to promote application software
changes to the live environment. Approval is captured within the relevant TfsNOW tool.
Fujitsu’s change management process consists of two components - Project Changes and Business as
Usual (BAU) changes. Project Changes relate to the delivery of new or changed services and BAU
Changes to Operational changes to the live service provided to POL (9.1).
Project Changes for HNG-X
External requests for changes are raised by POL on a Request to Quote (RTQ) and provided electronically
by Service Now to Business Change Management (ChM) and allocated to a Change Owner and converted
into a Change Proposal (CP) by Fujitsu.
All CPs are initially triaged (including where appropriate CPs indicate that they have the Design Authority
Board or DAB approval), reviewed and impacted by Programme teams. Impacts are returned to ChM where
they are collated and shared with the Change Owners.
Once reviewed, CPs will be presented to the Programme Change Control Board (PCCB) for agreement to
progress the CP. The PCCB typically meets weekly. The PCCB is chaired by ChM and brings together
representatives from a wide range of functions potentially affected by proposed changes. For urgent CPs
or those that meet certain criteria, CPs can be presented straight to the Change Control Board (CCB).
Once the PCCB has assessed and agreed the progression of a CP, it will be tabled for presentation to the
CCB along with the associated Change Work Order (CWO). The CCB consists of the Account management
team, with a recommendation from the PCCB as to whether the CCB should approve or reject it (9.2).
Description of Fujitsu's System 33
POL00337569
POL00337569
FUSITSU
The CCB typically meets weekly. Change Owners are required to attend to be able to sponsor the change
detailed in their CP/CWO. The CCB consists of members who represent the key functions within the
Account to help ensure that if the CWO is accepted for implementation, it will:
¢ Commercial/Finance
o Have no adverse financial or commercial implications.
o Notincrease the overall risk to the Account/Customer contract and Service commitments.
« Customer Service
o Be operationally supportable and will meet the Account's service obligations.
e Development
o Be developed to the required quality level.
« Architects
o Beconstrained within the overall architectural solution and is technically viable.
e Quality and Compliance Management
o Not inhibit the Account in exploiting future business opportunities for the Account and its
Customers.
o Comply with applicable contractual obligations and legislative standards agreed with POL.
The Delivery Executive (or delegate) and a quorum of the CCB members are required to be in attendance
for a CCB to be able to reach a decision on CPs.
Minutes from both of these meetings showing approval of the CP or agreement to progress to CWO are
held in Dimensions (Project Change database).
Once the CCB has approved a change the following occurs:
e Ifthe change is internal the Programme team is advised, time codes and plan activities are set-up
and work can start.
e If it is external, the CWO will be submitted to the customer (electronically) and POL reviews the
change and then once successfully approved (by both parties by electronically signing the CWO),
the Programme team is advised, times codes and plan activities are set-up and work can
commence.
Project Changes are allocated unique numbers and logged within a database (Dimensions) and updated
accordingly. These can be viewed by all members of the team working on that project but can only be
updated, edited and actioned by members of ChM.
All Minutes from the Change Boards (PCCB and CCB) and action points from the same are recorded in
the change history of the change vehicles in the database. Comments and decisions around the changes
are also logged in the change history.
Approvals from the CCB and POL for Contract Change Notifications (CCNs) and CWOs are documented
in the relevant change history, as well as the artefacts being actioned to an approved state.
Projects for HNG-X
Fujitsu follows its Corporate Methodology outlined in the diagram below to deliver a project to POL. Each
project has clear requirements, is designed, tested and deployed prior to its acceptance into the Live
Production Estate. All projects are assigned a Project Manager to deliver the specific project with oversight
of all projects by the Programme Director.
Description of Fujitsu's System 34
POL00337569
POL00337569
Design & Testing Deployment
Development
Customer
Change
Figure 8. Project Lifecycle
The diagram below shows an overview of the design and builds methodology used by Fujitsu to define,
design, develop and deliver a project into the POL production environment.
NPS ecmevoesousounon ——oesennorvon
Dev Code Build! Test Support
(PGMPAS/PROI0003)
Figure 9. Design and Build Method
Description of Fujitsu's System 35
POL00337569
POL00337569
FUSITSU
Definition
POL defines projects according to their business needs and provides these to Fujitsu with the documented
requirements and acceptance criteria.
Requirements
Requirements are managed within Fujitsu by the Requirements manager.
POL defines a requirement baseline as a Business Requirements Specification (BRS) or as part of the
Commercial Work Order (CWO). The BRS and/or CWO will contain the Acceptance Criteria.
Where applicable, a (CSP) Customer Solution Proposal, (PSD) Project Solution Design and (FSR)
Feasibility Study Reports are written to show how these requirements will or can be implemented (9.3).
The CSP or PSD contains three key elements:
e The Work Packages that are built to deliver the project.
e The Monitoring Criteria for the project and stipulated service delivery requirements after go live.
The FSR describes the relevant alternatives to the proposed implementation including the relevant
impact of each implementation.
Design
Application Development for the in-scope applications will be performed by a range of Fujitsu teams
depending on the nature of the project.
SDLC Methodology
HNGxDBM Design, Development and Build Method lifecycle was derived from the Fujitsu corporate
Applications Design Methodology (ADM), Infrastructure Design Methodology (IDM) and Test & Validation
lifecycles (9.1). This is the SDLC currently used by Post Office Account (POA) team to modify existing or
develop new applications for Post Office Limited (POL). It is defined in the standard document sets that
are specific to the in-scope applications.
Application Development for the in-scope applications will be performed by a range of Fujitsu teams
depending on the nature of the project.
High level designs (HLD) and Low-level designs (LLD) are the way Fujitsu meets the relevant Design
Proposal requirements and these are stored in Dimensions or SharePoint. The HLD's and LLD's for HNG-
X projects are approved by one of the approvers defined in PGM/DCM/ION/0001 (9.3).
Code Build and Test
The Application Development Manager is responsible for the delivery of the code for the project or
maintenance release. Code is developed and built in a segregated environment using appropriate source
code repositories e.g. subversion for storage and then deployment from the Dimensions CM tool via
Baselines containing checked in code content, and the management of changes associated with its
delivery. Each project will have a Lead Developer or SME who will work with the Development manager to
assign the packages of work and allocate these to developers. The Development manager will also produce
their own project plan to track progress and development of code, its testing and any documentation that
needs producing or updating. Code will then be produced within the context of this project plan.
Ageneric code review template or an automated code review tool, Crucible, is used to review the code and
using this it is then peer reviewed by the Lead Developer or Subject Matter Expert until any outstanding
issues are resolved. The resulting review document is stored in SharePoint or the Crucible tool itself.
Description of Fujitsu's System 36
POL00337569
POL00337569
FUSITSU
Individual developers are responsible for producing unit tests which are then peer reviewed by a developer
or subject matter expert where possible (in rare cases this maybe the same person). The developer will
develop and execute the unit test, depending on the development methodology used
(Waterfall/Agile/Blended) the unit test is then stored in Jira/SharePoint/Dimensions. The subsequent code
(if applicable) is then tested on the Component Integration Test rig (CIT) for a few cycles until all defects
raised are fixed and re-tested. A build of code is then produced at the end of this and uploaded into
Dimensions to produce a Product Version Baseline for the application or its subcomponents.
Not all applications can be tested in CIT due to the rig’s limitation or offshore security restrictions as this is
not a formal test environment, as a result some applications can only be tested on the SVI/LST test
environments.
Integration and Test
HNG-xX has 2 test streams responsible for testing software changes to the live estate:
e Solution Validation and Integration (SV&I):
o Testing against Requirements - Functional and Non-Functional covering business and
infrastructure and based on testing the complete integrated solution.
o Has End-to-End capability for testing with 3rd parties e.g., Merchant Acquirer.
e Live System Test (LST):
co Final pre-production proving and release deployment validation.
The development-written test automation framework (documented in DEV/APP/SPG/1208) has been
deployed into the SV&I environment to support testing. This automation framework offers the benefits of
unattended execution and allows the expansion of the automation suite to encompass a larger share of the
regression test overhead.
Testing uses Quality Centre (1 April 2022 to 30 June 2022) as the test management tool and Peaks for
defect management. Quality Centre interfaces with Peak which is the POA Development Defect
Management System:
e Adherence to gateway criteria such as test stage entry criteria.
As of July 2022, Quality Centre was replaced by Zephyr as the test management tool, however, it does not
interface with Peaks.
Entry into each test stream (or test cycle within test stream) will be subject to review against a pre-defined
and agreed set of entry criteria. These criteria are set by the Test stream manager. Similarly testing within
each stream will not be considered complete until the testing is adequately reported and a resolution path
for all outstanding issues is understood (9.4):
e Progressive, incremental development, testing and acceptance.
Each test cycle is subject to entry criteria acceptance. Quality Centre or Zephyr is used to store and
measure progress against project requirements. An assessment of requirements coverage is produced
towards the end of test completion. This feeds into the Acceptance Process which is a joint board (with
POL) with agreed criteria for acceptance.
SV&I Testing Process
Test Analysis is based on requirements and high level designs. Test cases are documented in Quality
Centre (QC) or Zephyr and details are extracted into a High Level Test Plan for each release. This
document is reviewed via POA document management.
Entry into Test Cycles is controlled by Test Readiness Reviews. Test Execution is recorded in QC or Zephyr
and defects are recorded within Peak.
Description of Fujitsu's System 37
POL00337569
POL00337569
FUSITSU
Daily and Weekly reports are produced using QC or Zephyr to produce statistics e.g., test coverage. After
the last cycle of testing (pre LST) a report is produced covering the full release.
LST Testing Process
Testing is controlled via the Release Management team.
Release planning sessions identify maintenance test slots and Peak Targeting Forums (PTF's) assign
defects into appropriate maintenance releases.
Release Management engage with test via Release Notes and Deployment plans.
LST puts test plans together which are stored in SharePoint and once testing is complete, these are
updated with results. LST assess test results and determine a release sign-off or release rejection position.
The final document is attached to the release peak which is returned to Release Management.
Acceptance
The Acceptance phase is managed by the Acceptance manager. The Acceptance manager will review the
progress of the testing teams in completing the testing specified for each acceptance criterion in the design
proposal/CWO (9.6).
The results of testing are summarised in the Release Acceptance Meeting (RAM) presentation.
This is then reviewed and discussed internally to assess the status of Acceptance, including Acceptance
Incidents. An acceptance incident is where the acceptance criteria has been tested and is either not met
or partially met.
The Release Acceptance Meeting (RAM) held jointly with POL will then review the results of Testing and
agree on how to progress the Acceptance Incidents and overall whether the project as stand-alone entity
is ready to be implemented.
Subsequent to the Release Acceptance Meeting (RAM) is the Release Authorisation Board (RAB) where
POL are asked to confirm that everything is ready to enact deployment plans for the Release.
The Release Acceptance Meeting (RAM) and Release Authorisation Board (RAB) meetings are typically
held as one joint meeting.
The RAB considers approving deployment based on whether:
e The Release has passed the Release Acceptance Meeting (RAM).
e That Fujitsu Service teams are ready to support the new services/functionality.
e That Post Office Service teams are ready to support the new services/functionality.
e¢ That communications to interested parties e.g., Subpostmasters, POL’s partners (such as Verizon,
Accenture, DXC) and Fujitsu's third parties
The decisions around Acceptance (RAM) and Authorisation to deploy (RAB) are documented in the minutes
of the RAM/RAB meeting and held in Dimensions in the form of the Release Acceptance Report (ACS.
document).
Once these approvals are in place, the project can be implemented into production.
Deploy and Support
Release management is based around the use of three documentation tools, Dimensions, Peak and
TfsNOW change management process, and three delivery tools, Dimensions and Tivoli Provisioning
Description of Fujitsu's System 38
POL00337569
POL00337569
FUJITSU
Manager (TPM) and BigFix End Point Manager (9.5). TPM is used for operating system deployments
whereas BigFix is used for application software deployments. A ticket will be created in Peak for each
change or element of a project. The PTF meets on a weekly basis to review the open Peak tickets and
groups these into deployment groups of typically, no more than 20 Peak tickets.
Development creates a Product Version Baseline (PVB) to group software at a component level and this
is effectively what is placed into production on the successful completion of the relevant testing.
Development will then perform unit, component and integration testing as outlined above. Once this is
successfully completed, they will use one of the standard tools to create a build package which is placed
in Dimensions.
Integration creates a Deployable Product Version Baseline (DPVB) from the PVB and tests that the
baseline package is capable of being deployed into the existing software / hardware environments and
can be regressed off of the Integration testing rig as well as doing some basic functional testing. Once
this has taken place and the baseline package is deemed fit to further progress into the testing
environments, the DPVB is made available to Release Management. Release Management control the
deployment of the packaged software (DPVBs) to SV&I for project functional testing with POL and other
third parties, or, if it is for current system maintenance for existing software security or minor bug fixes, it
will be implemented identified by a LT suffix in the LST (Live System Test) and Live by using a
combination of Release Notes generated in Peak and TfsNOW for change control.
The Release note (RN) will be passed to Software Configuration Management (SCM) to move the software
onto a staging server and then passed to the Deployment teams in Ireland (Unix and NT) to upload to the
deployment servers (TPM and TEM). TfsNOW is used to authorise deployment to the servers in the Data
Centres. SCM is the only team with access rights to move software from Dimensions to staging server and
the implementation teams are the only teams with access rights to upload the software to the deployment
servers and then deploy to the Data Centres (9.5).
The approvals to move the change through the various stages (both Fujitsu and POL approvals) are
logged in TfsNOW tickets and are typically copies of emails pasted into the TfsNOW ticket and does not
use formal workflow-based sign offs (9.6). The authority and ability to move the change into production is
given to the deployment team when Release Management assigns the TfsNOW and the release note
ticket to the deployment team.
Once the deployment is complete, the Release Note Peak ticket and the TfsNOW Change ticket will be
closed by the Change Manager.
Post Implementation
Monitoring and Review
Fujitsu Project Managers monitor and control projects throughout their lifecycle through the following:
Weekly Project report to Post Office Project Managers
A collated reporting pack issued to the Post Office Project Managers showing the delivery RAG (Red,
Amber, and Green) status, Executive summary, key milestones, dependencies, risks and issues for each
of the Project deliverables and/or Releases, as applicable. In addition, financial spend is also reported on,
with the report offering a view of Project Actuals and Forecast to completion.
Steering Committee Reporting (with Post Office)
For key programmes, presentation of a collated reporting pack to Post Office showing the RAG status,
Executive summary, key milestones, dependencies risks and issues for each of the key Releases that are
currently in Delivery. The Steering Committee consists of key stakeholders from Fujitsu, POL and POL’s
third parties.
Internal Weekly POA Transformation Steering Board
Description of Fujitsu's System 39
POL00337569
POL00337569
FUJITSU
Presentation of a collated reporting pack to the senior Fujitsu Post Office Management and Fujitsu
capability units showing the RAG status and Executive summary, plus any matters relevant at that time,
for each of the Releases that are currently in Delivery.
Network Change Management
All Network changes are considered in accordance with established Fujitsu operational practices. All
changes require an approved design, all changes must be impact assessed by all business and technical
stakeholders, an implementation plan is provided, and a change window is agreed and acted on. The
system used by Fujitsu for change management is the TfsNOW system. Full details of the change
management are in the section above.
All documents concerning the architecture, design, service delivery, monitoring and review of POL
networks are stored in the appropriate Fujitsu's document repositories Dimensions or SharePoint.
Exceptions to Fujitsu Change Management Process
The exception to this process is Reference Data which is supplied by POL for onwards transmission to the
POL Branch Counter estate via the Fujitsu network and is subject to a POL authorisation / POA to release
and having followed the POL / POA reference data testing process which is designed and managed by
POL.
Security
10. Control Objective 10: Controls provide reasonable assurance that access to system resources,
including computing platforms and operating systems, is restricted to properly authorised
individuals.
# Control
10.1 Client Security Policies: Security requirements for infrastructure and software are designed,
documented and agreed by both POL and Fujitsu.
10.2 Baseline Operating System Standards: Platforms in operational use have defined baseline
standards that document their set up and configurations, as agreed by Post Office Limited.
10.3 Baseline Operating System Standards Implementation: Platforms in operational use are
set up and configured in line with documented and agreed baseline standards. Variances from
the baseline standard are fully documented and appropriately approved.
10.4 User (Fujitsu) Set-up and Amendment: Fujitsu users requiring new or modified access to
Post Office Limited systems are set up appropriately after approval by an appropriate Fujitsu
line manager.
10.5 User (Fujitsu) Deletion: Access to Post Office Limited systems for Fujitsu users is removed in
a timely manner.
10.6 Periodic User Reviews: Fujitsu reviews user access to systems on a monthly basis to
determine the appropriateness of access, and changes performed as deemed necessary.
10.7 Two-Factor Authentication: Access to POL systems is controlled using two-factor
authentication.
Policies and Procedures
Fujitsu employees adhere to the over-arching Europe Security Policy Manual (ESMP001/A) which is
1S027001 compliant. This policy manual outlines the responsibility for the identification of risks to
information security arising through the activities it undertakes and the services it provides, and for the
implementation and operation of appropriate countermeasures to manage those risks down to an
acceptable level and in line with best practice. The policy addresses security based upon an understanding
Description of Fujitsu's System 40
POL00337569
POL00337569
FUSITSU
of the organisation's security objectives, an analysis of security risks and a suite of properly aligned and
managed controls in the areas of:
e Organising security.
¢ Human resources.
e Asset management.
e Logical access control.
¢ Cryptography.
« Physical and environmental security.
e Secure operations, Communications management.
e Information systems acquisition.
e Development and maintenance.
e Supplier relationships.
e Security incident management.
e Business continuity management and Compliance.
The Community Information Security Policy (CISP), SVM/SEC/POL/0005, is a contract reference document
which provides guidance from POL regarding information security for those responsible for initiating,
implementing or maintaining security for POL infrastructure. The document describes end-to-end security
management process and physical and technical requirements for the in scope systems. This document is
authored by POL and shared with relevant third parties. Fujitsu is required, where appropriate, to adhere
to the requirements outlined within the document.
The ARC/SEC/ARC/0003 document provides a technical standard to the architects and designers to assist
them in implementing and maintaining the solutions they provide to POL (10.1). The ARC/SEC/ARC/0003
is reviewed in line with customer requested changes in the contract.
General System Security Settings
Each Operating System and Database in use by Fujitsu to support HNG-X (e.g., Windows, Red Hat Linux,
Solaris, Oracle), has its own High Level Design (HLD) documentation in place. This sets out the required
settings and configuration specific to that Operating System (OS) or Database (DB) at a high ‘requirement
driven’ level (10.2).
A corresponding Low Level Design (LLD) document details the OS or DB specific configuration settings
needed to meet the requirements set out within the HLD document. These configuration settings are fully
documented at a granular level, for example including extracts of OS/DB configuration code and
initialisation files (10.3).
The HLDs and LLDs are established based on the security hardening guidelines provided from the
manufacturers of their products in line with industry standards.
Both the Operating System/Database HLD and LLD are subject to mandatory review and must be approved
by relevant approval authorities documented within Dimensions. All new device builds must conform to
specifications set out within the HLD and LLD. Any changes to configurations must be reviewed, risk
assessed and approved by POL prior to the configurations being implemented or updated.
New devices must be set up in line with the HLD for the required OS/DB. If an HLD does not exist (for
example if a new server type is being implemented), an HLD document must first be created, reviewed and
approved by the individuals defined in the Reviewers and Approvers Role Matrix. This document is owned
Description of Fujitsu's System 41
POL00337569
POL00337569
FUSITSU
and managed by the Fujitsu Document Manager. This document is reviewed upon changes to include key
members of staff, i.e., major document owners, as well as on an annual basis.
Platform Physical Design (PPD) Document
Each infrastructure element is initially set up from an agreed baseline configuration. Elements of the
infrastructure (for example servers) are grouped by type — based on the role they perform within the IT
environment — this is defined within Platform Hardware Instance List which is managed and maintained by
Infrastructure Lead on the Post Office Account. An example of this is ‘ACD’, a server type for servers
providing active directory services for support staff. Each server type has its own technical requirement,
and a PPD document is created by the Solution Architects detailing these requirements. The PPD sets out
exact hardware specifications, software requirements and configuration requirements for that particular
device type.
In short, the PPD sets out the exact requirements that a server must cater to, prior to it being set up. Before
a server is set up, the PPD must be reviewed and approved by the individuals defined in the Reviewers
and Approvers Role Matrix.
There is an entry for each server instance within Platform Hardware Instance List stored within Dimensions
and this also includes a link to the PPD that was used to initially set up that server. Note that this is a historic
document, and remains a record of the initial server configuration rather than necessarily reflecting its
current state.
Technical Interface Specification Document
As part of a project where a POL third party is involved, both POL and the third party agree a technical
interface specification that defines the connectivity between the third party and Fujitsu managed
infrastructure. This document is stored within Dimensions, once formally agreed by Fujitsu, POL and
relevant third parties. This is a historical document that is updated upon changes in requirements of the
discussed interface. Changes will have to be agreed by Fujitsu, POL and relevant third parties.
Baseline Implementation
A combination of the aforementioned documents dictates the initial configuration of a server added to the
Fujitsu POL account estate which is determined by the solution architects. It is then the responsibility of the
network and application architects to register application software and products to the identified hardware.
A baseline is then sourced and configured using the aforementioned documentation. This configuration is
uploaded into Dimensions. This step in turn creates a Package Virtual Baseline (PVB) for the platform. The
discussed platform is then set for “Ready for Build” within Dimensions.
The task is then handed over to the Integration Team. It is the responsibility of this team to convert the
discussed PVB into a Deployment Package Virtual Baseline (DPVB). This includes a number of packaging
exercises, as well as rigorous unit testing. Once a DPVB is established, server definitions are outlined by
the Integration team — essentially deciding which DVPB is applied to the differing technologies within the
platform.
In order to deliver the DPVB into the Fujitsu managed POL estate, the DPVB is handed to Release
Management who are responsible for ensuring the outlined configuration is applied to the appropriate
technologies. They will formulate the release note(s) for application of the DPVB to both the test and
production environments - the team manages the overall release process from receipt of request for
delivery of PSPID/DPVB to authorising deployment for all test rigs and live. The Release Management
team act as an escalation point area for the test team for issues falling within the Release Mechanism.
Once the relevant TfsNOW records have been raised to issue the platform, the release note will be
delivered to the relevant Core Service Delivery Unit (Core SDU) — in this case either the Windows NT or
UNIX teams. It is the responsibility of the Core SDU to action the release note. They will apply the DPVB
to the appropriate technologies, initially to a test rig which will be handed over to the test team.
Description of Fujitsu's System 42
POL00337569
POL00337569
FUSITSU
The test team will accept rig handover from Core SDU and begin their testing procedures — comprising of
a composition of High Level Test Plans which will act as the base for any Error Logging and Test Reports
that are produced once testing is complete. The final sign off from the test team results in liaising with
Release Management and the Core SDU to agree deployment of fixes, top-ups or to schedule a rig rebuild.
They will also liaise with Service Delivery Teams and POL to agree deferments, if applicable.
Once testing sign off is received, the release note will then be passed back to the Core SDU will deliver the
baseline via TPM to the relevant technologies.
Changes of Configuration to Existing Infrastructure
Once a device is set up, configured, and added to the Fujitsu infrastructure following the process detailed
above, its configuration remains static until the need for a configuration change is identified. The server
configuration is not updated by default when (for example) the relating OS HLD or LLD documents are
modified. Configuration changes made to in-service devices must follow change/incident management
processes described elsewhere in this report (include obtaining approval from POL).
The exception to this rule is for the application of standard OS/DB patches and security fixes, which Fujitsu
are (in many cases) contractually obliged to apply. Such patches do not bypass approval, as they are
reviewed by a Patch Approval Board (PAB) (attended by POL) prior to their application.
Changes to in-service infrastructure configurations can be identified in a number of ways, for example:
e Change Projects.
e New Application Development.
e Patch Application.
¢ — Infrastructure Refresh.
e Fixes identified through the Incident Management process.
Note that these changes follow the formal change and incident management processes described in this
report.
Password Settings
Password configuration requirements are defined in Fujitsu Systems Access and Passwords (EBMS
Security Toolkit) supplemented by the POA password policy rules defined within the POA Privileged
Account Policy, and/or the relevant baselines for infrastructure components. Any exceptions are recorded
and authorised by POA SecOps Passwords on relevant platforms and directory servers are stored in a
one-way encrypted form and are protected against substitution or dictionary attack.
User Administration
The principle of “least privilege” is used to restrict the access rights of users whether human or non-human.
The User Access Process details how access is gained to both physical and technical assets within the PO
Account and Fujitsu supporting functions and is managed by a POA Security Operations Team (SecOps).
New Joiners/Transfers
Detailed below are the steps that must be followed when an individual joins Fujitsu and POA, or joins the
POA from another area within Fujitsu which are shown in the Figure 10 below (10.4).
Description of Fujitsu's System 43
POL00337569
POL00337569
!
l
T
I
I
I
I
i
Figure 10. User System Access Process Flow for New Joiners, Movers, Transfers and Access
Amendments
The Assignment Manager will complete the latest New User Access form from the POA Security Operations
(SecOps) with all required information. The completed form is returned to CSPOA via email.
POA SecOps will check the form to ensure it has been completed correctly, and in line with Fujitsu Security
Policy. Once both the correct New User Access Form and the GDPR agreement have been received, POA
SecOps will arrange all relevant access to be set up for the user by e-mailing the relevant system owners
(e.g., Windows NT Team, Unix Team, etc.) and requesting user access to be set up. A TTSNOW call will
be raised for back-end system requirements and a copy of the completed request form will be attached to
the TTSNOW call, where required.
Once System Owners configure the user, they will update the TfsNOW call on completion of this
configuration. POA SecOps shall then close the TfsNOW call and update the register.
Leavers
The steps that are followed for an individual leaving Fujitsu Services and the PO Account are shown in the
figure below of the user system access flow for Leavers (10.5).
Assignment managers must submit a Leaver form as soon as possible prior to user leaving Fujitsu and/or
the POA. The Assignment Manager must complete the latest Leaver Form from the POA SecOps Portal
with all information required and return to CSPOA via email.
POA SecOps check the form is completed correctly, and in line with Fujitsu Security Policy. POA SecOps
notify the relevant system owners (e.g. Windows NT Team, Unix Team, etc.) via email, and where backend
system access is held, a TfSNOW call will be raised and progressed to the system owners requesting
revocation of access.
Once System Owners remove the user they will update the TfsNOW call on completion of this configuration.
POA SecOps will then close the TfsNOW call and update the register.
User Access Review
The POA User Management and CSPOA Teams undertake a monthly review of the access granted to
individuals and its continued appropriateness (10.6). POA User Management Team produce details of all
users contained in the register and their access levels and communicate these via email to the relevant
Description of Fujitsu's System 44
POL00337569
POL00337569
FUSITSU
Line/Assignment Managers. Line/Assignment Managers review the listing and consider whether any users
require their access to be amended by providing the details to POA User Management Team within 15
working days of receipt of the original e-mail. CSPOA performs an audit of access rights and roles with
each functional area; the results of which is presented at the monthly Team Access Review meeting with
POA User Management.
A more detailed access verification check is conducted monthly, specifically for Production Privileged
Access. CSPOA produce details of all users with Privileged Access and email these to the relevant
Line/Assignment Managers. As part of this monthly verification process, segregation of duties is also
checked to ensure there are no segregation of duties issues e.g., due to changes to a user's role or
responsibilities.
Information Security Management Forum
The Information Security Management Forum (ISMF), as organised by POL, is a formalised monthly forum
where Post Office and Fujitsu Security operations discuss governance matters and issues/risks are raised
and progressed with the necessary stakeholders. The purpose of the meeting is to:
e Tohelp ensure the early identification of issues together with timely & effective resolution by those
attendees with functional responsibility.
e Review Security Operations monthly reporting on common security control objectives e.g., Patch
& Vulnerability Management; Anti-virus/Malware etc. as agreed between Fujitsu and Post Office.
The Security Operations monthly reporting pack will be compiled and circulated in advance of the forum by
Fujitsu. This pack will include:
e Monthly summary
e Security Incidents raised in reporting period
e Operational security
e Security Event Analysis (in reporting period)
e Systems end of life status
e Privileged user access accounts
¢ Other matters.
User Authentication Technologies
A separate Active Directory (AD) forest is deployed for each of the environments: Systems Validation &
Integration (SV&I); Live System Test (LST); and Production. The SV&I, LST (collectively described as Test)
and Production environments are deployed on common infrastructure but are logically separated by virtual
LANs, virtualised services, access controls and firewalls.
Fujitsu employees have a corporate laptop that includes VPN software and cryptographic keys. The laptop
permits access to the Fujitsu corporate network and authenticates the user with a corporate user ID,
password and VPN key tuple.
Each support user has an HNG-X AD user ID and password. The user is issued an iKey hardware token
by POA Security Operations. The token contains a client certificate used to identify and authenticate the
user to the HNG-X Production or Test environment. The client certificates are issued by the HNG-X
Production or Test certification authority (CA). The combination of local physical access or remote VPN
access, user ID, password and a multi-factor authentication (MFA) token provides the support user access
to the Windows Terminal Server within the HNG-X environment (10.7).
The Windows Terminal Servers provide a virtual desktop environment and support a limited number of
applications the user may execute. The applications may themselves require further authentication. The
Description of Fujitsu's System 45
POL00337569
POL00337569
FUJITSU
support user's role (defined by AD groups and access permissions) restricts the user's access to platforms
and applications. The Windows Terminal Servers do not run core business applications; they only provide
the ability to connect the support user to other servers.
User logins to Linux servers are unprivileged. To gain additional privileges, the user must, if authorised,
use the Sudo command. AD incorporates the permitted Sudo privileges and distributes them via the System
Security Services Daemon (SSSD) process. Sudo use is logged.
TACACS supports the authentication, authorisation and accounting for support access to network (primarily
Cisco) devices. TACACS is not integrated with AD so user accounts are stored locally within the TACACS
servers. A designated team manages the network equipment and in order to access a network device, a
user must have already authenticated to a Windows Terminal Server as described above. The network
devices are further restricted to accept interactive support connections from the terminal and network
management servers. TACACS also limits the commands users can run on the network device according
to their role.
Access to Databases, Data Files and Programs
11. Control Objective 11: Controls provide reasonable assurance that access to databases, data
files and programs is restricted to authorised individuals.
# Control
11.1 Patch Management: In-scope platforms are maintained with vendor released security updates
and patches in line with agreed procedures and timescales.
11.2 System Administrators: Access to perform system administrator functions is restricted to
appropriate Fujitsu personnel.
11.3 Database Administrators: Access to administer POL databases is restricted to appropriate
Fujitsu personnel.
11.4 Administration Tools and System Utilities: Access to administration tools and system
utilities on Fujitsu managed infrastructure is restricted to appropriate Fujitsu personnel.
11.5 Unauthorised changes are monitored: The TripWire system is configured to monitor and
alert on changes made to in-scope applications and underlying data within the HNG-X estate.
11.6 Access to Data Files/Programs: Access is restricted to production program and data files
through the use of user groups to restrict and allow access.
Patch Management
Fujitsu's POA SecOps and the Service Delivery teams (SDT) subscribe to relevant vendor information
feeds to receive details of patches from vendors that provide critical operating systems, applications,
databases and network equipment to POL.
Details of patches are reviewed and documented in the Patch Deployment Spreadsheet. This spreadsheet
is stored within a secured SharePoint site only accessible by authorised individuals.
The Deployment Spreadsheet is reviewed by the SDTs and Application Support teams on a regular basis
(minimum monthly or as required for critical vulnerabilities); they assess whether the patch applies to
equipment they manage. They will then update the spreadsheet with the reasoning behind their decision
to apply, or not apply a patch in readiness for submission to the Patch Approval Board (PAB (11.1)).
The PAB consists of members of the Applications and Multi Cloud Services division, Application Delivery
and Support Team, Operational Security Team and a POL Security representative. The PAB is held on a
monthly basis. The PAB will review the Patch Deployment Spreadsheet and seek agreement on the patch
set to be deployed and in what timescale (e.g., deploys patches as an emergency fix or include at next
release).
Description of Fujitsu's System 46
POL00337569
POL00337569
FUSITSU
System Administrators & Database Administrators
System or Database Administrator user management controls are only implemented once appropriate
approval has been obtained for access to various sites and systems. The user management database
utilised by the POA SecOps holds details of all the support teams and the system access the team
resources have (11.2 and 11.3). This database is monitored on a regular basis to provide assurances
against contractual requirements and obligations against the Unit's Roles, Responsibilities and Access
Requirements.
Access and resources in the teams are reviewed and confirmed as appropriate on a monthly basis by the
line managers (11.4 and 11.6). The POA SecOps provides a monthly report for privileged users and
presents at the monthly ISMF with POL.
Throughout Fujitsu managed infrastructure, the same authoritative source of authentication and
authorisation data is used to manage access control for all operational support users. The purpose of this
approach is to:
1) Reduce the number of passwords required for support purposes.
2) Help ensure better audit and logging facilities for authentication and authorisation.
3) Streamline the process for adding, changing and removing authentication and authorisation
information.
4) Provide a standard method of authentication and authorisation throughout the estate.
Database access control also requires individual role-based accounts for each class of user, both for
controlling the actions a user can perform and for helping to ensure administrative and other actions are
traceable to an individual to provide a valid and informative audit trail.
The main classes of users will be:
1) Application — Accounts used by applications for database access to either Oracle or SQL Server
Databases.
2) System Administrators - Operational support users with responsibility for managing the database
systems.
3) Database Administrators — Operational support users with responsibility for specific databases.
4) Non-administrative Database support users - Operational support users with responsibility for
specific databases.
Unauthorised Changes are Monitored & Reviewed
Tripwire compares files and directories against a baseline database of file locations, dates modified, and
other data. It generates the baseline by taking a snapshot of specified files and directories in a known
secure state. After creating the baseline database, Tripwire compares the current system to the baseline
and reports modifications, additions or deletions (11.5). Tripwire ensures the integrity of critical system files
to POA SecOps who monitor the console.
On a monthly basis, the POA SecOps reviews alerts that have been raised from Tripwire. Monthly reports
are produced detailing alert statuses and a root cause analysis for each alert. In cases where no alerts are
raised within the month, a report may not be produced and this will be noted within the next month's report.
Description of Fujitsu's System 47
POL00337569
POL00337569
FUSITSU
External Threats and Access Violation Management
12. Control Objective 12: Controls provide reasonable assurance that networks and system
resources are protected from external threats and access violations are detected, reported and
investigated.
Control
6.4 Major & Security Incident review: Once a Major or Security Incident is resolved a formal
closure and review is performed including, if applicable a Root Cause Analysis.
12.1 Firewall Configuration Access: Access to set-up and configure firewalls is restricted to
appropriate users from the Fujitsu Security Delivery team.
122) Configuration Changes: Changes to firewall configuration follow the standard Fujitsu TisNOW
process including authorisation, testing (where deemed appropriate) and approval of changes
before they are implemented.
12.3 Anti-virus software: Anti-virus software is installed on critical Windows and Red Hat Linux
network platforms as agreed with POL. Installed anti-virus software is up to date in line with
agreed contractual requirements.
12.4 Intrusion Detection System (IDS): IDS is installed on critical network segments as per POL
contractual requirements to detect threats and alert the Fujitsu ATC Team.
Overall Network Security Design
Within each Data Centre, the POL network is segmented following the Security Domain model. The
Security Domain model provides a framework for the network architecture and designs, such that the flow
of data around the network is controlled following the principle of least privilege. The applied segmentation
is furthered developed within the Network Architecture document and Network High Level and Low Level
Design documents — stating the specific details that have been configured on the network.
The purpose of network segmentation is to reduce the possibility of a potential attack. By restricting the
‘attack surface’ to a limited number of systems, damage caused as a consequence of the attack, can be
kept to a minimum.
The network segmentation is achieved using a combination of physical and virtual controls. Dependent on
the Security Domain and specific contractual agreements with third parties, the network segmentation is
enforced using VLANs, IP's, proxy servers and Stateful Inspection Firewalls, ACLs, AES Encryption and
physical separation.
Network segmentation will also be used to provide separate environments. Each test environment will be
separated from other test environments, as well as from the live environment. This will be enforced through
the use of Firewall and Router access control lists, VLAN restrictions and user and network access control.
These controls will be monitored using the event management system to verify that access control lists and
configuration settings are not changed in a way that may allow a network path from one environment to
another, except under strictly controlled conditions.
Firewalls
Direct access between the internet and systems or system components in areas of the network that have
been classified as “sensitive” is prohibited and all traffic is routed through a DMZ - a logical sub network
that contains and exposes Fujitsu's external-facing services to the internet. Firewalls are configured to
perform stateful inspection in that, only established connections are permitted to connect to the network.
Perimeter firewalls and router components are configured to mask internal addresses to the internet using
NAT and PAT technologies.
Description of Fujitsu's System 48
POL00337569
POL00337569
FUSITSU
Access to set-up and configure firewalls is restricted to appropriate Fujitsu Security Delivery personnel
(12.1). TfsNOW process is followed to raise rule set changes to firewall configurations (12.2). Upon
operational change process invocation, an appropriate deployment plan is uploaded to the file store within
the TfsNOW system which is subjected to peer review prior to deployment, this plan is also used to facilitate
change regression, if appropriate.
Should any protocols that have been deemed as insecure be required to be included in the configuration
then additional information must be supplied that details the security features that have been implemented.
Rule Set Review Process
In order to verify the current configuration of network security enforcement devices that manage the POL
estate, all configurations are manually inspected at least monthly.
Authorised firewall configuration elements in relation to network security enforcement are documented in
the document SVM/SEC/STD/1985 which is stored securely in Dimensions. This document is compared
against the appropriate device's active configuration and helps to ensure these are in line with the
recommended standards in the document. SVM/SEC/STD/1985 is updated when operational
configurations are changed through the completion of TfsNOWs. As such, SVM/SEC/STD/1985 reflects
the secure elements of appropriate operational devices at all times.
If discrepancies are found between the recommended configuration within SVM/SEC/STD/1985 and the
operational configuration, they are then investigated to determine whether the environment has been
compromised or not and also ascertain why the correct process was not followed.
The SVM/SEC/STD/1985 document is updated every month to keep it up to date.
Anti-Virus Software
The ESET Anti-virus product is a real-time protection tool and performs automatic, scheduled and manual
scans on all managed platforms, in order to identify, contain and eliminate the spread of malicious code
(12.3).
For the in-scope Wintel systems, real-time file system protection is implemented. All files are scanned for
malicious code at the moment they are opened, created or run on any computer.
For the in-scope Linux systems, an on demand daemon has been created using the ESET SDK that can
scan files as they are transferred through the respective platforms. ESET is not installed on UNIX (Solaris)
systems, by agreement with POL.
In cases where a specific vulnerability or virus stream constitutes a high risk threat to the systems, a
scheduled scan is set up from the management console and the client configuration updated accordingly.
ESET provides regular updates of both, signatures and engines. For engine updates, these are distributed
to clients using the existing Tivoli software distribution management system after having been verified and
tested in the test environment to help ensure that no system functionality is compromised by the updates.
The ESET AV System is based on a central Management Server (ERAS) where all the updates (signatures)
are stored and managed. ERAS receives the updates from ESET, via an Internet connection, and makes
them available for clients to install.
Whenever a virus, vulnerability or suspicious event is detected, the ESET Antivirus system will react
according to a configuration that will be enabled using ESET antivirus policies. The workflow describing the
process followed is as follows:
1. Windows
a. Onaccess (read, copy, execute, etc.) every item will be scanned by the AV system.
Description of Fujitsu's System 49
POL00337569
POL00337569
FUSITSU
2. Linux
a. OnDemand scanning is performed by the ESET Scanner Daemon.
3. If a threat is identified, the AV system will try to automatically clean the item. If the cleaning is
successful, an alert event is logged in the ESET Notification manager - which has the ability to take
actions when configurable alerts are identified within the ESET environment. This functionality
provides an integration point between ESET and the Tivoli Netcool event system. The ESET
Notification Manager is monitored proactively by the POA SecOps.
4. If the cleaning is not successful, an alert event is logged and an incident is raised in TfsNOW, with
alerts going through to SMC to start a remediation action (refer to Control Objective 6 above for
further information around the incident process):
a. If development is needed to solve the issue, a Peak is raised.
b. A fix is produced and assessed according to normal procedure:
i. If the fix is rejected, a risk is raised on the Risk register.
ii. If the fix is approved, the fix is deployed on Test and Live environment.
The following is a diagram of the workflow to be applied. Tivoli and KBs are integrated with ESET in order
to automate the alerting process in the event of a High/Critical virus being identified by ESET, and start the
appropriate remediation activities.
Possible raise
PEAK if
development
is required
a \
, \
a \
Aleit to x
Tivoli
m and Assess Deploy
—Scan—eI Virus. I Yes} raise call -——}*°5°° I Deploy] PFEN
via TFS.
and
raise
Incident
Reject fix
Raise Risk on
Risk Register
Figure 11. AV Scanning Process
Intrusion Detection System (IDS)
Network-based intrusion detection is deployed as part of the HNG-X Data Centre and infrastructure. This
provides notification of an attempted compromise of systems within the Data Centre, through malicious
activity or malicious code (12.4).
The traffic paths to be monitored were identified by risk assessment during the IDS design phase and are
documented in the IDS Appliance Low Level Design (LLD) document (DEV/INF/LLD/0051). As part of the
system design process for new services, additional paths may be included in the monitoring with updates
to the IDS Appliance LLD as required.
The appliances allow the monitoring of multiple physical network segments from a single appliance. The
appliances are designed to prevent traffic flowing between sensor ports, i.e. it is not possible for the
appliance to act as a Router and connect networks, thereby bypassing other security controls.
Description of Fujitsu's System 50
POL00337569
POL00337569
FUSITSU
In addition to raising alerts of malicious activity, the IDS sensors send event logs into the secure event
management service, to provide an audit trail and to enable additional event correlation with Firewall,
Router and other network device logs.
To reduce processing overhead on core HNG-X systems, Host Based IDS (HIDS), is not deployed. The
inherent security of the platform foundation builds, the hardening process, the implementation of file and
process auditing, the network security controls and the implementation of anti-virus on Windows platforms
significantly reduce the need for HIDS. This decision came from POL, since POL felt that HIDS could affect
business transactions at critical business times.
Traffic types that are not inspected by the IDS are:
e SSH traffic originating from the SAS servers to the Counters.
e SSH traffic originating from the SAS servers to the Campus (Data Centre), servers.
e SSH traffic originating from the network management group connecting to the Branch Router.
Any use of other support tools such as Session Control Protocol (SCP) or SSH File Transfer Protocol
(SFTP) are also logged to ensure an audit trail is available in the event of an incident.
For the purposes of IDS coverage, it is assumed that this is acceptable to Post Office Information Security,
as the encrypted traffic is tightly access-controlled and is only permitted between specific end-points.
Access control is enforced at both the platform level and the network level through the use of strong
authentication and restrictive firewall rules.
The intrusion detection system ensures that any false positives and false negatives are reduced to a
minimum. Additionally, intrusion attempts are investigated by the ATC (Advanced Threat Centre) Team
and alerts raised as a result of failed attempts to logon or to access data with invalid permissions. The
Incident Management Procedure and Security Incident Management Work Instruction documents are
updated accordingly.
Distributed denial of service (DDOS) attacks are considered to be a low risk for the HNG-X system as it
operates as a closed network system and therefore the possibilities of attack from the Internet (the most
significant threat source), although present, are very low. However, to ensure that such attacks do not
originate from within the HNG-X infrastructure or through connections to and from third-parties, all edge
routers and firewalls are implemented with denial-of-service protection. In addition, the segmentation of the
HNG-X WAN and Data Centre LAN ensures that a successful denial of service attack is extremely difficult
to perform.
Daily high alerts and attack type reports are produced by the IDS for POA Security Operations team's
review and reference.
As notified to POL, as of January 2022, McAfee Intrusion Detection system sensors have reached their
end-of-life service. Signatures are still able to be downloaded but the vendor could change this at their
entire discretion. A project to implement a supported solution has been commissioned by POL.
Description of Fujitsu's System 51
FUSITSU
POL00337569
POL00337569
3.4 Third Party Considerations
We have detailed in the table below the third party considerations whereby additional contractors and sub-
contractors (acting as agents of POL) are responsible in part for delivery of particular services relating to
the ISAE 3402 controls. These additional third parties are not considered subservice organisations for the
purposes of ISAE 3402 audit opinion since Fujitsu do not outsource any controls and each third party POL
agent works independent of each other with separate contractual outsourcing arrangements with POL.
ISAE 3402 Control
Third Party
Relationship to Fujitsu and/or POL
6.3 Incident Resolution
Incidents are resolved in a
timely manner, as per the
assigned priority.
Dxc
Verizon
As part of the Tower Model service
delivery model, DXC manages the End
User Computing (EUC) Tower unit. Fujitsu
is not responsible for EUC support but can
be called upon to support incident
investigation if required.
POL's IT Digital Service Desk hosts the
front desk operations for POL's branches
and head office users and has taken
ownership for 1% level support calls.
Verizon are responsible for hosting POL's
network.
8.1 Change management
The TfsNOW toolset is used
to manage all changes with a
joint decision between Fujitsu
and POL as to which parts of
the tool are relevant for a
change.
POL
Dxc
Verizon
During the change request process,
approval is required for certain types that
impact the POL estate and, in some cases,
approval is also required from other POL
agents and third parties.
Description of Fujitsu's System
52
POL00337569
POL00337569
FUJITSU
3.5 Complementary User Entity Controls
In designing its system, Fujitsu has expected that certain complementary controls would be implemented
by POL, or POL's agents to achieve certain control objectives included in this report. There may be
additional control objectives and related controls that would be appropriate to the processing of POL's
transactions that are not identified in this report. POL should review its contract with Fujitsu to reinforce its
understanding of the scope of services provided by Fujitsu and hence the relevance of the controls
described and tested in this report.
This section describes other internal controls that should be in operation at POL (including POL third
parties) to complement the internal controls at Fujitsu. POL’s independent auditors should consider
whether the following internal controls are present and operating effectively.
e Physical Access
Controls should be established to:
o Appropriately restrict access to terminals, workstations, and other computing equipment at
POL sites or other locations (e.g. staff homes or POL 3" party suppliers), which can also
allow access to infrastructure located in the Fujitsu data centre.
o Request and approve non Fujitsu employee access to computer rooms in a manner that
limits access to only those employees requiring it based on job function.
« Computer Operations
Controls should be established to:
o Approve additions, modifications or deletions to scheduled jobs (including backups) if
necessary.
o Inform Fujitsu of critical scheduled jobs and the appropriate escalation procedures for
those jobs.
o Data Retention requirements are documented and agreed with Fujitsu.
o Periodically, request restores from backup to validate that programs, files and data are
recoverable.
o Formally agree with all third parties access boundaries to POL’s IT infrastructure.
e Availability and Capacity Management
Controls should be established to:
o Define SLAs for availability, capacity and performance management in the agreement with
Fujitsu.
o Review and take action on reports on availability, capacity and performance management,
supplied by Fujitsu, where required.
« Networks
Controls should be established to:
o Review network performance statistics (e.g., response time, availability) periodically and
that the service levels received are in compliance with the service levels specified in their
contracts.
o Compare metrics in network availability and performance reports to user experience to
determine whether availability and performance statistics are accurate.
o Formally agree with all third parties access boundaries to POL’s IT infrastructure.
o Ensure that POL agents with TIS interfaces provide the correct requirements and controls
for secure connectivity.
Description of Fujitsu’s System 53
POL00337569
POL00337569
FUJITSU
« Change Control
Controls should be established to:
o Ensure that application changes follow a formal change process and are approved by
relevant parties involved for the change (e.g. POL's clients, other third party suppliers, etc.)
on a timely basis.
o Ensure that requests for Fujitsu to implement changes to systems come from authorised
individuals.
o Ensure that a POL representative participates in, or has input to, the system development
activities that are relevant to POL, including participation in testing activities, if applicable.
o Ensure that POL individuals who are permitted to authorise firewall changes have an
understanding of the impact the change has and they carry out a risk assessment prior to
authorising a change.
e Logical Access
Controls should be established to:
o Ensure and implement procedures and documentation for authorising user access to
terminals and application functions exist.
o Periodically, review access granted to users at the application layer, to confirm that such
access remains appropriate based on users’ job functions.
o Implement procedures to ensure additions, changes, and deletions in client organisations’
personnel and their associated job responsibilities are authorised and communicated to
Fujitsu in a timely manner (if applicable). Where it is the responsibility of POL to remove
users, POL should implement procedures to review that all leavers are removed in a timely
manner.
o Ensure where Fujitsu is asked to implement compensating controls to address situations
where infrastructure cannot be configured to meet agreed baselines (e.g. additional
monitoring controls), ensure they are comfortable that such controls are being operated
whether it be by Fujitsu or POL’s employees or contractors.
co To prohibit the use of shared user IDs or user IDs whose passwords are not changed on
a regular basis.
o Advise POL employees regularly of the importance of security and to report suspicious
personnel, transactions or activity to management.
o Implement procedures to review operating system configurations to ensure settings
provide adequate security, particularly where security parameters are maintained at the
original client settings when transferred to Fujitsu.
o Ensure that POL's information security requirements in relation to services provided by
Fujitsu are periodically reviewed, discussed with Fujitsu and any necessary changes then
made.
o Review and approve any standard operating system builds and agree on the timeframes
for them to be deployed to the POL estate.
o Ensure that the privileged accounts reviewed in the monthly meeting with Fujitsu are
appropriate.
« Incident Management
Controls should be established to:
o Report timely to Fujitsu and/or other vendors of any issues, incidents, or problems with
appropriate incident priority ratings that impact the processing of data through HNG-X.
o Respond to Fujitsu requests for information in a timely manner and to confirm that issues,
incidents, or problems are resolved to their satisfaction.
o Ensure that POL has appropriate policies and procedures in place to track and monitor
major and security incidents to a timely resolution.
o POL and /or other vendors provide minimum data sets for incident reporting.
Description of Fujitsu’s System 54
POL00337569
POL00337569
FUJITSU
e Applications Development
Controls should be established to:
o Document, review and sign off user requirements by the business, prior to commencing a
change.
o Ensure that requests for Fujitsu to implement changes to POL systems come from
authorised individuals.
o Identify and prioritise data and its respective criticality as required by the applicable
legislative and industry standards which POL are subject to comply with.
o Ensure that where POL or its other suppliers administer POL infrastructure, the
application's developers have appropriate access.
o Ensure that POL agents with TIS interfaces provide the correct requirements and controls
for secure connectivity via API's.
e Design and Test
Controls should be established to:
o Ensure that agreements from authorised individuals are made with POL outlining
requirements captured in the design and test documents (with sign off) such as
Requirements Traceability Matrix (RTM), which are maintained throughout
developmenti/test cycles.
o Agree with Fujitsu an approved, documented process to guide the testing (validation &
verification) of software, system and service solutions.
o Agree actions with Fujitsu regarding the resolution path for recorded deviations from
expected outcomes of tests.
o Ensure that testing is conducted by appropriately trained and skilled resources (using
industry approved testing standard qualification boards).
o Confirm with Fujitsu that testing is risk based, which will ensure the testing extent is
appropriate.
o Ensure with Fujitsu that adequate funding and resources are in place to enable design and
testing to meet modern best practice.
e Business Change
Controls should be established to:
o Ensure that POL agrees commercial terms definition, costs, resources and requirements
of CWOs prior to initiation of project development.
e Project Management
Controls should be established to:
o Document, review and approve the lifecycle of new projects, from gathering requirements,
through to design, development and deployment into operational running.
o Agree with POL accepted methods for identifying and rectifying problems and issues early
in the project lifecycle, and so reduce the need for costly rework and fixes.
co Ensure that during the initiation phase of the Project Lifecycle, document, review and sign
off customer change requests prior to development work.
o Review results of test-specific requirements and provide approval sign off at end of testing
process.
o Formally communicate that upon successful testing review, changes developed have
satisfied business objectives in the Release Acceptance Meeting (RAM) and Release
Authorisation Board (RAB) meetings.
oe Identify and document all joint policies, processes, work instructions and guidelines that
are required between relevant POL partners and third parties that are interfaced with each
other as part of providing the POL solution.
Description of Fujitsu’s System 55
POL00337569
POL00337569
FUJITSU
The list of client control considerations presented above is not a comprehensive list of all internal controls
that should be applied by POL. Other internal controls may be needed at POL.
Description of Fujitsu’s System 56
POL00337569
POL00337569
FUJITSU
4. Description of Control Objectives, Controls, Tests
and Results of Tests
4.1 Testing Performed and Results of Tests of Entity-Level
Control
In planning the nature, timing and extent of our testing of the controls specified by Fujitsu, we considered
the aspects of Fujitsu's control environment, risk assessment processes, information and communication
and management monitoring procedures and performed such procedures as we considered necessary in
the circumstances.
4.2 Control Objectives, Control Activi
Procedures and Results of Testing
On the pages that follow, the description of control objectives and the controls to achieve the objectives
have been specified by, and are the responsibility of, Fujitsu. The description of the testing performed by
EY and the results of tests are the responsibility of the service auditor.
Ss, Testing
The service auditor's examination was limited to the IT general controls relevant to Fujitsu's operations
supporting IT services provided to POL to support the HNG-X application. Accordingly, the service auditor
expresses no opinion on the operating effectiveness of any aspects of application processing and
application controls, individually or in the aggregate. POL may need to gain information about application
processing and application controls through other means.
Remote Access Procedures for Assessing Completeness and Accuracy of
Information Produced by the Entity (IPE)
For tests of controls requiring the use of Information Produced by the Entity (IPE), procedures were
performed to assess the reliability of the information, including completeness and accuracy of the data or
reports, to determine whether the information can be relied upon in the examination procedures. This
includes IPE produced by Fujitsu and provided to POL (if relevant and defined as part of the output control
objectives), IPE used by Fujitsu management in performance of controls (i.e., periodic review of user
listings), and IPE used in the performance of our examination procedures.
Based on the nature of the IPE, a combination of the following procedures were performed to address the
completeness and accuracy of the data or reports used: (1) inspect source documentation relating to the
IPE, (2) inspect the query, script, or parameters used to generate the IPE, (3) agree data between the IPE
and the source, and/or (4) inspect the IPE for anomalous gaps in sequence or timing.
Description of Tests and Results 57
FUJITSU
POL00337569
POL00337569
4.2.1 Control Objective 1
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 1: Controls provide reasonable assurance that access to the data centre and facilities with computer equipment, storage media and program
documentation is restricted to properly authorised individuals.
1.1 Data Centre Access
Data centre specific physical access security
policies and procedures to control access to the
data centre and other sensitive areas, including
computer equipment and storage media, are
implemented and made available to Fujitsu staff
via the intranet.
Obtained and inspected the data centre and sensitive area
specific physical access security policies and procedures for
the in-scope data centre and determined whether these
policies outline the physical access security protocols for
controlling access to the data centre, including other
sensitive areas, and these were made available to Fujitsu
staff via the Fujitsu intranet.
No deviations noted.
1.2 Access Within the Data Centre
Access beyond the security desk is protected by
a key-card system to restrict individual access to
specific data processing areas based on the
access level granted. New users requiring access
to the data centre must complete an access form,
which must be signed as approved by the line
manager responsible for the zones requested.
Observed virtually that access doors are equipped with a
key-card system to restrict individual access to specific data
processing areas.
Inquired with management to determine that users were
granted access levels in order to restrict individual access
to specific data processing areas based on the access level
assigned.
Obtained and inspected the system generated data centre
user listing to determine the population of new users
granted access to the data centre.
No deviations noted.
Based on inspection of the data centre system
access listing, we determined there were no
new users that were granted access to the
Fujitsu data centre in the review period and
therefore no operation of the contro! within the
review period.
1.3 CCTV
The data centre access is monitored through the
use of CCTV video cameras placed at strategic
locations around the data centre. The CCTV
video footage is monitored by security guards.
Observed virtually that CCTV video cameras are placed at
key locations around the data centre to monitor user activity.
Observed virtually that the CCTV video footage is monitored
by the security staff at the data centre.
No deviations noted.
Description of Tests and Results
58
FUJITSU
POL00337569
POL00337569
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 1: Controls provide reasonable assurance that access to the data centre and facilities with computer equipment, storage media and program
documentation is restricted to properly authorised individuals.
1.4 Security Guards
Security guards are present at the data centre 24
hours per day and seven days per week. The
data centre can only be accessed through the
security desk manned by a security guard at all
times.
Virtually inspected the data centre security guard log to
determine that security guards are present at the data
centre (24 hours a day and seven days per week), and
observed that the data centre can only be accessed through
a central point (security desk), which has security guards in
place.
No deviations noted.
1.5 Data Centre Visitors
Visitors are required to sign in at the reception
area and temporary badges are issued. Visitors
must be pre-notified to data centre security by a
Fujitsu employee.
Observed virtually that visitors are granted access to the
data centre based upon pre-notification and that they are
required to sign in at the reception area and temporary
badges are issued after inspection of photo identification.
Observed virtually from inspection of the visitor log that
visitors are escorted by a Fujitsu staff at approved dates and
times per the visitor logbook and time in the data centre.
No deviations noted.
1.6 Failed Access Monitoring
Attempts to enter restricted areas without using
authentication devices are denied and a security
alert is triggered and logged. Data centre
management proactively follows up on security
alerts that are triggered.
For a sample of months, inspected the monthly security alert
log reviews performed by the data centre Facilities Manager
to determine whether these were reviewed for suspicious
activity and proactively followed up.
Please refer to Control Objective 6 for our test procedures
performed for the incident management process.
No deviations noted.
Based on inspection of the failed login alerts
and list of incidents logged, we determined
there were no unauthorised failed logins that
were identified that required access to the data
centre to be removed.
1.7 Review of User Access within the Data Centre
Periodic reviews are performed by the data
centre Facilities Manager for users with access to
the data centre on a quarterly basis.
For a sample of quarters, obtained the quarterly periodic
review of user access performed by the data centre
Facilities Manager and inspected it to determine whether
the review was performed timely and user access was
amended appropriately based on the output of the review.
No deviations noted.
Description of Tests and Results
59
POL00337569
POL00337569
FUJITSU
Controls Specified by Fujitsu Testing Performed Results of Tests
Control Objective 1: Controls provide reasonable assurance that access to the data centre and facilities with computer equipment, storage media and program
documentation is restricted to properly authorised individuals.
1.8 Deletion of User Access Inquired of management to determine that access to the I No deviations noted.
Delivery team managers notify the local site I data centre is removed on the users’ HR leave date.
facilities team of terminations or transfers of their I Obtained the system generated HR leavers list and I Based on inspection of the data centre system
direct reports. Upon notification, user access is I determined the complete and accurate population of I access listing and revocation requests logged,
revoked from the security access control system. I leavers. We observed that there were no leavers with I we determined there were no identified leavers
access to the data centre in the review period. from the data centre that required their access
to the data centre to be removed and therefore
no operation of the control within the review
period.
Description of Tests and Results 60
FUJITSU
POL00337569
POL00337569
4.2.2 Control Objective 2
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 2: Controls provide reasonable assurance that computer equipment and facilities are protected from damage by fire, flood and other environmental
hazards and maintenance agreements are in place.
2.1 Fire Suppression
Fire detection and suppression devices, such as
hand-held fire extinguishers, are strategically
placed throughout the entire data centre.
Observed virtually the existence of fire detection and
suppression devices (e.g., gaseous fire suppression
devices, hand-held fire extinguishers, smoke detectors and
monitoring devices, dry pipe sprinklers and fireproof wall)
throughout the data centre.
No deviations noted.
2.2 Maintenance Schedule
Periodic inspection and maintenance is
performed on protection devices, sensors and
alarm systems.
Inspected the maintenance schedules (for backup
generators, UPS, fire detection and suppression, heating,
ventilation and air-conditioning units) and service reports for
these devices supporting the environmental monitoring
controls in the data centre to determine whether the devices
had been inspected and serviced during the period of
examination.
No deviations noted.
2.3 Environmental Monitoring
Smoke detectors and water, humidity and
temperature monitoring devices are installed
throughout the data centre to detect abnormal
environmental conditions.
Observed virtually that smoke detectors and water, humidity
and temperature monitoring devices have been installed to
detect abnormal environmental conditions at the data
centre.
No deviations noted.
2.4 UPS Supply
UPS systems are installed to protect the facilities
and computer equipment from electrical power
fluctuations and outages.
Observed virtually that UPS systems have been installed to
protect the facilities and computer equipment from electrical
power fluctuations and outages at the data centre.
No deviations noted.
Description of Tests and Results
61
FUJITSU
POL00337569
POL00337569
4.2.3. Control Objective 3
Controls Specified by Fujitsu
Testing Performed
Results of Tests
and retained.
Control Objective 3: Controls provide reasonable assurance that programs, files and datasets that have been identified as requiring periodic backup are backed up
3.1 Backup Definition
The Backup High Level Design documents define
the backup and recovery requirements for each
platform.
Obtained the Platform Hardware Instance List (PHIL) from
the POL-owned Dimensions system which details the
current listing of all platforms and servers in operational use
within the POL account estate.
For a sample of platforms, inspected the Backup High Level
Design documents to determine whether they listed the
backup and recovery requirements for those platforms.
No deviations noted.
3.2 Backup Toolset
Backups are performed either using NetBackup
or RMAN (automated tools) for each platform.
Obtained the PHIL listing and selected a sample of
platforms.
Inspected the backup tool configuration and backup logs to
determine whether NetBackup or RMAN were installed on
those platforms to perform automated backups and backups
are completed successfully.
No deviations noted.
3.3 Backups are Written to a Secondary Location
Backups performed are written to a separate disk
array and are written to a disk array at the disaster
recovery site.
Obtained the PHIL listing and selected a sample of
platforms.
Inspected the backup tool configuration for the platforms to
determine whether backups performed are written to a
separate disk array and are written to a disk array at the
disaster recovery site.
No deviations noted.
3.4 Failed Backups
Failed backups are logged as events in the Tivoli
Works Scheduler tool for SMC review and
resolution.
For a sample backup failure logged in TWS, inspected the
alert to determine whether a TfsNOW ticket was logged and
resolved appropriately by the SMC Team.
Please refer to control 4.2 for the TWS configuration for
detecting job failures and control objective 6 for the testing
procedures over incidents.
No deviations noted.
Description of Tests and Results
62
FUJITSU
POL00337569
POL00337569
4.2.4 Control Objective 4
Controls Specified by Fujitsu
Testing Performed
Results of Tests
processing are identified and resolved.
Control Objective 4: Controls provide reasonable assurance that batch job processing is appropriately authorised and scheduled and that deviations from scheduled
4.1 Maintenance of Job Schedules
Access to amend job schedules is restricted to
appropriate Fujitsu personnel.
Obtained a system generated listing of access rights within
the scheduling tool, TWS, used to maintain the HNG-X job
schedules.
Inspected users with access to amend job schedules to
determine whether the access was restricted to appropriate
personnel based on their job responsibilities.
No deviations noted.
4.2 Failed Job Schedules are Monitored
Automated alerts are configured and sent to
relevant teams upon the occurrence of a batch
job failure. These are investigated in line with the
incident management process.
Changes to tool configuration follow the change
management process in Control Objective 8.
Inspected the TWS tool, which manages the batch jobs for
HNG-X infrastructure to determine whether it is configured
to raise an alert if a batch job fails and to then pass this alert
to the TBSM tool.
Please refer to control 6.6 for our testing procedures over
the handling of alerts.
No deviations noted.
Description of Tests and Results
63
FUJITSU
POL00337569
POL00337569
4.2.5 Control Objective 5
Controls Specified by Fujitsu
Testing Performed
Results of Tests
issues are captured and investigated.
Control Objective: 5 Controls provide reasonable assurance that system availability, performance and capacity are routinely monitored to help ensure that potential
5.1 HNG-X Performance Monitoring
The SYSMAN tools (Tivoli ITM and OEM)
proactively monitor CPU, Memory, Disk utilisation
and capacity of internal services on the platforms,
raising alerts for investigation by the SMC as
appropriate. Administrator access to the tools is
restricted to authorised users.
Changes to tool configuration follow the change
management process in Control Objective 8.
Inspected the configuration of the Tivoli ITM and OEM tools
on the HNG-X platform to determine whether they are
configured to monitor the CPU, memory, disk utilisation and
the capacity of internal services on the servers.
Inspected a system generated listing of users with
administrator access to the tools used to monitor the
environment and ascertained that it is restricted to
authorised users based on their job responsibilities.
Please refer to control 6.6 for our testing procedures over
the handling of alerts.
No deviations noted.
5.2 HNG-X Capacity and Availability Monitoring
The Tivoli ITM and OEM tools proactively monitor
the availability of Wintel, Oracle and Unix
platforms, feeding platform availability data to
Tivoli Business Service Manager (via Netcool
Omnibus) about the availability of platforms.
Tivoli Business Service Manager (TBSM)
presents this data in a business context to the
SMC, highlighting service affecting issues.
Administrator access to Netcool Omnibus is
restricted to authorised users.
Changes to tool configuration follow the change
management process in Control Objective 8.
Inspected the Tivoli ITM and OEM tool configurations to
determine whether:
« These showed that the tools monitor and manage
availability and capacity of servers; and
Thresholds were defined which, if breached, would send
alerts to TBSM for SMC review.
Please refer to control 6.6 for our testing procedures over
the handling of alerts.
Inspected a system generated listing of users with access
to administer Netcool Omnibus and ascertained that it is
restricted to authorised users based on their job
responsibilities.
No deviations noted.
Description of Tests and Results
64
FUJITSU
POL00337569
POL00337569
Control Objective: 5 Controls provide reasonable assurance that system availability, performance and capacity are routinely monitored to help ensure that potential
issues are captured and investigated.
5.3 HNG-X Monitoring of Service Delivery
A monthly Service Review analysis is provided to
POL to review details of capacity, availability and
incident management performance against the
agreed service level targets (SLTs).
For a sample of months, inspected the Service Review book
and corresponding communications between Fujitsu and
POL to determine whether the:
« Analysis was provided to POL to review its agreed SLTs;
and
« Book contained details of capacity, availability and
incident management performance.
No deviations noted.
Description of Tests and Results
65
FUJITSU
POL00337569
POL00337569
4.2.6 Control Objective 6
Controls Specified by Fujitsu
Testing Performed
Results of Tests
timely.
Control Objective 6: Controls provide reasonable assurance that significant incidents are adequately reported, tracked, monitored through resolution and resolved
5.3 HNG-X Monitoring of Service Delivery
Amonthly Service Review analysis is provided to
POL to review details of capacity, availability and
incident management performance against the
agreed service level targets (SLTs).
Refer to control 5.3 within Control Objective 5 for the testing
procedures performed.
No deviations noted.
6.1 Incident Policies and Procedures
Fujitsu has documented policies and procedures
for managing incidents impacting the in scope
applications which are available via SharePoint to
Fujitsu teams.
Through enquiry with management, identified the
documents that define the incident management processes
for the POL account.
Inspected the policies to determine whether these outline
the incident management process and were made available
to relevant Fujitsu employees via SharePoint.
No deviations noted.
6.2 Incident Prioritisation
Incidents are assigned a priority in accordance
with the severity levels agreed with POL.
Obtained a system generated listing of incidents from the
incident management tool, TfsNOW.
For a sample of incidents, inspected the incident tickets to
determine whether they had been assigned a priority in
accordance with the severity levels agreed with POL.
No deviations noted.
6.3 Incident Resolution
Incidents are resolved in a timely manner, as per
the assigned priority.
For a sample of incidents selected from the incident
management tool, TfsNOW, inspected the incident tickets
to determine whether they had been escalated and
monitored for timely resolution, as per the assigned priority.
No deviations noted.
Description of Tests and Results
66
FUJITSU
POL00337569
POL00337569
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 6: Controls provide reasonable assurance that significant incidents are adequately reported, tracked, monitored through resolution and resolved
timely.
6.4 Major & Security Incident Review
Once a Major or Security Incident is resolved, a
formal closure and review is performed, including,
if applicable, a Root Cause Analysis.
For a sample of Major and Security Incidents selected from
the Fujitsu SharePoint - Security Occurrence Reports
(Security Incidents) and incident tool, TfsNOW (Major
Incidents), inspected the incident tickets and incident
reports to determine whether a formal closure and review
was performed, including, if applicable, a Root Cause
Analysis.
No deviations noted.
6.5 Incident Reporting
27 October 2022 — 31 December 2022
On a weekly basis, the Fujitsu MAC Team
reviews and reports the number and severity of
outstanding incidents in TfsNOW.
For a sample of weeks inspected the incident reports to
determine whether the Fujitsu MAC Team had reviewed the
number and severity of outstanding incidents in TfsNOW.
Please refer to control 5.3 for the test procedures performed
for monthly incident reporting for the period prior to the
weekly incident reporting control operating.
No deviations noted.
6.6 Alert Handling
The Tivoli ITM and Netcool Omnibus tools
automate the collection of events and feed them
to the Tivoli Business Service Manager to
highlight areas of concern to the SMC.
Changes to tool configuration follow the change
management process in Control Objective 8.
Obtained a system generated listing of alerts from Tivoli
Business Service Manager.
For a key event, inspected the alert and TfsNOW ticket to
determine whether the alert was flagged to the SMC for
resolution and that the event was resolved in a timely
manner through Fujitsu's incident management procedures.
Please refer to controls 6.2-6.4 for test procedures
performed for incident management process.
No deviations noted.
Description of Tests and Results
67
FUJITSU
POL00337569
POL00337569
4.2.7 Control Objective 7
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 7: Controls provide reasonable assurance that networks are managed to contractual and site requirements, monitored for availability and response
times and issues are identified, tracked and resolved.
5.3 HNG-X Monitoring of Service Delivery
Amonthly Service Review analysis is provided to
POL to review details of capacity, availability and
incident management performance against the
agreed service level targets (SLTs).
Refer to control 5.3 within Control Objective 5 for the testing
procedures performed.
No deviations noted.
7.1 Network Performance Criteria
Network availability and performance
requirements are clearly defined between Fujitsu
and POL in the Network Service policies and
network service is measured and monitored using
these agreed service levels.
Inspected the network service policy documentation to
determine whether these are available to Fujitsu employees
via Dimensions and are used to measure and monitor
service levels.
No deviations noted.
7.2 Network Change Management
Network changes are managed using the
standard Fujitsu TfsNOW process which includes
authorisation, testing (where deemed
appropriate) and approval prior to deployment.
Network Changes follow the change
management process in Control Objective 8.
Obtained a system generated listing of network changes
from the change management tool TfsNOW.
Selected a network change and inspected the TfsNOW
ticket and related approvals to determine whether this
change was managed using the standard Fujitsu TfsNOW
process including authorisation, testing and approval prior
to deployment.
Please refer to Control Objective 8 for test procedures
performed on network change management.
No deviations noted.
Description of Tests and Results
68
FUJITSU
POL00337569
POL00337569
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 7: Controls provide reasonable assurance that networks are managed to contractual and site requirements, monitored for availability and response
times and issues are identified, tracked and resolved.
7.3 Network Availability Monitoring
Network availability is monitored using several
tools, which send automated alerts to the System
Management Centre (SMC) if key components
are unavailable, or if traffic levels breach
predefined thresholds.
Changes to tool configuration follow the change
management process in Control Objective 8.
Inspected the configuration of the Spectrum and Tivoli
Netcool tools monitoring network availability, to determine
whether they are configured to send automated alerts to the
SMC Team.
No deviations noted.
7.4 Network Incident Management
Incidents relating to network availability are
managed using standard incident management
procedures.
Selected a network incident from the incident management
tool, TfsNOW, and inspected the TfsNOW ticket and history
log of the incident to determine whether it was managed
using the standard POL incident management procedures,
and is included in the standard incident management
reporting to POL.
Please refer to Control Objective 6 for our test procedures
performed for the incident management process.
No deviations noted.
Description of Tests and Results
69
FUJITSU
POL00337569
POL00337569
4.2.8 Control Objective 8
Controls Specified by Fujitsu
Testing Performed
Results of Tests
implemented and documented.
Control Objective 8: Controls provide reasonable assurance that modifications to system software and networks are authorised, tested, approved, properly
8.1 Change Management
The TfsNOW toolset is used to manage all
changes with a joint decision between Fujitsu and
POL as to which parts of the tool are relevant for
a change.
Obtained a system generated listing of system software and
network changes from the change management tool,
TfsNOW.
Selected a sample of changes and inspected the supporting
TfsNOW change tickets and related change review
discussions between Fujitsu and POL to determine whether
the TfsNOW toolset had been used to manage these
changes in accordance with the defined procedures.
No deviations noted.
8.2 Change Approval
All changes must be authorised by the Fujitsu
Change Owner, with the approval being
documented in the TfsNOW toolset. Changes
that cause major service interruption or are a
significant risk must also be authorised by the
Change Advisory Board (CAB), with the approval
documented in the meeting minutes and within
the TfsNOW change record.
Obtained a system generated listing of system software and
network changes from TfsNOW.
For a sample of changes, inspected the supporting TfsNOW
tickets and related approval confirmations to determine
whether these changes were authorised by the Change
Owner and the approval was documented in meeting
minutes (including CAB approval for major service
interruption changes or significant risks) and within
TfsNOW.
No deviations noted.
8.3 Emergency Changes
A change deemed necessary in order to resume
live service will be agreed, approved and
documented on TfsNOW emergency change
record. Updates are communicated to POL at an
agreed timeframe dependent on the severity of
the incident.
Obtained a system generated listing of system software and
network changes from TfsNOW.
For a sample of emergency changes, inspected the
supporting TfsNOW tickets, approval confirmations and
corresponding communications between Fujitsu and POL to
determine whether:
e They had been agreed, approved and documented
during the incident; and
e Updates to POL had been sent as per the agreed
timeframes dependent on the severity of the incident.
No deviations noted.
Description of Tests and Results
70
FUJITSU
POL00337569
POL00337569
4.2.9 Control Objective 9
Controls Specified by Fujitsu
Testing Performed
Results of Tests
implemented and documented.
Control Objective 9: Controls provide reasonable assurance that new or modified application software development efforts are authorised, tested, approved, properly
9.1 System Development and Maintenance
Policies and Procedures
Fujitsu has a formal Systems Development Life
Cycle (SDLC) which incorporates phases
including Initiation, Requirements, Definition,
Design, Development, Deployment and
Maintenance.
Inspected SDLC policies and procedures on Europe
Connect to determine whether these were available to
relevant Fujitsu employees, and whether phases included:
Initiation;
e Requirements;
¢ Definition;
« Design;
« Development;
e Deployment; and
¢ Maintenance.
No deviations noted.
9.2 Change Governance
Depending on the nature, changes must either be
approved by the Change Control Board (CCB)
before progressing into development, or by the
Peak Targeting Forum (PTF).
Obtained a system generated listing of new or modified
application software changes from TfsNOW.
For a sample of changes, inspected the supporting TfsNOW
tickets and related change approval confirmations to
determine whether these changes were appropriately
approved by either the Change Control Board (CCB) or the
Peak Targeting Forum (PTF) before progressing into
development based on the nature of the change.
No deviations noted.
Description of Tests and Results
71
FUJITSU
POL00337569
POL00337569
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 9: Controls provide reasonable assurance that new or modified application software development efforts are authorised, tested, approved, properly
implemented and documented.
9.3 Design Proposal
Projects requirements are outlined in the
Commercial Work Order (CWO) and if justified,
within a (CSP) Customer Solution Proposal,
(PSD) Project Solution Design documents or
(FSR) Feasibility Study Reports, as applicable,
that is stored in Dimensions and is reviewed and
approved by POL and Fujitsu management.
Obtained a system generated listing of new or modified
application software changes from TfsNOW.
Selected a sample of changes and inspected the supporting
CWO and CSPs/PSDs/FSRs, approvals and Dimensions to
determine whether projects were reviewed and approved by
POL as well as Fujitsu management and stored in
Dimensions.
No deviations noted.
9.4 Change Testing
Changes are tested in line with the defined
procedure.
Obtained a system generated listing of new or modified
application software changes from TfsNOW.
For a sample of changes, inspected the supporting TfsNOW
tickets, test plans completed and approvals documented to
determine whether, where applicable, for these changes:
e Testing had been performed by the relevant Fujitsu
team and POL team;
e Test plans had been placed in the Quality Centre (1
April 2022 — 30 June 2022) or in the Zephyr (1 July 2022
to 31 December 2022) application; and
« The POL Testing Manager had emailed to indicate their
approval that testing has been successfully completed.
No deviations noted.
Description of Tests and Results
72
POL00337569
POL00337569
FUJITSU
Controls Specified by Fujitsu Testing Performed Results of Tests
Control Objective 9: Controls provide reasonable assurance that new or modified application software development efforts are authorised, tested, approved, properly
implemented and documented.
9.5 Ability to Implement Changes Obtained a system generated list of users with deployment I Deviation noted.
Only appropriate individuals have access to move I Privileges from the TPM and BigFix systems to determine I We inspected the list of users with development
code builds between environments or promote I Whether it was restricted to authorised users based on their I access and compared against users with
transports to live. Segregation of duties is I Job responsibilities. access to implement changes, and noted one
enforced between users able to develop and I Obtained a system generated list of users from the I user who has access to both develop and
implement changes respectively. Dimensions tool server and inspected the users with access__I implement changes.
to develop changes to determine whether segregation of I We performed additional testing to inspect the
duties was enforced between users able to develop and I geliyered baselines within Dimensions and
implement changes. noted that the user had not delivered a baseline
(i.e. did not perform any development activity)
from 1 April 2022 to 31 December 2022.
Management response:
There are compensating controls in place that
mitigate this finding. From a substantive review
of the user who had access to both
development and implementation, our risk
assessment shows that the user did not access
the development account during the audit
period, as validated by EY. The finding has
highlighted that having both types of access is
not required and is as a result of role changes.
This will be addressed in conjunction with the
applicable Assignment Managers to clarify the
specific access required, removing any
unnecessary access.
Description of Tests and Results 73
FUJITSU
POL00337569
POL00337569
Control Objective 9: Controls provide reasonable assurance that new or modified application software development efforts are authorised, tested, approved, properly
implemented and documented.
9.6 Approval to Implement Changes
POL approval is required to promote application
software changes to the live environment.
Approval is captured within the relevant TfsNOW
tool.
Obtained a system generated listing of new or modified
application software changes from TfsNOW.
For a sample of changes, inspected the supporting TfsNOW
tickets and change deployment approval confirmations to
determine whether POL approval to implement the change
was obtained and documented within the tool.
No deviations noted.
Description of Tests and Results
74
FUJITSU
POL00337569
POL00337569
4.2.10 Control Objective 10
Controls Specified by Fujitsu I
Testing Performed
Results of Tests
Control Objective 10: Controls provide reasonable assurance that access to system resources, including computing platforms and operating systems, is restricted to
properly authorised individuals.
10.1 Client Security Policies
Security requirements for infrastructure and
software are designed, documented and agreed
by both POL and Fujitsu.
Inspected Fujitsu's Post Office HNG-X Account Information
Security Policy on Europe Connect to determine whether
this policy was available to relevant Fujitsu employees, and
whether these had been reviewed and agreed by both POL
and Fujitsu.
No deviations noted.
10.2 Baseline Operating System Standards
Platforms in operational use have defined
baseline standards that document their set up
and configurations, as agreed by Post Office
Limited.
Obtained the Platform Hardware Instance List (PHIL) from
the Dimensions system which details the listing of platforms
and servers in operational use within the account estate.
For a sample of POL platforms in operational use, inspected
the High-Level Design, Low-Level Design, and Physical
Platform Design documents to determine whether baseline
standards had been defined and agreed with POL.
No deviations noted.
10.3. Baseline Operating System Standards
Implementation
Platforms in operational use are set up and
configured in line with documented and agreed
baseline standards. Variances from the baseline
standard are fully documented and appropriately
approved.
Obtained the Platform Hardware Instance List (PHIL),
selected the POL platforms in operational use, and
inspected key configuration settings to determine whether
the platforms had been set up and configured in line with
documented and agreed baseline standards.
Where settings differed from the baseline, inspected the
POL platform baseline standard documents to determine
whether these variances had been documented and
approved in accordance with defined procedures.
No deviations noted.
10.4 User (Fujitsu) Set-up and Amendment
Fujitsu users requiring new or modified access to
POL systems are set up appropriately after
approval by an appropriate Fujitsu line manager.
Obtained a system generated listing of users from the POL
starters, transfers and leavers management tool, EMEIA
Connect.
For a sample of new or modified Fujitsu users, inspected the
supporting user access request tickets and user access
listings to determine whether the users had been set up in
No deviations noted.
Description of Tests and Results
75
POL00337569
POL00337569
FUJITSU
Controls Specified by Fujitsu Testing Performed Results of Tests
Control Objective 10: Controls provide reasonable assurance that access to system resources, including computing platforms and operating systems, is restricted to
properly authorised individuals.
accordance with the approved access request and after the
approval by an appropriate Fujitsu line manager.
10.5 User (Fujitsu) Deletion Obtained a system generated Europe Connect report of I Deviations noted.
Access to Post Office Limited systems for Fujitsu leavers. We selected a sample of 10 Fujitsu staff with
users is removed in a timely manner. For a sample of leavers, inspected the supporting access I access to the in-scope POL infrastructure who
revocation requests and user access lists to determine I had left during the examination period. We noted
whether access had been removed within five working days I that for six of these leavers, their access to
of the user's leave date. certain Fujitsu systems and tools used to support
in-scope POL infrastructure was not removed
within five working days of their last day with
Fujitsu or the POL account.
We confirmed that access to the MSAD AD
domain (which is the first level authentication
after which Fujitsu staff gain privileged access to
the in-scope POL infrastructure through two-
factor authentication) for the sampled leavers
had not been used since they had either left
Fujitsu or the POL account.
We performed additional testing to compare all
leavers during the period against active and
disabled accounts on the MSAD AD domain. We
determined that none of the active MSAD
accounts belonged to staff who had left Fujitsu or
the POL account and that last log on dates for
leavers who had MSAD access were before or
on the leavers’ actual leave dates.
Management response:
The systems for which access had not been
revoked in a timely manner do not provide any
access to data. All the systems identified are call
Description of Tests and Results 76
POL00337569
POL00337569
FUJITSU
Controls Specified by Fujitsu Testing Performed Results of Tests
Control Objective 10: Controls provide reasonable assurance that access to system resources, including computing platforms and operating systems, is restricted to
properly authorised individuals.
handling systems and development areas.
However, we appreciate that timely revocation of
all user access is good practice.
To ensure we tighten up on this process, we
have re-educated the administrators of the
various systems that they must action revoke
requests within 5 days and report back on any
issues preventing them from doing so. We will
also ensure that we monitor more closely and
follow up when we do not obtain positive
confirmation of revocation of a user's access
within a short timeframe.
We have also re-stated that leavers forms
should be submitted by Assignment Managers
in good time to allow for the scheduling of
access revocation on the leave date.
10.6 Periodic User Reviews For a sample of monthly reviews inspected the ISMF report No deviations noted.
Fujitsu reviews user access to systems on a_ I to determine whether users and their access rights had
monthly basis to determine the appropriateness I been reviewed by Fujitsu security management and POL,
of access, and changes performed as deemed I and changes requested were actioned appropriately.
necessary.
10.7 Two-Factor Authentication Inspected the configuration settings in the Active Directory No deviations noted.
Access to POL systems for Fujitsu users is I Domain to determine whether two factor authentication was
controlled using two-factor authentication. required to access POL systems.
Observed a Fujitsu staff log on to the POL systems network
to determine whether it required two factor authentication.
Description of Tests and Results 77
FUJITSU
POL00337569
POL00337569
4.2.11 Control Objective 11
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 11: Controls provide reasonable assurance that access to databases, data files and programs is restricted to authorised individuals.
11.1 Patch Management
In-scope platforms are maintained with vendor
released security updates and patches in line with
agreed procedures and timescales.
Patch updates follow the change management
process in Control Objective 8.
Obtained the Platform Hardware Instance List (PHIL) from
the Dimensions system which details the current listing of
platforms and servers in operational use within the POL
estate.
For an in-scope sample platform, inspected the TfsNOW
change tickets, patch review and approvals to determine
whether the most recent patches had been applied as per
the TfsNOW change process.
Please refer to Control Objective 8 for patch management
test procedures performed.
No deviations noted.
11.2 System Administrators
Access to perform system administrator functions
is restricted to appropriate Fujitsu personnel.
Obtained the Platform Hardware Instance List (PHIL) of live
POL platforms.
For a sample of servers, inspected system-generated lists
of users with system administrator rights to determine
whether access to perform system administrator functions
was restricted to appropriate Fujitsu users based on their
job responsibilities.
No deviations noted.
11.3 Database Administrators
Access to administer POL databases is restricted
to appropriate Fujitsu personnel.
Obtained the Platform Hardware Instance List (PHIL) of live
POL platforms.
For a sample of in-scope databases, inspected system-
generated lists of users with database administrator access
rights to determine whether access to administer the
databases was restricted to appropriate Fujitsu users based
on their job responsibilities.
No deviations noted.
Description of Tests and Results
78
POL00337569
POL00337569
FUJITSU
Controls Specified by Fujitsu Testing Performed Results of Tests
Control Objective 11: Controls provide reasonable assurance that access to databases, data files and programs is restricted to authorised individuals.
11.4 Administration Tools and System Utilities Obtained the Platform Hardware Instance List (PHIL) of live No deviations noted.
Access to administration tools and system utilities I POL platforms
on Fujitsu managed infrastructure is restricted to I For a sample of platforms, inspected system-generated lists
appropriate Fujitsu personnel. of access rights to determine whether access to
administration tools and system utilities was restricted to
appropriate users based on their job responsibilities.
11.5 Unauthorised Changes are Monitored Obtained the Platform Hardware Instance List (PHIL) of I No deviations noted.
The TripWire system is configured to monitor and _ I POL platforms.
alert on changes made to in-scope applications Inspected the configuration settings of Fujitsu’s Tripwire
and underlying data within the HNG-X estate. system to determine whether automated alerts are
configured to alert the Security Operations Team for
Changes to tool configuration follow the change changes applied to Fujitsu-managed HNG-X infrastructure.
management process in Control Objective 8. For a sample alert from the Tripwire system, inspected the
supporting alert and TfsNOW ticket to determine whether
changes to Fujitsu-managed infrastructure followed the
formal incident management process.
Please refer to Control Objective 6 for test procedures
performed for the incident management process.
11.6 Access to Data Files/Programs Obtained the Platform Hardware Instance List (PHIL) of I No deviations noted.
Access is restricted to production program and POL platforms.
data files through the use of user groups to I Fora sample of platforms, inspected system-generated lists
restrict and allow access. of access rights to determine whether access to significant
production program and data files was appropriately
restricted to users based on their job responsibilities.
Description of Tests and Results 79
FUJITSU
POL00337569
POL00337569
4.2.12 Control Objective 12
Controls Specified by Fujitsu
Testing Performed
Results of Tests
detected, reported and investigated.
Control Objective 12: Controls provide reasonable assurance that networks and system resources are protected from external threats and access violations are
6.4 Major & Security Incident Review
Once a Major or Security Incident is resolved, a
formal closure and review is performed, including,
if applicable, a Root Cause Analysis.
Refer to control 6.4 within Control Objective 6 for the testing
procedures performed.
No deviations noted.
12.1 Firewall Configuration Access
Access to set-up and configure firewalls is
restricted to appropriate users from the Fujitsu
Security Delivery team.
Obtained the system generated list of network users from
Active Directory, with access to set-up and configure
firewalls, and inspected the listing to determine whether
access was restricted to Fujitsu Security Delivery team
users based on their job responsibilities.
No deviations noted.
12.2 Configuration Changes
Changes to firewall configuration follow the
standard Fujitsu TfsNOW process _ including
authorisation, testing (where deemed
appropriate) and approval of changes before they
are implemented.
Obtained the Patch Approval Board (PAB) deployment list.
Selected a sample change to firewall configurations and
inspected change documentation to determine whether the
change had been authorised, tested and approved prior to
implementation as per the TfsNOW process tested in
Control Objective 8.
Please refer to Control Objective 8 for configuration change
test procedures performed.
No deviations noted.
12.3 Anti-virus Software
Anti-virus software is installed on critical Windows
and Red Hat Linux network platforms as agreed
with POL. Installed anti-virus software is up to
date in line with agreed contractual requirements.
Obtained the list of in-scope servers from Platform
Hardware Instance List (PHIL) and inspected the Anti-Virus
tool to determine whether each server had Anti-Virus
software installed and updated based on POL's contractual
requirements.
No deviations noted.
Description of Tests and Results
80
FUJITSU
POL00337569
POL00337569
Controls Specified by Fujitsu
Testing Performed
Results of Tests
Control Objective 12: Controls provide reasonable assurance that networks and system resources are protected from external threats and access violations are
detected, reported and investigated.
12.4 Intrusion Detection System (IDS)
IDS is installed on critical network segments as
per POL contractual requirements to detect
threats and alert the Fujitsu ATC Team.
Changes to tool configuration follow the change
management process in Control Objective 8.
Inspected the IDS* tool configuration to determine whether
it is configured to monitor and detect threats and alert the
Fujitsu ATC team.
For a sample alert from IDS, inspected the supporting
TfsNOW incident ticket and resolution activities performed
to determine whether the alert was handled by the Fujitsu
ATC team and managed through Fujitsu's formal security
incident management process.
Please refer to Control Objective 6 for our test procedures
performed for the incident management process.
No deviations noted.
Description of Tests and Results
a1